CONSULTANCY SERVICES FOR UNDERTAKING ENVIRONMENTAL AND
SOCIAL IMPACT ASSESSMENT OF NEW BUS DEPOT FOR BRT-3 AT
GONGO LA MBOTO / ULONGONI AREA
TIME TABLE FOR STAKEHOLDER CONSULTATIONS
DAYS
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
STAKEHOLDER
Dar Es Salaam City Council (DCC)
ACTIVITIES
(a) Introduce the Project to the City Director
(b) Request for Technical Staff for condcting joint site
visit.
(c) Travel to the site with Technical Staff.
(d) Conduct site inspection with Technical Staff.
Dar Es Salaam Water and Sewerage (a) Introduce the Project to the Chief Executive Officer
Authority (DAWASA)
(b) Request for Technical Staff for condcting joint site
visit.
(c) Travel to the site with Technical Staff.
(d) Conduct site inspection with Technical Staff.
Tanzania Railway Corporation (TRC) (a) Introduce the Project to the Director General
Mrs. Magdalena Kitila (Environmental
Officer)
(b) Request for Technical Staff for conducting joint
siteTravel
visit. to the site with Technical Staff.
(c)
(d) Conduct site inspection with Technical Staff.
(a) Introduce the Project to the Managing Director.
TAZAMA Pipelines Ltd
(b) Request for Technical Staff for conducting joint
siteTravel
visit. to the site with Technical Staff.
(c)
(d) Conduct site inspection with Technical Staff.
Occupational Safety and Health
(a) Introduce the Project to the Chief Inspector
Authority (OSHA)
(b) Request for Technical Staff for conducting joint
siteTravel
visit. to the site with Technical Staff.
(c)
(d) Conduct site inspection with Technical Staff.
Fire and Rescue Force
(a) Introduce the Project to the Commissioner General
(b) Request for Technical Staff for conducting joint
siteTravel
visit. to the site with Technical Staff.
(c)
(d) Conduct site inspection with Technical Staff.
Land Transportation Control Authority (a) Introduce the Project to the Director General
(LATRA)
(b) Request for Technical Staff for conducting joint
siteTravel
visit. to the site with Technical Staff.
(c)
(d) Conduct site inspection with Technical Staff.
(a) Introduce the Project to the Director General
Energy and Water Utility Authority
(EWURA)
(b) Request for Technical Staff for conducting joint
siteTravel
visit. to the site with Technical Staff.
(c)
(d) Conduct site inspection with Technical Staff.