Uploaded by Mohammad Khateeb

configure SAU2

advertisement
Integrate Controller
Operating Instructions
123/1543-LZA 701 6016/1 Uen B
Copyright
© Ericsson AB 2019. All rights reserved. No part of this document may be
reproduced in any form without the written permission of the copyright owner.
Disclaimer
The contents of this document are subject to revision without notice due to
continued progress in methodology, design and manufacturing. Ericsson shall
have no liability for any error or damage of any kind resulting from the use of this
document.
Trademark List
All trademarks mentioned herein are the property of their respective owners.
These are shown in the document Trademark Information.
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
Contents
Contents
1
Introduction
1
1.1
Target Groups
1
2
Prerequisites
2
2.1
Documentation
2
2.2
Equipment
2
2.3
Conditions
2
3
Performing On-site Integration Procedure
3
3.1
Configuring the SCU
3
3.2
Site Check
7
3.3
Environment
7
4
Connect and Configure the Cabinet Controller
8
4.1
Configure Cabinet Controller IP Interface Settings
8
4.2
Set the VLAN Configuration
9
4.3
10
4.4
Configure the Cabinet Controller Name and Time Zone
Settings
Subscribe Alarm
4.5
Set Battery Capacity
11
5
Additional Information
13
5.1
Full Maintenance Mode Menu
13
6
References
14
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
11
Integrate Controller
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
Introduction
1
Introduction
This document describes the actions that are required before the SCU is fully
operational in an Enclosure.
1.1
Target Groups
The following are the target groups of this document:
— Site engineering personnel
— Field installation personnel
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
1
Integrate Controller
2
Prerequisites
This section contains information about the documentation, equipment, and
conditions required for the procedure.
2.1
Documentation
Before starting this procedure, ensure that the following documents have been
read and understood:
— Personal Health and Safety Information, 124 46-2885
— System Safety Information, 124 46-2886
2.2
Equipment
To use full maintenance mode, the following equipment is required:
— Ethernet cable
— Computer with network card set to DHCP
2.3
Conditions
Ensure that the following conditions are met:
— Information required for basic configuration is available, as described in
Cabinet Controller User Manual.
— Site access permission is obtained
— IP ports needed for communication to and from the SCU are accessible
The following ports are required for an OSS connection :
Table 1
2
IP Ports
Protocol
Port
SNMP
161 & 162 UDP
SSH
22 TCP
HTTPS
443 TCP
NTP
123 UDP
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
Performing On-site Integration Procedure
3
Performing On-site Integration Procedure
This section describes the procedure required to install and configure the SCU.
3.1
Configuring the SCU
3.1.1
Full Maintenance Mode Interface
Full maintenance mode is used to suppress alarms from being reported to the
management system, and to enable on-site access to the Cabinet Controller web
interface.
If the IP address of the unit is unknown and it is not possible to identify it, full
maintenance mode must be used. At first installation, the IP address of the unit is
set up through the controller integration procedure, and full maintenance mode
must be used..
Prerequisites
— Ethernet Cable is required.
— The IP of the computer must be set to STATIC.
Steps
Do the following to enter the full maintenance mode interface:
1. Bring the SCU into full maintenance mode by pressing the maintenance
button for 4 seconds. Use a watch to avoid pressing the button for more than
4 seconds.
The maintenance indicator, marked
when the button is released.
turns on with a steady blue light
2. Connect an Ethernet cable from the computer to Ethernet port 2 on the SCU.
3. Open a web browser and enter IP address https://169.254.0.1 into the
address field.
The full maintenance mode menu is shown. Table 6 provides a description of
the menu items.
4. Ignore the warning messages and log in using default username and
password. Username: oss, password: default.
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
3
Integrate Controller
3.1.2
Basic Configuration Settings
Steps
1. Select Advanced configuration > SDN=0 > IPInterface > NORTHBOUND-IP
from the menu.
2. Select Attributes.
3. Click on the Start button at the top of the page to edit the values.
4. Change the values according to the site specific data as described in Table 2.
Table 2
IP Settings
Field
IP Interface Mode
mode
Client IP address mode of the SCU:
— DHCP: the SCU receives its IP
address through DHCP
negotiation
— STATIC: the SCU has a
designated static IP address
primaryIPAddress
IPv4 address of the SCU
If mode is set to STATIC, enter the
IP address here
primarySubNetMask
Subnet mask for the SCU
If mode is set to STATIC, enter the
subnet mask here
defaultGateway
IP Gateway for the SCU
If mode is set to STATIC, enter the
gateway IP address here
For other configuration settings, see Basic Configuration Setting Descriptions
on page 4.
5. Select Commit and End at the top of the page for changes to take effect.
3.1.2.1
Basic Configuration Setting Descriptions
The basic configuration settings are under SDN=0 menu.
4
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
Performing On-site Integration Procedure
Table 3
3.1.3
Basic Configuration Setting Descriptions
Field
Value
Name
Must be a unique name of the SCU
within the network of nodes.
Recommended characters are: 0–9
and A–Z
Time Server IPv4 Address
IPv4 address of the Network Time
Protocol (NTP) server that is used by
the SCU as a reference clock.
Time Zone
Time zone where the SCU is located
Wakeup Registration
The IPv4 address of the SNMP trap
receiver, typically the ENM, OSS-RC or
the ESC Manager.
Setup Power System
1. Click on the Advanced Configuration > Power Manager > SCU > Battery > 1 >
BatteryString > 1 link in the menu.
2. The settings shown are factory defaults. Modify the Battery Capacity
(default as 100Ah) to the real capacity. If it is needed, modify other
parameters according to battery manufacturers recommendations.
To apply the changes, do the following:
3. Select Commit and End at the top of the page for changes to take effect.
An alternative way to set the power system is to perform changes on the
power system controller and then click on the Action Sync from Power
System. After this, all values will be imported to the SCU. Page refresh is
required to view the changes, click on the Reload button.
3.1.4
Add alarm SNMP trap receivers on the SCU
1. Click on Basic Configuration > Alarm subscriptions link in the menu.
2. Type IP address of the SNMP trap receiver to the Manager reference field.
3. Select Manager Type:
— SN if the cabinet controller is managed through ENM or native OSS-RC.
— SDN if the cabinet controller is managed through the ESC Manager.
— SDN if 3PP trap receiver is used to monitor alarms.
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
5
Integrate Controller
After This Task
Type in Heartbeat period (Unit in minutes which is the time interval when SCU
should report the alarms to the SNMP trap receiver)
Click Subscribe
3.1.5
Back Up Configuration
It is recommended to back up and save configuration in an appropriate place
every time when SCU is successfully configured.
Steps
1. Enter full maintenance mode.
2. Log in to the SCU through the web GUI.
3. Click Export Configuration , then click Export XML.
Result: A dialog box appears, asking to save or open a file.
4. Save the file to an appropriate folder on the computer.
Note:
The software is not included in the backup.
5. Press the maintenance button for no more than 2 seconds to bring the SCU
into operational mode.
3.1.6
Restore Configuration
This section describes how to restore a configuration after a hardware
replacement.
Install the software from the USB memory stick as described in Replace Ericsson
Site Controller before restoring the configuration.
Steps
Do the following to restore a backup file to the SCU:
1. In the full maintenance mode menu, click on the Import Configuration link.
2. Click the Browse button and select a previously saved configuration file,
which must be an XML file. If the file is compressed, uncompress it before
proceeding.
3. Check the Replace current configuration box.
4. Click the Upload button.
6
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
Performing On-site Integration Procedure
3.2
Site Check
Before leaving the site, make sure the following tasks have been completed.
Table 4
Checklist
Ensure That
Done
The backup files and license files are stored in an appropriate
location.
The SCU is operational. The green optical indicator is on with
steady light, and the blue optical indicator is off.
All cables are correctly routed and connected and, if applicable,
fastened to the top or sides of the cabinet.
The Site Installation Documentation is updated.
No alarm light exists, the yellow LED is off.
The northbound connectivity has been checked.
3.2.1
Check Northbound Connectivity
1. From SCU
— Connect to SCU using SSH (for example, Putty or Tera term).
— Log in using default credentials. Username: oss, password: default.
— Ping the OSS IP address with PING command to verify connectivity. See
Command Description.
2. From NOC
— Connect to the SCU IP address using SSH CLI or web GUI.
— Verify that the name of the SCU matches what have been decided for
this site.
— If possible, activate an alarm and verify that it is received in the NOC.
3.3
Environment
Ericsson strongly recommends paying careful attention to the environment when
cleaning a site after installation. In particular, recycle all waste that can be
recycled and sort the rest so that it can be disposed of in accordance with local
regulations.
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
7
Integrate Controller
4
Connect and Configure the Cabinet Controller
The following procedures are valid for R10 and higher versions of the cabinet
controller software.
4.1
Configure Cabinet Controller IP Interface Settings
1. Select Advanced configuration > SDN=0 > IPInterface > NORTHBOUND-IP
from the menu on the left side.
Note:
The arrow to the left of the NORTHBOUND-IP button must be
pressed.
2. Select Attributes.
3. Click on the Start button at the top of the page.
8
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
Connect and Configure the Cabinet Controller
4. Set the proper mode from the drop-down list.
5. Enter primaryIPAddress, primarySubNetMask and defaultGateway.
6. Select Commit and End to commit and end the transaction.
To configure the cabinet controller name and time zone settings, see
Configure the Cabinet Controller Name and Time Zone Settings on page 10
4.2
Set the VLAN Configuration
Note:
Changes are only necessary in case of VLAN tagging is used.
Steps
1. Select Advanced configuration > SDN=0 > VLANGroup > NORTHBOUND-VG
> VLAN > default from the menu on the left side.
2. Click on the Start button at the top of the page.
3. To activate the VLAN, enter a number for tagvalue
4. Check the tagged box.
5. Select Commit and End to commit and end the transaction.
Figure 1 VLAN Settings
Table 5
VLAN Configuration Setting Descriptions
Field
Value
VLAN Tag (optional)
VLAN tag for the ESC IP or SCU IP
communication
Leave this field blank if VLAN
tagging is not used.
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
9
Integrate Controller
4.3
Configure the Cabinet Controller Name and Time Zone
Settings
1. Select Advanced configuration > SDN=0 from the menu on the left side.
2. Select Attributes.
3. Click on the Start button at the top of the page.
4. Enter name, systemTimeZone, the IP address of systemClockTimeServer, the
IP address of wakeUpRegistration, and wakeUpEventInterval.
Note:
In the case of OSS-RC, limit name to 25 characters to remain
compatible with OSS-RC regulations.
5. Select Commit and End at the top of the page for changes to take effect.
10
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
Connect and Configure the Cabinet Controller
4.4
Subscribe Alarm
1. Select Alarm subscriptions from the menu on the left side.
2. Enter the IP address of the Manager reference.
3. Select Manager type from the drop-down list.
4. Set the required Heartbeat period.
5. Click the Subscribe button.
4.5
Set Battery Capacity
1. Select the BatteryString referring to the proper battery in Advanced
configuration > SDN=0 > Power Manager > ERS > Battery > 1 >
BatteryString from the menu on the left side.
Note:
If multiple strings are in the system, repeat this step for each strings.
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
11
Integrate Controller
2. Click the Start button in the Transaction Control Menu on the top of the
page.
3. Enter the required configuredCapacity.
4. Select Commit and End at the top of the page for changes to take effect.
12
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
Additional Information
5
Additional Information
This section provides additional information about the SCU.
5.1
Full Maintenance Mode Menu
Table 6 lists the menu items in the full maintenance mode menu.
Table 6
Full Maintenance Mode Menu
Menu Item
Description
Product Info
Product information about the SCU.
Alarm List
List of all active alarms.
Basic Configuration
Basic SCUconfiguration.
Advanced Configuration
Configuration of features.
Licenses
License on SCU when using R11A or a
newer software version is not required
for Cabinet Controllers.
Upgrade Software
Upload and install a new image from
the computer to the SCU.
Export Configuration
Download a configuration file from the
SCU to the computer.
Import Configuration
Upload a configuration file from the
computer to the SCU.
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
13
Integrate Controller
6
References
— SCU Description
5/1551-LZA 701 6016/1
— Personal Health and Safety information
124 46-2885
— System Safety Information
124 46-2886
14
123/1543-LZA 701 6016/1 Uen B | 2019-11-18
Download