LOD 200 / 300 - Typical Geometry
• Develop scalable 3D model with all
major systems and spaces coordinated
• Verify and finalize space plans,
structural MEPFP, mat
and coordinate in model
LOD 200 - Approximate Geometry
• Generate placeholder model
(Eg: building massing, quan , loca
and orienta
s,
AT
SC
HE
M
Coo
&
r
nate e
i
d
r
re-c dinate
Coo rdinat
oor
&
o
o
d
c
i
n
e
r
ate
de
gn
desi
info sign
rm
ma
infor trades amon a
g tr
ng
ade
amo
s
Cons
Coordina
Workflow
©Feb 2020 by United-BIM Inc.
Ver: 17July2020
eady Model
talla
vel of
Available Services
Building metrics •
Leasing assistance •
Building and equipment inventories •
•
As-built and exis
Furniture, Fixture and Equipment inventory •
•
Future altera
Base plans •
BI
DD
IN
& G,
FA C
B
T
BUIL
NT
AS- ANAGEME
M
ITY
ted
A
inee rchitect
,
ring
Con
CM, sultant
s,
Gate
keep
er
Eng
CIL
FA
PRE -D
ESIG
N
UM
EN
TS
ilt &
As-bu dels
rd mo
Reco
+1 (860) 317-7105
s
& a
n
ig din ck
s
de oor che
c
DOC
ts,
itect,
Arch onsultan
ing C M,
neer
Engi
GC/C eper
ke
Gate
et
e
c
pa
TION
&
te
na
di se
or ea
Co rel
el
ns d
co mo
t, ult
c
s
ite on
h
c C
r
Ar ing M, epe
er C ke
e
e
in
at
g
G
n
CONSTRUC
LOD 350 / 400 - Fabrica
• Provide fabrica
detailing into model
N
IO
CT
RU
ST ION
t
an
Output
• Provide BIM model to subcontractors for
Shop drawing development
• Coordinate and update model as per shop drawings
ted model as per
• Final clash det
shop drawing
N
s,
O AT
nt
C
RI
, lta
ct su
ite on
ch C , r
Ar ing /CM epe
er C ke
ne G ate
G
D
itect, ultants,
h
c
r
A
Cons
g
n
i
neer CM,
i
g
n
E
eper
e
k
e
t
Ga
awings
gi
IC
N
IG
S
E
E
LOD-100 - Conceptual
• Massing/Blocking plan
• Site level coordina
• Special req - branding/design review
For More Info:
NT
LOPME
E
V
E
ND
G
I
S
DE
Input
• Bidding RFI sketches as requested cons
• Coordina
etches with drawings
• Shop drawing and the Coordinated model
LOD 300 - Precise Geometry
• Complete, accurate and scalable
drawings
• Individual object level coordina
of all systems
En
Input
• Site loca
• Site survey
• Borings
forma
• Zoning- Municipal requirements
• Budget
• Space needs
• Special requirements
Output
• Design budget
• Cons
• Prelim schedule
Output
ons
• 100% comple
& 3D models
• Develop material quan
Output
• Develop typical details and
coordinate in model
• Preliminary conflict reduced in
3D models
Output
• Prepare the basis of design
(drawings/plans/2D CAD)
orkflow
Input
ork by other consultants, site-engineers
• Coordina
and designers
• Coordinate drawings and BIM models: Architectural,
MEP-FP and Structural - final clash det
Input
• Select typical building materials and
FF&E (furniture fixture and equipments)
• Client/owner review & approval design
development phase
• Detailed review of methods and materials
Input
• Approve and review selected architectural,
ystems
MEP, structural, and fire-prot
• Review design concepts for compa
• Alternate review cost es
te of selected systems
• Verify space plan, missing inputs for program and MEP
system requirements
dina
Output
As required
LOD 500 - As-built
•
The model element is a field verified representa
•
Graphically represented with detailing, fabrica
assembly, and installa
forma
•
Final design coordina