RISK ASSESSMENT
SITE: RAMADI WEST
Ref No: IDP IRAQ/RA/
Blinding Concrete, Formworks
NAME & POSITION OF THE
ASSESSOR:
SABAH ANWAR, QAIS ZUHAIR
2
1
2
2
2
4
HSE+ S. V
2
2
4
HSE+ S.V
Risk
Factor
Risk Control Measures
Existing and Measures
To Be Implemented
Likelihood
DATE OF ASSESSMENT:
Risk
Factor
Severity
Basic Job Step
Or Activity
Likelihood
JOB UNDER RISK ASSESSMENT:
Serial No:
Severity
PROJECT: IDP IRAQ
Action by
HEALTH, SAFETY AND ENVIRONMENT

Permit to Work
Transportation of
equipment to site
Violation of Permit to Work
Procedure
3
2
6
Collision, run over
3
3
9





Equipment traffic
and personal
traffic issue
Persons major injury,
Property damage.
3
3
9



Supervisor to obtain required Permit to Work
& shall be available at site at all times.
Supervisor/Foreman to conduct toolbox talk
and discuss about the hazards involved in
the job as per RA.
The speed limit will be restricted to - - Km/ph.
Overloading shall not be allowed.
No part of the human body shall be
extended outside any vehicle.
Vehicles on site will have an alarm that
automatically sounds when the vehicle goes
into reverse.
Have a person overseeing as it goes
backwards and watches to make sure that no
one
gets
behind
the
vehicle/heavy
equipment.
Flagger, sings must be present in site.
Hard barricade and warning tape must be
found in the site.
Site traffic plan to be followed when
conducting this activity.
HSE+ S. V
Page 1 of 4
PROJECT: IDP IRAQ
SITE: South Samara
Ref No: IDP IRAQ/RA/
JOB UNDER RISK ASSESSMENT:
Blinding Concrete, Formworks
NAME & POSITION OF THE
ASSESSOR:
SABAH ANWAR, QAIS ZUHAIR
Entrance to the
Blinding,
Formworks area
Persons major injury,
Property damage.
3
3
9
DATE OF ASSESSMENT:










pouring concrete
by mixer truck &
hand tools
Concrete Splash
3
3
9



Check documents of the operator and should
be well trained.
Operator should have full knowledge about
existing facilities.
Equipment inspection checklist.
Use appropriate access/egress means.
Appropriate PPE shall be worn
Make pre-work visual inspection.
Arrange site condition to be free from
obstructions for work area.
Prevent unauthorized entry to the site.
Banks man should be in place to make traffic
control.
Insulate pedestrians from the area of work.
2
2
4
HSE+ S.V
2
1
2
HSE+ S.V
2
2
4
HSE+ S.V
2
2
4
HSE+ S.V
Use of hand tools
Body injury
2
3
6





Wear hand gloves/protection at all times.
Beware of sharp edge and hand position
Avoid staying too close to the bucket while
pouring.
Use Eye protection and full-body protection
(coverall).
Use the tag line to steer the movement of the
concrete bucket to and away from the truck
area.
Proper handling of the concrete trunk line.
Avoid doing the job long hour. Take turn.
Check on body posture. Switch off vibrator if
waiting time too long.
Follow MSDS.
A trained flagman shall be in place The
vehicle shall be fitted with a reverse alarm
Inspect tools before each use
Make sure inspection tag existed
Wear proper PPE
Daily check must be applied
PPE must be worn all the time
Exposed to dust
Respiratory problem
2
3
6


Wear dust mask
conducting TBM to workers
Struck by Concrete vehicle

Bucket Concrete Truck
Line
Serial No:






Page 2 of 4
PROJECT: IDP IRAQ
SITE: South Samara
Ref No: IDP IRAQ/RA/
JOB UNDER RISK ASSESSMENT:
Blinding Concrete, Formworks
NAME & POSITION OF THE
ASSESSOR:
SABAH ANWAR, QAIS ZUHAIR
Fire
Explosion or fire from fuel
Personnel injuries
Property damage
3
3
9
DATE OF ASSESSMENT:





COVID 19
infection lead to serious
health damage or death
3
4
12







Poor
housekeeping
Slips, Trips And falls
3
3
9
Serial No:



Do not operate power tools in explosive
atmospheres.
such as in the presence of flammable liquids,
gases or dust.
Filling the Trowel with caution of spillage and
fire
Wear protective clothing during operation.
Avoid contact with hot components. Never
operate the engine with heat shields removed.
Keep body parts, hair and loose clothing clear
of moving parts. Do not remove guards or
covers.
2
2
4
HSE+ S.V
All Employees temp should be checked at
main Gate.
Keep at least 2m distance between the
workers.
Wearing special PPE (face mask, gloves)
Using hand sanitizer for employees
Attend TBT and training for COVID 19.
Any employee feeling tired should inform
management and leave the site and should
recommend visiting the nearest health facility.
Any employee feels tired at home should not
come to work.
Ensure proper housekeeping in working
location.
Maintain proper arrangement of hand tools.
Make clear access/egress and use design
access all time.
2
2
4
HSE+ S.V
2
1
2
HSE+ S.V
Page 3 of 4
PROJECT: IDP IRAQ
SITE: South Samara
Ref No: IDP IRAQ/RA/
JOB UNDER RISK ASSESSMENT:
Blinding Concrete, Formworks
NAME & POSITION OF THE
ASSESSOR:
SABAH ANWAR, QAIS ZUHAIR
Serial No:
DATE OF ASSESSMENT:
Likelihood.
Severity
1
2
3
4
5
2
4
6
8
10
3
6
9
12
15
4
8
12
16
20
5
10
15
20
25
Risk level
Low
Medium
High
Severity
12345-
Likelihood
No potential for injury, illness or incident
Potential for minor injury, illness or incident
Potential for recordable injury, illness or incident
Potential for major incident, or major injury or illness causing short term disability
Potential for major incident or major injury or illness causing a fatality or long-term disability
1- Very unlikely
2- Unlikely
3- Likely
4- Very likely
5- Certain
Sub-Contractor Site Manager (Unitech): QAIS ZUHAIR
Sub-Contractor Safety Officer (Unitech): SABAH ANWAR
Approved Site Manager (GE): HASAN MAHMOOD
Approved Safety Officer (GE): AMEEN TAQI
Page 4 of 4