PROPOSAL FOR TERMS OF REFERENCE (ToR) TO OBTAIN ENVIRONMENTAL CLEARANCE FOR ROUGH STONE AND GRAVEL QUARRY PROJECT AT MARUDUR VILLAGE BELONGS TO M/S. VENKATESWARA BLUE METALS, SUBMITTED TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (SEIAA), GOVERNMENT OF TAMIL NADU, CHENNAI SUBMISSION OF (FORM -1, FORM -1M, PRE-FEASIBILITY REPORT, BASELINE STUDIES REPORT, HYDRO GEOLOGICAL REPORT, APPROVED MINING PLAN AND PROGRESSIVE QUARRY CLOSURE PLAN) (PROJECT CATEGORY-“B1” >5ha in Cluster category/ PATTA LAND) LEASE PERIOD –FIVE YEARS LOCATION OF THE PROJECT AREA Extent : 7.00.0ha S.F.Nos : 635/1A, 635/2A, 740, 800/2 (P) & 801 (P) Village : Marudur Taluk Mettupalayam : M/s. Venkateswara Blue Metals, No.486/3B, Mangalakkaraipudur, Karamadai, Mettupalayam, District : Coimbatore State Tamil Nadu : PROPOSED BY Coimbatore District - 641 104 PREPARED BY Dr.P.Thangaraju, M.Sc., Ph.D., Qualified Person From: M/s. Venkateswara Blue Metals, No.486/3B, Mangalakkaraipudur, Karamadai, Mettupalayam, Coimbatore District - 641 104 Mobile No: +91 98427 74339 To: The Member Secretary, State Environment Impact Assessment Authority (SEIAA), 3rd Floor, Panagal Maligai, No.1 Jeenis Road, Saidapet, Chennai – 15, Tamil Nadu. Sub: An application for Terms of Reference (ToR) to obtaining Environmental Clearance for our New Marudur Rough stone and Gravel Quarry Project over an Extent of 7.00.0ha of Patta land in S.F.Nos. 635/1A, 635/2A, 740, 800/2 (P) & 801 (P) of Marudur Village, Mettupalayam Taluk, Coimbatore District, Tamil Nadu. Respected Sir, As per the EIA notification No. S.O. 1533 (E) Dated 14th September 2006 and amended thereafter, I am submitting herewith our application in the prescribed Form -1, Form -1M, Pre-Feasibility Report, Baseline studies Report, Hydro Geological Report, Approved Mining Plan and Progressive Quarry Closure Plan etc., Mining plan was approved by the Assistant Director, Department of Geology and Mining, Coimbatore vide Rc.No. 301/Mines/2021, Dated: 23.08.2021 I have submitted all the relevant document in online for Terms of Reference (ToR) to obtain Environmental Clearance for our Rough stone and Gravel Quarry project (Patta Land/Minor Mineral/Existing Quarry-new proposal)/ B1 Category, >5Ha in Cluster category). I request that Terms of Reference (ToR) to obtaining Environmental Clearance for the above newly proposed Rough stone and Gravel Quarry at Marudur Village, Mettupalayam Taluk, Coimbatore District, Tamil Nadu may please be issued as early as possible please. I am submitting the following documents for obtaining Environmental Clearance. 1. Demand Draft for Rs:1,00,000/2. Form-1 3. Form-1 M 4. Pre-Feasibility Report 5. Baseline studies Report 6. Hydro geological report 7. Mining Plan Approval letter and Approved Mining Plan along with Progressive Quarry Closure Plan 8. Cluster letter from Department of Geology and Mining (500m radius) and Pit dimension letter 9. Quarry site photograph and Habitation details in 300m radius attested by VAO 10. Affidavit by the Project proponent 11. Blasting Agreement along with explosives license copy 12. Land Document 13. Previous EC copy & CTO copy 14. CD(Above said documents in PDF format) As all the reports and documents are submitted and soft copies of reports, plans etc are send to SEIAA-by Email. I request you to grant Environmental Clearance as early as possible. Thanking you Yours Faithfully, For M/s. Venkateswara Blue Metals, Place: Coimbatore Dated: 27.08.2021 B.Nandakumar, (Partner) MARUDUR ROUGH STONE AND GRAVEL QUARRY LEASE APPLIED AREA (7.00.0ha) The Company M/s. Venkateswara Blue Metals has applied for Terms of Reference (ToR) to obtain Environmental clearance for the proposed quarry Rough stone and Gravel for over an extent of 7.00.0ha of Patta land in S.F.Nos. 635/1A, 635/2A, 740, 800/2 (P) & 801 (P) of Marudur Village, Mettupalayam Taluk, Coimbatore District, Tamil Nadu. Salient features of the proposal are as follows: S.No 1. 2. 3. 4. 5. 6. Details of the proposal Name of the Owner + Firm Data furnished M/s. Venkateswara Blue Metals, No.486/3B, Mangalakkaraipudur, Karamadai, Mettupalayam, Coimbatore District - 641 104 Mobile No: +91 98427 74339 Location of the quarry- S.F.Nos. 635/1A, 635/2A, 740, 800/2 (P) & 801 (P) S.F.No. of Marudur Village, Mettupalayam Taluk, Coimbatore District, Tamil Nadu. Purpose of Application It is a New Rough stone and Gravel Quarry project (the area has been quarrying operation earlier) in Marudur Village. Extent of quarry in Ha- Area: 7.00.0ha Land use planning a) Mining b) Storage of Topsoil over burden c) Infrastructure Road d) Utilized Area Total 8. 9. Quarrying pit Infrastructure Roads Green Belt Unutilized Area Grand Total Area at the end of this quarrying period (Ha) 6.00.0 Nil 0.04.0 Nil 6.37.5 7.00.0 0.01.0 0.04.0 0.20.0 0.75.0 7.00.0 8,28,50,117, 8,27,50,119, 8,27,50,119, 8,27,50,119, 10,65,136, 146, Production capacity: ➢ ➢ ➢ ➢ 7. Description Present area in Ha) 0.58.5 Page No Rough stone Gravel Proposed depth Lease period = = = = 24,32,415m3 or 2,70,268 Lorry loads 1,10,220m3 or 12,247 Lorry loads 67m [26m AGL + 41m BGL] Five years Gravel in m3 Description Rough stone in m3 Geological Resources 35,68,885 1,37,656 Available Mineable reserves 24,32,415 1,10,220 Five years plan period As in 24,32,415 1,10,220 the approved mining plan Top soil & overburden The overburden in the form of Gravel formation is about 1,10,220m3 (quantity in m3) Method of Mining Open cast Mechanized Mining is being carried out with 5.0 meter vertical bench and a bench width not less than the bench height. Lease period = Five years Life of Mine as per approved mining plan 7,59,121,123 ,125,126, 61,125, 60,124, 7,27,117, 1 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Height / width of the bench Source of water / quantity required a. Drinking & Domestic Purpose a. Dust Suppression c. Green belt development Waste water Sewage water Height 5.0 m & Width 5.0 m. Quantity required (in litres)/ Source Total = 5.0KLD 1.5KLD – From existing bore wells and drinking water will be sourced from approved water vendors. 2.5KLD – From existing bore wells 1.0KLD – From existing bore wells There is no waste water. The septic tank is constructed on semi-permanent structure with in the quarry lease area. Mode of disposal To local Panchyat Authority APC Measures 1.Mist Spray using water tankers, 2. Enclosed covered system. (Tarpaulin) for transportation. Ariel distance of nearest habitation Approximate distance S. Name of the Approximate & Direction from lease No Village population applied area 1km – North 1,600 1. Mangalakkarai 3km – Southeast 35,300 2. Karamadai 3km – Southwest 9,600 3. Marudur 2km – Northwest 1,200 4. Kittampalayam Ariel distance from Reserved Forest: Reserve forest, ➢ Nellimalai R.F., - 3.6Km – NW side. Sensitive areas, Forest, ➢ Kandiyur R.F., - 5.6Km – West side. ➢ Hulical R.F., - 7.0Km – NW side. Bird sanctuaries, Wild ➢ Odanthurai R.F., - 7.7Km – North side. life sanctuaries, ➢ Thadagam R.F., - 5.4Km – SW side. National parks, Monuments etc., Wildlife Sanctuary – Nil within 10km Bird Sanctuaries – Nil National Park – Nil Monuments – Nil Land owner ship Land Details: document Own patta It is a Patta lands. Registered in the name of the land Lease Govt. applicant M/s. Venkateswara Blue Metals Poromboke (Thiru.B.Nandakumar, Guardian), vide Patta Nos.2479, 2283 & 2278.Refer Annexure No. IV. Land use classification The lease applied area is exhibits undulated topography. The area is a dry barren land devoid of Agriculture and Habitations. The land is not used for any specific vegetation. Mining plan Dr.P.Thangaraju, M.Sc., Ph.D., Prepared by Qualified Person Precise area statement The precise area communication letter was received Approved by from the Assistant Director, Department of Geology 60,124, 15,63, 17, 18, 24,69,138, 23,39,47,68, 28,66,119, 160-162, 66,120,136, 117,179,180, 152-154 2 20. 21. 22. 23. and Mining, Coimbatore District vide Rc.No. 301/Mines/2021, Dated: 11.08.2021 Approved by The Mining plan was approved by the Assistant Director, Department of Geology and Mining, Coimbatore vide Rc.No. 301/Mines/2021, Dated: 23.08.2021 Nearby quarries There are following quarries located within the radius of 500m from the proposed project site. Details – Abandoned quarry – 2Nos (2.43.0Ha) Expired quarry – Nil Existing Quarry – 1No (6.71.6Ha) Proposed quarry – 2Nos (11.81.7Ha) The total extent of existing and proposed quarry within the radius of 500m is 18.53.3Ha. The project area falls under the cluster situation. Nearby lake / river/ Water bodies: ➢ Odai – 700m - South side odai / channel etc. ➢ Belladhi Lake – 3.5Km- East side ➢ Canal – 4.3Km – SE side. ➢ Canal – 4.2Km – West side. ➢ Bhavani River – 6.0km- NW side Latitude / Longitude Latitude between: 11°14'39.67"N to 11°14'53.15"N Longitude between:76°55'48.14"E to 76°55'58.07"E 24. Topo Sheet No. Topo sheet: 58 - A/16 25. Total Project cost The total Project cost: Operational cost = Rs. 3,18,17,000/EMP Cost = Rs. 3,80,000/Total Project Cost = Rs. 3,21,97,000/CER Cost (2.0%) = Rs. 6,44,000/Total Cost = Rs. 3,28,41,000/The total EMP cost is Rs. 3,80,000/The Ground water is about 70-65mt depth from ground level. There is no Interstate boundary within the radius of 10Km. There is no Western Ghats boundary within the radius of 10Km. 26. 27. EMP cost Water table 28. Interstate boundary 29. Western Ghats 102-103, 189-190 23,39,47,68, 27,53,119, 181 27,53,119, 181 73,141-143, 73,143, 28,120,132, 23,39,47,68, 23,39,47,68, 3 INDEX FILE S. No Description Page Nos. 1-3 1 Environmental Clearance Format 2 Declaration Letter 4 3 Demand Draft 5 4 Form 1 5 Form-1 M 26 - 41 6 Pre Feasibility Report 42–76 7 Baseline Studies 77–91 8 Hydro geological Report 92- 101 6- 25 ANNEXURES Annexure No I II III IV V VI VII VIII Description Mining plan approval Letter Page Nos 102-103 Approved Mining Plan along with Mine Closure 104 –188 Plan Cluster letter from Department of Geology and 189-192 Mining (500m Radius) & Pit Dimension letter Quarry site Photograph attested by Village 193 Administrative officer (VAO) Habitations and Nearby Features details in 300m 194 Radius attested by Village Administrative officer (VAO) Affidavit by the Project proponent (500m Radius quarries details and CER Proposals 195-198 included) Blasting Agreement along with Explosives 199 -202 License copy Sale Deed 203-272 IX Lease Deed 273-290 X Previous EC copy 291-294 XI Previous CTO copy 295-297 Attachments Consolidated Above Document in PDF Format (DVD)-298 Check List for Submission of Application for Prior Environmental Clearance for Mining Projects Whether S.No Page reference Remarks enclosed Details or not 1 Name of the Proponent/Project (Name of the contact Yes 8,28,50,117, person with designation, Mobile No. Email) 2 Online receipt for the application submitted through online to obtain the Environmental clearance from the Yes State Level Environment Impact Assessment Authority 3 Report for Compliance of conditions which are imposed in the existing Environmental clearance from No the competent authority. (if applicable) 4 Whether there is any litigation, if yes latest orders of No the court in original, have to be attached. (such as stay, status of the petition etc.,) 5 Type of quarrying (Gravel/Rough Stone/sand / Yes 8,27,50,119, Granite) 6 Topo map for 5km radius & 10km radius highlighting water bodies, catchment areas, forest areas, protected / Yes 182 Wild life areas & ecological sensitive area, airports, marine ecosystem. 7 Village, Town Panchayat / Panchayat Union in which Yes 8,27,50,119, situated 8 Taluk in which situated Yes 8,27,50,119, 9 District in which situated Yes 8,27,50,119, ` 10 Extent of quarry (in Ha) Yes 8,27,50,119, 11 New or existing quarry Yes 115, 12 If in case of existing Rough Stone/ Blue metal/ Granite quarry, The length, width and depth to which quarrying Yes 115,122,192, has already been done (below the ground level/ above the ground level) 13 If quarrying had been done below the ground level /above the ground level. The height of quarrying Yes 115,122,192, already done) 14 Name of the owner who had earlier undertaken the quarrying & a copy of mining lease issued with date, if Yes 115, he is different from the present applicant 15 Proof of land ownership. If owned patta copy. 28,66,119, Yes If not own patta land agreement/lease copy entered 160-162, with the owner (to be enclosed) details 16 Period of quarrying proposed Yes 7,27,117, 17 Production (Quarrying in m3) Yes 7,59,121,123, 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Method of Mining Top Soil/ Overburden in case of Rough Stone /Blue Metal Quantity of rejects in M3 in case of Granite Mining. Length, Width, Depth & Proposed Quarry in meters. Land use pattern for a radius of 500m topo sheet around the quarry site such as Agriculture, Habitation etc., Details of other quarries for a radius of 500m, around the quarry site Aerial distance from the periphery of the site to the nearest habitation, Structures, Temples etc., Aerial distance to the interstate borders, in case of Rough Stone/ Blue metal/ Granite quarry to be obtained from IRS, Anna University. In case of Rough Stone/ Blue Metal/ Granite quarry no objection certificate from the concerned district Forest officer/ Wild Life Sanctuaries/ National Parks/HACA / Western Ghats region if the quarry site is within 10km of these areas. Aerial distance to the nearest eco- sensitive areas, CRZ, Forests, monuments etc., within 10kms of these areas. Latitude and Longitude of all corners of the quarry site. Topo Sheet No Copy of explosives license and a consent letter / Agreement of competent recognized person who has agreed to handle explosive for the blasting, in case of Rough Stone/ Blue Metal/ Granite quarry. Brief details of APC measures proposed to be proposed to be implemented. Mine closure plan to be furnished in Mining Plan Mining Plan prepared by (Xerox copy of certificate to be attached) Precise area communication approved by the District Collector Mining plan approved by the Deputy/ Assistant Director of the District. Water requirement: a) Drinking & domestic purposes in KLD b) Dust suppression (in KLD) c) Green belt (in KLD) Yes 125,126, 60,124, Yes 61,125, No Yes 129 Yes 183 Yes 189-190 Yes 24,69,138, No - No - Yes 23,39,47,68, Yes Yes 27,53,119,181 27,53,119,181 Yes 199-202 Yes 138 Yes 144-151 Yes 117,179,180, Yes 152-154 Yes 102-103, Yes 15,63, 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 Source of water Ground water table Project cost (excluding EMP cost) Break up details for the EMP. The EMP shall include the following for each subhead i. Cost of manpower ii. Capital investment iii. Consumables iv. Monitoring of environmental parameter And the environmental management plan/ programme should have two parts a) Part – I should indicate man power, tools and machineries, power requirement, solid waste management, water supply, storm water drain and environmental monitored. b) Part – II should indicate the cost of each sub head of part - I Disclosure RQP Soft copy of the Form –1, Pre –feasibility report and mining plan in CD Key map showing the approach roads to the site to be attested by the Deputy/ Assistant Director of Geology and Mining of the Concerned District. Village map with S.F. Nos & Salient features such as vegetation, habitations etc., for a radius of 500m around the quarry site. Section map for mining to be attested by the Deputy/ Assistant Director of Geology and Mining of the Concerned District. Photograph of the proposed Mining site with SF.Nos and break – up –details attested by VAO or a senior official Form - 1 To be signed by applicant Pre –Feasibility Report to be signed by Both applicant and RQP. First and last page and the page at which quantity of mining has been worked out to be signed by the Deputy/ Assistant Director of Geology and Mining of the concerned District. Affidavit from the applicant that child lobour is not being employed in the mining activity. Affidavit from the applicant regarding planting of trees around the quarry site in fulfillment of the Green belt Yes Yes Yes 15,63, 28,120,132, 73,141-143, Yes 73,143, Yes 117,179,180, Yes 298 Yes 184 Yes 183 Yes 186 Yes 193 Yes 25 Yes 76 Yes 151 Yes Yes 195-198, 195-198, 52 53 54 commitment furnished. Details (POD) Regarding communicating the proposal to the members of the committee. Disclosure of consultant as per MoEF OM Dt.04.08.2009 and Accreditation certificate issued by QCI/NABET Processing Fee of Rs.1,00,000/- in the form of DD taken in favour of Member Secretary, SEIAA Payable at Chennai. Local body / Panchayat / Panchayat Union with full address No - Yes 5 Yes 114 As authorized signatory of this project, I am aware that I can be prosecuted under relevant Act and Rules, if I am not ensuring the adherence of the above commitments. Place: Coimbatore Dated: 27.08.2021 1. Signature of the Applicant For M/s. Venkateswara Blue Metals, B.Nandakumar, (Partner) 2. Signature of the Qualified Person Dr.P.Thangaraju, M.Sc., Ph.D., Checklist for Mining of Minor Mineral Rough stone and Gravel Quarry in Marudur Village, 7.00.0Ha, B1Category, >5Ha in Cluster category S.No Details of the proposal : 1. Name of the owner/Firm : Correspondence Address 2. with Pin Code : Mobile Number and 3. Aadhaar Number 4. Email Type of quarrying 5. (Earth/ Rough stone and Gravel/Sand/Granite) S.F. No of the Quarry 6. site Village , Town Panchayat/ Municipality 7. in which the village is situated 8. Taluk in which situated 9. District in which situated 10. Extent of quarry (in Ha) New or existing quarry 11. : : : : Data furnished M/s. Venkateswara Blue Metals, M/s. Venkateswara Blue Metals, No.486/3B, Mangalakkaraipudur, Karamadai, Mettupalayam, Coimbatore District - 641 104 +91 98427 74339 6364 3027 3112 Page No 8,28,50,117, 8,117, crusher.vbm@gmail.com It is a New Rough stone and Gravel Quarry project (the area has been quarrying operation earlier) in Marudur Village. S.F.Nos. 635/1A, 635/2A, 740, 800/2 (P) & 801 (P) 8,117, 8,27,50,119, 8,27,50,119, Marudur Village : : : : : If in case of existing Rough stone and Gravel/ Blue Metal/ Granite Quarry, the length, width 12. and depth to which : quarrying has already been done (below the ground level/ above the ground level) If quarrying had been done below the ground : 13. level/above the Ground level, the height of quarrying Name of the owner who had earlier undertaken 14. the quarrying & a copy : of mining lease issued with date 8,27,50,119, Mettupalayam Taluk Coimbatore District Area: 7.00.0ha It is an existing Quarry. 8,27,50,119, 8,27,50,119, 8,27,50,119, 115, The maximum dimension of the existing quarry pit is given table below (Refer Plate No. II). Length (m) Width (m) Depth(m) (Max) (Max) (Max) 192 55 19m AGL 115,122,192, Existing depth – max 19m AGL 115,122,192, It is a fresh lease application but, the applied area has been considered quarrying operation earlier. The quarry lease was previously granted in the favour of Tvl. Venkateswara Blue Metals, over an extent of 6.71.6hectares of Patta lands in S.F.Nos.740 (P), 741/1D (P), 741/2 (P), 800/2 & 801 of 115, Marudur Village, Mettupalayam Taluk, Coimbatore District vide Rc.No.99/2011/X-1, Dated:14.05.2011 for the period of five years from 14.05.2011 to 13.05.2016 and subsequently another quarry lease granted in favour of the same applicant, vide Rc.No.977/Mines/2015, Dated: 17.09.2016 for the period of five years from 17.09.2016 to 16.09.2021andthe applicant has obtained Environmental Clearance from the SEIAA, Tamil Nadu vide Lr. No. SEIAATN/F.No.5463/1(a)/EC.No.3409/2016, Dated:25.07.2016for quarrying of Rough stone and Earth. Proof of land ownership. If owned patta copy. If not own patta land 15. : agreement/ lease copy entered with the owner (to be enclosed) Period of quarrying 16. : It is a Patta lands. Registered in the name of the applicant M/s. Venkateswara Blue Metals (Thiru.B.Nandakumar, Guardian), vide Patta Nos.2479, 2283 & 2278.Refer Annexure No. IV. Lease period = Five years 28,66,119, 160-162, 7,27,117, Production capacity: ➢ ➢ ➢ ➢ 17. Rough stone Gravel Proposed depth Lease period = = = = 24,32,415m3 or 2,70,268 Lorry loads 1,10,220m3 or 12,247 Lorry loads 67m [26m AGL + 41m BGL] Five years Rough stone in m3 35,68,885 24,32,415 24,32,415 Description Geological Resources Available Mineable reserves Five years plan period As in the approved mining plan 18. Method of Mining : Top soil/ Overburden in 19. case of Rough stone and : Gravel/ Blue Metal Quantity of rejects in m3 20. in case of Granite : Mining. Length, Width, Depth & Proposed Quarry in 21. meters. Gravel in m3 1,37,656 1,10,220 1,10,220 Open cast Mechanized Mining is being carried out with 5.0 meter vertical bench with a bench width is not less than the bench height. The overburden in the form of Gravel formation is about 1,10,220m3 7,59,121,123, 125,126, 60,124, 61,125, It is a Rough stone and Gravel Quarrying. 61,125, Length (m) (Max) Width (m) (Max) 366 189 Depth(m) (Max) 67m (26m AGL + 41m BGL) 129 Land use pattern for a radius of 1Km around the quarry site such as 22. Agriculture, Habitation : etc., Details of other quarries for a radius of 1Km, around the quarry site. 23. Aerial distance from 24. periphery of the site to the nearest habitation Aerial distance to the interstate borders, in case of Rough stone and 25. Gravel/ Blue Metal/ Granite quarry to be obtained from IRS, Anna University. In case of Rough stone and Gravel/ Blue Metal/ Granite quarry no objection certificate from the concerned district 26. Forest Officer/ Wild Life Sanctuaries/ National Parks/ HACA/ Western Ghats region if the quarry site is within 10Kms of these areas. Aerial distance to the nearest eco-sensitive areas, CRZ, Forests, 27. Monuments etc., within 10Kms of these areas. : : Land use pattern Quarry pits/Crusher – 04% Trees/Coco. Farm – 09% Seasonal Agri Land – 34% Roads – 05% Habitation – 07% Barren land – 21% Elevated area – 20% There are following quarries located within the radius of 500m from the proposed project site. Details – Abandoned quarry – 2Nos (2.43.0Ha) Expired quarry – Nil Existing Quarry – 1No (6.71.6Ha) Proposed quarry – 2Nos (11.81.7Ha) The total extent of existing and proposed quarry within the radius of 500m is 18.53.3Ha. The project area falls under the cluster situation. ➢ Mangalakkarai – 1.0km - North 183 189-190 24,69,138, There is no Interstate boundary within the radius of 10Km. : 23,39,47,68, There is no NOC is enclosed. : : - There is no eco-sensitive areas, CRZ, within the radius of 10Km Reserved Forest: ➢ Nellimalai R.F., - 3.6Km – NW side. ➢ Kandiyur R.F., - 5.6Km – West side. ➢ Hulical R.F., - 7.0Km – NW side. 23,39,47,68, ➢ Odanthurai R.F., - 7.7Km – North side. ➢ Thadagam R.F., - 5.4Km – SW side. 28. 29. 30. 31. Latitude and Longitude of all corners of the quarry site. Topo Sheet No. Copy of explosives license and a consent letter/ agreement of competent recognized person who has agreed to handle explosive for the blasting, in case of Rough stone and Gravel/ Blue Metal/ Granite quarry. Brief details of APC measures proposed to be proposed to be implemented. : Latitude between: 11°14'39.67"N to 11°14'53.15"N Longitude between:76°55'48.14"E to 76°55'58.07"E 27,53,119,181 : Topo sheet: 58 - A/16 27,53,119,181 A copy of agreement is enclosed. : : Mine Closure Plan to be 32. furnished in Mining : plan. Mining plan prepared by 33. (Xerox copy of : certificate to be attached) Precise area communication approved 34. : by the District Collector Mining plan approved by 35. the Deputy/ Assistant : Director of the District. Water requirement : a) Drinking & domestic purposes in 36. : KLD. b) Dust suppression (in KLD) c) Green belt (in KLD) 199-202 The Air quality will be affected during the quarrying period due to drilling and blasting, which will be within prescribed limits. Air quality will be monitored periodically as per norms and Mitigation measures will be carried out to prevent dust and air propagation in to air. Mist water spraying will be carried out to suppress dust and also wet drilling practiced. Yes, the progressive quarry closure plan furnished in Mining plan. Dr.P.Thangaraju, M.Sc., Ph.D., Qualified Person The precise area communication letter was received from the Assistant Director, Department of Geology and Mining, Coimbatore District vide Rc.No. 301/Mines/2021, Dated: 11.08.2021 The Mining plan was approved by the Assistant Director, Department of Geology and Mining, Coimbatore vide Rc.No. 301/Mines/2021, Dated: 23.08.2021 Drinking Water - 1.5KLD & Domestic purpose Dust Suppression - 2.5KLD Green belt -1.0KLD Total - 5.0KLD 138 144-151 117,179,180, 152-154 102-103, 15,63, Source of water 37. : 38. Ground water table : Project Cost (excluding EMP Cost) 39. : 40. EMP Cost Disclosure RQP 41. : Soft copy of the Form–1, 42. Pre –feasibility report and Mining plan in CD. Key map showing the approach roads to the site to be attested by the 43. Deputy/ Assistant Director of Geology and Mining of the concerned District. Village map with S.F. Nos& salient features such as vegetation, 44. habitations etc., for a radius of 500m around the quarry site. If lakes, Ponds, river, nallah, odaietc are situated near the quarry 45. site permission from the concerned PWD authorities for mining Section map for mining to be attested by the 46. Deputy/ Assistant Director of Geology and : : Purpose Drinking & Domestic Purpose Dust suppression Sources From Existing bore wells and drinking water will be sourced from Approved Water vendors. From existing bore wells Green belt development From existing bore wells The Ground water is about 70-65m depth from ground level. The total Project cost: Operational cost = Rs. 3,18,17,000/EMP Cost = Rs. 3,80,000/Total Project Cost = Rs. 3,21,97,000/CER Cost (2.0%) = Rs. 6,44,000/Total Cost = Rs. 3,28,41,000/The total EMP cost is Rs. 3,80,000/Dr.P.Thangaraju, M.Sc., Ph.D., Qualified Person There is enclosed Soft copy for form –1,form – 1 M, Pre – feasibility report and mining plan in CD. 15,63, 28,120,132, 73,141-143, 73,143, 117,179,180, 298 The Key map showing with approach roads to the site is enclosed. Plate No. IC : : : : 184 Village map with S.F.No and Salient features such as vegetation, habitation etc., for 500mt radius is enclosed as plate no. IB Water bodies: ➢ Odai – 700m - South side ➢ Belladhi Lake – 3.5Km- East side ➢ Canal – 4.3Km – SE side. ➢ Canal – 4.2Km – West side. ➢ Bhavani River – 6.0km- NW side The Geological Plan and section in 1:1000 scales is enclosed. 183 23,39,47,68, 186 47. 48. 49. 50. 51. Mining of the concerned District. Photograph of the proposed Mining site with S.F.No and attested by at least VAO. Form –1 To be signed by applicant Pre- Feasibility Report to be signed by Both applicant and RQP. First and last page and the page at which quantity of mining has been worked out to be signed by the Deputy/Assistant Director of Geology and Mining of the concerned District. Affidavit from the applicant that child labour is not being employed in the mining activity. The Photo of the Mines site is enclosed. : : : 193 I am hereby signed. Pre-feasibility report has been signed by the applicant and Qualified Person. 25 76 First page and last page and the quantity proposed in the plan have been signed by the Assistant Director of Geology and Mining. : : Affidavit from the applicant regarding planting of trees around 52. the quarry site in : fulfillment of the Green belt commitment furnished. Details (POD) Regarding communicating the 53. : proposal to the members of the committee. 151 It is been ensured that the labor will not be employed less than 18 years, No child labour will engaged or entertained for any kind of quarrying operations. All the labour engaged for quarrying operations will be insured during the quarry lease period. 195-198, Affidavit from the applicant regarding the proposal for planting trees around the quarry and fulfillment of greenbelt commitment is enclosed. 195-198, Place: Coimbatore Dated: 27.08.2021 1. Signature of the Applicant For M/s. Venkateswara Blue Metals, B.Nandakumar, (Partner) 2. Signature of the Qualified Person Dr.P.Thangaraju, M.Sc., Ph.D., From: M/s. Venkateswara Blue Metals, No.486/3B, Mangalakkaraipudur, Karamadai, Mettupalayam, Coimbatore District - 641 104 Mobile No: +91 98427 74339 To: The Member Secretary, State Environment Impact Assessment Authority (SEIAA), 3rd Floor, Panagal Maligai, No.1 Jeenis Road, Saidapet, Chennai – 15, Tamil Nadu Sub: Submission of Form -1, Form -1M, Pre-Feasibility Report, Baseline studies Report, Hydro Geological Report, Approved Mining Plan and Progressive Quarry Closure Plan and other relevant document for Terms of Reference (ToR) to obtaining Environmental Clearance for our Marudur Rough stone and Gravel Quarry Project - Reg., Ref: The Mining plan was approved by the Assistant Director, Department of and Mining, Coimbatore vide Rc.No. 301/Mines/2021, Dated: 23.08.2021 Geology Sir, I am here by submitting the processing fee in the form of Demand Draft for Rupees One lakh along with Form-1, Form-1 M, Pre-feasibility Report and Approved mining plan to your good office for obtaining clearance from SEIAA, Chennai, for our Marudur Rough Stone and Gravel Quarry project over an extent of 7.00.0ha of Patta land in S.F.Nos. 635/1A, 635/2A, 740, 800/2 (P) & 801 (P) of Marudur Village, Mettupalayam Taluk, Coimbatore District, Tamil Nadu. I have submitted all the relevant documents to your good office to the best of our knowledge. If any clarifications are required, I am ready to submit the same to your office at your convenient time. Also I am ready to present regards this quarry project in front of the committee. Hence I request your good office to kindly process my application and allow me to present our project at the earliest. Thanking you Yours sincerely For M/s. Venkateswara Blue Metals, B.Nandakumar, (Partner) Place: Coimbatore Date: 27.08.2021 4