SERVICE SPECIFICATION
DNVGL-SE-0480
Edition July 2017
Verification of lifting appliances for the oil
and gas industry
The electronic pdf version of this document, available free of charge
from http://www.dnvgl.com, is the officially binding version.
DNV GL AS
FOREWORD
DNV GL service specifications contain procedural requirements for obtaining and retaining
certificates and other conformity statements to the objects, personnel, organisations and/or
operations in question.
©
DNV GL AS July 2017
Any comments may be sent by e-mail to rules@dnvgl.com
This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this
document. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility
for loss or damages resulting from any use of this document.
General
This document supersedes the October 2010 edition of DNV-OSS-308.
The purpose of the revision of this service document is to comply with the new DNV GL document reference
code system and profile requirements following the merger between DNV and GL in 2013. Changes mainly
consist of updated company name and references to other documents within the DNV GL portfolio.
Some references in this service document may refer to documents in the DNV GL portfolio not yet published
(planned published within 2017). In such cases please see the relevant legacy DNV or GL document.
References to external documents (non-DNV GL) have not been updated.
Editorial corrections
In addition to the above stated changes, editorial corrections may have been made.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 3
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Changes - current
CHANGES – CURRENT
Changes – current.................................................................................................. 3
Section 1 General.................................................................................................... 6
1.1 General............................................................................................. 6
1.2 Risk based verification..................................................................... 8
1.3 Defining a verification plan...............................................................9
1.4 DNV GL lifting reports and certificates........................................... 10
1.5 Definitions/abbreviations............................................................... 10
Section 2 Service overview................................................................................... 15
2.1 General........................................................................................... 15
2.2 Service process............................................................................... 15
2.3 Project initiation............................................................................. 16
2.4 Project realization.......................................................................... 17
2.5 Verification documents................................................................... 24
Appendix A Selection of verification level............................................................. 25
A.1 General........................................................................................... 25
A.2 Trigger questions............................................................................25
Appendix B Detailed example scope of work tables for verification...................... 28
B.1 General........................................................................................... 28
B.2 Description of terms used in the scope of work tables....................28
B.3 Overall project management.......................................................... 30
B.4 Design.............................................................................................30
B.5 Construction and factory acceptance test....................................... 40
B.6 Installation and commissioning...................................................... 49
Appendix C Examples of verification documents................................................... 60
C.1 Verification documents................................................................... 60
C.2 Use of quality management systems.............................................. 62
C.3 Document forms............................................................................. 64
Appendix D Lifting appliance life cycle................................................................. 71
D.1 Lifting appliance life cycle.............................................................. 71
Appendix E Informative documents...................................................................... 72
E.1 Technical terminology..................................................................... 72
E.2 Guide for selection of verification level.......................................... 73
Service specification — DNVGL-SE-0480. Edition July 2017
Page 4
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Contents
CONTENTS
Service specification — DNVGL-SE-0480. Edition July 2017
Page 5
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Contents
Changes – historic................................................................................................ 74
SECTION 1 GENERAL
1.1 General
1.1.1 Introduction
1.1.1.1 This DNV GL service specification gives criteria for and guidance on verification of lifting appliances
for the oil and gas industry within the European Economic Area (EEA).
1.1.1.2 This specification falls under the top level document DNVGL-SE-0474 Risk based verification.
1.1.1.3 The descriptions in this specification directly support a simplified verification planning as described in
DNVGL-SE-0474. When using the advanced or combined planning, the descriptions will give good references
and starting points.
Guidance note:
The latest revision of all DNV GL documents may be found in the publications list in the DNV GL web site www.dnvgl.com.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
1.1.2 Objectives
1.1.2.1 The objectives of this specification are to describe the following for a lifting appliance:
— preparation of a verification plan using DNV GL’s risk differentiated levels of verification activities and
detailed example scope of work tables
— DNV GL’s implementation and reporting of the verification plan
1.1.3 Scope of application for verification
1.1.3.1 This specification may be adopted for the verification of lifting appliances throughout the project
phases conceptual design, detailed design, construction, installation and commissioning.
1.1.3.2 Lifting appliances for offshore applications typically comprise the following objects:
Cranes:
—
—
—
—
—
—
—
—
—
—
mobile cranes
tower cranes
slewing jib cranes
bridge and gantry cranes
offshore cranes
floating cranes
winches and hoists
loader cranes
cable cranes
hand powered cranes.
Lifting accessories:
—
—
—
—
chain slings
fibre slings
wire rope slings
spreader beams
Service specification — DNVGL-SE-0480. Edition July 2017
Page 6
Verification of lifting appliances for the oil and gas industry
DNV GL AS
—
—
—
—
—
—
—
—
—
lifting magnets
vacuum lifters
lifting forks
trollies
beam clamps
hooks
blocks
shackles
other loose gear.
Lifting appliances for life saving equipment:
—
—
—
—
—
—
—
life boat winches
rescue boat davits
davits for life rafts
lifting appliances for rescue chutes
stretchers
lifting capsules
medical baskets.
Lifting person devices:
—
—
—
—
—
—
—
—
lifting tables
mobile elevating work platforms
personnel baskets
manrider winches
access platforms
case stabbing baskets
cherry pickers
climbing platforms.
Drilling hoisting equipment:
—
—
—
—
—
—
—
—
draw work
ram rigs
BOP cranes
pipe handling cranes
swivels
crown block
travelling block
dead line anchor.
Robots:
— manipulator arms
— manually controlled load manipulating devices
— production lines.
which are applied in various configurations and tailored to each particular project’s specific requirements.
1.1.3.3 This specification describes the principles of a levelled verification involvement. These principles may
be applied both for planning of any need or obligations for independent external verification (third party) as
well as internal company verification (second party).
Service specification — DNVGL-SE-0480. Edition July 2017
Page 7
Verification of lifting appliances for the oil and gas industry
DNV GL AS
1.1.4 Structure of this document
This section explains the relationship between this document and DNV GL’s overall risk based verification
systematics.
Sec.2 describes the activities for each project and the project phases for lifting appliances for offshore
applications.
App.A poses trigger questions to assist in the selection of verification level
App.B gives detailed example scope of work tables for the different phases and levels of involvement. These
tables are the basis for the development of project specific scope of work tables.
App.C gives example verification documents and describes the documents issued during and as a result of
the verification process. The use of quality management systems is addressed here also.
App.D is a separate appendix for lifting appliances which includes figures for information.
1.2 Risk based verification
1.2.1 Elements of the service
1.2.1.1 The risk based verification concept is described in DNVGL-SE-0474 and shown in Figure 1-1.
1.2.1.2 The verification plan is the pivot element, with the asset specification, risk sssessment and definition
of involvement level as input and the verification execution being the implementation.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 8
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Figure 1-1 The DNV GL risk based verification flow chart
1.3 Defining a verification plan
1.3.1 Risk based verification planning
1.3.1.1 The selection of the level of verification shall depend on the risk level of each of the elements that
have an impact on the management of hazards and associated risk levels of the asset. The planning may be
simplified or detailed. This is further described in DNVGL-SE-0474.
1.3.1.2 This specification mainly aids in a simplified preparation of the Verification Plan.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 9
Verification of lifting appliances for the oil and gas industry
DNV GL AS
1.4 DNV GL lifting reports and certificates
1.4.1 General on verification
1.4.1.1 Verification describes the individual activities undertaken by DNV GL at the various stages of design,
construction and operation of the facility. The scope of the verification plan is ultimately determined by the
client. A statement of conformity may be issued by DNV GL to confirm compliance according to the scope of
work.
1.4.2 General on certification
1.4.2.1 Certification describes the totality of verification activities leading up to the issue of a certificate of
conformity. The scope of work and verification plan, called a certification plan, is set by DNV GL. All design
and construction aspects, related to process facility safety and integrity, shall be covered by the certification
plan.
1.4.3 DNV GL certificate of lifting appliance
1.4.3.1 In the event that DNV GL does not define the scope of work necessary to achieve certification, a
certificate of lifting appliance shall not be issued.
1.5 Definitions/abbreviations
1.5.1 General
1.5.1.1 Relevant definitions in ISO also apply to this service specification.
1.5.2 Abbreviations
Table 1-1 Abbreviations
Term
Definition
ISO
International Standardisation Organisation
ILO
International Labour Organisation
CEN
European Standardisation Organisation
FAT
factory acceptance test
NB
notified body
CE
Communauté Européenne
EMC
electromagnetic compatibility
FE
finite element analysis
FLS
fatigue element state
HAZID
hazard identification
Service specification — DNVGL-SE-0480. Edition July 2017
Page 10
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Term
Definition
HAZOP
hazard and operability review
MPQT
manufacturing procedure qualification test
MPS
manufacturing procedure specification
NDE
non-destructive examination
QRA
quantitative risk analysis
RP
recommended practice
SCF
stress concentration factor
SHE
safety, healt, environment
TCF
technical construction file
ULS
ultimate limit state
WPS
welding procedure specifications
WPQR
welding procedur qualification record
EEA
European Economic Area (EU and EFTA countries)
1.5.3 Verbal Forms
Table 1-2 Definitions of verbal forms
Term
Definition
shall
indicates requirements strictly to be followed in order to conform to this service specification and from
which no deviation is permitted
should
indicates that among several possibilities, one is recommended as particularly suitable, without mentioning
or excluding others, or that a certain course of action is preferred but not necessarily required
Other possibilities may be applied subject to agreement.
may
verbal form used to indicate a course of action permissible within the limits of the service specification
1.5.4 Definitions
Table 1-3 Definitions
Term
Definition
client
DNV GL's contractual partner
It may be the manufacturer, purchaser, operator (User), the owner or the contractor.
construction
all activities during purchase, manufacturing, assembly, and erection at the manufacturers site. until the
lifting appliance is ready factory acceptance test
factory
acceptance test
(FAT)
final testing at the manufacturers site prior to shipment
Service specification — DNVGL-SE-0480. Edition July 2017
Page 11
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Term
Definition
design
engineering activities related to planning and preparation of the technical documentation of a lifting
appliance and its components to enable its construction
installation
activities related to the assembly and erection of the lifting appliance on the working location
commissioning
ctivity after installation, including review, survey and testing in the presence of the client in order to
assess compliance with the requirements
decommissioning activity to bring a lifting appliance out of operation after it has served its purpose
removal
de-install the lifting appliance from its operating location
hazard
a deviation (departure from the design and operating intention) which could cause damage, injury or other
form of loss (Chemical Industries Association HAZOP Guide)
hazop
the application of a formal systematic critical examination to the process and engineering intentions of
new or existing facilities to assess the hazard potential of mal-operation or mal-function of individual items
of equipment and their consequential effects on the facility as a whole (Chemical Industries Association
HAZOP Guide)
manufacture
making of articles or materials, often in large volumes
In relation to process facilities, this typically refers to activities for the production of various components
under contracts from one or more contractor or supplier.
operations
(phase)
the phase when the lifting appliance is being used for the purpose for which it was designed. Use includes
start-up, stopping, transport, operation, monitoring, inspection, repair, maintenance, service and cleaning
lifting appliance machine or deviceused for the purpose of vertical movement of a load with or without horizontal
movement
crane
machine for cyclic lifting or cyclic lifting and handling of loads suspended on hooks or other load handling
devices, whether manufactured to an individual design, in series or from prefabricated components
Guidance note:
Suspended includes any additional means fitted to prevent swinging, rotation of load etc.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
machine
an assembly of linked parts or components, at least one of which moves, with the appropriate machine
actuators, control and power circuits, etc., joined together for a specific application, in particular for the
processing, treatment, moving or packing of a material
The term machinery also covers an assembly of machines which, in order to achieve one and the same
end, are arranged and controlled so that they function as an integral whole.
certificate of
conformity
a document signed by a qualified party affirming that, at the time of assessment, the product or service
met the stated requirements (BS 4778: Part 2)
lifting
accessory
component or equipment not attached to the machine and placed between the machinery and the load or
on the load in order to attach it
lifting
component
parts of a lifting accessory
certificate of
a document based on the ILO convention no. 152, issued by the competent person, which confirm that the
lifting appliance lifting appliance is in compliance with the requirements and is designed, fabricated, assembled, erected,
tested, documented and maintained, and can be safely used
Service specification — DNVGL-SE-0480. Edition July 2017
Page 12
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Term
Definition
risk
the qualitative or quantitative likelihood of an accident or unplanned event occurring, considered in
conjunction with the potential consequences of such a failure
In quantitative terms, risk is the quantified probability of a defined failure mode times its quantified
consequence.
risk reduction
measures
those measures taken to reduce the risks to the operation of process facilities and to the health and safety
of personnel associated with it or in its vicinity by:
— reduction in the probability of failure
— mitigation of the consequences of failure.
Guidance note:
The usual order of preference of risk reduction measures is:
a)
inherent safety
b)
prevention
c)
detection
d)
control
e)
mitigation
f)
emergency response
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
safety
objectives
the safety goals for the design, construction, installation operation and abandonment the fixed offshore
structure including acceptance criteria for the level of risk acceptable to the owner
statement of
conformity
a statement or report signed by a qualified party affirming that, at the time of assessment, the defined
facility, phase, or collection of activities, met the requirements stated by the owner
verification
an examination to confirm that an activity, a product or a service is in accordance with specified
requirements
Guidance note:
The examination should be based on information, which can be proved true, based on facts obtained through
observation, measurement, test or other means.
ISO 8402: 1994: Verification: Confirmation by examination and provision of objective evidence that specified
requirements has been fulfilled.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
competent
person
person, organisation or unit who has sufficient theoretical knowledge and practical experience to examine
and judge the technical safety of lifting appliances, in order to issue reports and certificates
Guidance note:
The term competent person corresponds to the term Enterprice of Competence (EOC) used by The Offshore
Mechanical Handling Committee (OMHEC). In some countries the Authorities require that the Competent person
shall be certified, authorised or accredited.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
assessment
codes
codes used in this document to describe the type and extent of assessment during risk based verification
Service specification — DNVGL-SE-0480. Edition July 2017
Page 13
Verification of lifting appliances for the oil and gas industry
DNV GL AS
1.5.4.1
Table 1-4 Assessment codes
Code
I
Legend
For information only
R1
review of principles and general aspects
R2
Review of principles, general aspects and spot check of calculations
S1
Surveillance on a visit basis, e.g. once per week or sample review 10-20%
S2
Surveillance frequency minimum once per day or review of 50-60%
S3
Surveillance frequency minimum once per shift or review of 100% of items
A
Audit
H
Hold point
1.5.5 References
—
—
—
—
CEN standards
Norsok standards
ISO standards
API codes.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 14
Verification of lifting appliances for the oil and gas industry
DNV GL AS
SECTION 2 SERVICE OVERVIEW
2.1 General
2.1.1 Objectives
2.1.1.1 The objectives of this section are to provide:
— an overview all verification activities relating to lifting appliances
— details of DNV GL’s verification services for lifting appliances.
2.2 Service process
2.2.1 General principles
2.2.1.1 The description of the process of DNV GL’s verification of lifting appliances is based on distinct
project phases and the recognition of key milestones.
2.2.1.2 Verification performed by DNV GL normally progresses through one or more of these project phases
and may include all or selected aspects of the project.
2.2.1.3 The risk based verification process is described in relation to the normal project phases:
Project initiation:
— conceptual design.
Project realisation:
—
—
—
—
detail design
construction and factory acceptance test
installation and commissioning
issue of certificates enabling for operation.
Project operation:
— operation
— maintenance
— repair.
Project abandonment:
— decommissioning
— removal.
2.2.2 Simplified verification planning
2.2.2.1 The steps in the simplified verification planning are as follows:
— Use trigger questions to assess the overall risk level of the project (or manageable elements thereof).
— Evaluate the risk against the relevant owner or project acceptance criteria (often this can be directly tied
to the owner core values or a sub-set of these) and decide whether the general verification involvement
shall be low, medium or high.
— Use the example detailed scope of work tables in App.B to make a first draft of a verification plan
Service specification — DNVGL-SE-0480. Edition July 2017
Page 15
Verification of lifting appliances for the oil and gas industry
DNV GL AS
— Generate the project specific verification plan by including a project specific engineering judgment or risk
analysis to adjust the table to suit the project.
— Perform the verification execution according to the verification plan, making revision to the plan if and
when necessary.
— Report the verification.
2.2.2.2 The trigger questions are included in App.A.
2.2.2.3 Generic scopes of work for verification at the three levels of verification; low (L), medium (M) and
high (H), are given in the tables in this section.
2.2.2.4 Project specific detailed scope of work descriptions, based on the generic scopes of work tables and
showing all the activities to be verified, should be made. Examples of the level of detail are given in App.B.
2.2.2.5 Tables in this section give the principle differences between the levels of verification involvement.
The detailed example tables should be treated as examples only. They shall not be used without a project
specific confirmation of their completeness.
2.2.2.6 The project specific scope of work definition, derived from the tables in App.B (or similar), shall be
part of the final DNV GL verification report.
2.2.3 Selection of level of verification
2.2.3.1 The selection of the level of verification for the simplified verification planning is facilitated by the
trigger questions included in App.A.
2.2.4 Codes, standards and reference documents
2.2.4.1 The verification process described in this DNVGL-SE-0480 is not tailored to a specific technical
standard, code or reference document.
2.2.4.2 It is recommended to use internationally recognised codes or standards. Where combinations of
standards and external criteria are used the exact terms of reference and documents to be issued shall be
agreed at the beginning of the project and formally defined in the contract.
2.2.4.3 It is recommended strongly not to mix standards due to the possible differences in safety
philosophies.
Guidance note:
Most standards are a coherent collection of requirements for all the relevant aspects of a lifting appliance. These aspects, e.g. load
and resistance, are normally among themselves adjusted to give an overall acceptable safety level. To pick requirements from
different standards can then easily result in unpredictable and non-uniform levels of safety.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
2.3 Project initiation
2.3.1 Verification during conceptual design
2.3.1.1 Verification during the conceptual and/or feasibility studies of a project and in the early stages of a
project may reduce the need for verification during the design, construction and installation phases, and can
reduce costs during the long term operation, inspection and maintenance phases.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 16
Verification of lifting appliances for the oil and gas industry
DNV GL AS
2.3.1.2 It is recommended to combine the design verification during project initiation phase with additional
review of:
— project schedule
— cost impacts
— business risks.
2.3.1.3 During this phase it may be beneficial to make an initial verification plan. Risk evaluations are carried
out during this phase and should be used to get an indication of the general verification level; Low, Medium
or High.
2.4 Project realization
2.4.1 General
2.4.1.1 All design, construction and installation aspects, relevant to a lifting appliance, may be covered by
the life cycle verification.
2.4.1.2 In this specification the split in the scope of work between design, construction and installation is
made between sets of requirements (specifications) developed during the various phases.
Guidance note:
The split between design, construction and installation may vary, but it is useful to spend some time on the definition to reduce
interface problems later.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
2.4.2 Verification of overall project management
2.4.2.1 Verification of the overall project management is the examination of the means of controlling the
entire process leading up to an operational lifting appliance.
2.4.2.2 This verification should confirm that the necessary controls are in place to ensure information flow
across the various interfaces. It is especially important where separate contractors have been employed for
different phases of the project such as design, construction and installation.
2.4.2.3 Typically the documentation is expected to be in line with ISO 9000 requirements.
2.4.2.4 Definition of scope of work for verification of overall project management shall follow Table 2-1.
Table 2-1 Scope of work for verification of overall project management
Level
Verification activity
Low
Med
High
X
X
Review of the project management process by
— review of project quality management documentation
— audit of project quality management system
X
— review of sub-contractor control
X
Service specification — DNVGL-SE-0480. Edition July 2017
Page 17
Verification of lifting appliances for the oil and gas industry
DNV GL AS
2.4.2.5 The verification of the overall project management quality system and documentation is optional.
The reviews and audits should typically be performed if an extensive verification of a project is performed,
while might be omitted for smaller sub-phase verifications.
2.4.3 Verification during design
2.4.3.1 Design verification is the examination of the assumptions, methods and results of the design process
and is performed at the specified level of verification to ensure that the specified performance requirements
of the lifting appliance will be achieved.
2.4.3.2 Design verification should consist of one, or some, of the following:
—
—
—
—
—
review
review
review
review
review
of
of
of
of
of
the design process
specifications for design (asset specifications)
design reports and drawings
diagrams and descriptions
specifications for construction, installation and operation, resulting from design.
2.4.3.3 The documents that shall be produced in the project should as a minimum satisfy the requirements
of the selected code.
2.4.3.4 Definition of scope of work for verification of design should follow Table 2-2.
2.4.3.5 Design documentation may depend on the complexity of the lifting appliance consist of the following:
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
name and address of the manufacturer, vendors, client, crane owner and intended location (if known)
specifications for design, i.e. regulations, standards, codes, and client specifications (optional)
design criteria including design temperature, environmental influences, and area classifications
load ratings
classification of structures, mechanisms and systems
general arrangement of the lifting appliance including rigging/reeving plans
info regarding personnel lifting, if applicable
detailed construction drawings on all elements concerning technical safety
structural design calculations, including failure curves, if applicable
machinery design calculations
system design calculations
fire and gas protection drawings and descriptions
noise protection plans and drawings
drawings and specifications for electrical components
cable and piping specifications
prime and secondary movers, such as diesel engines, el. motors, hydraulic pumps etc.
operational limitations including overload protection system calculations if applicable
specifications for construction including material specifications, welding specifications, NDE-extent
programme for functional and load tests
fabrication plans and schedules
drawings of marking
operation and maintenance manual.
2.4.3.6 The documents that shall be produced in the project and handed over to DNV GL shall enable for the
selected level of verification, see Table 2-2 and should as a minimum satisfy the requirements of the selected
code.
2.4.3.7 Definition of scope of work for verification of design should follow Table 2-2.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 18
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Table 2-2 Scope of work for verification of design
Level
Verification activity
Low
Med
High
Review of the design process by
X
— review of design quality management documentation
Review of specifications for design by
X
X
X
X
X
X
— review of the risk assessment reports, including acceptance requirements and
results
X
X
— spot check of critical aspects
X
X
— review of the design specifications, i.e. regulations, standards, codes and client
specifications (optional)
— review of the design basis with emphasis on the design criteria and classifications
Review of design risk assessment
X
— evaluation of critical aspects, including SHE as identified in the risk assessment
reports
Review of drawings, diagrams and documentation by
— review of the formal documentation to ensure that the requirements have been
accounted for in design and that the chosen design philosophies are in accordance
with specified codes and standards
X
— evaluation of the main methods used and spot checks of the input data and the
calculation results
X
X
X
X
X
— detailed review of main design reports
— detailed review of the foundation reaction forces
X
X
X
— detailed review of the user manual
X
X
X
Guidance note:
Design verification activities may be split up between basic design and detailed design, or other sub-phases, depending on type of
contract.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
2.4.4 Verification during construction and factory acceptance test
2.4.4.1 This phase comprises prefabrication, fabrication, assembly, erection and Factory acceptance Test.
An important element is to ensure that the contractual design requirements are incorporated in the purchase
documentation, and that correct materials, components and proper testing procedures are applied such that
it meets the requirements as per approved specifications and procedures. It is recommended that relevant
preparations for this is started as early as possible, e.g. by the appointment of a vendor supply verification
co-ordinator.
2.4.4.2 Verification during construction and factory acceptance test is carried out by means of attendance,
audits, inspection or spot checks of the work as well as witnessing of factory acceptance test, as appropriate,
in sufficient detail to ensure that the specified requirements of the lifting appliance will be achieved.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 19
Verification of lifting appliances for the oil and gas industry
DNV GL AS
2.4.4.3 Verification of these activities relates not only to the manufacturers work but also to the monitoring
of this work carried out by vendors and contractors others.
2.4.4.4 Construction and factory acceptance test verification may consist of one, or some, of the following:
—
—
—
—
—
—
—
—
reviewing the quality assurance system documentation adopted by the manufacturer and vendors
reviewing the construction process
reviewing construction procedures
reviewing qualification process
reviewing manufacturer survey arrangements, if applicable
surveillance during construction activities
witnessing during factory acceptance test
reviewing final documentation.
2.4.4.5 The documentation that should be submitted for review are typically:
— manufacturing quality system documentation
— manufacturing procedures, including test requirements and acceptance criteria, repairs, personnel
qualification records etc.
— material certificates
— test and calibration records
— dimensional measurement reports
— welding documentation incl. NDE reports
— noise and vibration records.
2.4.4.6 Particularly for the factory acceptance test it is highly recommended to prepare a formal test
procedure be verified prior to commencement.
2.4.4.7 Scope of work for verification of construction should follow Table 2-3 for manufacturing and
fabrication and Table 2-4 for FAT.
Table 2-3 Scope of work for verification of manufacturing and fabrication
Level
Verification activity
Low
Med
High
X
X
Review of the manufacturing and fabrication process
— Review of manufacturing and fabrication quality management systems
X
— Audit of the quality management system
Review of manufacturing and fabrication procedures
X
— Review of the design verification report
X
X
— Review manufacturing, fabrication and inspection procedures for confirmation of
compliance with the manufacturing specification
Surveillance during manufacturing and fabrication activities
— Visit-based or full-time attendance during manufacturing and fabrication to ensure,
based on spot checks, that the components and assemblies have been produced in
accordance with the manufacturing specification
X
X
Review of fabrication records
Service specification — DNVGL-SE-0480. Edition July 2017
Page 20
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Level
Verification activity
Low
Med
High
— Review the manufacturing data book, as applicable
X
X
— Review of formal documentation
X
X
Guidance note:
Materials and components may be ordered with certificates of varying degrees of independent 3rd party verification This may be
integrated in the overall verification activities, so not to duplicate work.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Table 2-4 Scope of work for verification of factory acceptance tests
Level
Verification activity
Low
Med
High
X
X
— Surveillance to ensure that the assembly, erection, rigging and configuration,
complies with the test procedure requirements
X
X
— Survey of the main elements to verify compliance with the construction
requirements
X
X
— Survey of testing to ensure that the results comply with the test procedure
requirements regarding safety aspects
X
X
Review of test programme and preparations for testing
— Review the FAT programme for confirmation of compliance with the requirements
and specifications
Surveillance during testing
— Survey of testing to ensure that the results comply with the test procedure
requirements regarding performance, endurance and SHE aspects
X
2.4.5 Verification during installation and commisioning
2.4.5.1 This phase comprises shipment, installation, testing and commissioning in conjunction with hand
over of the lifting appliance to the user and to bring the lifting appliance into use for the first time.
2.4.5.2 An important element is to ensure that the lifting appliance as installed on its final location meets
the requirements in the regulations and as per approved specifications and procedures. It is imperative that
relevant preparations for this is started as early as possible, e.g. by the appointment of a installation and
commissioning responsible co-ordinator.
2.4.5.3 Verification during installation and commissioning is carried out by means of attendance, audits,
inspection or spot checks of the work as well as witnessing of function and overload testing, as appropriate,
in sufficient detail to ensure that the specified requirements of the lifting appliance will be achieved.
2.4.5.4 Verification of these activities relates not only to the manufacturers work but also to the monitoring
of the work carried out by vendors installation contractors and others.
2.4.5.5 Installation and commissioning test verification shall consist of one, or some, of the following:
Service specification — DNVGL-SE-0480. Edition July 2017
Page 21
Verification of lifting appliances for the oil and gas industry
DNV GL AS
—
—
—
—
—
—
reviewing the installation and commissioning plans
reviewing installation and commissioning procedures
reviewing qualification process
surveillance during installation activities
witnessing during function and overload test
reviewing final documentation.
2.4.5.6 The documents that should be produced in the project and submitted for review prior to installation
and commissioning are typically:
— quality plans
— installation procedures, including test requirements and acceptance criteria, repairs, personnel
qualification records etc
— welding documentation including NDT reports
— pressure testing procedures
— pretensioning procedures
— piping and cabling hook up procedures
— access and maintenance plans and
— manufacturer’s/installers quality system manual.
2.4.5.7 Particularly for the commisioning acceptance test it is highly recommended to prepare a formal test
procedure be verified prior to commencement.
2.4.5.8 The as-built documentation to be submitted after installation include but not be limited to:
—
—
—
—
—
installation records, i.e. dimensional reports, hook up test reports, personnel qualification records etc
material certificates
welding records, oil test samples, heat treatment etc.
vibration and noise reports
commissioning report.
2.4.5.9 Definition of scope of work for verification of installation and commissioning should follow Table 2-5
for testing and completion.
Table 2-5 Scope of work for verification during installation and commissioning
Level
Verification activity
Low
Med
High
X
X
X
X
Initial activities
— Review of quality system documentation
X
— Review of previous verification reports
X
— Review of qualification records
Surveillance during installation activities
— Part time attendance during installation to verify that the foundation, interface
connection, access and escape routes are properly installed
X
X
X
X
Review of installation documentation
X
— Review of foundation design report
Service specification — DNVGL-SE-0480. Edition July 2017
Page 22
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Level
Verification activity
Low
Med
High
X
X
X
X
X
X
— Review of installation records and reports
— Surveillance during test activities
— Witnessing of installation and commissioning testing regarding safety and integrity
X
— Witnessing of SHE aspects, performance and endurance testing
Review of final documentation
X
— Spot check of as-built documentation
X
X
— Review of as-built documentation
— Review of formal documentation, i.e. EC Declaration of Conformity, if applicable
X
X
X
— Review of user instructions
X
X
X
— Review of former ILO certificates, if applicable
X
X
X
2.4.6 Verification at issuance of certificate of lifting appliance
2.4.6.1 This phase comprises final issuance of the certificate of lifting appliance which is required to bring
the lifting appliance into use for the first time.
2.4.6.2 The scope of this verification is to summarise all previous verification activities and issue the
required certification documents as competent person.
2.4.6.3 Verification at issuance of the certificate of lifting appliance shall consist of some or all of the
following activities:
—
—
—
—
reviewing the design verification reports
reviewing the construction and FAT reports, including
component and product certificates and former ILO certificates
reviewing installation and commissioning reports, including modification/repair reports, and upgrading
documentation, if relevant.
2.4.6.4 The scope of work for verification at issuance of certificate of lifting appliance shall follow Table 2-6.
If a certain verification level is aimed for to be stated on the certificate, this verification level as a minimum
has to be followed in the previous verification phases.
Table 2-6 Scope of work for final issuance of certificate of lifting appliance
Level
Verification level applied stated on the certificate
Low
— Verification of project management
Med
High
M/H
H
— Design verification report
L/M/H
1)
M/H
H
— Construction and FAT report
L/M/H
2)
M/H
H
Service specification — DNVGL-SE-0480. Edition July 2017
Page 23
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Level
Verification level applied stated on the certificate
— Installation and commissioning report
1)
2)
Low
Med
High
L/M/H
M/H
H
The design verification activity may be carried out during installation and commissioning.
The low level verification during construction and FAT does not involve DNV GL.
2.5 Verification documents
2.5.1 General
2.5.1.1 The hierarchy of verification document is given in DNVGL-SE-0474. The descriptions of the content of
these documents as well as examples of document forms are given in App.C to this specification.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 24
Verification of lifting appliances for the oil and gas industry
DNV GL AS
APPENDIX A SELECTION OF VERIFICATION LEVEL
A.1 General
A.1.1 General principles
A.1.1.1 The selection of the level of verification depends on the risk level of each of the elements that have
an impact on the management of risks to the asset.
A.1.1.2 Verification shall direct greatest effort at those elements of the asset where the risk is highest and
whose failure or reduced performance will have the most significant impact on the project objective and
goals, e.g.:
— safety risks,
— environmental risks,
— economic/business risks.
A.1.1.3 Suitable selection factors include, but are not limited to, the:
—
—
—
—
—
—
overall safety and other objectives for the asset
assessment of the risks associated with the asset and the measures taken to reduce these risks
degree of technical innovation in the asset
experience of the contractors in carrying out the work
quality management systems of the owner and its contractors
business risk associated with schedule impact and rework.
A.1.1.4 Due to the diversity of various lifting appliances, their contents, their degree of innovation,
the geographic location, etc., it is not possible to give precise guidelines on how to decide what level of
verification is appropriate for each particular structure.
A.1.1.5 Therefore, guidance is given in the form of a series of questions that should be answered when
deciding the appropriate level of verification for a process facility. This list is not exhaustive and other
questions should be added to the list if appropriate for a particular process facility.
A.1.1.6 It is emphasised that the contribution of each element should be judged qualitatively and/or
quantitatively. Wherever possible quantified risk assessment data should use to provide a justifiable basis for
any decisions made.
A.1.1.7 Depending on the stage of the project, the activities may not have taken place yet in which case the
questions should also be posed in another form, i.e. “Is …. planned to be?”
A.2 Trigger questions
A.2.1 Overall project objective and goals
— Does the safety objective address the main safety goals?
— Does the safety objective establish acceptance criteria for the level of risk acceptable to the owner?
— Is this risk (depending on the type of appliance and its location) also measured in terms of environmental,
economic and political consequences?
— In terms of scope of work is the project schedule realistic?
— Does the contract place severe financial penalties if target dates for commissioning are not met?
Service specification — DNVGL-SE-0480. Edition July 2017
Page 25
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Guidance note:
Substitute safety objective with other relevant objectives for the project, and go through all of them.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
A.2.2 Assessment of risk
— Has a systematic review been carried out to identify and evaluate the probabilities and consequences of
failures in the lifting appliance?
— Has this review judged the contribution of each element qualitatively and/or quantitatively and used,
where possible, quantified risk assessment data to provide a justifiable basis for any decisions made?
— Does the extent of the review reflect the risk level of the lifting appliance, the planned operation and
previous experience with similar appliances?
— Does this review identify the risk to the operation of the lifting appliance and to the health and safety of
personnel associated with it or in its vicinity?
— Has the extent of the identified risks been reduced to a level as low as reasonably practicable by means of
one or both of:
— reduction in the probability of failure?
— mitigation of the consequences of failure?
— Has the result of the systematic review of the risks been measured against the owner’s safety (or other)
objective?
— Has the result of this review been used in the selection of the appropriate verification activity level?
— In terms of schedule which are the items which have a significant impact?
A.2.3 Technical innovation
— Has the degree of technical innovation in the lifting appliance design been considered?
— Has it been considered that risks to the structure are likely to be greater with a high degree of technical
innovation than with an appliance designed, fabricated and installed to usual/typical criteria?
— Have factors been considered in the selection of the appropriate verification level such as:
— degree of difficulty in achieving technical requirements?
— knowledge of similar solutions?
A.2.4 Contractors’ experience
— Has the degree of risk to the design/fabrication and installation been considered with respect to the
experience of the manufacturer/contractor?
— Has the degree of risk been considered where the manufacturers/contractors are experienced but not in
similar work?
— Has the degree of risk been considered where the work schedule is tight?
A.2.5 Quality management systems
— Have all parties involved in the project implemented an adequate quality management system to ensure
that gross errors in the work are limited?
— Do these parties include the:
— owner
— design contractor
Service specification — DNVGL-SE-0480. Edition July 2017
Page 26
Verification of lifting appliances for the oil and gas industry
DNV GL AS
—
—
—
—
construction contractors
vendors
installation contractor
operator.
— Do the factors being considered when evaluating the adequacy of the quality management system
include:
—
—
—
—
—
whether or not an ISO 9000 or equivalent certified system is in place?
results from external audits?
results from internal audits?
experience with contractors’ previous work?
project work force familiarity with the quality management system?
A.2.6 Simplified assessment and verification level
See Table E-2.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 27
Verification of lifting appliances for the oil and gas industry
DNV GL AS
APPENDIX B DETAILED EXAMPLE SCOPE OF WORK TABLES FOR
VERIFICATION
B.1 General
B.1.1 General introduction
B.1.1.1 This appendix provides the format of the detailed verification lists (tables), generated for typical
systems comprising a lifting facility:
1)
2)
3)
4)
5)
6)
cranes
lifting accessories
lifting appliances for life saving equipment
lifting person devices
drilling hoisting equipment
robots.
which shall be made for each particular project.
B.1.1.2 The detailed project specific verification lists for the chosen level of verification shall be based on
these tables.
B.1.1.3 For project scenarios or components not covered in this appendix, similar lists with the same degree
of detail shall be made.
B.1.1.4 If any of the activities are moved from one phase to another, then this should be clearly identified on
the list where it is removed. Similarly, the detailed list for the phase to where it is moved shall be amended.
Guidance note:
Typically, contractual boundaries may give natural splits of activities between phases. However, then it is even more important to
ensure that there is a traceably as to which phases what activity belong and that this is also conveyed to the contractors also.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
B.2 Description of terms used in the scope of work tables
B.2.1 General
B.2.1.1 The following abbreviations have been used. The definitions of which are given subsequently:
—
—
—
—
—
A is audit
S is surveillance
H is hold point
R is review
I is for information.
B.2.1.2 These abbreviations are DNV GL’s preferred terms and normally will be used in DNV GL generated
documents. However, other terms, for example monitoring or witnessing, will be used by DNV GL if these
are the terms commonly used in documents, such as inspection and test plans, generated by others. In that
case, it is expected that these other terms are defined in these documents.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 28
Verification of lifting appliances for the oil and gas industry
DNV GL AS
B.2.2 Audit
B.2.2.1 Systematic and independent examination to determine whether quality activities and related results
comply with planned arrangements and whether these arrangements are implemented effectively and are
suitable to achieve objectives (ISO 8402:1994).
Guidance note:
This activity differs from the surveillance by being focused on the adherence to and completeness and robustness of the
procedures and not on the actual result of the procedure (although this is not ignored). Further, the audit is normally a ‘one-off’
activity as opposed to the continuity in monitoring.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
B.2.3 Surveillance
B.2.3.1 Continual monitoring and verification of the status of an entity and analysis of records to ensure that
specified requirements are being fulfilled (ISO 8402:1994).
Guidance note:
Other commonly used terms for surveillance are monitoring or witnessing.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
B.2.3.2 The amount of work involved in surveillance is not described in detail in the tables. This shall be part
of the final contractual scope of work which shall define the frequency of surveillance based on the overall
surveillance and the quality control performed by other parties as well as DNV GL’s experience.
B.2.3.3 The following shall be used to describe the frequency if nothing else is specifically defined:
S1
S2
S3
= surveillance on a visit basis, e.g. once per week or sample review 10-20%
= surveillance frequency minimum once per day or review of 50-60%
= surveillance frequency minimum once per shift or review of 100% of items
Guidance note:
These surveillance frequencies may be modified to correspond with production work flow.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
B.2.4 Review
B.2.4.1 Systematic examination of reports and documentation against a project defined verification basis.
The depth of review will depend both on the type of document and the level of involvement.
B.2.4.2 The following shall be used to describe the extent of the review if nothing else is specifically defined:
I
R1
R2
= for information only
= review of principles and general aspects
= Review of principles, general aspects and spot check of calculations
Guidance note:
Review of production records does not guarantee their correctness. It is a confirmation to DNV GL that the manufacturer and/or
sub-contractor has preformed the required activity and issued a report.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Service specification — DNVGL-SE-0480. Edition July 2017
Page 29
Verification of lifting appliances for the oil and gas industry
DNV GL AS
B.2.4.3 Reports that are reviewed by DNV GL will, unless otherwise agreed, not be signed and stamped.
Table B-1 Assessment codes
Code
I
Legend
For information only
R1
Review of principles and general aspects
R2
Review of principles, general aspects and spot check of calculations
S1
Surveillance on a visit basis, e.g. once per week or sample review 10-20%
S2
Surveillance frequency minimum once per day or review of 50-60%
S3
Surveillance frequency minimum once per shift or review of 100% of items
A
Audit
H
Hold point
B.3 Overall project management
B.3.1 General
B.3.1.1 The project quality management documentation, if part of scope, should be available for review at
the early stages of the project, preferably before design is underway, to ensure that the necessary controls
are in place.
Table B-2 Overall project management
Item
Description
Level
Low
1
review of project quality management documentation
2
audit of project quality management system
3
review of sub-contractor control
4
review of interface controls
5
review of methods of information flow
Med
High
R2
R2
A
R2
R1
R2
R1
B.4 Design
B.4.1 General
B.4.1.1 Design consists of conceptual and detailed design and their associated documentation.
B.4.1.2 The scope of work for design verification is shown in tables listed in this chapter, for various types
of lifting appliances. The tables states a recommended scope of work for low, medium and high level
Service specification — DNVGL-SE-0480. Edition July 2017
Page 30
Verification of lifting appliances for the oil and gas industry
DNV GL AS
verification, and may be changed upon an agreement between the client and DNV GL based on the method
listed in App.A.
B.4.1.3 For manufacturers and vendors who have established a DNV GL approved ISO9000 quality system
covering design of lifting appliances, this may reduce the scope of work accordingly, upon agreement with
DNV GL. App.B describes the issues to be reviewed and the extent of verification included in the three
verification levels.
B.4.2 Verification during design
B.4.2.1 For verification of lifting appliances during design the following activities are considered:
— initial activities
— review activities
— final activities.
The initial activities includes a review of basic project information, design criteria and the design quality
management system of the designer. The review activities include evaluation of documentation related to the
design of the lifting appliance. The final activities include issuance of a design verification report.
B.4.3 Low level design verification
B.4.3.1 The low level design verification consists of a minimum verification involvement in order for DNV
GL to issue a design verification report. Provided that the proceeding verification activities are performed
during construction, FAT, installation and commissioning, a DNV GL certificate of lifting appliance may finally
be issued. The ow level verification scheme is based that the risks associated with potential faulty design is
considered to be low, typically for smaller, low capacity lifting appliances. The client may find internal control
measures sufficient and choose a low level design verification based on formal requirements towards the
designer, such as quality assurance requirement, internal verification or EC Declaration of Conformity issued
by the manufacturer. Low level design verification will imply that the manufacturer is the sole responsible for
the technical construction file, and that a very limited extent of documentation is subject for design review.
B.4.4 Medium level design verification
B.4.4.1 Medium level design verification consists of a review of main design documents related to safety
and integrity. Critical aspects will be spot checked with focus on strength and integrity. The review will be
detailed for high risk aspects and independent checks will be performed. The medium level design verification
corresponds to the ILO certification scheme applied world wide in the maritime area. See DNVGL-ST-0377
Standard for shipboard lifting appliances or DNVGL-ST-0378 Standard for offshore and platform lifting
appliances.
B.4.5 High level design verification
B.4.5.1 High level design verification consists of a full review of most of the produced documents related to
safety and integrity, including SHE aspects, performance and endurance of the lifting appliance. The main
specifications are also checked. The review will be detailed for all high risk aspects and independent checks
will be performed. Less critical aspects will be spot checked. High level design verification is recommended
for lifting appliances representing high risks, such as high capacity cranes, cranes lifting over process areas,
cranes lifting persons, etc.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 31
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Table B-3 Crane verification during design
Item
Level
Description
Low
Med
High
Initial activities
1
Review of basic information, name of address of designer, manufacturer,
vendors, user and intended location, if known
I
I
I
2
Review of design specifications, i.e. regulations, standards, codes and client
specifications, if applicable
I
R1
R2
3
Review of design criteria, including design temperature, environmental
influences, area classifications, design classifications of structures, mechanisms
and systems
R1
R1
R2
4
Review of design quality management system
-
R1
R2
5
Review of technical risk assessment report
-
-
R2
6
Technical design verification kick-off meeting
-
-
H
Review activities
7
Review of general arrangement, rigging and reeving plan
R1
R2
R2
8
Review of ratings, load charts and lifting tables, speeds and operational
limitations
R1
R2
R2
9
Review info on personnel lifting, if applicable
R1
R2
R2
10
Review of detailed construction drawings and design calculations on all structural
elements essential for strength and safety
-
R1
R2
11
Review of diagrams and calculations for sequence of failure, if applicable
-
R1
R2
12
Review of detailed drawings, calculations and documentation on all machinery
elements and components essential for strength and safety
-
R1
R2
13
Review of performance capacity and endurance calculations
-
-
R1
14
Review of detailed drawings, diagrams and calculations on all system elements
essential for technical safety
-
R1
R2
15
Review of control and work position including all SHE aspects
-
R1
R2
16
Review of control system documentation, including PLC programs if applicable
-
R1
R2
17
Review of safety system documentation including PLC programs if applicable
-
R1
R2
Review of communication and utility systems documentation
-
R1
R1
19
Review of fire and explosion protection drawings and descriptions
-
R1
R2
20
Review of noise and vibration protection drawings and descriptions
-
R1
R2
21
Review of electrical drawings and diagrams including EMC
-
R1
R2
22
Review of cabling and termination specification and arrangement drawings
-
-
R1
23
Review of piping specification and arrangement drawings
-
-
R1
24
Review of access and escape routes arrangement drawings
-
R1
R2
8
Service specification — DNVGL-SE-0480. Edition July 2017
Page 32
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
25
Review of control station and work positions arrangement drawings
-
R1
R2
26
Review of FAT test programmes and commissioning test programmes
-
R1
R2
27
Review of labelling and marking documentation
-
R1
R1
28
Review of corrosion protection documentation
-
-
R1
29
Review of vendor documentation, including product certificates
-
R2
R2
30
Review of foundation reaction forces
R2
R2
R2
31
Review of fabrication specifications, plans and schedules
-
I
I
32
Review of user manual including operating instructions, emergency procedures
and maintenance instructions
R2
R2
R2
33
Review of EC declaration of conformity, if applicable
R2
R2
R2
34
Review of notified body certificates or statements, if applicable
R2
R2
R2
H
H
H
Final activities
35
Issue design verification report
Table B-4 Lifting accessories verification during design
Item
Level
Description
Low
Med
High
Initial activities
1
Review of basic information, name of address of designer, manufacturer, vendors,
user and intended location, if known
I
I
I
2
Review of design specifications, i.e. regulations, standards, codes and client
specifications, if applicable
I
R1
R2
3
Review of design criteria, including design temperature, environmental
influences, area classifications, design classifications of structures, mechanisms
and systems, if applicable
R1
R1
R2
4
Review of design quality management system
-
R1
R2
5
Review of technical risk assessment report
-
-
R2
6
Technical design verification kick-off meeting
-
-
H
Review activities
7
Review of general arrangement, rigging and reeving plan
R1
R2
R2
8
Review of ratings, load charts and lifting tables and operational limitations
R1
R2
R2
9
Review info on personnel lifting, if applicable
R1
R2
R2
-
R1
R2
10
Review of detailed construction drawings and design calculations on all structural
elements essential for strength and safety
Service specification — DNVGL-SE-0480. Edition July 2017
Page 33
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
11
Review of detailed drawings, calculations and documentation on all machinery
elements and components essential for strength and safety
-
R1
R2
12
Review of performance capacity and endurance calculations
-
-
R1
13
Review of detailed drawings, diagrams and calculations on all system elements
essential for technical safety
-
R1
R2
14
Review of control and work position including all SHE aspects
-
R1
R2
15
Review of control system documentation, including PLC programs if applicable
-
R1
R2
16
Review of safety system documentation including PLC programs if applicable
-
R1
R2
17
Review of communication and utility systems documentation
-
R1
R1
18
Review of electrical drawings and diagrams, including EMC
-
R1
R2
19
Review of cabling and termination specification and arrangement drawings
-
-
R1
20
Review of piping specification and arrangement drawings
-
-
R1
21
Review of corrosion protection documentation
-
-
R1
22
Review of FAT test programmes and commissioning test programmes
-
R1
R2
23
Review of labelling and marking documentation
-
R1
R1
24
Review of vendor documentation, including product certificates
-
R2
R2
25
Review of suspension reaction forces
R2
R2
R2
26
Review of fabrication specifications, plans and schedules
-
I
I
27
Review of user manual including operating instructions, emergency procedures
and maintenance instructions
R2
R1
R2
28
Review of EC declaration of conformity, if applicable
R2
R1
R1
29
Review of notified body certificates or statements, if applicable
R2
R2
R2
H
H
H
Final activities:
30
Issue design verification report
Table B-5 Lifting appliances for life saving equipment verification during design
Item
Level
Description
Low
Med
High
Initial activities
1
Review of basic information, name of address of designer, manufacturer,
vendors, user and intended location, if known
I
I
I
2
Review of design specifications, i.e. regulations, standards, codes and client
specifications, if applicable
I
R1
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 34
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
R1
R1
R2
3
Review of design criteria, including design temperature, environmental
influences, area classifications, design classifications of structures, mechanisms
and systems
4
Review of design quality management system
-
R1
R2
5
Review of technical risk assessment report
-
-
R2
6
Technical design verification kick-off meeting
-
-
H
Review activities
7
Review of general arrangement, rigging and reeving plan
R1
R2
R2
8
Review of ratings, load charts and lifting tables, speeds and operational
limitations
R1
R2
R2
9
Review info on personnel lifting, if applicable
R1
R2
R2
10
Review of detailed construction drawings and design calculations on all structural
elements essential for strength and safety
-
R1
R2
11
Review of detailed drawings, calculations and documentation on all machinery
elements and components essential for strength and safety
-
R1
R2
12
Review of performance capacity and endurance calculations
-
-
R1
13
Review of detailed drawings, diagrams and calculations on all system elements
essential for technical safety
-
R1
R2
14
Review of control and work position including all SHE aspects
-
R1
R2
15
Review of control system documentation, including PLC programs if applicable
-
R1
R2
16
Review of safety system documentation, including PLC programs if applicable
-
R1
R2
17
Review of communication and utility systems documentation
-
R1
R1
18
Review of fire and explosion protection drawings and descriptions
-
R1
R2
19
Review of noise and vibration protection drawings and descriptions
-
R1
R2
20
Review of electrical drawings and diagrams including EMC
-
R1
R2
21
Review of cabling and termination specification and arrangement drawings
-
-
R1
22
Review of piping specification and arrangement drawings
-
-
R1
23
Review of access and escape routes arrangement drawings
-
R1
R2
24
Review of control station and work positions arrangement drawings
-
R1
R2
25
Review of FAT test programmes and commissioning test programmes
-
R1
R2
26
Review of labelling and marking documentation
-
R1
R1
27
Review of corrosion protection documentation
-
-
R1
28
Review of vendor documentation, including product certificates
-
R2
R2
29
Review of foundation reaction forces
R2
R2
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 35
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
-
I
I
30
Review of fabrication specifications, plans and schedules
31
Review of user manual including operating instructions, emergency procedures
and maintenance instructions
R2
R2
R2
32
Review of EC declaration of conformity, if applicable
R2
R2
R2
33
Review of notified body certificates or statements, if applicable
R2
R2
R2
H
H
H
Final activities:
34
Issue design verification report
Table B-6 Lifting person devices verification during design
Item
Level
Description
Low
Med
High
Initial activities
1
Review of basic information, name of address of designer, manufacturer,
vendors, user and intended location, if known
I
I
I
2
Review of design specifications, i.e. regulations, standards, codes and client
specifications, if applicable
I
R1
R2
3
Review of design criteria, including design temperature, environmental
influences, area classifications, design classifications of structures, mechanisms
and systems
R1
R1
R2
4
Review of design quality management system
-
R1
R2
5
Review of technical risk assessment report
-
-
R2
6
Technical design verification kick-off meeting
-
-
H
Review activities
7
Review of general arrangement, rigging and reeving plan
R1
R2
R2
8
Review of ratings, load charts and lifting tables, speeds and operational
limitations
R1
R2
R2
9
Review info on personnel lifting
R1
R2
R2
10
Review of detailed construction drawings and design calculations on all
structural elements essential for strength and safety
-
R1
R2
11
Review of detailed drawings, calculations and documentation on all machinery
elements and components essential for strength and safety
-
R1
R2
12
Review of performance capacity and endurance calculations
-
-
R1
13
Review of detailed drawings, diagrams and calculations on all system elements
essential for technical safety
-
R1
R2
14
Review of control and work position including all SHE aspects
-
R1
R2
15
Review of control system documentation, including PLC programs if applicable
-
R1
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 36
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
16
Review of safety system documentation including PLC programs if applicable
-
R1
R2
17
Review of communication and utility systems documentation
-
R1
R1
18
Review of fire and explosion protection drawings and descriptions
-
R1
R2
19
Review of noise and vibration protection drawings and descriptions
-
R1
R2
20
Review of electrical drawings and diagrams including EMC
-
R1
R2
21
Review of cabling and termination specification and arrangement drawings
-
-
R1
22
Review of piping specification and arrangement drawings
-
-
R1
23
Review of access and escape routes arrangement drawings
-
R1
R2
24
Review of control station and work positions arrangement drawings
-
R1
R2
25
Review of FAT test programmes and commissioning test programmes
-
R1
R2
26
Review of labelling and marking documentation
-
R1
R1
27
Review of corrosion protection documentation
-
-
R1
28
Review of vendor documentation, including product certificates
-
R2
R2
29
Review of foundation reaction forces
R2
R2
R2
30
Review of fabrication specifications, plans and schedules
-
I
I
31
Review of user manual including operating instructions, emergency procedures
and maintenance instructions
R2
R2
R2
32
Review of EC declaration of conformity, if applicable
R2
R2
R2
33
Review of notified body certificates or statements, if applicable
R2
R2
R2
H
H
H
Final activities:
34
Issue design verification report
Table B-7 Drilling hoisting equipment verification during design
Item
Level
Description
Low
Med
High
Initial activities
1
Review of basic information, name of address of designer, manufacturer,
vendors, user and intended location, if known
I
I
I
2
Review of design specifications, i.e. regulations, standards, codes and client
specifications, if applicable
I
R1
R2
3
Review of design criteria, including design temperature, environmental
influences, area classifications, design classifications of structures, mechanisms
and systems
R1
R1
R2
4
Review of design quality management system documentation
-
R1
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 37
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
5
Review of technical risk assessment report
-
-
R2
6
Technical design verification kick-off meeting
-
-
H
Review activities
7
Review of general arrangement, rigging and reeving plan
R1
R2
R2
8
Review of ratings, load charts and lifting tables, speeds and operational
limitations
R1
R2
R2
9
Review info on personnel lifting, if applicable
R1
R2
R2
10
Review of detailed construction drawings and design calculations on all
structural elements essential for strength and safety
-
R1
R2
11
Review of detailed drawings, calculations and documentation on all machinery
elements and components essential for strength and safety
-
R1
R2
12
Review of performance capacity and endurance calculations
-
-
R1
13
Review of detailed drawings, diagrams and calculations on all system elements
essential for technical safety
-
R1
R2
14
Review of control and work position including all SHE aspects
-
R1
R2
15
Review of control system documentation, including PLC programs if applicable
-
R1
R2
16
Review of safety system documentation including PLC programs if applicable
-
R1
R2
17
Review of communication and utility systems documentation
-
R1
R1
18
Review of fire and explosion protection drawings and descriptions
-
R1
R2
19
Review of noise and vibration protection drawings and descriptions
-
R1
R2
20
Review of electrical drawings and diagrams including EMC
-
R1
R2
21
Review of cabling and termination specification and arrangement drawings
-
-
R1
22
Review of piping specification and arrangement drawings
-
-
R1
23
Review of access and escape routes arrangement drawings
-
R1
R2
24
Review of control station and work positions arrangement drawings
-
R1
R2
25
Review of FAT test programmes and commissioning test programmes
-
R1
R2
26
Review of labelling and marking documentation
-
R1
R1
27
Review of corrosion protection documentation
-
-
R1
28
Review of vendor documentation, including product certificates
-
R2
R2
29
Review of foundation reaction forces
R2
R2
R2
30
Review of fabrication specifications, plans and schedules
-
I
I
31
Review of user manual including operating instructions, emergency procedures
and maintenance instructions
R2
R2
R2
32
Review of EC declaration of conformity, if applicable
R2
R2
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 38
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
33
Level
Description
Review of notified body certificates or statements, if applicable
Low
Med
High
R2
R2
R2
H
H
H
Final activities:
34
Issue design verification report
Table B-8 Robots verification during design
Item
Level
Description
Low
Med
High
Initial activities
1
Review of basic information, name of address of designer, manufacturer,
vendors, user and intended location, if known
I
I
I
2
Review of design specifications, i.e. regulations, standards, codes and client
specifications, if applicable
I
R1
R2
3
Review of design criteria, including design temperature, environmental
influences, area classifications, design classifications of structures, mechanisms
and systems
R1
R1
R2
4
Review of design quality management system
-
R1
R2
5
Review of technical risk assessment report
-
-
R2
6
Technical design verification kick-off meeting
-
-
H
Review activities
7
Review of general arrangement, rigging and reeving plan
R1
R2
R2
8
Review of ratings, load charts and lifting tables, speeds and operational
limitations
R1
R2
R2
9
Review of detailed construction drawings and design calculations on all
structural elements essential for strength and safety
-
R1
R2
10
Review of detailed drawings, calculations and documentation on all machinery
elements and components essential for strength and safety
-
R1
R2
11
Review of detailed drawings, diagrams and calculations on all system elements
essential for technical safety
-
R1
R2
12
Review of control system documentation, including PLC programs if applicable
-
R1
R2
13
Review of performance capacity and endurance calculations
-
-
R1
14
Review of detailed drawings, diagrams and calculations on all system elements
essential for technical safety
-
R1
R2
15
Review of control and work position including all SHE aspects
-
R1
R2
16
Review of noise and vibration protection drawings and descriptions
-
R1
R2
17
Review of electrical drawings and diagrams including EMC
-
R1
R2
18
Review of cabling and termination specification and arrangement drawings
-
-
R1
Service specification — DNVGL-SE-0480. Edition July 2017
Page 39
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
19
Review of piping specification and arrangement drawings
-
-
R1
20
Review of access and escape routes arrangement drawings
-
R1
R2
21
Review of control station and work positions arrangement drawings
-
R1
R2
22
Review of FAT test programmes and commissioning test programmes
-
R1
R2
23
Review of labelling and marking documentation
-
R1
R1
24
Review of corrosion protection documentation
-
-
R1
25
Review of vendor documentation, including product certificates
-
R2
R2
26
Review of foundation reaction forces
R2
R2
R2
27
Review of fabrication specifications, plans and schedules
-
I
I
28
Review of user manual including operating instructions, emergency procedures
and maintenance instructions
R2
R2
R2
29
Review of EC declaration of conformity, if applicable
R2
R2
R2
30
Review of notified body certificates or statements, if applicable
R2
R2
R2
H
H
H
Final activities:
31
Issue design verification report
B.5 Construction and factory acceptance test
B.5.1 General
B.5.1.1 Construction and factory acceptance test (FAT) consists of fabrication site activities and their
associated documentation.
B.5.1.2 The scope of work for verification during construction and FAT is shown in tables listed in this
chapter, for various types of lifting appliances. The tables states a recommended scope of work for low,
medium and high level verification, and may be changed upon an agreement between the client and DNV GL
based on the method listed in App.A.
B.5.1.3 For manufacturers and vendors who have established a DNV GL approved ISO9000 quality system
covering construction and FAT of lifting appliances, this may reduce the scope of work accordingly, upon
agreement with DNV GL.
B.5.1.4 For manufacturers who have established a manufacturing survey agreement (MSA) with DNV GL, in
order to systematically survey the construction and FAT activities, this arrangement may be used instead of
the verification scheme listed in this chapter, upon further agreement.
B.5.2 Construction and factory acceptance test verification
B.5.2.1 For verification of lifting appliances the following activities are considered:
— initial activities
Service specification — DNVGL-SE-0480. Edition July 2017
Page 40
Verification of lifting appliances for the oil and gas industry
DNV GL AS
— surveillance, review and test activities, and
— final activities.
B.5.2.2 The initial activities include the review of procedures, attendance during qualification of procedures
(e.g. MPQT) and personnel (e.g. welders) and other start-up activities. The surveillance, review and test
activities are the site attendance and the final activities are the review of production results/records, and the
completion of documentation and reports.
B.5.3 Low level construction and factory acceptance test verification
B.5.3.1 For low level verification, no verification activities are stated. For this verification level, it is assumed
that construction and FAT of the lifting appliance in question is associated with low risk. This may be caused
by the type and nature of the particular lifting appliance, or due to extensive internal quality assurance
measures taken by the manufacturer or the client to ensure that all requirements are met.
B.5.3.2 Some of the potential verification activities during construction and FAT for low level verification will
however be covered by verification during installation and commissioning.
B.5.4 Medium level construction and factory acceptance test verification
B.5.4.1 For medium level verification, the procedure review consists of a review of principles and general
aspects of the construction quality system, design review reports and procedures for construction and FAT.
B.5.4.2 During construction, DNV GL’s verification will be performed by part time attendance at the main
site. The verification will mainly be spot check survey of structural parts and their assembly. Further, review
of the construction records and the manufacturing record book will be reviewed by spot check.
B.5.4.3 Verification of the final activities will be carried out witnessing of safety critical parts of the FAT. An
inspection release note will then be issued.
B.5.5 High level construction verification
B.5.5.1 For high level verification, the initial activities consist of a detailed review of construction
management system and procedures. A quality audit will be performed. Design verification reports and the
FAT procedure will be reviewed. Any design changes will be required to be verified before construction.
B.5.5.2 Survey activity will include all main elements, SHE aspects, performance, endurance properties
and marking. Depending on the fabrication schedule, part or full time attendance during construction will be
required. Verification will focus on the critical items and or aspects as identified in the detailed scope of work
tables.
B.5.5.3 Verification of the final activities will be by detailed review of the production records and witnessing
of FAT during testing of safety critical aspects as well as performance and endurance tests.
B.5.5.4 Finally an inspection release note and a FAT verification report will be issued.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 41
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Table B-9 Crane verification during construction and FAT
Item
Level
Description
Low
Med
High
Initial activities
1
Review construction quality management system
-
R1
R2
2
Quality system audit of relevant manufacturers
-
-
A
3
Review of design verification reports
-
R1
R2
4
Review of construction specifications and procedures
-
I
R2
5
Review of FAT procedure
-
R1
R2
6
Technical kick-off meeting and review of construction plans
-
-
R1
7
Verify personnel qualification records
-
-
R1
Surveillance activities
8
Confirm prefabricated items and vendor deliveries acc. to requirements
-
-
S
9
Survey of interface to foundation and critical bolt connections
-
S
W
10
Survey of main structural elements
-
S
S
11
Survey of main machinery elements
-
S
S
12
Survey of main system elements
-
-
S
13
Survey of control station and work positions, internal access and escape routes
-
-
S
14
Survey of SHE aspects for operation and maintenance
-
-
S
15
Survey of marking, load tables, manufacturer plates and signboards
-
S
S
Review activities
16
Review of documentation for prefabricated items and vendor deliveries
-
R1
R2
17
Review of main structural elements fabrication documentation
-
R2
R2
18
Review of main machinery elements fabrication documentation
-
R1
R2
19
Review of main system elements fabrication documentation
-
-
R2
20
Review component certificates for wire ropes, hooks, blocks, other accessories
-
R2
R2
21
Review of manufacturing record book including NDE records, dimensional
measurement records, flatness measurement test records, pressure test
records, instrumentation test records, noise test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, corrosion protection and preservation records, as applicable
-
R1
R2
22
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
-
R2
R2
23
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
-
R1
R2
24
Review EC Type examination certificates or other notified body statements, if
applicable
-
R1
R2
Test activities
Service specification — DNVGL-SE-0480. Edition July 2017
Page 42
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
25
Witness FAT, safety critical parts
-
H
H
26
Witness FAT, performance and endurance tests etc.
-
-
S
-
H
H
Final activities
27
Issue inspection release note and FAT verification report
Table B-10 Lifting accessories verification during construction and FAT
Item
Level
Description
Low
Med
High
Initial activities
1
Review construction quality management system
-
R1
R2
2
Quality system audit of relevant manufacturers
-
-
A
3
Review of design verification reports
-
R1
R2
4
Review of construction specifications and procedures
-
I
R2
5
Review of FAT procedure
-
R1
R2
6
Technical/kick-off meeting and review of construction plans
-
-
R1
7
Verify personnel qualification records
-
-
R1
Confirm prefabricated items and vendor deliveries acc. to requirements
-
-
S
10
Survey of main structural elements
-
S
S
11
Survey of main machinery elements
-
S
S
12
Survey of main system elements
-
-
S
13
Survey of SHE aspects for operation and maintenance
-
-
S
14
Survey of marking, load tables, manufacturer plates and signboards
-
S
S
Surveillance activities
8
Review activities
15
Review of documentation for prefabricated items and vendor deliveries
-
R1
R2
16
Review of main structural elements fabrication documentation
-
R2
R2
17
Review of main machinery elements fabrication documentation
-
R1
R2
18
Review of main system elements fabrication documentation
-
-
R2
19
Review integral component certificates for wire ropes, hooks, blocks, other
accessories
-
R2
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 43
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
20
Review of manufacturing record book including NDE records, dimensional
measurement records, flatness measurement test records, pressure test records,
instrumentation test records, electrical test records, lubrication reports, corrosion
protection and preservation records, as applicable
-
R1
R2
21
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
-
R2
R2
22
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
-
R1
R2
23
Review EC Type examination certificates or other notified body statements, if
applicable
-
R1
R2
Test activities
24
Witness FAT, safety critical parts
-
H
H
25
Witness FAT, performance and endurance tests etc.
-
-
S
-
H
H
Final activities
26
Issue inspection release note and FAT verification report
Table B-11 Lifting appliances for life saving equipment verification during construction and FAT
Item
Level
Description
Low
Med
High
Initial activities
1
Review construction quality management system
-
R1
R2
2
Quality system audit of relevant manufacturers
-
-
A
3
Review of design verification reports
-
R1
R2
4
Review of construction specifications and procedures
-
I
R2
5
Review of FAT procedure
-
R1
R2
6
Technical/kick-off meeting and review of construction plans
-
-
R1
7
Verify personnel qualification records
-
-
R1
Surveillance activities
8
Confirm prefabricated items and vendor deliveries acc. to requirements
-
-
S
9
Survey of interface to foundation and critical bolt connections
-
S
W
10
Survey of main structural elements
-
S
S
11
Survey of main machinery elements
-
S
S
12
Survey of main system elements
-
-
S
13
Survey of control station and work positions, internal access and escape routes
-
-
S
14
Survey of SHE aspects for operation and maintenance
-
-
S
15
Survey of marking, load tables, manufacturer plates and signboards
-
S
S
Service specification — DNVGL-SE-0480. Edition July 2017
Page 44
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
Review activities
16
Review of documentation for prefabricated items and vendor deliveries
-
R1
R2
17
Review of main structural elements fabrication documentation
-
R2
R2
18
Review of main machinery elements fabrication documentation
-
R1
R2
19
Review of main system elements fabrication documentation
-
-
R2
20
Review component certificates for wire ropes, hooks, blocks, other accessories
-
R2
R2
21
Review of manufacturing record book including NDE records, dimensional
measurement records, flatness measurement test records, pressure test
records, instrumentation test records, noise test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, corrosion protection and preservation records, as applicable
-
R1
R2
22
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
-
R2
R2
23
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
-
R1
R2
24
Review EC Type examination certificates or other notified body statements, if
applicable
-
R1
R2
Test activities
25
Witness FAT, safety critical parts
-
H
H
26
Witness FAT, performance and endurance tests etc.
-
-
S
-
H
H
Final activities
27
Issue inspection release note and FAT verification report
Table B-12 Lifting person devices verification during construction and FAT
Item
Level
Description
Low
Med
High
Initial activities
1
Review construction quality management system
-
R1
R2
2
Quality system audit of relevant manufacturers
-
-
A
3
Review of design verification reports
-
R1
R2
4
Review of construction specifications and procedures
-
I
R2
5
Review of FAT procedure
-
R1
R2
6
Technical/kick-off meeting and review of construction plans
-
-
R1
7
Verify personnel qualification records
-
-
R1
-
-
S
Surveillance activities
8
Confirm prefabricated items and vendor deliveries acc. to requirements
Service specification — DNVGL-SE-0480. Edition July 2017
Page 45
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
Survey of interface to foundation and critical bolt connections
-
S
W
10
Survey of main structural elements
-
S
S
11
Survey of main machinery elements
-
S
S
12
Survey of main system elements
-
-
S
13
Survey of control station and work positions, internal access and escape routes
-
-
S
14
Survey of SHE aspects for operation and maintenance
-
-
S
15
Survey of marking, load tables, manufacturer plates and signboards
-
S
S
9
Review activities
16
Review of documentation for prefabricated items and vendor deliveries
-
R1
R2
17
Review of main structural elements fabrication documentation
-
R2
R2
18
Review of main machinery elements fabrication documentation
-
R1
R2
19
Review of main system elements fabrication documentation
-
-
R2
20
Review component certificates for wire ropes, hooks, blocks, other accessories
-
R2
R2
21
Review of manufacturing record book including NDE records, dimensional
measurement records, flatness measurement test records, pressure test
records, instrumentation test records, noise test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, corrosion protection and preservation records, as applicable
-
R1
R2
22
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
-
R2
R2
23
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
-
R1
R2
24
Review EC Type examination certificates or other notified body statements, if
applicable
-
R1
R2
Test activities
25
Witness FAT, safety critical parts
-
H
H
26
Witness FAT, performance and endurance tests etc.
-
-
S
--
H
H
Final activities
27
Issue inspection release note and FAT verification report
Table B-13 Drilling hoisting equipment verification during construction and FAT
Item
Level
Description
Low
Med
High
Initial activities
1
Review construction quality management system
-
R1
R2
2
Quality system audit of relevant manufacturers
-
-
A
Service specification — DNVGL-SE-0480. Edition July 2017
Page 46
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
3
Review of design verification reports
-
R1
R2
4
Review of construction specifications and procedures
-
I
R2
5
Review of FAT procedure
-
R1
R2
6
Technical/kick-off meeting and review of construction plans
-
-
R1
7
Verify personnel qualification records
-
-
R1
Surveillance activities
8
Confirm prefabricated items and vendor deliveries acc. to requirements
-
-
S
9
Survey of interface to foundation and critical bolt connections
-
S
W
10
Survey of main structural elements
-
S
S
11
Survey of main machinery elements
-
S
S
12
Survey of main system elements
-
-
S
13
Survey of control station and work positions, internal access and escape routes
-
-
S
14
Survey of SHE aspects for operation and maintenance
-
-
S
15
Survey of marking, load tables, manufacturer plates and signboards
-
S
S
Review activities
16
Review of documentation for prefabricated items and vendor deliveries
-
R1
R2
17
Review of main structural elements fabrication documentation
-
R2
R2
18
Review of main machinery elements fabrication documentation
-
R1
R2
19
Review of main system elements fabrication documentation
-
-
R2
20
Review component certificates for wire ropes, hooks, blocks, other accessories
-
R2
R2
21
Review of manufacturing record book including NDE records, dimensional
measurement records, flatness measurement test records, pressure test
records, instrumentation test records, noise test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, corrosion protection and preservation records, as applicable
-
R1
R2
22
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
-
R2
R2
23
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
-
R1
R2
24
Review EC Type examination certificates or other notified body statements, if
applicable
-
R1
R2
Test activities
25
Witness FAT, safety critical parts
-
H
H
26
Witness FAT, performance and endurance tests etc.
-
-
S
-
H
H
Final activities
27
Issue inspection release note and FAT verification report
Service specification — DNVGL-SE-0480. Edition July 2017
Page 47
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Table B-14 Robot verification during construction and FAT
Item
Level
Description
Low
Med
High
Initial activities
1
Review construction quality management system
-
R1
R2
2
Quality system audit of relevant manufacturers
-
-
A
3
Review of design verification reports
-
R1
R2
4
Review of construction specifications and procedures
-
I
R2
5
Review of FAT procedure
-
R1
R2
6
Technical/kick-off meeting and review of construction plans
-
-
R1
7
Verify personnel qualification records
-
-
R1
Surveillance activities
8
Confirm prefabricated items and vendor deliveries acc. to requirements
-
-
S
9
Survey of interface to foundation and critical bolt connections
-
S
W
10
Survey of main structural elements
-
S
S
11
Survey of main machinery elements
-
S
S
12
Survey of main system elements
-
-
S
13
Survey of SHE aspects for operation and maintenance
-
-
S
14
Survey of marking, load tables, manufacturer plates and signboards
-
S
S
Review activities
15
Review of documentation for prefabricated items and vendor deliveries
-
R1
R2
16
Review of main structural elements fabrication documentation
-
R2
R2
17
Review of main machinery elements fabrication documentation
-
R1
R2
18
Review of main system elements fabrication documentation
-
-
R2
19
Review component certificates for wire ropes, hooks, blocks, other accessories
-
R2
R2
20
Review of manufacturing record book including NDE records, dimensional
measurement records, flatness measurement test records, pressure test
records, instrumentation test records, noise test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, corrosion protection and preservation records, as applicable
-
R1
R2
21
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
-
R2
R2
22
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
-
R1
R2
23
Review EC Type examination certificates or other notified body statements, if
applicable
-
R1
R2
-
H
H
Test activities
24
Witness FAT, safety critical parts
Service specification — DNVGL-SE-0480. Edition July 2017
Page 48
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
25
Level
Description
Witness FAT, performance and endurance tests etc.
Low
Med
High
-
-
S
-
H
H
Final activities
26
Issue inspection release note and FAT verification report
B.6 Installation and commissioning
B.6.1 General
B.6.1.1 Installation and commissioning consists of a number of different activities at the installation site
including reviews, surveys and witnessing of testing.
B.6.1.2 The scope of work for verification during installation and commissioning is shown in tables listed in
this chapter, for various types of lifting appliances. The tables states a recommended scope of work for low,
medium and high level verification, and may be changed upon an agreement between the client and DNV GL
based on the method listed in App.A.
B.6.1.3 For manufacturers and vendors who have established a DNV GL approved ISO9000 quality system
covering installation and commissioning of lifting appliances, this may reduce the scope of work accordingly,
upon agreement with DNV GL.
B.6.2 Verification during installation and commissioning
B.6.2.1 For verification of lifting appliances during installation and commissioning the following activities are
considered:
—
—
—
—
—
initial activities
surveillance
review activities
test activities
final activities.
B.6.2.2 The initial activities include review of the quality management system for installation and
commissioning and other start-up activities. The surveillance activities are the site attendance, the review
activities may be carried out prior to or at site and the test and final activities are the (continuous) review of
installation and commissioning results/records and the completion of documentation and reports.
B.6.3 Low level installation and commissioning verification
B.6.3.1 For low level verification, the initial activities consist of a limited review of the documentation from
the previous phases.
B.6.3.2 During the surveillance activities, main focus will be on the installation of the lifting appliance and
the foundation and the interface between the foundation and the lifting appliance. Also access and escape
routes, signs and marking will be surveyed. The verification will be performed during site visits.
B.6.3.3 The subsequent review activities will focus on the documentation for the foundation structure
and the manufacturing record book, including construction and FAT but also from the installation and
Service specification — DNVGL-SE-0480. Edition July 2017
Page 49
Verification of lifting appliances for the oil and gas industry
DNV GL AS
commissioning phase. The review will also cover the final user instructions including maintenance
and operation manual. The formal documentation such as EC Declarations of Conformity and EC Type
examination certificates if applicable will also be reviewed.
B.6.3.4 The verification during testing includes witnessing of test activities for safety critical elements and
overload tests according to the installation and commissioning test programme.
B.6.3.5 The final activities include issuance of an installation and commissioning verification report including
the certificate of lifting appliance.
B.6.4 Medium level construction verification
B.6.4.1 For medium level verification, the initial activities consists of a general review of the installation and
commissioning quality management system in addition to a detailed review of the documentation from the
previous phases. Also installation specifications and procedures will be reviewed in general.
B.6.4.2 During the surveillance activities, main focus will be on the installation of the lifting appliance and
on the foundation and the interface between the foundation and the lifting appliance. Control stations, work
positions, access and escape routes, signs and marking will be surveyed. The verification will be performed
during site visits.
B.6.4.3 The subsequent review activities will focus on the documentation for the foundation structure,
upgrading/repair reports and the manufacturing record book, including construction and FAT but also from
the installation and commissioning phase. The review will also cover the final user instructions including
maintenance and operation manual. Test records for safety critical elements, fire and explosion alarms
are reviewed if applicable. The formal documentation such as EC Declarations of Conformity and EC Type
examination certificates if applicable, will also be reviewed.
B.6.4.4 The verification during testing includes witnessing of test activities for safety critical elements and
overload tests according to the installation and commissioning test programme.
B.6.4.5 The final activities include issuance of an installation and commissioning verification report including
the certificate of lifting appliance.
B.6.5 High level construction verification
B.6.5.1 For high level verification, the initial activities consists of a detailed review of the installation and
commissioning quality management system in addition to a detailed review of the documentation from the
previous phases. Also installation specifications and procedures will be reviewed in general.
B.6.5.2 During the surveillance activities, main focus will be on the installation of the lifting appliance and
on the foundation and the interface between the foundation and the lifting appliance. Control stations,
work positions, access and escape routes, signs and marking and other SHE aspects will be surveyed. The
verification will be performed during site visits.
B.6.5.3 The subsequent review activities will focus on the documentation for the foundation structure,
upgrading/repair reports and the manufacturing record book, including construction and FAT but also from
the installation and commissioning phase. The review will also cover the final user instructions including
maintenance and operation manual. Test records for safety critical elements, fire and explosion alarms
are reviewed if applicable. The formal documentation such as EC Declarations of Conformity and EC Type
examination certificates if applicable, will also be reviewed.
B.6.5.4 The verification during testing includes witnessing of test activities for safety critical and other
elements and overload tests according to the installation and commissioning test programme.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 50
Verification of lifting appliances for the oil and gas industry
DNV GL AS
B.6.5.5 The final activities include issuance of an installation and commissioning verification report including
the certificate of lifting appliance. This item is not related to the installation and commissioning process
as a normal hold point would be. This item is intended as a reminder to the DNV GL (or others) inspection
personnel that a final report of their verification activities is required to finish the work and issue the
certificate of lifting appliance which is needed to bring the lifting appliance into use.
Table B-15 Crane verification during installation and commissioning
Item
Level
Description
Low
Med
High
Initial activities
1
Review installation and commissioning quality management system
-
R1
R2
2
Quality system audit of relevant installation
-
-
A
3
Review of design verification report
R1
R2
R2
4
Review of inspection release note and FAT verification report, or alternatively the
manufacturers documentation from construction and FAT
R1
R1
R2
5
Review of installation specifications and procedures
I
R1
R2
6
Technical/kick-off meeting and review of installer’s documents
-
R1
R2
7
Verify personnel qualification test records
-
-
R1
Surveillance activities
8
Survey of the installation to confirm correct installation and equipment hook-up
H
H
H
9
Survey of the foundation
S
S
S
10
Survey of interface to foundation and critical bolt connections
S
S
W
11
Survey of access and escape routes
S
S
S
12
Survey of control station and work positions
-
S
S
13
Survey of SHE aspects for operation and maintenance
-
-
S
14
Survey of marking, load tables, manufacturer plates and signboards
S
S
S
R1
R1
R2
Review activities
15
Review of foundation design and fabrication report, or ILO certificate
16
Review of noise measurement report, if applicable
-
-
R1
17
Review of upgrading/repair report, if applicable
-
R2
R2
18
Review of weight reports
-
R1
R2
19
Review of ILO certificates, if applicable
R2
R2
R2
20
Review installation records and equipment hook-up, incl. non-conformance logs
-
R1
R2
21
Review component certificates for wire ropes, hooks, blocks, other accessories
R2
R2
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 51
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
22
Review of installation and commissioning manufacturing records including NDE
records, dimensional measurement records, flatness measurement test records,
pressure test records, instrumentation test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, as applicable
-
R2
R2
23
Review of fire and gas alarms and shut downs test records, if applicable
-
R1
R2
24
Review of commissioning records for testing of all safety critical functions
-
R1
R2
25
Review the final user instructions including maintenance and operation manual
R1
R2
R2
26
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
R1
R2
R2
27
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
R1
R1
R2
28
Review EC Type examination certificates or other notified body statements, if
applicable
R1
R1
R2
Test activities
29
Witness testing according to commissioning functional test programme, safety
critical elements including emergency stop, emergency procedures, shut downs,
etc.
H
H
H
30
Witness testing according to commissioning functional test programme, other
elements
-
-
H
31
Witness overload tests
H
H
H
32
Witness testing of installation fire and gas warning and alarm systems, if applicable
W
W
W
33
Witness testing of installation emergency evacuation warning and alarm systems, if
applicable
W
W
W
H
H
H
Final activities
34
Issue installation and commissioning close-out report incl. certificate of lifting
appliance
Table B-16 Lifting accessories during installation and commissioning
Item
Level
Description
Low
Med
High
Initial activities
1
Review installation and commissioning quality management system
-
R1
R2
2
Quality system audit of relevant installation
-
-
A
3
Review of design verification report
R1
R2
R2
4
Review of inspection release note and FAT verification report
R1
R1
R2
5
Review of installation specifications and procedures
I
R1
R2
6
Technical/kick-off meeting and review of installer’s documents
-
R1
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 52
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
7
Level
Description
Verify personnel qualification test records
Low
Med
High
-
-
R1
Surveillance activities
8
Survey of the installation to confirm correct installation and equipment hook-up
H
H
H
9
Survey of SHE aspects for operation and maintenance
-
-
S
Survey of marking, load tables, manufacturer plates and signboards
S
S
S
10
Review activities
11
Review of noise measurement report, if applicable
-
-
R1
12
Review of upgrading/repair report, if applicable
-
R2
R2
13
Review of weight reports
-
R1
R2
14
Review of ILO certificates, if applicable
R2
R2
R2
15
Review installation records and equipment hook-up, incl. non-conformance logs
-
R1
R2
16
Review component certificates for wire ropes, hooks, blocks, other accessories
R2
R2
R2
17
Review of installation and commissioning manufacturing records including NDE
records, dimensional measurement records, flatness measurement test records,
pressure test records, instrumentation test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, as applicable
-
R2
R2
18
Review of commissioning records for testing of all safety critical functions
-
R1
R2
19
Review the final user instructions including maintenance and operation manual
R1
R2
R2
20
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
R1
R2
R2
21
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
R1
R1
R2
22
Review EC Type examination certificates or other notified body statements, if
applicable
R1
R1
R2
Test activities
23
Witness testing according to commissioning functional test programme
H
H
H
24
Witness overload tests
H
H
H
H
H
H
Final activities
25
Issue installation and commissioning close-out report incl. certificate of lifting
appliance
Service specification — DNVGL-SE-0480. Edition July 2017
Page 53
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Table B-17 Lifting appliances for life saving equipment verification during installation and
commissioning
Item
Level
Description
Low
Med
High
Initial activities
1
Review installation and commissioning quality management system
-
R1
R2
2
Quality system audit of relevant installation
-
-
A
3
Review of design verification report
R1
R2
R2
4
Review of inspection release note and FAT verification report
R1
R1
R2
5
Review of installation specifications and procedures
I
R1
R2
6
Technical/kick-off meeting and review of installer’s documents
-
R1
R2
7
Verify personnel qualification test records
-
-
R1
Surveillance activities
8
Survey of the installation to confirm correct installation and equipment hook-up
H
H
H
9
Survey of the foundation
S
S
S
10
Survey of interface to foundation and critical bolt connections
S
S
W
11
Survey of access and escape routes
S
S
S
12
Survey of control station and work positions
-
S
S
13
Survey of SHE aspects for operation and maintenance
-
-
S
14
Survey of marking, load tables, manufacturer plates and signboards
S
S
S
R1
R1
R2
Review activities
15
Review of foundation design and fabrication report, or ILO certificate
16
Review of noise measurement report, if applicable
-
-
R1
17
Review of upgrading/repair report, if applicable
-
R2
R2
18
Review of weight reports
-
R1
R2
19
Review of life saving equipment documentation and certificates, if applicable
R2
R2
R2
20
Review installation records and equipment hook-up, incl. non-conformance logs
-
R1
R2
21
Review component certificates for wire ropes, hooks, blocks, other accessories
R2
R2
R2
22
Review of manufacturing record book including NDE records, dimensional
measurement records, flatness measurement test records, pressure test
records, instrumentation test records, noise test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, as applicable
-
R2
R2
23
Review of commissioning records for testing of all safety critical functions
-
R1
R2
24
Review the final user instructions including maintenance and operation manual
R1
R2
R2
25
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
R1
R2
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 54
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
26
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
R1
R1
R2
27
Review EC Type examination certificates or other notified body statements, if
applicable
R1
R1
R2
Witness testing according to commissioning functional test programme, safety
critical elements including emergency stop, emergency procedures, shut downs,
etc.
H
H
H
29
Witness testing according to commissioning functional test programme, other
elements
-
-
H
30
Witness overload tests
H
H
H
H
H
H
Test activities
28
Final activities
31
Issue installation and commissioning close-out report incl. certificate of lifting
appliance
Table B-18 Lifting person devices verification during installation and commissioning
Item
Level
Description
Low
Med
High
Initial activities
1
Review installation and commissioning quality management system
-
R1
R2
2
Quality system audit of relevant installation
-
-
A
3
Review of design verification report
R1
R2
R2
4
Review of inspection release note and FAT verification report
R1
R1
R2
5
Review of installation specifications and procedures
I
R1
R2
6
Technical/kick-off meeting and review of installer’s documents
-
R1
R2
7
Verify personnel qualification test records
-
-
R1
Surveillance activities
8
Survey of the installation to confirm correct installation and equipment hook-up
H
H
H
9
Survey of the foundation and machine on which the lifting person device is
connected to, if applicable
S
S
S
10
Survey of interface to foundation, machine and critical bolt connections
S
S
W
11
Survey of access and escape routes
S
S
S
12
Survey of control station and work positions
-
S
S
13
Survey of SHE aspects for operation and maintenance
-
-
S
14
Survey of marking, load tables, manufacturer plates and signboards
S
S
S
Review activities
Service specification — DNVGL-SE-0480. Edition July 2017
Page 55
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
R1
R1
R2
15
Review of foundation design and fabrication report, or ILO certificate for the
foundation
16
Review of certificates for the machine on which the lifting person device is
connected to, if applicable
-
R1
R2
17
Review of noise measurement report, if applicable
-
-
R1
18
Review of upgrading/repair report, if applicable
-
R2
R2
19
Review of weight reports
-
R1
R2
20
Review of former ILO certificates, if applicable
R2
R2
R2
21
Review installation records and equipment hook-up, incl. non-conformance logs
-
R1
R2
22
Review component certificates for wire ropes, hooks, blocks, other accessories
R2
R2
R2
23
Review of installation and commissioning manufacturing records including NDE
records, dimensional measurement records, flatness measurement test records,
pressure test records, instrumentation test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, as applicable
-
R2
R2
24
Review of commissioning records for testing of all safety critical functions
-
R1
R2
25
Review the final user instructions including maintenance and operation manual
R1
R2
R2
26
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
R1
R2
R2
27
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
R1
R1
R2
28
Review EC Type examination certificates or other notified body statements, if
applicable
R1
R1
R2
Test activities
29
Witness testing according to commissioning functional test programme, safety
critical elements including emergency stop, emergency procedures, shut downs,
etc.
H
H
H
30
Witness testing according to commissioning functional test programme, other
elements
-
-
H
31
Witness overload tests
H
H
H
H
H
H
Final activities
32
Issue installation and commissioning close-out report incl. certificate of lifting
appliance
Service specification — DNVGL-SE-0480. Edition July 2017
Page 56
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Table B-19 Drilling hoisting equipment verification during installation and commissioning
Item
Level
Description
Low
Med
High
Initial activities
1
Review installation and commissioning quality management system
-
R1
R2
2
Quality system audit of relevant installation
-
-
A
3
Review of design verification report
R1
R2
R2
4
Review of inspection release note and FAT verification report
R1
R1
R2
5
Review of installation specifications and procedures
I
R1
R2
6
Technical/kick-off meeting and review of installer’s documents
-
R1
R2
7
Verify personnel qualification test records
-
-
R1
Surveillance activities
8
Survey of the installation to confirm correct installation and equipment hook-up
H
H
H
9
Survey of the foundation
S
S
S
10
Survey of interface to foundation and critical bolt connections
S
S
W
11
Survey of access and escape routes
S
S
S
12
Survey of control station and work positions
-
S
S
13
Survey of SHE aspects for operation and maintenance
-
-
S
14
Survey of marking, load tables, manufacturer plates and signboards
S
S
S
R1
R1
R2
Review activities
15
Review of foundation design and fabrication report, or ILO certificate for the
foundation
16
Review of noise measurement report, if applicable
-
-
R1
17
Review of upgrading/repair report, if applicable
-
R2
R2
18
Review of weight reports
-
R1
R2
19
Review of former ILO certificates, if applicable
R2
R2
R2
20
Review installation records and equipment hook-up, incl. non-conformance logs
-
R1
R2
21
Review component certificates for wire ropes, hooks, blocks, other accessories
R2
R2
R2
22
Review of installation and commissioning manufacturing records including NDE
records, dimensional measurement records, flatness measurement test records,
pressure test records, instrumentation test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, as applicable
-
R2
R2
23
Review of fire and gas alarms and shut downs test records, if applicable
-
R1
R2
24
Review of commissioning records for testing of all safety critical functions
-
R1
R2
25
Review the final user instructions including maintenance and operation manual
R1
R2
R2
Service specification — DNVGL-SE-0480. Edition July 2017
Page 57
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
26
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
R1
R2
R2
27
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
R1
R1
R2
28
Review EC Type examination certificates or other notified body statements, if
applicable
R1
R1
R2
Test activities
29
Witness testing according to commissioning functional test programme, safety
critical elements including emergency stop, emergency procedures, shut downs,
etc.
H
H
H
30
Witness testing according to commissioning functional test programme, other
elements
-
-
H
31
Witness overload tests as applicable
H
H
H
32
Witness testing of installation fire and gas warning and alarm systems, if applicable
W
W
W
33
Witness testing of installation emergency evacuation warning and alarm systems, if
applicable
W
W
W
H
H
H
Final activities
34
Issue installation and commissioning close-out report incl. certificate of lifting
appliance
Table B-20 Robot verification during installation and commissioning
Item
Level
Description
Low
Med
High
Initial activities
1
Review installation and commissioning quality management system
-
R1
R2
2
Quality system audit of relevant installation
-
-
A
3
Review of design verification report
R1
R2
R2
4
Review of inspection release note and FAT verification report
R1
R1
R2
5
Review of installation specifications and procedures
I
R1
R2
6
Technical/kick-off meeting and review of installer’s documents
-
R1
R2
7
Verify personnel qualification test records
-
-
R1
Surveillance activities
8
Survey of the installation to confirm correct installation and equipment hook-up
H
H
H
9
Survey of the foundation
S
S
S
10
Survey of interface to foundation and critical bolt connections
S
S
W
11
Survey of access and escape routes
S
S
S
12
Survey of control station and work positions
-
S
S
Service specification — DNVGL-SE-0480. Edition July 2017
Page 58
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Item
Level
Description
Low
Med
High
13
Survey of SHE aspects for operation and maintenance
-
-
S
14
Survey of marking, load tables, manufacturer plates and signboards
S
S
S
R1
R1
R2
Review activities
15
Review of foundation design and fabrication report, or ILO certificate
16
Review of EMC measurement report, if applicable
-
-
R1
17
Review of noise measurement report, if applicable
-
-
R1
18
Review of upgrading/repair report, if applicable
-
R2
R2
19
Review of weight reports
-
R1
R2
20
Review of ILO certificates, if applicable
R2
R2
R2
21
Review installation records and equipment hook-up, incl. non-conformance logs
-
R1
R2
22
Review component certificates for wire ropes, hooks, blocks, other accessories
R2
R2
R2
23
Review of installation and commissioning manufacturing records including NDE
records, dimensional measurement records, flatness measurement test records,
pressure test records, instrumentation test records, electrical test records,
communication system test records, lubrication reports and lubrication sampling
test records, as applicable
-
R2
R2
24
Review of fire and gas alarms and shut downs test records, if applicable
-
R1
R2
25
Review of commissioning records for testing of all safety critical functions
-
R1
R2
26
Review the final user instructions including maintenance and operation manual
R1
R2
R2
27
Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable
R1
R2
R2
28
Review EC Declaration of Conformity acc. to other EU Directives, if applicable
R1
R1
R2
29
Review EC Type examination certificates or other notified body statements, if
applicable
R1
R1
R2
Test activities
30
Witness testing according to commissioning functional test programme, safety
critical elements including emergency stop, emergency procedures, shut downs,
etc.
H
H
H
31
Witness testing according to commissioning functional test programme, other
elements
-
-
H
33
Witness overload tests
H
H
H
33
Witness testing of installation fire and gas warning and alarm systems, if applicable
W
W
W
34
Witness testing of installation emergency evacuation warning and alarm systems, if
applicable
W
W
W
H
H
H
Final activities
35
Issue installation and commissioning close-out report incl. certificate of lifting
appliance
Service specification — DNVGL-SE-0480. Edition July 2017
Page 59
Verification of lifting appliances for the oil and gas industry
DNV GL AS
APPENDIX C EXAMPLES OF VERIFICATION DOCUMENTS
C.1 Verification documents
C.1.1 Validity of verification documents
C.1.1.1 Verification documents are, in principle, documents confirming that an examination has been carried
out, and are valid only at the date of issue.
C.1.2 Certificate of lifting appliance
C.1.2.1 A statement of conformity may be issued on completion of each particular project phase, or natural
part thereof, and shall be based on a dedicated verification report.
C.1.2.2 A certificate of lifting appliance, however, shall be issued as a formal statement confirming that
rd
verification of a lifting appliance complies with the minimum requirements applicable for 3 party verification
of that particular product.
C.1.2.3 The certificate of lifting appliance is based on the international form recommended by ILO convention
no.152.
C.1.2.4 The technical information on a certificate of lifting appliance shall contain:
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
certificate no. and date, replacing cert.no.
verification level applied (tick off boxes)
product description
standardised type of lifting appliance
name of owner
client reference
location (name of ship, installation, site, etc.
certified for the lifting of persons yes or no
regulation reference
cdode/standard reference
situation and description of lifting appliance (with distinguishing marks, if any) which has been testes and
thoroughly examined
angle to the horizontal or radius at which test load is applied
test load (tonnes)
safe working load (SWL) at angle or radius shown in column 2 (tonnes)
reference documents (tick off boxes)
signatures
application (operational limitations and conditions of use) for which the facility is intended
codes and standards with which the fixed structure has been found to comply
reason for issuing the certificate (tick off boxes)
DNV GL report reference
level of verification
an appendix containing the accompanying dedicated verification report.
C.1.2.5 An example of a typical statement of conformity is shown at the end of this appendix.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 60
Verification of lifting appliances for the oil and gas industry
DNV GL AS
C.1.3 Verification reports
C.1.3.1 Verification reports are issued to confirm that the relevant product or service has been completed in
accordance with specified requirements.
C.1.3.2 The report shall include information such as:
—
—
—
—
—
—
—
—
—
product or service description and item number, if relevant
application (operational limitations and conditions of use) for which the product or service is intended
codes and standards with which the product or service has been verified against
clear statement of the conclusion from the verification (does it or does it not meet the specified
requirements)
codes and standards used as reference
documentation on which the verification report is based (documents, drawings, correspondence, including
revision numbers)
project-specific scope of work tables
any comments
identification of any non-conformances.
C.1.3.3 The verification report shall always be dated and have two signatures, the originator and the DNV GL
internal verifier.
C.1.4 Verification comments
C.1.4.1 Reviews of documents shall be reported using verification comment sheets (often called VerComs).
These documents give details to the client of aspects of the fixed offshore structure facilities design and
construction that DNV GL:
— considers does not meet the specified requirements
— does not have enough information to make a decision
— offers advice based on its own experience.
C.1.4.2 Only in the first two instances does DNV GL expect a response from the owner or its contractors.
C.1.4.3 An example of a typical verification comment sheet is shown at the end of this appendix.
C.1.5 Audit report
C.1.5.1 Audit reports are issued to confirm that a company’s quality management system has been reviewed
to confirm compliance (or not) with the nominated standard and project requirements. In addition, the audit
reports confirm compliance with the documented procedures and that these procedures are effective.
C.1.5.2 Audit reports shall contain information such as whether:
— the company has a documented quality system
— this quality system has been certified by an accredited certification body for the product (or service) in
question
— the quality system covers the following quality assurance elements adequately for the product:
—
—
—
—
organisation
authority/responsibility
job descriptions for key persons
internal quality audits
Service specification — DNVGL-SE-0480. Edition July 2017
Page 61
Verification of lifting appliances for the oil and gas industry
DNV GL AS
— documentation change control
— job instructions/procedures
— non-conformance/corrective action
— there are adequate procedures for activities such as:
—
—
—
—
—
—
calibration of equipment
material identification and marking
control of special processes such as welding, NDT, PWHT
non-conformance identification and handling
inspection status
final inspection
— the company’s facilities are, in general, considered adequate for the scope of supply
— a quality plan has been prepared for the order concerned
— the purchaser or their appointed inspection agency are planned to attend the works
— there are any problem areas identified.
C.1.5.3 An example of a typical audit report is shown at the end of this appendix.
C.1.6 Visit reports
C.1.6.1 Visit reports are documentation/recording of attendance activity by DNV GL.
Guidance note:
Visit reports are and may be called by different names. Examples are inspection release note, survey report, inspection certificate,
site report, etc.
---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
C.1.6.2 A visit report shall contain enough information to identify clearly the product or service that has
been examined, the operating conditions or specifications to which it has been examined and the conclusion
reached by DNV GL.
C.1.6.3 The visit report shall be printed on the relevant form and shall contain as much information as
possible in accordance with the standard headings in the form. In addition, the report number shall be
shown.
C.1.6.4 An example of a typical visit report is shown at the end of this appendix.
C.2 Use of quality management systems
C.2.1 General
C.2.1.1 The assurance of structural integrity requires that gross errors during design, construction and
operation be minimised. The likelihood of gross errors shall be reduced in a systematic manner by the
operation of a quality management system adequate for the work being carried out.
C.2.1.2 Quality management systems frequently are documented at three levels:
— the quality manual and related procedures document how the organisation, as a whole, manages the
quality of all its products and services
— the quality plan documents the specific procedures related to a particular project
Service specification — DNVGL-SE-0480. Edition July 2017
Page 62
Verification of lifting appliances for the oil and gas industry
DNV GL AS
— the inspection and test plan documents how the quality control activities for a particular project shall be
carried out and recorded.
C.2.2 Quality plans
C.2.2.1 The basic function of a quality plan is as an aide in the management of a project. In an organisation
with many quality procedures for a variety of functions the quality plan states those that are applicable to
that particular project. The quality plan acts as a route map through the complexities of management of the
project and highlights those activities relevant to quality management.
C.2.2.2 The project quality plan normally consists of two parts; firstly, a narrative description of the means
of controlling the project, and secondly, a tabular description of the inspections and tests to be carried out
during the work.
C.2.2.3 The quality plan should address:
—
—
—
—
—
organisational details of the project
authorities and responsibilities of key personnel
interfaces between, the client, contractors, sub-contractors and third parties
quality assurance activities placed on sub-contractors
cross references to existing company procedures.
C.2.2.4 The narrative part of the quality plan should include a description of:
—
—
—
—
—
the applicable standards
project organisation and responsibilities
review of the contractual requirements
project planning and progress reporting
procedures for such activities as design control, purchasing, construction, installation, commissioning,
interface control and auditing
— procedures for inspection and maintenance as well as normal operation
— emergency response issues.
C.2.2.5 Additionally, the narrative part of the plan should describe the documentation requirements. It
should be specified:
—
—
—
—
—
—
—
—
what documents are required
at what stage these documents are required
who is responsible for preparing the documents
relevant parties to whom documents are submitted
how any necessary approvals are acquired
who has originals and who has copies
if copies have to be certified copies
the length of time documents shall be retained and by whom.
C.2.3 Inspection and test plans
C.2.3.1 The tabular description of the inspections and tests to be carried out during the work is frequently
known as the inspection and test plan.
C.2.3.2 The following items should be checked for inclusion within the inspection and test plan:
— each inspection and test point and its relative location in the production cycle should be shown
— the characteristics to be inspected and tested at each point should be identified
Service specification — DNVGL-SE-0480. Edition July 2017
Page 63
Verification of lifting appliances for the oil and gas industry
DNV GL AS
— the use of sub-contractors should be indicated and details of how the verification of sub-contractor’s
quality shall be carried out should be shown
— hold points established by the constructor, the operator or a third party, where witness or review of the
selected inspection or test is required, should be shown.
C.2.4 Review of quality management programme
C.2.4.1 The contractor’s quality manual shall be reviewed for compliance with ISO 9001 or 9002 as
appropriate. The contractor’s operations should be audited to establish compliance with the documented
system.
C.2.4.2 If the contractor has a quality system certified by an accredited third party certification body,
this may be taken as evidence of a satisfactory quality system provided the certificate is relevant to the
contractor’s scope of work for the project. However, the last two years’ periodical audit reports shall be
reviewed to identify if any recurring non-conformities have been revealed.
C.2.4.3 Any weaknesses revealed during this audit, or review of periodical audit reports, shall be considered
when planning the contractor monitoring activities.
C.2.4.4 Surveillance of the continuing acceptability of the contractor’s quality management system is carried
out by observing a selection of audits carried out by the contractor as part of its internal audit system. The
audits to be observed should be selected over the length of the project at suitable intervals and should cover
as wide a selection of activities as possible.
C.2.4.5 Contractors’ inspection and test plans for the various activities undertaken during their scope of work
for the pipeline shall be reviewed and accepted, if adequate.
C.3 Document forms
C.3.1 Introduction
C.3.1.1 The end of this appendix includes example forms for use by DNV GL in verification.
C.3.1.2 The following forms are included:
—
—
—
—
certificate of lifting appliance
verification comments sheet
audit report
visit report.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 64
Verification of lifting appliances for the oil and gas industry
DNV GL AS
EX
AM
PL
E
C.3.2 Certificate of lifting appliance
Service specification — DNVGL-SE-0480. Edition July 2017
Page 65
Verification of lifting appliances for the oil and gas industry
DNV GL AS
PL
E
AM
EX
Service specification — DNVGL-SE-0480. Edition July 2017
Page 66
Verification of lifting appliances for the oil and gas industry
DNV GL AS
C.3.3 Verification comments sheet
Service specification — DNVGL-SE-0480. Edition July 2017
Page 67
Verification of lifting appliances for the oil and gas industry
DNV GL AS
EX
AM
PL
E
C.3.4 Audit report
Service specification — DNVGL-SE-0480. Edition July 2017
Page 68
Verification of lifting appliances for the oil and gas industry
DNV GL AS
PL
E
AM
EX
Service specification — DNVGL-SE-0480. Edition July 2017
Page 69
Verification of lifting appliances for the oil and gas industry
DNV GL AS
EX
AM
PL
E
C.3.5 Visit report
Service specification — DNVGL-SE-0480. Edition July 2017
Page 70
Verification of lifting appliances for the oil and gas industry
DNV GL AS
APPENDIX D LIFTING APPLIANCE LIFE CYCLE
D.1 Lifting appliance life cycle
Table D-1 DNV GL services and documentation within lifting appliance life cycle
Project phases
Type of verification
documents
Design
Design verification report
Construction and FAT
Inspection reports
Installation and
commissioning
Installation and
commissioning report
Operation
Inspection reports
De-commissioning
and removal
Inspection reports
Certificate of lifting
appliance application
Application of DNVGL-SE-0480
Reference for certification
— Authority regulations
— International standards
— DNV GL standards
Service specification — DNVGL-SE-0480. Edition July 2017
Page 71
Verification of lifting appliances for the oil and gas industry
DNV GL AS
APPENDIX E INFORMATIVE DOCUMENTS
E.1 Technical terminology
Table E-1 Technical terminology used in this document
Lifting appliances are grouped into the following sub-systems and components
Structure
Machinery
Systems
Pedestal
Prime mover
Valve
Adaptor
Motor
Pipe
Beam
Pump
Cable
Boom
Gearbox
Switch
A-frame
Transmission
Fuse
Column
Shaft
Bus
Travers
Spline
Computer
Davit
Pin
Logic unit
Post
Bolt
Solenoid
Gantry
Nut
Program
Supports
Sheave
Indicator
Frame
Brake
Alarm
Mast
Cylinder
Warning
Suspension
Winch
Control
Plate
Wire rope
Monitor
Box
Hook
Terminal
Lattice
Block
Sensor
Gangway
Bearing
Display
Ladder
Integral accessories
Relays
Platform
Component
Light
Handrail
Mechanisms
Instrument
Service specification — DNVGL-SE-0480. Edition July 2017
Page 72
Verification of lifting appliances for the oil and gas industry
DNV GL AS
E.2 Guide for selection of verification level
Table E-2 Critical elements, status and verification level
Element
Status
Design
Proven
Unproven
Construction
Proven
Unproven
Low
High
Slack
Tight
Mild
Harsh
Location
Open
Compact
Operator skills
High
Low
Failure tolerance
High
Low
Downtime tolerance
High
Low
Utilisation
Delivery schedule
Environment
Verification level
Service specification — DNVGL-SE-0480. Edition July 2017
Page 73
Verification of lifting appliances for the oil and gas industry
DNV GL AS
Changes – historic
CHANGES – HISTORIC
There are currently no historical changes for this document.
Service specification — DNVGL-SE-0480. Edition July 2017
Page 74
Verification of lifting appliances for the oil and gas industry
DNV GL AS
About DNV GL
Driven by our purpose of safeguarding life, property and the environment, DNV GL enables
organizations to advance the safety and sustainability of their business. We provide classification,
technical assurance, software and independent expert advisory services to the maritime, oil & gas
and energy industries. We also provide certification services to customers across a wide range
of industries. Operating in more than 100 countries, our experts are dedicated to helping our
customers make the world safer, smarter and greener.