QUANTITY SURVEYING CE 2225 Prepared by: Engr. Kyra Kamille A. Toledo, CE Department MODULE 5 STRUCTURAL WORKS Formworks and Scaffoldings CE 2225 – Quantity Surveying ESTIMATING FORMWORKS & SCAFFOLDING = CONTACT AREA Checklist for Concreting Works which is also for F&S ❑ General construction notes ❑ Foundation plan ❑ Structural framing plans ❑ Structural details ❑ Schedule (Footing, Wall Footing, Column, Beam, Slab) ❑ Stair, Retaining Wall, Shearwall, Underground tanks, etc. ❑ Architectural Elevations CE 2225 – Quantity Surveying CE 2225 – Quantity Surveying Prepare a list of all the scopes of work that involves concreting which also involves formworks and scaffoldings This is an example of a list of the scopes of work. Preferably, estimates should be done from bottom to top or from foundation to columns. Other drawings (stair, retaining walls, etc.) that need to be concreted should be included. CE 2225 – Quantity Surveying Column Footing Wall Footing Column Beam 2F Beams – Upper Floors Roof Beams Slabs Slab on Fill / Slab on Grade 2F Slabs – Upper Floors Roof Deck Stair, Retaining Wall, Shearwall, Underground tanks, etc FORMWORKS (Phenolic Board) SCAFFOLDING (Wood) Contact Area = Perimeter * length/depth/thickness Perimeter = (a+2b) + lapping length (50mm) OR = 2(a+b) + lapping length # of pcs = depends on plywood size; in this discussion, 4’ x 8’ was used 1 BD.FT = 1’ x 1’ x 1” BRACING or FRAME of Forms (Wood) Qty of SCAFFOLD = Height/Length/Contact Area * Factor Qty of BRACE/FRAME = Contact Area * Factor OR # of plywood * Factor CE 2225 – Quantity Surveying Column Footing, Column A. FORMWORKS Contact Area = Perimeter * height/thickness Perimeter = 2(a+b) + lapping length (50mm) = 2(a+b) + (4*0.05) # of pcs = depends on plywood size; in this discussion, 4’x8’ was used 1 BD.FT = 1’ x 1’ x 1” a b b a B. BRACINGS or FRAME: Assume as 2”x2” lumber Amount of Bracing in BD.FT. = Contact Area * Table 5.2 C. SCAFFOLDING – Column footing: no scaffolding Column: Amount of Scaffolding in BD.FT. = Column height * Table 5.5 CE 2225 – Quantity Surveying Example: F1 (FORMWORKS) Perimeter = 2 (3.1+3.1) + (4*0.05) = 12.6 m Total Contact Area = 12.6 *0.3 * 2 = 7.56 sq.m # of pcs = 7.56/2.88 = 2.625 say 3 pcs of 4’x8’ board size 2 CE 2225 – Quantity Surveying 12.6 0.3 7.56 3pcs, 4’x8’ Example: F1 (BRACING) Perimeter = 2 (3.1+3.1) + (4*0.05) = 12.6 m Total Contact Area = 12.6 *0.3 * 2 = 7.56 sq.m # of pcs = 7.56/2.88 = 2.625 say 3 pcs of 4’x8’ board size BRACING/FRAMES = 7.56 * 12.71 = 96.09 BD.FT. Assume 1pc 2”x2”x12’ = 4 BD.FT. # of pcs = 96.09/4 = 24.02 say 25 pcs of 2”x2”x12’ lumber OR 96.09 BD.FT of 2” x 2” x 1ft lumber Example: F1 (SCAFFOLDING) No scaffolding for footings CE 2225 – Quantity Surveying Column Estimates Column Estimates Perimeter = 2 (0.2+0.4) + (4*0.05) = 1.4 m Contact Area = 1.4 * (1.5-0.3+0.8+3.2+3.15) * 8 = 93.52sq.m # of pcs = 93.52/2.88 = 32.47 say 33pcs of 4’x8’ board size 8 CE 2225 – Quantity Surveying 1.4 8.35 93.52 33pcs, 4’x8’ Column Estimates Perimeter = 2 (0.2+0.4) + (4*0.05) = 1.4 m Contact Area = 1.4 * (1.5-0.3+0.8+3.2) * 5 = 36.4sq.m # of pcs = 36.4/2.88 = 12.6 say 13pcs of 4’x8’ board size 8 5 CE 2225 – Quantity Surveying 1.4 1.4 8.35 5.2 93.52 36.4 33pcs, 4’x8’ 13pcs, 4’x8’ Example: C1 (BRACING) Contact Area: C1(pink) = 93.52 ; C1(blue) = 36.54 SCAFFOLDING (Wood) BRACING/FRAMES(pink) = 93.52 * 12.71 = 1188.64 BD.FT. BRACING/FRAMES(blue) = 36.54 * 12.71 = 464.42 BD.FT. Assume 1pc 2”x2”x12’ = 4 BD.FT. # of pcs (pink)= 1188.64/4 = 297.16 say 298 pcs of 2”x2”x12’ lumber # of pcs (blue)= 464.42/4 = 116.105 say 117 pcs of 2”x2”x12’ lumber OR 1188.64 BD.FT of 2” x 2” x 28ft lumber 464.42 BD.FT of 2” x 2” x 17ft lumber Example: C1 (SCAFFOLDING) Assumption: 2”x3” V; 2”x2” H & B Vertical = (8.35*8) * 7.00 = 467.5 BD.FT Horizontal = (8.35*8) * 21.00 = 1402.8 BD.FT Brace = (8.35*8) * 11.67 = 779.56 BD.FT CE 2225 – Quantity Surveying Vertical = (5.2*8) * 7.00 = 291.2 BD.FT Horizontal = (5.2*8) * 21.00 = 873.6 BD.FT Brace = (5.2*8) * 11.67 = 485.472 BD.FT Wall footing A. FORMWORKS Contact Area = Perimeter * length Perimeter = (a+2b) + lapping length (50mm) # of pcs = depends on plywood size; in this discussion, 4’x8’ was used 1 BD.FT = 1’ x 1’ x 1” B. BRACINGS Amount of Bracing in BD.FT. = Contact Area * Table 5.4 b b C. SCAFFOLDINGS – No scaffolding a CE 2225 – Quantity Surveying CE 2225 – Quantity Surveying Beams A. FORMWORKS Contact Area = Perimeter * length Perimeter = (a+2b) + lapping length (50mm) # of pcs = depends on plywood size; in this discussion, 4’x8’ was used 1 BD.FT = 1’ x 1’ x 1” B. BRACINGS Amount of Bracing in BD.FT. = # of plywood * Table 5.4 b C. SCAFFOLDINGS – No scaffolding Amount of Scaffolding in BD.FT. = Length of beam * Table 5.5 CE 2225 – Quantity Surveying b a Beam Estimates Perimeter = [0.2 + (2*0.4)] + (2*0.05) = 1.1 m Contact Area = 1.1 * 3.625 * 2 = 7.975sq.m # of pcs = 7.975/2.88 = 2.77 say 3pcs of 4’x8’ board size 2 CE 2225 – Quantity Surveying 1.1 3.625 7.98 3pcs, 4’x8’ Example: 2G-1 (BRACING) # of plywood = 3 pcs BRACING/FRAMES = 3 * 32 = 96 BD.FT. Assume 1pc 2”x2”x12’ = 4 BD.FT. # of pcs = 96/4 = 24 pcs of 2”x2”x12’ lumber OR 96 BD.FT of 2” x 2” x 12ft lumber Example: 2G-1 (SCAFFOLDING) Assumption: 2”x3” V; 2”x2” H & B Vertical = (3.625*2) * 6.00 = 43.5 BD.FT Horizontal = (3.625*2) * 4.67 = 33.86 BD.FT CE 2225 – Quantity Surveying SCAFFOLDING (Wood) CE 2225 – Quantity Surveying Slabs, Stairs b A. FORMWORKS Contact Area = a * b a # of pcs = depends on plywood size; in this discussion, 4’x8’ was used 1 BD.FT = 1’ x 1’ x 1” B. BRACINGS Amount of Bracing in BD.FT. = # of plywood * Table 5.4 C. SCAFFOLDINGS – No scaffolding Amount of Scaffolding in BD.FT. = Contact Area * Table 5.5 CE 2225 – Quantity Surveying Slab Estimates Clear spans = 3.7m & 2.7m Contact Area = 3.7 * 2.7 * 2 = 19.98sq.m # of pcs = 19.98/2.88 = 6.94 say 7pcs of 4’x8’ board size 2 CE 2225 – Quantity Surveying 19.98 7pcs, 4’x8’ Example: 2S-1 (BRACING) Contact Area: 19.98 sq.m # of plywood = 7 pcs BRACING/FRAMES = 7 * 32 = 224 BD.FT. Assume 1pc 2”x2”x12’ = 4 BD.FT. # of pcs = 224/4 = 56 pcs of 2”x2”x12’ lumber Example: 2S-1 (SCAFFOLDING) Assumption: 2”x2” Flooring = 19.98 * 6.1 = 121.878 BD.FT CE 2225 – Quantity Surveying SCAFFOLDING (Wood) CONCRETE STAIRS *same methodology as beams Treated as flat slab- thickness is the distance between the underside of the stair and a parallel line that passes thru the centerline of the treads and risers. CE 2225 – Quantity Surveying CONCRETE STAIRS *same methodology as beams CE 2225 – Quantity Surveying CONCRETE STAIRS CE 2225 – Quantity Surveying RETAINING WALLS *same methodology with columns Basement Floors Elevator Pit Escalator Pit CE 2225 – Quantity Surveying SHEARWALL *same methodology with columns CE 2225 – Quantity Surveying UNDERGROUND TANKS *same methodology with columns Cistern Sump Pit Septic Tank Manhole Domestic Tank Fire Reserve CE 2225 – Quantity Surveying CE 2225 – Quantity Surveying End Endof ofModule Module Thank Thankyou! you! Reference: Vertical Construction Estimate by Cesar Balisado CE 2225 – Quantity Surveying