KOCHUVELI-SURIBABU-29.07.2021 SLNd RATE DESCRIPTION AMOUNT QTY Excavation of cable Trunch 1m depth and 0.3m width,placing of one raw of bricks & refilling the same Excavation of Trunch to a depth of 0.6 4402 528240 375 112500 53498| 374486 120 M on the platform&refillingand replastering 250 replastering with cement 100 Opening of duct and closing the duct and Excavation of trunch to a depth of 1 meter for 4 Track crossing 300 Road crossing 350 Excavation of trunch to a depth of 1 meter for Laying ofcables Laying of HDPE PIPE 6 Blowingof OFC 2100 1420 9940 15 1220 18300 200 182| 36400 28800 125600 Provision of Gl pipe 50/100mm dia with its concrete and plastering work provision of earth electrode 11 12 13 14 800 36 Labour rate/per day 800 157| concrete 150 198 175 790 Provision of Gl pipe 50/100mm dia without 29700 Excavation of cable Trunch 1m depth and 0.5m width,placing of one raw of bricks & refilling the 15 same 1404316 TOTAL Measnman J aiveo 138250 Srcaj If eo 28-0* 2021 Doblt 100000.00 Date 11-03-2021 STATE BANK OF INDIA 11-03-2021 STATE BANK OF INDIA 06-04-2021 STATE BANK OF INDIA 24-04-2021 STATE BANK OF INDIA 200000.00 30000.00 60000.00 25000.00 26-05-2021 STATE BANK OF INDIA 30000.00 03-00-2021 STATE BANK OF INDIA 17-06-2021 STATE BANK OF INDIA 05-07-2021 STATE BANK OF INDIA 07-07-2021 STATE BANK OF INDIA 09-07-2021 STATE BANK OF INDIA 200000.00 200000.00 14-07-2021 STATE BANK OF INDIA 50000.00 15-07-2021 STATE BANK OF INDIA 25000.00 23-07-2021 STATE BANK OF INDIA 15000.00 16-04-2021 STATE BANK OF INDIA Crodit 25000.00 5000.00 20000.00 9,75,000.00 Analo o 2-o4-2oa Setklemn JadaA pd PeyA meruN 1404316. d Bane 4 293T6 E