Monthly Progress Report

advertisement
MANAGEMENT ASSOCIATES
MONTHLY PROGRESS REPORT
REPORT NO. _3__
NAME:
_Ali Husnain
DESIGNATION:
P.NO:
PERIOD COVERED 31-12-2021 TO 01-02-2022
04-02-2022___________
TO:
Unit Manager - L&D
Thru:
__________________
Management Associate_
___25th__
_3009_____ APP. BATCH:
DEPT./ SECTION:
DATE:
_Operations/Ammonia
UM / Sec. Head / Dept. Mngr.
OBJECTIVE
Summary for the Month of January regarding activities performed and jobs observed.
ACTIVITIES PERFORMED
➢
➢
➢
➢
➢
➢
➢
➢
Line tracing of synthesis gas circuit from C-214 to C-211.
Line tracing of lean solution, semi lean and rich solution circuit.
Line tracing of condensate recovery circuit, low heat recovery steam generation and stripping steam
circuits.
Line tracing of flash vessel C-2001 and ejector steam circuits.
Line tracing of process condensate circuit, vacuum condensate circuit and BFW circuits.
Line tracing of DWM circuit, service air, N2, BBD circuits.
Line tracing of HS, MS, LS steam circuit.
Line tracing of Phosphate, NH3, Hydrazine dosing circuit.
JOBS OBSERVED
➢
➢
➢
➢
How to adjust the LTSC I/L temperature.
Air injection to C-102
Start-up of KGT-306A
Start-up of G/GHT-201B
SELF-STUDY AND COURSE ATTENDED
➢
➢
Study of Area specific course of CO2 removal and methanation
Study of API of centrifugal compressor
Name:-_________________
Signature: _______________