Uploaded by demirgmert

BEFORE TAKE OFF

advertisement
BEFORE TAKE OFF
-
-
-
Belgeler
Elektrik
ADC ON, FIRE/LIGHT TEST
ATIS
CDU SET
ATC CLEARENCE
CDU REVİZE(ALT)
DEPARTURE BRIEFING
BEFORE START CHECKLIST TO THE LINE
RAMP CHECK
BEFORE START CHECKLIST BELOW THE LINE
ATC PUSH AND START CLEARENCE
RAMP CLEAR PUSH AND START
ENGINE START BAŞLAR (ARABA GIDER)
AFTER START CHECKLIST (KAPTAN ISTER, FIRST OFFICER YAPAR)
FLIGHT CONTROLS CHECK
TAXI CLEARENCE
TAXI LIGHTS ON
GROUND TO ATC
BEFORE TAKE OFF CHECKLIST DOWN TO THE LINE(HDG SPD MODE SEL)
TAKE OFF CLEARENCE
BEFORE TAKE OFF CHECKLIST BELOW THE LINE
LINE UP
CRUISE / DESCENT
-
CRUISE BRIEF
TOD MIN 80
ATIS
100 MİL DESCENT BRIEFING/APPROACH BRIEFING
Download