SERVICE SPECIFICATION DNVGL-SE-0480 Edition July 2017 Verification of lifting appliances for the oil and gas industry The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. DNV GL AS FOREWORD DNV GL service specifications contain procedural requirements for obtaining and retaining certificates and other conformity statements to the objects, personnel, organisations and/or operations in question. © DNV GL AS July 2017 Any comments may be sent by e-mail to rules@dnvgl.com This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any use of this document. General This document supersedes the October 2010 edition of DNV-OSS-308. The purpose of the revision of this service document is to comply with the new DNV GL document reference code system and profile requirements following the merger between DNV and GL in 2013. Changes mainly consist of updated company name and references to other documents within the DNV GL portfolio. Some references in this service document may refer to documents in the DNV GL portfolio not yet published (planned published within 2017). In such cases please see the relevant legacy DNV or GL document. References to external documents (non-DNV GL) have not been updated. Editorial corrections In addition to the above stated changes, editorial corrections may have been made. Service specification — DNVGL-SE-0480. Edition July 2017 Page 3 Verification of lifting appliances for the oil and gas industry DNV GL AS Changes - current CHANGES – CURRENT Changes – current.................................................................................................. 3 Section 1 General.................................................................................................... 6 1.1 General............................................................................................. 6 1.2 Risk based verification..................................................................... 8 1.3 Defining a verification plan...............................................................9 1.4 DNV GL lifting reports and certificates........................................... 10 1.5 Definitions/abbreviations............................................................... 10 Section 2 Service overview................................................................................... 15 2.1 General........................................................................................... 15 2.2 Service process............................................................................... 15 2.3 Project initiation............................................................................. 16 2.4 Project realization.......................................................................... 17 2.5 Verification documents................................................................... 24 Appendix A Selection of verification level............................................................. 25 A.1 General........................................................................................... 25 A.2 Trigger questions............................................................................25 Appendix B Detailed example scope of work tables for verification...................... 28 B.1 General........................................................................................... 28 B.2 Description of terms used in the scope of work tables....................28 B.3 Overall project management.......................................................... 30 B.4 Design.............................................................................................30 B.5 Construction and factory acceptance test....................................... 40 B.6 Installation and commissioning...................................................... 49 Appendix C Examples of verification documents................................................... 60 C.1 Verification documents................................................................... 60 C.2 Use of quality management systems.............................................. 62 C.3 Document forms............................................................................. 64 Appendix D Lifting appliance life cycle................................................................. 71 D.1 Lifting appliance life cycle.............................................................. 71 Appendix E Informative documents...................................................................... 72 E.1 Technical terminology..................................................................... 72 E.2 Guide for selection of verification level.......................................... 73 Service specification — DNVGL-SE-0480. Edition July 2017 Page 4 Verification of lifting appliances for the oil and gas industry DNV GL AS Contents CONTENTS Service specification — DNVGL-SE-0480. Edition July 2017 Page 5 Verification of lifting appliances for the oil and gas industry DNV GL AS Contents Changes – historic................................................................................................ 74 SECTION 1 GENERAL 1.1 General 1.1.1 Introduction 1.1.1.1 This DNV GL service specification gives criteria for and guidance on verification of lifting appliances for the oil and gas industry within the European Economic Area (EEA). 1.1.1.2 This specification falls under the top level document DNVGL-SE-0474 Risk based verification. 1.1.1.3 The descriptions in this specification directly support a simplified verification planning as described in DNVGL-SE-0474. When using the advanced or combined planning, the descriptions will give good references and starting points. Guidance note: The latest revision of all DNV GL documents may be found in the publications list in the DNV GL web site www.dnvgl.com. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 1.1.2 Objectives 1.1.2.1 The objectives of this specification are to describe the following for a lifting appliance: — preparation of a verification plan using DNV GL’s risk differentiated levels of verification activities and detailed example scope of work tables — DNV GL’s implementation and reporting of the verification plan 1.1.3 Scope of application for verification 1.1.3.1 This specification may be adopted for the verification of lifting appliances throughout the project phases conceptual design, detailed design, construction, installation and commissioning. 1.1.3.2 Lifting appliances for offshore applications typically comprise the following objects: Cranes: — — — — — — — — — — mobile cranes tower cranes slewing jib cranes bridge and gantry cranes offshore cranes floating cranes winches and hoists loader cranes cable cranes hand powered cranes. Lifting accessories: — — — — chain slings fibre slings wire rope slings spreader beams Service specification — DNVGL-SE-0480. Edition July 2017 Page 6 Verification of lifting appliances for the oil and gas industry DNV GL AS — — — — — — — — — lifting magnets vacuum lifters lifting forks trollies beam clamps hooks blocks shackles other loose gear. Lifting appliances for life saving equipment: — — — — — — — life boat winches rescue boat davits davits for life rafts lifting appliances for rescue chutes stretchers lifting capsules medical baskets. Lifting person devices: — — — — — — — — lifting tables mobile elevating work platforms personnel baskets manrider winches access platforms case stabbing baskets cherry pickers climbing platforms. Drilling hoisting equipment: — — — — — — — — draw work ram rigs BOP cranes pipe handling cranes swivels crown block travelling block dead line anchor. Robots: — manipulator arms — manually controlled load manipulating devices — production lines. which are applied in various configurations and tailored to each particular project’s specific requirements. 1.1.3.3 This specification describes the principles of a levelled verification involvement. These principles may be applied both for planning of any need or obligations for independent external verification (third party) as well as internal company verification (second party). Service specification — DNVGL-SE-0480. Edition July 2017 Page 7 Verification of lifting appliances for the oil and gas industry DNV GL AS 1.1.4 Structure of this document This section explains the relationship between this document and DNV GL’s overall risk based verification systematics. Sec.2 describes the activities for each project and the project phases for lifting appliances for offshore applications. App.A poses trigger questions to assist in the selection of verification level App.B gives detailed example scope of work tables for the different phases and levels of involvement. These tables are the basis for the development of project specific scope of work tables. App.C gives example verification documents and describes the documents issued during and as a result of the verification process. The use of quality management systems is addressed here also. App.D is a separate appendix for lifting appliances which includes figures for information. 1.2 Risk based verification 1.2.1 Elements of the service 1.2.1.1 The risk based verification concept is described in DNVGL-SE-0474 and shown in Figure 1-1. 1.2.1.2 The verification plan is the pivot element, with the asset specification, risk sssessment and definition of involvement level as input and the verification execution being the implementation. Service specification — DNVGL-SE-0480. Edition July 2017 Page 8 Verification of lifting appliances for the oil and gas industry DNV GL AS Figure 1-1 The DNV GL risk based verification flow chart 1.3 Defining a verification plan 1.3.1 Risk based verification planning 1.3.1.1 The selection of the level of verification shall depend on the risk level of each of the elements that have an impact on the management of hazards and associated risk levels of the asset. The planning may be simplified or detailed. This is further described in DNVGL-SE-0474. 1.3.1.2 This specification mainly aids in a simplified preparation of the Verification Plan. Service specification — DNVGL-SE-0480. Edition July 2017 Page 9 Verification of lifting appliances for the oil and gas industry DNV GL AS 1.4 DNV GL lifting reports and certificates 1.4.1 General on verification 1.4.1.1 Verification describes the individual activities undertaken by DNV GL at the various stages of design, construction and operation of the facility. The scope of the verification plan is ultimately determined by the client. A statement of conformity may be issued by DNV GL to confirm compliance according to the scope of work. 1.4.2 General on certification 1.4.2.1 Certification describes the totality of verification activities leading up to the issue of a certificate of conformity. The scope of work and verification plan, called a certification plan, is set by DNV GL. All design and construction aspects, related to process facility safety and integrity, shall be covered by the certification plan. 1.4.3 DNV GL certificate of lifting appliance 1.4.3.1 In the event that DNV GL does not define the scope of work necessary to achieve certification, a certificate of lifting appliance shall not be issued. 1.5 Definitions/abbreviations 1.5.1 General 1.5.1.1 Relevant definitions in ISO also apply to this service specification. 1.5.2 Abbreviations Table 1-1 Abbreviations Term Definition ISO International Standardisation Organisation ILO International Labour Organisation CEN European Standardisation Organisation FAT factory acceptance test NB notified body CE Communauté Européenne EMC electromagnetic compatibility FE finite element analysis FLS fatigue element state HAZID hazard identification Service specification — DNVGL-SE-0480. Edition July 2017 Page 10 Verification of lifting appliances for the oil and gas industry DNV GL AS Term Definition HAZOP hazard and operability review MPQT manufacturing procedure qualification test MPS manufacturing procedure specification NDE non-destructive examination QRA quantitative risk analysis RP recommended practice SCF stress concentration factor SHE safety, healt, environment TCF technical construction file ULS ultimate limit state WPS welding procedure specifications WPQR welding procedur qualification record EEA European Economic Area (EU and EFTA countries) 1.5.3 Verbal Forms Table 1-2 Definitions of verbal forms Term Definition shall indicates requirements strictly to be followed in order to conform to this service specification and from which no deviation is permitted should indicates that among several possibilities, one is recommended as particularly suitable, without mentioning or excluding others, or that a certain course of action is preferred but not necessarily required Other possibilities may be applied subject to agreement. may verbal form used to indicate a course of action permissible within the limits of the service specification 1.5.4 Definitions Table 1-3 Definitions Term Definition client DNV GL's contractual partner It may be the manufacturer, purchaser, operator (User), the owner or the contractor. construction all activities during purchase, manufacturing, assembly, and erection at the manufacturers site. until the lifting appliance is ready factory acceptance test factory acceptance test (FAT) final testing at the manufacturers site prior to shipment Service specification — DNVGL-SE-0480. Edition July 2017 Page 11 Verification of lifting appliances for the oil and gas industry DNV GL AS Term Definition design engineering activities related to planning and preparation of the technical documentation of a lifting appliance and its components to enable its construction installation activities related to the assembly and erection of the lifting appliance on the working location commissioning ctivity after installation, including review, survey and testing in the presence of the client in order to assess compliance with the requirements decommissioning activity to bring a lifting appliance out of operation after it has served its purpose removal de-install the lifting appliance from its operating location hazard a deviation (departure from the design and operating intention) which could cause damage, injury or other form of loss (Chemical Industries Association HAZOP Guide) hazop the application of a formal systematic critical examination to the process and engineering intentions of new or existing facilities to assess the hazard potential of mal-operation or mal-function of individual items of equipment and their consequential effects on the facility as a whole (Chemical Industries Association HAZOP Guide) manufacture making of articles or materials, often in large volumes In relation to process facilities, this typically refers to activities for the production of various components under contracts from one or more contractor or supplier. operations (phase) the phase when the lifting appliance is being used for the purpose for which it was designed. Use includes start-up, stopping, transport, operation, monitoring, inspection, repair, maintenance, service and cleaning lifting appliance machine or deviceused for the purpose of vertical movement of a load with or without horizontal movement crane machine for cyclic lifting or cyclic lifting and handling of loads suspended on hooks or other load handling devices, whether manufactured to an individual design, in series or from prefabricated components Guidance note: Suspended includes any additional means fitted to prevent swinging, rotation of load etc. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- machine an assembly of linked parts or components, at least one of which moves, with the appropriate machine actuators, control and power circuits, etc., joined together for a specific application, in particular for the processing, treatment, moving or packing of a material The term machinery also covers an assembly of machines which, in order to achieve one and the same end, are arranged and controlled so that they function as an integral whole. certificate of conformity a document signed by a qualified party affirming that, at the time of assessment, the product or service met the stated requirements (BS 4778: Part 2) lifting accessory component or equipment not attached to the machine and placed between the machinery and the load or on the load in order to attach it lifting component parts of a lifting accessory certificate of a document based on the ILO convention no. 152, issued by the competent person, which confirm that the lifting appliance lifting appliance is in compliance with the requirements and is designed, fabricated, assembled, erected, tested, documented and maintained, and can be safely used Service specification — DNVGL-SE-0480. Edition July 2017 Page 12 Verification of lifting appliances for the oil and gas industry DNV GL AS Term Definition risk the qualitative or quantitative likelihood of an accident or unplanned event occurring, considered in conjunction with the potential consequences of such a failure In quantitative terms, risk is the quantified probability of a defined failure mode times its quantified consequence. risk reduction measures those measures taken to reduce the risks to the operation of process facilities and to the health and safety of personnel associated with it or in its vicinity by: — reduction in the probability of failure — mitigation of the consequences of failure. Guidance note: The usual order of preference of risk reduction measures is: a) inherent safety b) prevention c) detection d) control e) mitigation f) emergency response ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- safety objectives the safety goals for the design, construction, installation operation and abandonment the fixed offshore structure including acceptance criteria for the level of risk acceptable to the owner statement of conformity a statement or report signed by a qualified party affirming that, at the time of assessment, the defined facility, phase, or collection of activities, met the requirements stated by the owner verification an examination to confirm that an activity, a product or a service is in accordance with specified requirements Guidance note: The examination should be based on information, which can be proved true, based on facts obtained through observation, measurement, test or other means. ISO 8402: 1994: Verification: Confirmation by examination and provision of objective evidence that specified requirements has been fulfilled. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- competent person person, organisation or unit who has sufficient theoretical knowledge and practical experience to examine and judge the technical safety of lifting appliances, in order to issue reports and certificates Guidance note: The term competent person corresponds to the term Enterprice of Competence (EOC) used by The Offshore Mechanical Handling Committee (OMHEC). In some countries the Authorities require that the Competent person shall be certified, authorised or accredited. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- assessment codes codes used in this document to describe the type and extent of assessment during risk based verification Service specification — DNVGL-SE-0480. Edition July 2017 Page 13 Verification of lifting appliances for the oil and gas industry DNV GL AS 1.5.4.1 Table 1-4 Assessment codes Code I Legend For information only R1 review of principles and general aspects R2 Review of principles, general aspects and spot check of calculations S1 Surveillance on a visit basis, e.g. once per week or sample review 10-20% S2 Surveillance frequency minimum once per day or review of 50-60% S3 Surveillance frequency minimum once per shift or review of 100% of items A Audit H Hold point 1.5.5 References — — — — CEN standards Norsok standards ISO standards API codes. Service specification — DNVGL-SE-0480. Edition July 2017 Page 14 Verification of lifting appliances for the oil and gas industry DNV GL AS SECTION 2 SERVICE OVERVIEW 2.1 General 2.1.1 Objectives 2.1.1.1 The objectives of this section are to provide: — an overview all verification activities relating to lifting appliances — details of DNV GL’s verification services for lifting appliances. 2.2 Service process 2.2.1 General principles 2.2.1.1 The description of the process of DNV GL’s verification of lifting appliances is based on distinct project phases and the recognition of key milestones. 2.2.1.2 Verification performed by DNV GL normally progresses through one or more of these project phases and may include all or selected aspects of the project. 2.2.1.3 The risk based verification process is described in relation to the normal project phases: Project initiation: — conceptual design. Project realisation: — — — — detail design construction and factory acceptance test installation and commissioning issue of certificates enabling for operation. Project operation: — operation — maintenance — repair. Project abandonment: — decommissioning — removal. 2.2.2 Simplified verification planning 2.2.2.1 The steps in the simplified verification planning are as follows: — Use trigger questions to assess the overall risk level of the project (or manageable elements thereof). — Evaluate the risk against the relevant owner or project acceptance criteria (often this can be directly tied to the owner core values or a sub-set of these) and decide whether the general verification involvement shall be low, medium or high. — Use the example detailed scope of work tables in App.B to make a first draft of a verification plan Service specification — DNVGL-SE-0480. Edition July 2017 Page 15 Verification of lifting appliances for the oil and gas industry DNV GL AS — Generate the project specific verification plan by including a project specific engineering judgment or risk analysis to adjust the table to suit the project. — Perform the verification execution according to the verification plan, making revision to the plan if and when necessary. — Report the verification. 2.2.2.2 The trigger questions are included in App.A. 2.2.2.3 Generic scopes of work for verification at the three levels of verification; low (L), medium (M) and high (H), are given in the tables in this section. 2.2.2.4 Project specific detailed scope of work descriptions, based on the generic scopes of work tables and showing all the activities to be verified, should be made. Examples of the level of detail are given in App.B. 2.2.2.5 Tables in this section give the principle differences between the levels of verification involvement. The detailed example tables should be treated as examples only. They shall not be used without a project specific confirmation of their completeness. 2.2.2.6 The project specific scope of work definition, derived from the tables in App.B (or similar), shall be part of the final DNV GL verification report. 2.2.3 Selection of level of verification 2.2.3.1 The selection of the level of verification for the simplified verification planning is facilitated by the trigger questions included in App.A. 2.2.4 Codes, standards and reference documents 2.2.4.1 The verification process described in this DNVGL-SE-0480 is not tailored to a specific technical standard, code or reference document. 2.2.4.2 It is recommended to use internationally recognised codes or standards. Where combinations of standards and external criteria are used the exact terms of reference and documents to be issued shall be agreed at the beginning of the project and formally defined in the contract. 2.2.4.3 It is recommended strongly not to mix standards due to the possible differences in safety philosophies. Guidance note: Most standards are a coherent collection of requirements for all the relevant aspects of a lifting appliance. These aspects, e.g. load and resistance, are normally among themselves adjusted to give an overall acceptable safety level. To pick requirements from different standards can then easily result in unpredictable and non-uniform levels of safety. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 2.3 Project initiation 2.3.1 Verification during conceptual design 2.3.1.1 Verification during the conceptual and/or feasibility studies of a project and in the early stages of a project may reduce the need for verification during the design, construction and installation phases, and can reduce costs during the long term operation, inspection and maintenance phases. Service specification — DNVGL-SE-0480. Edition July 2017 Page 16 Verification of lifting appliances for the oil and gas industry DNV GL AS 2.3.1.2 It is recommended to combine the design verification during project initiation phase with additional review of: — project schedule — cost impacts — business risks. 2.3.1.3 During this phase it may be beneficial to make an initial verification plan. Risk evaluations are carried out during this phase and should be used to get an indication of the general verification level; Low, Medium or High. 2.4 Project realization 2.4.1 General 2.4.1.1 All design, construction and installation aspects, relevant to a lifting appliance, may be covered by the life cycle verification. 2.4.1.2 In this specification the split in the scope of work between design, construction and installation is made between sets of requirements (specifications) developed during the various phases. Guidance note: The split between design, construction and installation may vary, but it is useful to spend some time on the definition to reduce interface problems later. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 2.4.2 Verification of overall project management 2.4.2.1 Verification of the overall project management is the examination of the means of controlling the entire process leading up to an operational lifting appliance. 2.4.2.2 This verification should confirm that the necessary controls are in place to ensure information flow across the various interfaces. It is especially important where separate contractors have been employed for different phases of the project such as design, construction and installation. 2.4.2.3 Typically the documentation is expected to be in line with ISO 9000 requirements. 2.4.2.4 Definition of scope of work for verification of overall project management shall follow Table 2-1. Table 2-1 Scope of work for verification of overall project management Level Verification activity Low Med High X X Review of the project management process by — review of project quality management documentation — audit of project quality management system X — review of sub-contractor control X Service specification — DNVGL-SE-0480. Edition July 2017 Page 17 Verification of lifting appliances for the oil and gas industry DNV GL AS 2.4.2.5 The verification of the overall project management quality system and documentation is optional. The reviews and audits should typically be performed if an extensive verification of a project is performed, while might be omitted for smaller sub-phase verifications. 2.4.3 Verification during design 2.4.3.1 Design verification is the examination of the assumptions, methods and results of the design process and is performed at the specified level of verification to ensure that the specified performance requirements of the lifting appliance will be achieved. 2.4.3.2 Design verification should consist of one, or some, of the following: — — — — — review review review review review of of of of of the design process specifications for design (asset specifications) design reports and drawings diagrams and descriptions specifications for construction, installation and operation, resulting from design. 2.4.3.3 The documents that shall be produced in the project should as a minimum satisfy the requirements of the selected code. 2.4.3.4 Definition of scope of work for verification of design should follow Table 2-2. 2.4.3.5 Design documentation may depend on the complexity of the lifting appliance consist of the following: — — — — — — — — — — — — — — — — — — — — — — name and address of the manufacturer, vendors, client, crane owner and intended location (if known) specifications for design, i.e. regulations, standards, codes, and client specifications (optional) design criteria including design temperature, environmental influences, and area classifications load ratings classification of structures, mechanisms and systems general arrangement of the lifting appliance including rigging/reeving plans info regarding personnel lifting, if applicable detailed construction drawings on all elements concerning technical safety structural design calculations, including failure curves, if applicable machinery design calculations system design calculations fire and gas protection drawings and descriptions noise protection plans and drawings drawings and specifications for electrical components cable and piping specifications prime and secondary movers, such as diesel engines, el. motors, hydraulic pumps etc. operational limitations including overload protection system calculations if applicable specifications for construction including material specifications, welding specifications, NDE-extent programme for functional and load tests fabrication plans and schedules drawings of marking operation and maintenance manual. 2.4.3.6 The documents that shall be produced in the project and handed over to DNV GL shall enable for the selected level of verification, see Table 2-2 and should as a minimum satisfy the requirements of the selected code. 2.4.3.7 Definition of scope of work for verification of design should follow Table 2-2. Service specification — DNVGL-SE-0480. Edition July 2017 Page 18 Verification of lifting appliances for the oil and gas industry DNV GL AS Table 2-2 Scope of work for verification of design Level Verification activity Low Med High Review of the design process by X — review of design quality management documentation Review of specifications for design by X X X X X X — review of the risk assessment reports, including acceptance requirements and results X X — spot check of critical aspects X X — review of the design specifications, i.e. regulations, standards, codes and client specifications (optional) — review of the design basis with emphasis on the design criteria and classifications Review of design risk assessment X — evaluation of critical aspects, including SHE as identified in the risk assessment reports Review of drawings, diagrams and documentation by — review of the formal documentation to ensure that the requirements have been accounted for in design and that the chosen design philosophies are in accordance with specified codes and standards X — evaluation of the main methods used and spot checks of the input data and the calculation results X X X X X — detailed review of main design reports — detailed review of the foundation reaction forces X X X — detailed review of the user manual X X X Guidance note: Design verification activities may be split up between basic design and detailed design, or other sub-phases, depending on type of contract. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 2.4.4 Verification during construction and factory acceptance test 2.4.4.1 This phase comprises prefabrication, fabrication, assembly, erection and Factory acceptance Test. An important element is to ensure that the contractual design requirements are incorporated in the purchase documentation, and that correct materials, components and proper testing procedures are applied such that it meets the requirements as per approved specifications and procedures. It is recommended that relevant preparations for this is started as early as possible, e.g. by the appointment of a vendor supply verification co-ordinator. 2.4.4.2 Verification during construction and factory acceptance test is carried out by means of attendance, audits, inspection or spot checks of the work as well as witnessing of factory acceptance test, as appropriate, in sufficient detail to ensure that the specified requirements of the lifting appliance will be achieved. Service specification — DNVGL-SE-0480. Edition July 2017 Page 19 Verification of lifting appliances for the oil and gas industry DNV GL AS 2.4.4.3 Verification of these activities relates not only to the manufacturers work but also to the monitoring of this work carried out by vendors and contractors others. 2.4.4.4 Construction and factory acceptance test verification may consist of one, or some, of the following: — — — — — — — — reviewing the quality assurance system documentation adopted by the manufacturer and vendors reviewing the construction process reviewing construction procedures reviewing qualification process reviewing manufacturer survey arrangements, if applicable surveillance during construction activities witnessing during factory acceptance test reviewing final documentation. 2.4.4.5 The documentation that should be submitted for review are typically: — manufacturing quality system documentation — manufacturing procedures, including test requirements and acceptance criteria, repairs, personnel qualification records etc. — material certificates — test and calibration records — dimensional measurement reports — welding documentation incl. NDE reports — noise and vibration records. 2.4.4.6 Particularly for the factory acceptance test it is highly recommended to prepare a formal test procedure be verified prior to commencement. 2.4.4.7 Scope of work for verification of construction should follow Table 2-3 for manufacturing and fabrication and Table 2-4 for FAT. Table 2-3 Scope of work for verification of manufacturing and fabrication Level Verification activity Low Med High X X Review of the manufacturing and fabrication process — Review of manufacturing and fabrication quality management systems X — Audit of the quality management system Review of manufacturing and fabrication procedures X — Review of the design verification report X X — Review manufacturing, fabrication and inspection procedures for confirmation of compliance with the manufacturing specification Surveillance during manufacturing and fabrication activities — Visit-based or full-time attendance during manufacturing and fabrication to ensure, based on spot checks, that the components and assemblies have been produced in accordance with the manufacturing specification X X Review of fabrication records Service specification — DNVGL-SE-0480. Edition July 2017 Page 20 Verification of lifting appliances for the oil and gas industry DNV GL AS Level Verification activity Low Med High — Review the manufacturing data book, as applicable X X — Review of formal documentation X X Guidance note: Materials and components may be ordered with certificates of varying degrees of independent 3rd party verification This may be integrated in the overall verification activities, so not to duplicate work. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- Table 2-4 Scope of work for verification of factory acceptance tests Level Verification activity Low Med High X X — Surveillance to ensure that the assembly, erection, rigging and configuration, complies with the test procedure requirements X X — Survey of the main elements to verify compliance with the construction requirements X X — Survey of testing to ensure that the results comply with the test procedure requirements regarding safety aspects X X Review of test programme and preparations for testing — Review the FAT programme for confirmation of compliance with the requirements and specifications Surveillance during testing — Survey of testing to ensure that the results comply with the test procedure requirements regarding performance, endurance and SHE aspects X 2.4.5 Verification during installation and commisioning 2.4.5.1 This phase comprises shipment, installation, testing and commissioning in conjunction with hand over of the lifting appliance to the user and to bring the lifting appliance into use for the first time. 2.4.5.2 An important element is to ensure that the lifting appliance as installed on its final location meets the requirements in the regulations and as per approved specifications and procedures. It is imperative that relevant preparations for this is started as early as possible, e.g. by the appointment of a installation and commissioning responsible co-ordinator. 2.4.5.3 Verification during installation and commissioning is carried out by means of attendance, audits, inspection or spot checks of the work as well as witnessing of function and overload testing, as appropriate, in sufficient detail to ensure that the specified requirements of the lifting appliance will be achieved. 2.4.5.4 Verification of these activities relates not only to the manufacturers work but also to the monitoring of the work carried out by vendors installation contractors and others. 2.4.5.5 Installation and commissioning test verification shall consist of one, or some, of the following: Service specification — DNVGL-SE-0480. Edition July 2017 Page 21 Verification of lifting appliances for the oil and gas industry DNV GL AS — — — — — — reviewing the installation and commissioning plans reviewing installation and commissioning procedures reviewing qualification process surveillance during installation activities witnessing during function and overload test reviewing final documentation. 2.4.5.6 The documents that should be produced in the project and submitted for review prior to installation and commissioning are typically: — quality plans — installation procedures, including test requirements and acceptance criteria, repairs, personnel qualification records etc — welding documentation including NDT reports — pressure testing procedures — pretensioning procedures — piping and cabling hook up procedures — access and maintenance plans and — manufacturer’s/installers quality system manual. 2.4.5.7 Particularly for the commisioning acceptance test it is highly recommended to prepare a formal test procedure be verified prior to commencement. 2.4.5.8 The as-built documentation to be submitted after installation include but not be limited to: — — — — — installation records, i.e. dimensional reports, hook up test reports, personnel qualification records etc material certificates welding records, oil test samples, heat treatment etc. vibration and noise reports commissioning report. 2.4.5.9 Definition of scope of work for verification of installation and commissioning should follow Table 2-5 for testing and completion. Table 2-5 Scope of work for verification during installation and commissioning Level Verification activity Low Med High X X X X Initial activities — Review of quality system documentation X — Review of previous verification reports X — Review of qualification records Surveillance during installation activities — Part time attendance during installation to verify that the foundation, interface connection, access and escape routes are properly installed X X X X Review of installation documentation X — Review of foundation design report Service specification — DNVGL-SE-0480. Edition July 2017 Page 22 Verification of lifting appliances for the oil and gas industry DNV GL AS Level Verification activity Low Med High X X X X X X — Review of installation records and reports — Surveillance during test activities — Witnessing of installation and commissioning testing regarding safety and integrity X — Witnessing of SHE aspects, performance and endurance testing Review of final documentation X — Spot check of as-built documentation X X — Review of as-built documentation — Review of formal documentation, i.e. EC Declaration of Conformity, if applicable X X X — Review of user instructions X X X — Review of former ILO certificates, if applicable X X X 2.4.6 Verification at issuance of certificate of lifting appliance 2.4.6.1 This phase comprises final issuance of the certificate of lifting appliance which is required to bring the lifting appliance into use for the first time. 2.4.6.2 The scope of this verification is to summarise all previous verification activities and issue the required certification documents as competent person. 2.4.6.3 Verification at issuance of the certificate of lifting appliance shall consist of some or all of the following activities: — — — — reviewing the design verification reports reviewing the construction and FAT reports, including component and product certificates and former ILO certificates reviewing installation and commissioning reports, including modification/repair reports, and upgrading documentation, if relevant. 2.4.6.4 The scope of work for verification at issuance of certificate of lifting appliance shall follow Table 2-6. If a certain verification level is aimed for to be stated on the certificate, this verification level as a minimum has to be followed in the previous verification phases. Table 2-6 Scope of work for final issuance of certificate of lifting appliance Level Verification level applied stated on the certificate Low — Verification of project management Med High M/H H — Design verification report L/M/H 1) M/H H — Construction and FAT report L/M/H 2) M/H H Service specification — DNVGL-SE-0480. Edition July 2017 Page 23 Verification of lifting appliances for the oil and gas industry DNV GL AS Level Verification level applied stated on the certificate — Installation and commissioning report 1) 2) Low Med High L/M/H M/H H The design verification activity may be carried out during installation and commissioning. The low level verification during construction and FAT does not involve DNV GL. 2.5 Verification documents 2.5.1 General 2.5.1.1 The hierarchy of verification document is given in DNVGL-SE-0474. The descriptions of the content of these documents as well as examples of document forms are given in App.C to this specification. Service specification — DNVGL-SE-0480. Edition July 2017 Page 24 Verification of lifting appliances for the oil and gas industry DNV GL AS APPENDIX A SELECTION OF VERIFICATION LEVEL A.1 General A.1.1 General principles A.1.1.1 The selection of the level of verification depends on the risk level of each of the elements that have an impact on the management of risks to the asset. A.1.1.2 Verification shall direct greatest effort at those elements of the asset where the risk is highest and whose failure or reduced performance will have the most significant impact on the project objective and goals, e.g.: — safety risks, — environmental risks, — economic/business risks. A.1.1.3 Suitable selection factors include, but are not limited to, the: — — — — — — overall safety and other objectives for the asset assessment of the risks associated with the asset and the measures taken to reduce these risks degree of technical innovation in the asset experience of the contractors in carrying out the work quality management systems of the owner and its contractors business risk associated with schedule impact and rework. A.1.1.4 Due to the diversity of various lifting appliances, their contents, their degree of innovation, the geographic location, etc., it is not possible to give precise guidelines on how to decide what level of verification is appropriate for each particular structure. A.1.1.5 Therefore, guidance is given in the form of a series of questions that should be answered when deciding the appropriate level of verification for a process facility. This list is not exhaustive and other questions should be added to the list if appropriate for a particular process facility. A.1.1.6 It is emphasised that the contribution of each element should be judged qualitatively and/or quantitatively. Wherever possible quantified risk assessment data should use to provide a justifiable basis for any decisions made. A.1.1.7 Depending on the stage of the project, the activities may not have taken place yet in which case the questions should also be posed in another form, i.e. “Is …. planned to be?” A.2 Trigger questions A.2.1 Overall project objective and goals — Does the safety objective address the main safety goals? — Does the safety objective establish acceptance criteria for the level of risk acceptable to the owner? — Is this risk (depending on the type of appliance and its location) also measured in terms of environmental, economic and political consequences? — In terms of scope of work is the project schedule realistic? — Does the contract place severe financial penalties if target dates for commissioning are not met? Service specification — DNVGL-SE-0480. Edition July 2017 Page 25 Verification of lifting appliances for the oil and gas industry DNV GL AS Guidance note: Substitute safety objective with other relevant objectives for the project, and go through all of them. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- A.2.2 Assessment of risk — Has a systematic review been carried out to identify and evaluate the probabilities and consequences of failures in the lifting appliance? — Has this review judged the contribution of each element qualitatively and/or quantitatively and used, where possible, quantified risk assessment data to provide a justifiable basis for any decisions made? — Does the extent of the review reflect the risk level of the lifting appliance, the planned operation and previous experience with similar appliances? — Does this review identify the risk to the operation of the lifting appliance and to the health and safety of personnel associated with it or in its vicinity? — Has the extent of the identified risks been reduced to a level as low as reasonably practicable by means of one or both of: — reduction in the probability of failure? — mitigation of the consequences of failure? — Has the result of the systematic review of the risks been measured against the owner’s safety (or other) objective? — Has the result of this review been used in the selection of the appropriate verification activity level? — In terms of schedule which are the items which have a significant impact? A.2.3 Technical innovation — Has the degree of technical innovation in the lifting appliance design been considered? — Has it been considered that risks to the structure are likely to be greater with a high degree of technical innovation than with an appliance designed, fabricated and installed to usual/typical criteria? — Have factors been considered in the selection of the appropriate verification level such as: — degree of difficulty in achieving technical requirements? — knowledge of similar solutions? A.2.4 Contractors’ experience — Has the degree of risk to the design/fabrication and installation been considered with respect to the experience of the manufacturer/contractor? — Has the degree of risk been considered where the manufacturers/contractors are experienced but not in similar work? — Has the degree of risk been considered where the work schedule is tight? A.2.5 Quality management systems — Have all parties involved in the project implemented an adequate quality management system to ensure that gross errors in the work are limited? — Do these parties include the: — owner — design contractor Service specification — DNVGL-SE-0480. Edition July 2017 Page 26 Verification of lifting appliances for the oil and gas industry DNV GL AS — — — — construction contractors vendors installation contractor operator. — Do the factors being considered when evaluating the adequacy of the quality management system include: — — — — — whether or not an ISO 9000 or equivalent certified system is in place? results from external audits? results from internal audits? experience with contractors’ previous work? project work force familiarity with the quality management system? A.2.6 Simplified assessment and verification level See Table E-2. Service specification — DNVGL-SE-0480. Edition July 2017 Page 27 Verification of lifting appliances for the oil and gas industry DNV GL AS APPENDIX B DETAILED EXAMPLE SCOPE OF WORK TABLES FOR VERIFICATION B.1 General B.1.1 General introduction B.1.1.1 This appendix provides the format of the detailed verification lists (tables), generated for typical systems comprising a lifting facility: 1) 2) 3) 4) 5) 6) cranes lifting accessories lifting appliances for life saving equipment lifting person devices drilling hoisting equipment robots. which shall be made for each particular project. B.1.1.2 The detailed project specific verification lists for the chosen level of verification shall be based on these tables. B.1.1.3 For project scenarios or components not covered in this appendix, similar lists with the same degree of detail shall be made. B.1.1.4 If any of the activities are moved from one phase to another, then this should be clearly identified on the list where it is removed. Similarly, the detailed list for the phase to where it is moved shall be amended. Guidance note: Typically, contractual boundaries may give natural splits of activities between phases. However, then it is even more important to ensure that there is a traceably as to which phases what activity belong and that this is also conveyed to the contractors also. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.2 Description of terms used in the scope of work tables B.2.1 General B.2.1.1 The following abbreviations have been used. The definitions of which are given subsequently: — — — — — A is audit S is surveillance H is hold point R is review I is for information. B.2.1.2 These abbreviations are DNV GL’s preferred terms and normally will be used in DNV GL generated documents. However, other terms, for example monitoring or witnessing, will be used by DNV GL if these are the terms commonly used in documents, such as inspection and test plans, generated by others. In that case, it is expected that these other terms are defined in these documents. Service specification — DNVGL-SE-0480. Edition July 2017 Page 28 Verification of lifting appliances for the oil and gas industry DNV GL AS B.2.2 Audit B.2.2.1 Systematic and independent examination to determine whether quality activities and related results comply with planned arrangements and whether these arrangements are implemented effectively and are suitable to achieve objectives (ISO 8402:1994). Guidance note: This activity differs from the surveillance by being focused on the adherence to and completeness and robustness of the procedures and not on the actual result of the procedure (although this is not ignored). Further, the audit is normally a ‘one-off’ activity as opposed to the continuity in monitoring. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.2.3 Surveillance B.2.3.1 Continual monitoring and verification of the status of an entity and analysis of records to ensure that specified requirements are being fulfilled (ISO 8402:1994). Guidance note: Other commonly used terms for surveillance are monitoring or witnessing. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.2.3.2 The amount of work involved in surveillance is not described in detail in the tables. This shall be part of the final contractual scope of work which shall define the frequency of surveillance based on the overall surveillance and the quality control performed by other parties as well as DNV GL’s experience. B.2.3.3 The following shall be used to describe the frequency if nothing else is specifically defined: S1 S2 S3 = surveillance on a visit basis, e.g. once per week or sample review 10-20% = surveillance frequency minimum once per day or review of 50-60% = surveillance frequency minimum once per shift or review of 100% of items Guidance note: These surveillance frequencies may be modified to correspond with production work flow. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.2.4 Review B.2.4.1 Systematic examination of reports and documentation against a project defined verification basis. The depth of review will depend both on the type of document and the level of involvement. B.2.4.2 The following shall be used to describe the extent of the review if nothing else is specifically defined: I R1 R2 = for information only = review of principles and general aspects = Review of principles, general aspects and spot check of calculations Guidance note: Review of production records does not guarantee their correctness. It is a confirmation to DNV GL that the manufacturer and/or sub-contractor has preformed the required activity and issued a report. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- Service specification — DNVGL-SE-0480. Edition July 2017 Page 29 Verification of lifting appliances for the oil and gas industry DNV GL AS B.2.4.3 Reports that are reviewed by DNV GL will, unless otherwise agreed, not be signed and stamped. Table B-1 Assessment codes Code I Legend For information only R1 Review of principles and general aspects R2 Review of principles, general aspects and spot check of calculations S1 Surveillance on a visit basis, e.g. once per week or sample review 10-20% S2 Surveillance frequency minimum once per day or review of 50-60% S3 Surveillance frequency minimum once per shift or review of 100% of items A Audit H Hold point B.3 Overall project management B.3.1 General B.3.1.1 The project quality management documentation, if part of scope, should be available for review at the early stages of the project, preferably before design is underway, to ensure that the necessary controls are in place. Table B-2 Overall project management Item Description Level Low 1 review of project quality management documentation 2 audit of project quality management system 3 review of sub-contractor control 4 review of interface controls 5 review of methods of information flow Med High R2 R2 A R2 R1 R2 R1 B.4 Design B.4.1 General B.4.1.1 Design consists of conceptual and detailed design and their associated documentation. B.4.1.2 The scope of work for design verification is shown in tables listed in this chapter, for various types of lifting appliances. The tables states a recommended scope of work for low, medium and high level Service specification — DNVGL-SE-0480. Edition July 2017 Page 30 Verification of lifting appliances for the oil and gas industry DNV GL AS verification, and may be changed upon an agreement between the client and DNV GL based on the method listed in App.A. B.4.1.3 For manufacturers and vendors who have established a DNV GL approved ISO9000 quality system covering design of lifting appliances, this may reduce the scope of work accordingly, upon agreement with DNV GL. App.B describes the issues to be reviewed and the extent of verification included in the three verification levels. B.4.2 Verification during design B.4.2.1 For verification of lifting appliances during design the following activities are considered: — initial activities — review activities — final activities. The initial activities includes a review of basic project information, design criteria and the design quality management system of the designer. The review activities include evaluation of documentation related to the design of the lifting appliance. The final activities include issuance of a design verification report. B.4.3 Low level design verification B.4.3.1 The low level design verification consists of a minimum verification involvement in order for DNV GL to issue a design verification report. Provided that the proceeding verification activities are performed during construction, FAT, installation and commissioning, a DNV GL certificate of lifting appliance may finally be issued. The ow level verification scheme is based that the risks associated with potential faulty design is considered to be low, typically for smaller, low capacity lifting appliances. The client may find internal control measures sufficient and choose a low level design verification based on formal requirements towards the designer, such as quality assurance requirement, internal verification or EC Declaration of Conformity issued by the manufacturer. Low level design verification will imply that the manufacturer is the sole responsible for the technical construction file, and that a very limited extent of documentation is subject for design review. B.4.4 Medium level design verification B.4.4.1 Medium level design verification consists of a review of main design documents related to safety and integrity. Critical aspects will be spot checked with focus on strength and integrity. The review will be detailed for high risk aspects and independent checks will be performed. The medium level design verification corresponds to the ILO certification scheme applied world wide in the maritime area. See DNVGL-ST-0377 Standard for shipboard lifting appliances or DNVGL-ST-0378 Standard for offshore and platform lifting appliances. B.4.5 High level design verification B.4.5.1 High level design verification consists of a full review of most of the produced documents related to safety and integrity, including SHE aspects, performance and endurance of the lifting appliance. The main specifications are also checked. The review will be detailed for all high risk aspects and independent checks will be performed. Less critical aspects will be spot checked. High level design verification is recommended for lifting appliances representing high risks, such as high capacity cranes, cranes lifting over process areas, cranes lifting persons, etc. Service specification — DNVGL-SE-0480. Edition July 2017 Page 31 Verification of lifting appliances for the oil and gas industry DNV GL AS Table B-3 Crane verification during design Item Level Description Low Med High Initial activities 1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known I I I 2 Review of design specifications, i.e. regulations, standards, codes and client specifications, if applicable I R1 R2 3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mechanisms and systems R1 R1 R2 4 Review of design quality management system - R1 R2 5 Review of technical risk assessment report - - R2 6 Technical design verification kick-off meeting - - H Review activities 7 Review of general arrangement, rigging and reeving plan R1 R2 R2 8 Review of ratings, load charts and lifting tables, speeds and operational limitations R1 R2 R2 9 Review info on personnel lifting, if applicable R1 R2 R2 10 Review of detailed construction drawings and design calculations on all structural elements essential for strength and safety - R1 R2 11 Review of diagrams and calculations for sequence of failure, if applicable - R1 R2 12 Review of detailed drawings, calculations and documentation on all machinery elements and components essential for strength and safety - R1 R2 13 Review of performance capacity and endurance calculations - - R1 14 Review of detailed drawings, diagrams and calculations on all system elements essential for technical safety - R1 R2 15 Review of control and work position including all SHE aspects - R1 R2 16 Review of control system documentation, including PLC programs if applicable - R1 R2 17 Review of safety system documentation including PLC programs if applicable - R1 R2 Review of communication and utility systems documentation - R1 R1 19 Review of fire and explosion protection drawings and descriptions - R1 R2 20 Review of noise and vibration protection drawings and descriptions - R1 R2 21 Review of electrical drawings and diagrams including EMC - R1 R2 22 Review of cabling and termination specification and arrangement drawings - - R1 23 Review of piping specification and arrangement drawings - - R1 24 Review of access and escape routes arrangement drawings - R1 R2 8 Service specification — DNVGL-SE-0480. Edition July 2017 Page 32 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 25 Review of control station and work positions arrangement drawings - R1 R2 26 Review of FAT test programmes and commissioning test programmes - R1 R2 27 Review of labelling and marking documentation - R1 R1 28 Review of corrosion protection documentation - - R1 29 Review of vendor documentation, including product certificates - R2 R2 30 Review of foundation reaction forces R2 R2 R2 31 Review of fabrication specifications, plans and schedules - I I 32 Review of user manual including operating instructions, emergency procedures and maintenance instructions R2 R2 R2 33 Review of EC declaration of conformity, if applicable R2 R2 R2 34 Review of notified body certificates or statements, if applicable R2 R2 R2 H H H Final activities 35 Issue design verification report Table B-4 Lifting accessories verification during design Item Level Description Low Med High Initial activities 1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known I I I 2 Review of design specifications, i.e. regulations, standards, codes and client specifications, if applicable I R1 R2 3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mechanisms and systems, if applicable R1 R1 R2 4 Review of design quality management system - R1 R2 5 Review of technical risk assessment report - - R2 6 Technical design verification kick-off meeting - - H Review activities 7 Review of general arrangement, rigging and reeving plan R1 R2 R2 8 Review of ratings, load charts and lifting tables and operational limitations R1 R2 R2 9 Review info on personnel lifting, if applicable R1 R2 R2 - R1 R2 10 Review of detailed construction drawings and design calculations on all structural elements essential for strength and safety Service specification — DNVGL-SE-0480. Edition July 2017 Page 33 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 11 Review of detailed drawings, calculations and documentation on all machinery elements and components essential for strength and safety - R1 R2 12 Review of performance capacity and endurance calculations - - R1 13 Review of detailed drawings, diagrams and calculations on all system elements essential for technical safety - R1 R2 14 Review of control and work position including all SHE aspects - R1 R2 15 Review of control system documentation, including PLC programs if applicable - R1 R2 16 Review of safety system documentation including PLC programs if applicable - R1 R2 17 Review of communication and utility systems documentation - R1 R1 18 Review of electrical drawings and diagrams, including EMC - R1 R2 19 Review of cabling and termination specification and arrangement drawings - - R1 20 Review of piping specification and arrangement drawings - - R1 21 Review of corrosion protection documentation - - R1 22 Review of FAT test programmes and commissioning test programmes - R1 R2 23 Review of labelling and marking documentation - R1 R1 24 Review of vendor documentation, including product certificates - R2 R2 25 Review of suspension reaction forces R2 R2 R2 26 Review of fabrication specifications, plans and schedules - I I 27 Review of user manual including operating instructions, emergency procedures and maintenance instructions R2 R1 R2 28 Review of EC declaration of conformity, if applicable R2 R1 R1 29 Review of notified body certificates or statements, if applicable R2 R2 R2 H H H Final activities: 30 Issue design verification report Table B-5 Lifting appliances for life saving equipment verification during design Item Level Description Low Med High Initial activities 1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known I I I 2 Review of design specifications, i.e. regulations, standards, codes and client specifications, if applicable I R1 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 34 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High R1 R1 R2 3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mechanisms and systems 4 Review of design quality management system - R1 R2 5 Review of technical risk assessment report - - R2 6 Technical design verification kick-off meeting - - H Review activities 7 Review of general arrangement, rigging and reeving plan R1 R2 R2 8 Review of ratings, load charts and lifting tables, speeds and operational limitations R1 R2 R2 9 Review info on personnel lifting, if applicable R1 R2 R2 10 Review of detailed construction drawings and design calculations on all structural elements essential for strength and safety - R1 R2 11 Review of detailed drawings, calculations and documentation on all machinery elements and components essential for strength and safety - R1 R2 12 Review of performance capacity and endurance calculations - - R1 13 Review of detailed drawings, diagrams and calculations on all system elements essential for technical safety - R1 R2 14 Review of control and work position including all SHE aspects - R1 R2 15 Review of control system documentation, including PLC programs if applicable - R1 R2 16 Review of safety system documentation, including PLC programs if applicable - R1 R2 17 Review of communication and utility systems documentation - R1 R1 18 Review of fire and explosion protection drawings and descriptions - R1 R2 19 Review of noise and vibration protection drawings and descriptions - R1 R2 20 Review of electrical drawings and diagrams including EMC - R1 R2 21 Review of cabling and termination specification and arrangement drawings - - R1 22 Review of piping specification and arrangement drawings - - R1 23 Review of access and escape routes arrangement drawings - R1 R2 24 Review of control station and work positions arrangement drawings - R1 R2 25 Review of FAT test programmes and commissioning test programmes - R1 R2 26 Review of labelling and marking documentation - R1 R1 27 Review of corrosion protection documentation - - R1 28 Review of vendor documentation, including product certificates - R2 R2 29 Review of foundation reaction forces R2 R2 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 35 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High - I I 30 Review of fabrication specifications, plans and schedules 31 Review of user manual including operating instructions, emergency procedures and maintenance instructions R2 R2 R2 32 Review of EC declaration of conformity, if applicable R2 R2 R2 33 Review of notified body certificates or statements, if applicable R2 R2 R2 H H H Final activities: 34 Issue design verification report Table B-6 Lifting person devices verification during design Item Level Description Low Med High Initial activities 1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known I I I 2 Review of design specifications, i.e. regulations, standards, codes and client specifications, if applicable I R1 R2 3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mechanisms and systems R1 R1 R2 4 Review of design quality management system - R1 R2 5 Review of technical risk assessment report - - R2 6 Technical design verification kick-off meeting - - H Review activities 7 Review of general arrangement, rigging and reeving plan R1 R2 R2 8 Review of ratings, load charts and lifting tables, speeds and operational limitations R1 R2 R2 9 Review info on personnel lifting R1 R2 R2 10 Review of detailed construction drawings and design calculations on all structural elements essential for strength and safety - R1 R2 11 Review of detailed drawings, calculations and documentation on all machinery elements and components essential for strength and safety - R1 R2 12 Review of performance capacity and endurance calculations - - R1 13 Review of detailed drawings, diagrams and calculations on all system elements essential for technical safety - R1 R2 14 Review of control and work position including all SHE aspects - R1 R2 15 Review of control system documentation, including PLC programs if applicable - R1 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 36 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 16 Review of safety system documentation including PLC programs if applicable - R1 R2 17 Review of communication and utility systems documentation - R1 R1 18 Review of fire and explosion protection drawings and descriptions - R1 R2 19 Review of noise and vibration protection drawings and descriptions - R1 R2 20 Review of electrical drawings and diagrams including EMC - R1 R2 21 Review of cabling and termination specification and arrangement drawings - - R1 22 Review of piping specification and arrangement drawings - - R1 23 Review of access and escape routes arrangement drawings - R1 R2 24 Review of control station and work positions arrangement drawings - R1 R2 25 Review of FAT test programmes and commissioning test programmes - R1 R2 26 Review of labelling and marking documentation - R1 R1 27 Review of corrosion protection documentation - - R1 28 Review of vendor documentation, including product certificates - R2 R2 29 Review of foundation reaction forces R2 R2 R2 30 Review of fabrication specifications, plans and schedules - I I 31 Review of user manual including operating instructions, emergency procedures and maintenance instructions R2 R2 R2 32 Review of EC declaration of conformity, if applicable R2 R2 R2 33 Review of notified body certificates or statements, if applicable R2 R2 R2 H H H Final activities: 34 Issue design verification report Table B-7 Drilling hoisting equipment verification during design Item Level Description Low Med High Initial activities 1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known I I I 2 Review of design specifications, i.e. regulations, standards, codes and client specifications, if applicable I R1 R2 3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mechanisms and systems R1 R1 R2 4 Review of design quality management system documentation - R1 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 37 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 5 Review of technical risk assessment report - - R2 6 Technical design verification kick-off meeting - - H Review activities 7 Review of general arrangement, rigging and reeving plan R1 R2 R2 8 Review of ratings, load charts and lifting tables, speeds and operational limitations R1 R2 R2 9 Review info on personnel lifting, if applicable R1 R2 R2 10 Review of detailed construction drawings and design calculations on all structural elements essential for strength and safety - R1 R2 11 Review of detailed drawings, calculations and documentation on all machinery elements and components essential for strength and safety - R1 R2 12 Review of performance capacity and endurance calculations - - R1 13 Review of detailed drawings, diagrams and calculations on all system elements essential for technical safety - R1 R2 14 Review of control and work position including all SHE aspects - R1 R2 15 Review of control system documentation, including PLC programs if applicable - R1 R2 16 Review of safety system documentation including PLC programs if applicable - R1 R2 17 Review of communication and utility systems documentation - R1 R1 18 Review of fire and explosion protection drawings and descriptions - R1 R2 19 Review of noise and vibration protection drawings and descriptions - R1 R2 20 Review of electrical drawings and diagrams including EMC - R1 R2 21 Review of cabling and termination specification and arrangement drawings - - R1 22 Review of piping specification and arrangement drawings - - R1 23 Review of access and escape routes arrangement drawings - R1 R2 24 Review of control station and work positions arrangement drawings - R1 R2 25 Review of FAT test programmes and commissioning test programmes - R1 R2 26 Review of labelling and marking documentation - R1 R1 27 Review of corrosion protection documentation - - R1 28 Review of vendor documentation, including product certificates - R2 R2 29 Review of foundation reaction forces R2 R2 R2 30 Review of fabrication specifications, plans and schedules - I I 31 Review of user manual including operating instructions, emergency procedures and maintenance instructions R2 R2 R2 32 Review of EC declaration of conformity, if applicable R2 R2 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 38 Verification of lifting appliances for the oil and gas industry DNV GL AS Item 33 Level Description Review of notified body certificates or statements, if applicable Low Med High R2 R2 R2 H H H Final activities: 34 Issue design verification report Table B-8 Robots verification during design Item Level Description Low Med High Initial activities 1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known I I I 2 Review of design specifications, i.e. regulations, standards, codes and client specifications, if applicable I R1 R2 3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mechanisms and systems R1 R1 R2 4 Review of design quality management system - R1 R2 5 Review of technical risk assessment report - - R2 6 Technical design verification kick-off meeting - - H Review activities 7 Review of general arrangement, rigging and reeving plan R1 R2 R2 8 Review of ratings, load charts and lifting tables, speeds and operational limitations R1 R2 R2 9 Review of detailed construction drawings and design calculations on all structural elements essential for strength and safety - R1 R2 10 Review of detailed drawings, calculations and documentation on all machinery elements and components essential for strength and safety - R1 R2 11 Review of detailed drawings, diagrams and calculations on all system elements essential for technical safety - R1 R2 12 Review of control system documentation, including PLC programs if applicable - R1 R2 13 Review of performance capacity and endurance calculations - - R1 14 Review of detailed drawings, diagrams and calculations on all system elements essential for technical safety - R1 R2 15 Review of control and work position including all SHE aspects - R1 R2 16 Review of noise and vibration protection drawings and descriptions - R1 R2 17 Review of electrical drawings and diagrams including EMC - R1 R2 18 Review of cabling and termination specification and arrangement drawings - - R1 Service specification — DNVGL-SE-0480. Edition July 2017 Page 39 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 19 Review of piping specification and arrangement drawings - - R1 20 Review of access and escape routes arrangement drawings - R1 R2 21 Review of control station and work positions arrangement drawings - R1 R2 22 Review of FAT test programmes and commissioning test programmes - R1 R2 23 Review of labelling and marking documentation - R1 R1 24 Review of corrosion protection documentation - - R1 25 Review of vendor documentation, including product certificates - R2 R2 26 Review of foundation reaction forces R2 R2 R2 27 Review of fabrication specifications, plans and schedules - I I 28 Review of user manual including operating instructions, emergency procedures and maintenance instructions R2 R2 R2 29 Review of EC declaration of conformity, if applicable R2 R2 R2 30 Review of notified body certificates or statements, if applicable R2 R2 R2 H H H Final activities: 31 Issue design verification report B.5 Construction and factory acceptance test B.5.1 General B.5.1.1 Construction and factory acceptance test (FAT) consists of fabrication site activities and their associated documentation. B.5.1.2 The scope of work for verification during construction and FAT is shown in tables listed in this chapter, for various types of lifting appliances. The tables states a recommended scope of work for low, medium and high level verification, and may be changed upon an agreement between the client and DNV GL based on the method listed in App.A. B.5.1.3 For manufacturers and vendors who have established a DNV GL approved ISO9000 quality system covering construction and FAT of lifting appliances, this may reduce the scope of work accordingly, upon agreement with DNV GL. B.5.1.4 For manufacturers who have established a manufacturing survey agreement (MSA) with DNV GL, in order to systematically survey the construction and FAT activities, this arrangement may be used instead of the verification scheme listed in this chapter, upon further agreement. B.5.2 Construction and factory acceptance test verification B.5.2.1 For verification of lifting appliances the following activities are considered: — initial activities Service specification — DNVGL-SE-0480. Edition July 2017 Page 40 Verification of lifting appliances for the oil and gas industry DNV GL AS — surveillance, review and test activities, and — final activities. B.5.2.2 The initial activities include the review of procedures, attendance during qualification of procedures (e.g. MPQT) and personnel (e.g. welders) and other start-up activities. The surveillance, review and test activities are the site attendance and the final activities are the review of production results/records, and the completion of documentation and reports. B.5.3 Low level construction and factory acceptance test verification B.5.3.1 For low level verification, no verification activities are stated. For this verification level, it is assumed that construction and FAT of the lifting appliance in question is associated with low risk. This may be caused by the type and nature of the particular lifting appliance, or due to extensive internal quality assurance measures taken by the manufacturer or the client to ensure that all requirements are met. B.5.3.2 Some of the potential verification activities during construction and FAT for low level verification will however be covered by verification during installation and commissioning. B.5.4 Medium level construction and factory acceptance test verification B.5.4.1 For medium level verification, the procedure review consists of a review of principles and general aspects of the construction quality system, design review reports and procedures for construction and FAT. B.5.4.2 During construction, DNV GL’s verification will be performed by part time attendance at the main site. The verification will mainly be spot check survey of structural parts and their assembly. Further, review of the construction records and the manufacturing record book will be reviewed by spot check. B.5.4.3 Verification of the final activities will be carried out witnessing of safety critical parts of the FAT. An inspection release note will then be issued. B.5.5 High level construction verification B.5.5.1 For high level verification, the initial activities consist of a detailed review of construction management system and procedures. A quality audit will be performed. Design verification reports and the FAT procedure will be reviewed. Any design changes will be required to be verified before construction. B.5.5.2 Survey activity will include all main elements, SHE aspects, performance, endurance properties and marking. Depending on the fabrication schedule, part or full time attendance during construction will be required. Verification will focus on the critical items and or aspects as identified in the detailed scope of work tables. B.5.5.3 Verification of the final activities will be by detailed review of the production records and witnessing of FAT during testing of safety critical aspects as well as performance and endurance tests. B.5.5.4 Finally an inspection release note and a FAT verification report will be issued. Service specification — DNVGL-SE-0480. Edition July 2017 Page 41 Verification of lifting appliances for the oil and gas industry DNV GL AS Table B-9 Crane verification during construction and FAT Item Level Description Low Med High Initial activities 1 Review construction quality management system - R1 R2 2 Quality system audit of relevant manufacturers - - A 3 Review of design verification reports - R1 R2 4 Review of construction specifications and procedures - I R2 5 Review of FAT procedure - R1 R2 6 Technical kick-off meeting and review of construction plans - - R1 7 Verify personnel qualification records - - R1 Surveillance activities 8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S 9 Survey of interface to foundation and critical bolt connections - S W 10 Survey of main structural elements - S S 11 Survey of main machinery elements - S S 12 Survey of main system elements - - S 13 Survey of control station and work positions, internal access and escape routes - - S 14 Survey of SHE aspects for operation and maintenance - - S 15 Survey of marking, load tables, manufacturer plates and signboards - S S Review activities 16 Review of documentation for prefabricated items and vendor deliveries - R1 R2 17 Review of main structural elements fabrication documentation - R2 R2 18 Review of main machinery elements fabrication documentation - R1 R2 19 Review of main system elements fabrication documentation - - R2 20 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R2 21 Review of manufacturing record book including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable - R1 R2 22 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R2 23 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R2 24 Review EC Type examination certificates or other notified body statements, if applicable - R1 R2 Test activities Service specification — DNVGL-SE-0480. Edition July 2017 Page 42 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 25 Witness FAT, safety critical parts - H H 26 Witness FAT, performance and endurance tests etc. - - S - H H Final activities 27 Issue inspection release note and FAT verification report Table B-10 Lifting accessories verification during construction and FAT Item Level Description Low Med High Initial activities 1 Review construction quality management system - R1 R2 2 Quality system audit of relevant manufacturers - - A 3 Review of design verification reports - R1 R2 4 Review of construction specifications and procedures - I R2 5 Review of FAT procedure - R1 R2 6 Technical/kick-off meeting and review of construction plans - - R1 7 Verify personnel qualification records - - R1 Confirm prefabricated items and vendor deliveries acc. to requirements - - S 10 Survey of main structural elements - S S 11 Survey of main machinery elements - S S 12 Survey of main system elements - - S 13 Survey of SHE aspects for operation and maintenance - - S 14 Survey of marking, load tables, manufacturer plates and signboards - S S Surveillance activities 8 Review activities 15 Review of documentation for prefabricated items and vendor deliveries - R1 R2 16 Review of main structural elements fabrication documentation - R2 R2 17 Review of main machinery elements fabrication documentation - R1 R2 18 Review of main system elements fabrication documentation - - R2 19 Review integral component certificates for wire ropes, hooks, blocks, other accessories - R2 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 43 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 20 Review of manufacturing record book including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, lubrication reports, corrosion protection and preservation records, as applicable - R1 R2 21 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R2 22 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R2 23 Review EC Type examination certificates or other notified body statements, if applicable - R1 R2 Test activities 24 Witness FAT, safety critical parts - H H 25 Witness FAT, performance and endurance tests etc. - - S - H H Final activities 26 Issue inspection release note and FAT verification report Table B-11 Lifting appliances for life saving equipment verification during construction and FAT Item Level Description Low Med High Initial activities 1 Review construction quality management system - R1 R2 2 Quality system audit of relevant manufacturers - - A 3 Review of design verification reports - R1 R2 4 Review of construction specifications and procedures - I R2 5 Review of FAT procedure - R1 R2 6 Technical/kick-off meeting and review of construction plans - - R1 7 Verify personnel qualification records - - R1 Surveillance activities 8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S 9 Survey of interface to foundation and critical bolt connections - S W 10 Survey of main structural elements - S S 11 Survey of main machinery elements - S S 12 Survey of main system elements - - S 13 Survey of control station and work positions, internal access and escape routes - - S 14 Survey of SHE aspects for operation and maintenance - - S 15 Survey of marking, load tables, manufacturer plates and signboards - S S Service specification — DNVGL-SE-0480. Edition July 2017 Page 44 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High Review activities 16 Review of documentation for prefabricated items and vendor deliveries - R1 R2 17 Review of main structural elements fabrication documentation - R2 R2 18 Review of main machinery elements fabrication documentation - R1 R2 19 Review of main system elements fabrication documentation - - R2 20 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R2 21 Review of manufacturing record book including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable - R1 R2 22 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R2 23 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R2 24 Review EC Type examination certificates or other notified body statements, if applicable - R1 R2 Test activities 25 Witness FAT, safety critical parts - H H 26 Witness FAT, performance and endurance tests etc. - - S - H H Final activities 27 Issue inspection release note and FAT verification report Table B-12 Lifting person devices verification during construction and FAT Item Level Description Low Med High Initial activities 1 Review construction quality management system - R1 R2 2 Quality system audit of relevant manufacturers - - A 3 Review of design verification reports - R1 R2 4 Review of construction specifications and procedures - I R2 5 Review of FAT procedure - R1 R2 6 Technical/kick-off meeting and review of construction plans - - R1 7 Verify personnel qualification records - - R1 - - S Surveillance activities 8 Confirm prefabricated items and vendor deliveries acc. to requirements Service specification — DNVGL-SE-0480. Edition July 2017 Page 45 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High Survey of interface to foundation and critical bolt connections - S W 10 Survey of main structural elements - S S 11 Survey of main machinery elements - S S 12 Survey of main system elements - - S 13 Survey of control station and work positions, internal access and escape routes - - S 14 Survey of SHE aspects for operation and maintenance - - S 15 Survey of marking, load tables, manufacturer plates and signboards - S S 9 Review activities 16 Review of documentation for prefabricated items and vendor deliveries - R1 R2 17 Review of main structural elements fabrication documentation - R2 R2 18 Review of main machinery elements fabrication documentation - R1 R2 19 Review of main system elements fabrication documentation - - R2 20 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R2 21 Review of manufacturing record book including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable - R1 R2 22 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R2 23 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R2 24 Review EC Type examination certificates or other notified body statements, if applicable - R1 R2 Test activities 25 Witness FAT, safety critical parts - H H 26 Witness FAT, performance and endurance tests etc. - - S -- H H Final activities 27 Issue inspection release note and FAT verification report Table B-13 Drilling hoisting equipment verification during construction and FAT Item Level Description Low Med High Initial activities 1 Review construction quality management system - R1 R2 2 Quality system audit of relevant manufacturers - - A Service specification — DNVGL-SE-0480. Edition July 2017 Page 46 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 3 Review of design verification reports - R1 R2 4 Review of construction specifications and procedures - I R2 5 Review of FAT procedure - R1 R2 6 Technical/kick-off meeting and review of construction plans - - R1 7 Verify personnel qualification records - - R1 Surveillance activities 8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S 9 Survey of interface to foundation and critical bolt connections - S W 10 Survey of main structural elements - S S 11 Survey of main machinery elements - S S 12 Survey of main system elements - - S 13 Survey of control station and work positions, internal access and escape routes - - S 14 Survey of SHE aspects for operation and maintenance - - S 15 Survey of marking, load tables, manufacturer plates and signboards - S S Review activities 16 Review of documentation for prefabricated items and vendor deliveries - R1 R2 17 Review of main structural elements fabrication documentation - R2 R2 18 Review of main machinery elements fabrication documentation - R1 R2 19 Review of main system elements fabrication documentation - - R2 20 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R2 21 Review of manufacturing record book including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable - R1 R2 22 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R2 23 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R2 24 Review EC Type examination certificates or other notified body statements, if applicable - R1 R2 Test activities 25 Witness FAT, safety critical parts - H H 26 Witness FAT, performance and endurance tests etc. - - S - H H Final activities 27 Issue inspection release note and FAT verification report Service specification — DNVGL-SE-0480. Edition July 2017 Page 47 Verification of lifting appliances for the oil and gas industry DNV GL AS Table B-14 Robot verification during construction and FAT Item Level Description Low Med High Initial activities 1 Review construction quality management system - R1 R2 2 Quality system audit of relevant manufacturers - - A 3 Review of design verification reports - R1 R2 4 Review of construction specifications and procedures - I R2 5 Review of FAT procedure - R1 R2 6 Technical/kick-off meeting and review of construction plans - - R1 7 Verify personnel qualification records - - R1 Surveillance activities 8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S 9 Survey of interface to foundation and critical bolt connections - S W 10 Survey of main structural elements - S S 11 Survey of main machinery elements - S S 12 Survey of main system elements - - S 13 Survey of SHE aspects for operation and maintenance - - S 14 Survey of marking, load tables, manufacturer plates and signboards - S S Review activities 15 Review of documentation for prefabricated items and vendor deliveries - R1 R2 16 Review of main structural elements fabrication documentation - R2 R2 17 Review of main machinery elements fabrication documentation - R1 R2 18 Review of main system elements fabrication documentation - - R2 19 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R2 20 Review of manufacturing record book including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable - R1 R2 21 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R2 22 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R2 23 Review EC Type examination certificates or other notified body statements, if applicable - R1 R2 - H H Test activities 24 Witness FAT, safety critical parts Service specification — DNVGL-SE-0480. Edition July 2017 Page 48 Verification of lifting appliances for the oil and gas industry DNV GL AS Item 25 Level Description Witness FAT, performance and endurance tests etc. Low Med High - - S - H H Final activities 26 Issue inspection release note and FAT verification report B.6 Installation and commissioning B.6.1 General B.6.1.1 Installation and commissioning consists of a number of different activities at the installation site including reviews, surveys and witnessing of testing. B.6.1.2 The scope of work for verification during installation and commissioning is shown in tables listed in this chapter, for various types of lifting appliances. The tables states a recommended scope of work for low, medium and high level verification, and may be changed upon an agreement between the client and DNV GL based on the method listed in App.A. B.6.1.3 For manufacturers and vendors who have established a DNV GL approved ISO9000 quality system covering installation and commissioning of lifting appliances, this may reduce the scope of work accordingly, upon agreement with DNV GL. B.6.2 Verification during installation and commissioning B.6.2.1 For verification of lifting appliances during installation and commissioning the following activities are considered: — — — — — initial activities surveillance review activities test activities final activities. B.6.2.2 The initial activities include review of the quality management system for installation and commissioning and other start-up activities. The surveillance activities are the site attendance, the review activities may be carried out prior to or at site and the test and final activities are the (continuous) review of installation and commissioning results/records and the completion of documentation and reports. B.6.3 Low level installation and commissioning verification B.6.3.1 For low level verification, the initial activities consist of a limited review of the documentation from the previous phases. B.6.3.2 During the surveillance activities, main focus will be on the installation of the lifting appliance and the foundation and the interface between the foundation and the lifting appliance. Also access and escape routes, signs and marking will be surveyed. The verification will be performed during site visits. B.6.3.3 The subsequent review activities will focus on the documentation for the foundation structure and the manufacturing record book, including construction and FAT but also from the installation and Service specification — DNVGL-SE-0480. Edition July 2017 Page 49 Verification of lifting appliances for the oil and gas industry DNV GL AS commissioning phase. The review will also cover the final user instructions including maintenance and operation manual. The formal documentation such as EC Declarations of Conformity and EC Type examination certificates if applicable will also be reviewed. B.6.3.4 The verification during testing includes witnessing of test activities for safety critical elements and overload tests according to the installation and commissioning test programme. B.6.3.5 The final activities include issuance of an installation and commissioning verification report including the certificate of lifting appliance. B.6.4 Medium level construction verification B.6.4.1 For medium level verification, the initial activities consists of a general review of the installation and commissioning quality management system in addition to a detailed review of the documentation from the previous phases. Also installation specifications and procedures will be reviewed in general. B.6.4.2 During the surveillance activities, main focus will be on the installation of the lifting appliance and on the foundation and the interface between the foundation and the lifting appliance. Control stations, work positions, access and escape routes, signs and marking will be surveyed. The verification will be performed during site visits. B.6.4.3 The subsequent review activities will focus on the documentation for the foundation structure, upgrading/repair reports and the manufacturing record book, including construction and FAT but also from the installation and commissioning phase. The review will also cover the final user instructions including maintenance and operation manual. Test records for safety critical elements, fire and explosion alarms are reviewed if applicable. The formal documentation such as EC Declarations of Conformity and EC Type examination certificates if applicable, will also be reviewed. B.6.4.4 The verification during testing includes witnessing of test activities for safety critical elements and overload tests according to the installation and commissioning test programme. B.6.4.5 The final activities include issuance of an installation and commissioning verification report including the certificate of lifting appliance. B.6.5 High level construction verification B.6.5.1 For high level verification, the initial activities consists of a detailed review of the installation and commissioning quality management system in addition to a detailed review of the documentation from the previous phases. Also installation specifications and procedures will be reviewed in general. B.6.5.2 During the surveillance activities, main focus will be on the installation of the lifting appliance and on the foundation and the interface between the foundation and the lifting appliance. Control stations, work positions, access and escape routes, signs and marking and other SHE aspects will be surveyed. The verification will be performed during site visits. B.6.5.3 The subsequent review activities will focus on the documentation for the foundation structure, upgrading/repair reports and the manufacturing record book, including construction and FAT but also from the installation and commissioning phase. The review will also cover the final user instructions including maintenance and operation manual. Test records for safety critical elements, fire and explosion alarms are reviewed if applicable. The formal documentation such as EC Declarations of Conformity and EC Type examination certificates if applicable, will also be reviewed. B.6.5.4 The verification during testing includes witnessing of test activities for safety critical and other elements and overload tests according to the installation and commissioning test programme. Service specification — DNVGL-SE-0480. Edition July 2017 Page 50 Verification of lifting appliances for the oil and gas industry DNV GL AS B.6.5.5 The final activities include issuance of an installation and commissioning verification report including the certificate of lifting appliance. This item is not related to the installation and commissioning process as a normal hold point would be. This item is intended as a reminder to the DNV GL (or others) inspection personnel that a final report of their verification activities is required to finish the work and issue the certificate of lifting appliance which is needed to bring the lifting appliance into use. Table B-15 Crane verification during installation and commissioning Item Level Description Low Med High Initial activities 1 Review installation and commissioning quality management system - R1 R2 2 Quality system audit of relevant installation - - A 3 Review of design verification report R1 R2 R2 4 Review of inspection release note and FAT verification report, or alternatively the manufacturers documentation from construction and FAT R1 R1 R2 5 Review of installation specifications and procedures I R1 R2 6 Technical/kick-off meeting and review of installer’s documents - R1 R2 7 Verify personnel qualification test records - - R1 Surveillance activities 8 Survey of the installation to confirm correct installation and equipment hook-up H H H 9 Survey of the foundation S S S 10 Survey of interface to foundation and critical bolt connections S S W 11 Survey of access and escape routes S S S 12 Survey of control station and work positions - S S 13 Survey of SHE aspects for operation and maintenance - - S 14 Survey of marking, load tables, manufacturer plates and signboards S S S R1 R1 R2 Review activities 15 Review of foundation design and fabrication report, or ILO certificate 16 Review of noise measurement report, if applicable - - R1 17 Review of upgrading/repair report, if applicable - R2 R2 18 Review of weight reports - R1 R2 19 Review of ILO certificates, if applicable R2 R2 R2 20 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R2 21 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 51 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 22 Review of installation and commissioning manufacturing records including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable - R2 R2 23 Review of fire and gas alarms and shut downs test records, if applicable - R1 R2 24 Review of commissioning records for testing of all safety critical functions - R1 R2 25 Review the final user instructions including maintenance and operation manual R1 R2 R2 26 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable R1 R2 R2 27 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R2 28 Review EC Type examination certificates or other notified body statements, if applicable R1 R1 R2 Test activities 29 Witness testing according to commissioning functional test programme, safety critical elements including emergency stop, emergency procedures, shut downs, etc. H H H 30 Witness testing according to commissioning functional test programme, other elements - - H 31 Witness overload tests H H H 32 Witness testing of installation fire and gas warning and alarm systems, if applicable W W W 33 Witness testing of installation emergency evacuation warning and alarm systems, if applicable W W W H H H Final activities 34 Issue installation and commissioning close-out report incl. certificate of lifting appliance Table B-16 Lifting accessories during installation and commissioning Item Level Description Low Med High Initial activities 1 Review installation and commissioning quality management system - R1 R2 2 Quality system audit of relevant installation - - A 3 Review of design verification report R1 R2 R2 4 Review of inspection release note and FAT verification report R1 R1 R2 5 Review of installation specifications and procedures I R1 R2 6 Technical/kick-off meeting and review of installer’s documents - R1 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 52 Verification of lifting appliances for the oil and gas industry DNV GL AS Item 7 Level Description Verify personnel qualification test records Low Med High - - R1 Surveillance activities 8 Survey of the installation to confirm correct installation and equipment hook-up H H H 9 Survey of SHE aspects for operation and maintenance - - S Survey of marking, load tables, manufacturer plates and signboards S S S 10 Review activities 11 Review of noise measurement report, if applicable - - R1 12 Review of upgrading/repair report, if applicable - R2 R2 13 Review of weight reports - R1 R2 14 Review of ILO certificates, if applicable R2 R2 R2 15 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R2 16 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R2 17 Review of installation and commissioning manufacturing records including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable - R2 R2 18 Review of commissioning records for testing of all safety critical functions - R1 R2 19 Review the final user instructions including maintenance and operation manual R1 R2 R2 20 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable R1 R2 R2 21 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R2 22 Review EC Type examination certificates or other notified body statements, if applicable R1 R1 R2 Test activities 23 Witness testing according to commissioning functional test programme H H H 24 Witness overload tests H H H H H H Final activities 25 Issue installation and commissioning close-out report incl. certificate of lifting appliance Service specification — DNVGL-SE-0480. Edition July 2017 Page 53 Verification of lifting appliances for the oil and gas industry DNV GL AS Table B-17 Lifting appliances for life saving equipment verification during installation and commissioning Item Level Description Low Med High Initial activities 1 Review installation and commissioning quality management system - R1 R2 2 Quality system audit of relevant installation - - A 3 Review of design verification report R1 R2 R2 4 Review of inspection release note and FAT verification report R1 R1 R2 5 Review of installation specifications and procedures I R1 R2 6 Technical/kick-off meeting and review of installer’s documents - R1 R2 7 Verify personnel qualification test records - - R1 Surveillance activities 8 Survey of the installation to confirm correct installation and equipment hook-up H H H 9 Survey of the foundation S S S 10 Survey of interface to foundation and critical bolt connections S S W 11 Survey of access and escape routes S S S 12 Survey of control station and work positions - S S 13 Survey of SHE aspects for operation and maintenance - - S 14 Survey of marking, load tables, manufacturer plates and signboards S S S R1 R1 R2 Review activities 15 Review of foundation design and fabrication report, or ILO certificate 16 Review of noise measurement report, if applicable - - R1 17 Review of upgrading/repair report, if applicable - R2 R2 18 Review of weight reports - R1 R2 19 Review of life saving equipment documentation and certificates, if applicable R2 R2 R2 20 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R2 21 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R2 22 Review of manufacturing record book including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable - R2 R2 23 Review of commissioning records for testing of all safety critical functions - R1 R2 24 Review the final user instructions including maintenance and operation manual R1 R2 R2 25 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable R1 R2 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 54 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 26 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R2 27 Review EC Type examination certificates or other notified body statements, if applicable R1 R1 R2 Witness testing according to commissioning functional test programme, safety critical elements including emergency stop, emergency procedures, shut downs, etc. H H H 29 Witness testing according to commissioning functional test programme, other elements - - H 30 Witness overload tests H H H H H H Test activities 28 Final activities 31 Issue installation and commissioning close-out report incl. certificate of lifting appliance Table B-18 Lifting person devices verification during installation and commissioning Item Level Description Low Med High Initial activities 1 Review installation and commissioning quality management system - R1 R2 2 Quality system audit of relevant installation - - A 3 Review of design verification report R1 R2 R2 4 Review of inspection release note and FAT verification report R1 R1 R2 5 Review of installation specifications and procedures I R1 R2 6 Technical/kick-off meeting and review of installer’s documents - R1 R2 7 Verify personnel qualification test records - - R1 Surveillance activities 8 Survey of the installation to confirm correct installation and equipment hook-up H H H 9 Survey of the foundation and machine on which the lifting person device is connected to, if applicable S S S 10 Survey of interface to foundation, machine and critical bolt connections S S W 11 Survey of access and escape routes S S S 12 Survey of control station and work positions - S S 13 Survey of SHE aspects for operation and maintenance - - S 14 Survey of marking, load tables, manufacturer plates and signboards S S S Review activities Service specification — DNVGL-SE-0480. Edition July 2017 Page 55 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High R1 R1 R2 15 Review of foundation design and fabrication report, or ILO certificate for the foundation 16 Review of certificates for the machine on which the lifting person device is connected to, if applicable - R1 R2 17 Review of noise measurement report, if applicable - - R1 18 Review of upgrading/repair report, if applicable - R2 R2 19 Review of weight reports - R1 R2 20 Review of former ILO certificates, if applicable R2 R2 R2 21 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R2 22 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R2 23 Review of installation and commissioning manufacturing records including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable - R2 R2 24 Review of commissioning records for testing of all safety critical functions - R1 R2 25 Review the final user instructions including maintenance and operation manual R1 R2 R2 26 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable R1 R2 R2 27 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R2 28 Review EC Type examination certificates or other notified body statements, if applicable R1 R1 R2 Test activities 29 Witness testing according to commissioning functional test programme, safety critical elements including emergency stop, emergency procedures, shut downs, etc. H H H 30 Witness testing according to commissioning functional test programme, other elements - - H 31 Witness overload tests H H H H H H Final activities 32 Issue installation and commissioning close-out report incl. certificate of lifting appliance Service specification — DNVGL-SE-0480. Edition July 2017 Page 56 Verification of lifting appliances for the oil and gas industry DNV GL AS Table B-19 Drilling hoisting equipment verification during installation and commissioning Item Level Description Low Med High Initial activities 1 Review installation and commissioning quality management system - R1 R2 2 Quality system audit of relevant installation - - A 3 Review of design verification report R1 R2 R2 4 Review of inspection release note and FAT verification report R1 R1 R2 5 Review of installation specifications and procedures I R1 R2 6 Technical/kick-off meeting and review of installer’s documents - R1 R2 7 Verify personnel qualification test records - - R1 Surveillance activities 8 Survey of the installation to confirm correct installation and equipment hook-up H H H 9 Survey of the foundation S S S 10 Survey of interface to foundation and critical bolt connections S S W 11 Survey of access and escape routes S S S 12 Survey of control station and work positions - S S 13 Survey of SHE aspects for operation and maintenance - - S 14 Survey of marking, load tables, manufacturer plates and signboards S S S R1 R1 R2 Review activities 15 Review of foundation design and fabrication report, or ILO certificate for the foundation 16 Review of noise measurement report, if applicable - - R1 17 Review of upgrading/repair report, if applicable - R2 R2 18 Review of weight reports - R1 R2 19 Review of former ILO certificates, if applicable R2 R2 R2 20 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R2 21 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R2 22 Review of installation and commissioning manufacturing records including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable - R2 R2 23 Review of fire and gas alarms and shut downs test records, if applicable - R1 R2 24 Review of commissioning records for testing of all safety critical functions - R1 R2 25 Review the final user instructions including maintenance and operation manual R1 R2 R2 Service specification — DNVGL-SE-0480. Edition July 2017 Page 57 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 26 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable R1 R2 R2 27 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R2 28 Review EC Type examination certificates or other notified body statements, if applicable R1 R1 R2 Test activities 29 Witness testing according to commissioning functional test programme, safety critical elements including emergency stop, emergency procedures, shut downs, etc. H H H 30 Witness testing according to commissioning functional test programme, other elements - - H 31 Witness overload tests as applicable H H H 32 Witness testing of installation fire and gas warning and alarm systems, if applicable W W W 33 Witness testing of installation emergency evacuation warning and alarm systems, if applicable W W W H H H Final activities 34 Issue installation and commissioning close-out report incl. certificate of lifting appliance Table B-20 Robot verification during installation and commissioning Item Level Description Low Med High Initial activities 1 Review installation and commissioning quality management system - R1 R2 2 Quality system audit of relevant installation - - A 3 Review of design verification report R1 R2 R2 4 Review of inspection release note and FAT verification report R1 R1 R2 5 Review of installation specifications and procedures I R1 R2 6 Technical/kick-off meeting and review of installer’s documents - R1 R2 7 Verify personnel qualification test records - - R1 Surveillance activities 8 Survey of the installation to confirm correct installation and equipment hook-up H H H 9 Survey of the foundation S S S 10 Survey of interface to foundation and critical bolt connections S S W 11 Survey of access and escape routes S S S 12 Survey of control station and work positions - S S Service specification — DNVGL-SE-0480. Edition July 2017 Page 58 Verification of lifting appliances for the oil and gas industry DNV GL AS Item Level Description Low Med High 13 Survey of SHE aspects for operation and maintenance - - S 14 Survey of marking, load tables, manufacturer plates and signboards S S S R1 R1 R2 Review activities 15 Review of foundation design and fabrication report, or ILO certificate 16 Review of EMC measurement report, if applicable - - R1 17 Review of noise measurement report, if applicable - - R1 18 Review of upgrading/repair report, if applicable - R2 R2 19 Review of weight reports - R1 R2 20 Review of ILO certificates, if applicable R2 R2 R2 21 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R2 22 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R2 23 Review of installation and commissioning manufacturing records including NDE records, dimensional measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable - R2 R2 24 Review of fire and gas alarms and shut downs test records, if applicable - R1 R2 25 Review of commissioning records for testing of all safety critical functions - R1 R2 26 Review the final user instructions including maintenance and operation manual R1 R2 R2 27 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable R1 R2 R2 28 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R2 29 Review EC Type examination certificates or other notified body statements, if applicable R1 R1 R2 Test activities 30 Witness testing according to commissioning functional test programme, safety critical elements including emergency stop, emergency procedures, shut downs, etc. H H H 31 Witness testing according to commissioning functional test programme, other elements - - H 33 Witness overload tests H H H 33 Witness testing of installation fire and gas warning and alarm systems, if applicable W W W 34 Witness testing of installation emergency evacuation warning and alarm systems, if applicable W W W H H H Final activities 35 Issue installation and commissioning close-out report incl. certificate of lifting appliance Service specification — DNVGL-SE-0480. Edition July 2017 Page 59 Verification of lifting appliances for the oil and gas industry DNV GL AS APPENDIX C EXAMPLES OF VERIFICATION DOCUMENTS C.1 Verification documents C.1.1 Validity of verification documents C.1.1.1 Verification documents are, in principle, documents confirming that an examination has been carried out, and are valid only at the date of issue. C.1.2 Certificate of lifting appliance C.1.2.1 A statement of conformity may be issued on completion of each particular project phase, or natural part thereof, and shall be based on a dedicated verification report. C.1.2.2 A certificate of lifting appliance, however, shall be issued as a formal statement confirming that rd verification of a lifting appliance complies with the minimum requirements applicable for 3 party verification of that particular product. C.1.2.3 The certificate of lifting appliance is based on the international form recommended by ILO convention no.152. C.1.2.4 The technical information on a certificate of lifting appliance shall contain: — — — — — — — — — — — — — — — — — — — — — — certificate no. and date, replacing cert.no. verification level applied (tick off boxes) product description standardised type of lifting appliance name of owner client reference location (name of ship, installation, site, etc. certified for the lifting of persons yes or no regulation reference cdode/standard reference situation and description of lifting appliance (with distinguishing marks, if any) which has been testes and thoroughly examined angle to the horizontal or radius at which test load is applied test load (tonnes) safe working load (SWL) at angle or radius shown in column 2 (tonnes) reference documents (tick off boxes) signatures application (operational limitations and conditions of use) for which the facility is intended codes and standards with which the fixed structure has been found to comply reason for issuing the certificate (tick off boxes) DNV GL report reference level of verification an appendix containing the accompanying dedicated verification report. C.1.2.5 An example of a typical statement of conformity is shown at the end of this appendix. Service specification — DNVGL-SE-0480. Edition July 2017 Page 60 Verification of lifting appliances for the oil and gas industry DNV GL AS C.1.3 Verification reports C.1.3.1 Verification reports are issued to confirm that the relevant product or service has been completed in accordance with specified requirements. C.1.3.2 The report shall include information such as: — — — — — — — — — product or service description and item number, if relevant application (operational limitations and conditions of use) for which the product or service is intended codes and standards with which the product or service has been verified against clear statement of the conclusion from the verification (does it or does it not meet the specified requirements) codes and standards used as reference documentation on which the verification report is based (documents, drawings, correspondence, including revision numbers) project-specific scope of work tables any comments identification of any non-conformances. C.1.3.3 The verification report shall always be dated and have two signatures, the originator and the DNV GL internal verifier. C.1.4 Verification comments C.1.4.1 Reviews of documents shall be reported using verification comment sheets (often called VerComs). These documents give details to the client of aspects of the fixed offshore structure facilities design and construction that DNV GL: — considers does not meet the specified requirements — does not have enough information to make a decision — offers advice based on its own experience. C.1.4.2 Only in the first two instances does DNV GL expect a response from the owner or its contractors. C.1.4.3 An example of a typical verification comment sheet is shown at the end of this appendix. C.1.5 Audit report C.1.5.1 Audit reports are issued to confirm that a company’s quality management system has been reviewed to confirm compliance (or not) with the nominated standard and project requirements. In addition, the audit reports confirm compliance with the documented procedures and that these procedures are effective. C.1.5.2 Audit reports shall contain information such as whether: — the company has a documented quality system — this quality system has been certified by an accredited certification body for the product (or service) in question — the quality system covers the following quality assurance elements adequately for the product: — — — — organisation authority/responsibility job descriptions for key persons internal quality audits Service specification — DNVGL-SE-0480. Edition July 2017 Page 61 Verification of lifting appliances for the oil and gas industry DNV GL AS — documentation change control — job instructions/procedures — non-conformance/corrective action — there are adequate procedures for activities such as: — — — — — — calibration of equipment material identification and marking control of special processes such as welding, NDT, PWHT non-conformance identification and handling inspection status final inspection — the company’s facilities are, in general, considered adequate for the scope of supply — a quality plan has been prepared for the order concerned — the purchaser or their appointed inspection agency are planned to attend the works — there are any problem areas identified. C.1.5.3 An example of a typical audit report is shown at the end of this appendix. C.1.6 Visit reports C.1.6.1 Visit reports are documentation/recording of attendance activity by DNV GL. Guidance note: Visit reports are and may be called by different names. Examples are inspection release note, survey report, inspection certificate, site report, etc. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- C.1.6.2 A visit report shall contain enough information to identify clearly the product or service that has been examined, the operating conditions or specifications to which it has been examined and the conclusion reached by DNV GL. C.1.6.3 The visit report shall be printed on the relevant form and shall contain as much information as possible in accordance with the standard headings in the form. In addition, the report number shall be shown. C.1.6.4 An example of a typical visit report is shown at the end of this appendix. C.2 Use of quality management systems C.2.1 General C.2.1.1 The assurance of structural integrity requires that gross errors during design, construction and operation be minimised. The likelihood of gross errors shall be reduced in a systematic manner by the operation of a quality management system adequate for the work being carried out. C.2.1.2 Quality management systems frequently are documented at three levels: — the quality manual and related procedures document how the organisation, as a whole, manages the quality of all its products and services — the quality plan documents the specific procedures related to a particular project Service specification — DNVGL-SE-0480. Edition July 2017 Page 62 Verification of lifting appliances for the oil and gas industry DNV GL AS — the inspection and test plan documents how the quality control activities for a particular project shall be carried out and recorded. C.2.2 Quality plans C.2.2.1 The basic function of a quality plan is as an aide in the management of a project. In an organisation with many quality procedures for a variety of functions the quality plan states those that are applicable to that particular project. The quality plan acts as a route map through the complexities of management of the project and highlights those activities relevant to quality management. C.2.2.2 The project quality plan normally consists of two parts; firstly, a narrative description of the means of controlling the project, and secondly, a tabular description of the inspections and tests to be carried out during the work. C.2.2.3 The quality plan should address: — — — — — organisational details of the project authorities and responsibilities of key personnel interfaces between, the client, contractors, sub-contractors and third parties quality assurance activities placed on sub-contractors cross references to existing company procedures. C.2.2.4 The narrative part of the quality plan should include a description of: — — — — — the applicable standards project organisation and responsibilities review of the contractual requirements project planning and progress reporting procedures for such activities as design control, purchasing, construction, installation, commissioning, interface control and auditing — procedures for inspection and maintenance as well as normal operation — emergency response issues. C.2.2.5 Additionally, the narrative part of the plan should describe the documentation requirements. It should be specified: — — — — — — — — what documents are required at what stage these documents are required who is responsible for preparing the documents relevant parties to whom documents are submitted how any necessary approvals are acquired who has originals and who has copies if copies have to be certified copies the length of time documents shall be retained and by whom. C.2.3 Inspection and test plans C.2.3.1 The tabular description of the inspections and tests to be carried out during the work is frequently known as the inspection and test plan. C.2.3.2 The following items should be checked for inclusion within the inspection and test plan: — each inspection and test point and its relative location in the production cycle should be shown — the characteristics to be inspected and tested at each point should be identified Service specification — DNVGL-SE-0480. Edition July 2017 Page 63 Verification of lifting appliances for the oil and gas industry DNV GL AS — the use of sub-contractors should be indicated and details of how the verification of sub-contractor’s quality shall be carried out should be shown — hold points established by the constructor, the operator or a third party, where witness or review of the selected inspection or test is required, should be shown. C.2.4 Review of quality management programme C.2.4.1 The contractor’s quality manual shall be reviewed for compliance with ISO 9001 or 9002 as appropriate. The contractor’s operations should be audited to establish compliance with the documented system. C.2.4.2 If the contractor has a quality system certified by an accredited third party certification body, this may be taken as evidence of a satisfactory quality system provided the certificate is relevant to the contractor’s scope of work for the project. However, the last two years’ periodical audit reports shall be reviewed to identify if any recurring non-conformities have been revealed. C.2.4.3 Any weaknesses revealed during this audit, or review of periodical audit reports, shall be considered when planning the contractor monitoring activities. C.2.4.4 Surveillance of the continuing acceptability of the contractor’s quality management system is carried out by observing a selection of audits carried out by the contractor as part of its internal audit system. The audits to be observed should be selected over the length of the project at suitable intervals and should cover as wide a selection of activities as possible. C.2.4.5 Contractors’ inspection and test plans for the various activities undertaken during their scope of work for the pipeline shall be reviewed and accepted, if adequate. C.3 Document forms C.3.1 Introduction C.3.1.1 The end of this appendix includes example forms for use by DNV GL in verification. C.3.1.2 The following forms are included: — — — — certificate of lifting appliance verification comments sheet audit report visit report. Service specification — DNVGL-SE-0480. Edition July 2017 Page 64 Verification of lifting appliances for the oil and gas industry DNV GL AS EX AM PL E C.3.2 Certificate of lifting appliance Service specification — DNVGL-SE-0480. Edition July 2017 Page 65 Verification of lifting appliances for the oil and gas industry DNV GL AS PL E AM EX Service specification — DNVGL-SE-0480. Edition July 2017 Page 66 Verification of lifting appliances for the oil and gas industry DNV GL AS C.3.3 Verification comments sheet Service specification — DNVGL-SE-0480. Edition July 2017 Page 67 Verification of lifting appliances for the oil and gas industry DNV GL AS EX AM PL E C.3.4 Audit report Service specification — DNVGL-SE-0480. Edition July 2017 Page 68 Verification of lifting appliances for the oil and gas industry DNV GL AS PL E AM EX Service specification — DNVGL-SE-0480. Edition July 2017 Page 69 Verification of lifting appliances for the oil and gas industry DNV GL AS EX AM PL E C.3.5 Visit report Service specification — DNVGL-SE-0480. Edition July 2017 Page 70 Verification of lifting appliances for the oil and gas industry DNV GL AS APPENDIX D LIFTING APPLIANCE LIFE CYCLE D.1 Lifting appliance life cycle Table D-1 DNV GL services and documentation within lifting appliance life cycle Project phases Type of verification documents Design Design verification report Construction and FAT Inspection reports Installation and commissioning Installation and commissioning report Operation Inspection reports De-commissioning and removal Inspection reports Certificate of lifting appliance application Application of DNVGL-SE-0480 Reference for certification — Authority regulations — International standards — DNV GL standards Service specification — DNVGL-SE-0480. Edition July 2017 Page 71 Verification of lifting appliances for the oil and gas industry DNV GL AS APPENDIX E INFORMATIVE DOCUMENTS E.1 Technical terminology Table E-1 Technical terminology used in this document Lifting appliances are grouped into the following sub-systems and components Structure Machinery Systems Pedestal Prime mover Valve Adaptor Motor Pipe Beam Pump Cable Boom Gearbox Switch A-frame Transmission Fuse Column Shaft Bus Travers Spline Computer Davit Pin Logic unit Post Bolt Solenoid Gantry Nut Program Supports Sheave Indicator Frame Brake Alarm Mast Cylinder Warning Suspension Winch Control Plate Wire rope Monitor Box Hook Terminal Lattice Block Sensor Gangway Bearing Display Ladder Integral accessories Relays Platform Component Light Handrail Mechanisms Instrument Service specification — DNVGL-SE-0480. Edition July 2017 Page 72 Verification of lifting appliances for the oil and gas industry DNV GL AS E.2 Guide for selection of verification level Table E-2 Critical elements, status and verification level Element Status Design Proven Unproven Construction Proven Unproven Low High Slack Tight Mild Harsh Location Open Compact Operator skills High Low Failure tolerance High Low Downtime tolerance High Low Utilisation Delivery schedule Environment Verification level Service specification — DNVGL-SE-0480. Edition July 2017 Page 73 Verification of lifting appliances for the oil and gas industry DNV GL AS Changes – historic CHANGES – HISTORIC There are currently no historical changes for this document. Service specification — DNVGL-SE-0480. Edition July 2017 Page 74 Verification of lifting appliances for the oil and gas industry DNV GL AS About DNV GL Driven by our purpose of safeguarding life, property and the environment, DNV GL enables organizations to advance the safety and sustainability of their business. We provide classification, technical assurance, software and independent expert advisory services to the maritime, oil & gas and energy industries. We also provide certification services to customers across a wide range of industries. Operating in more than 100 countries, our experts are dedicated to helping our customers make the world safer, smarter and greener. SAFER, SMARTER, GREENER