EMERGENCY DRILL REPORT Sensitive Drill date: 24 Aug 2022 Start Time: 11:30AM Number of Present: 300 Workers End Time: Location: C22 A02&A05 11:15AM Total time taken: Number of Employees present on Assembly point: 15 minutes N/A 1. Type of drill Announced Emergency Fire Drill Evacuation Major work-related accident/injury Medical emergency (Heat Stress) Major equipment accident which may cause subsequent major accident due to falling or tipping over Other Unannounced Multi-casualty Confined space incident Natural dangerous phenomena Bomb alarm 2. Drill initiated by Name: Irfan Shafiq Person-in-charge Name: Muhammad Jamshid Position: HSE Supervisor Position: HSE Manager Drill scenario: Emergency Fire Drill Evacuation was performed . 1. On Today morning, 24th August 2022 at approx. 11:30AM, Al Bawani operative was observed a smoke coming from a covered general waste bin located in the office at B-1. He was checked the waste bin and found cigarette butts, plastic, and paper waste burning. The fire was started to aggravated the moment he opened the lid of the waste bin. 2. A couple of minutes back, they was caught two (2) visitors smoking in the same area (Non-smoking zone) where the fire incident occurs. Emergency response: 1) The worker raised the nearest Fire alarm and called for help. 2) All workers and office staff respond to the alarm and evacuated to the Assembly point. 3) The trained fire fighter extinguished the fire . 4) Fire wardens ensured that all personnel have evacuated safely. 5) Evacuees gathered at assembly point where supervisors started the head count. 6) HSE confirmed that all personnel are present at assembly point. Post Drill: 1) Post event briefing 2) Observer findings / Recommendations/Drill report 3) Evacuees allow back to building after head counting and declare by fire marshal that exercise is over . EMERGENCY DRILL REPORT Sensitive 3. Sequence of events S/No Event Time 1 Drill initiated at 11: 30 AM 2 Office staff respond to extinguish the fire at 11: 31 AM 3 Alarm raised at 11: 32 AM 4 Fire wardens started evacuation of building at 11: 33 AM 5 First person reached to the assembly point at 11: 34 AM 6 Head count started by supervisors & HSE at 11: 37 AM 7 Last person reached to assembly point at 11: 39 AM 8 Head count finished 11: 40 AM 9 HSEM started post event briefing at 11: 41 AM 10 HSEM finished post event briefing at 11: 43 AM 11 Fire extinguisher training conducted by HSES at 11: 44 AM 12 Drill finished at 11: 45 AM Remark 4. Results of drill: Positive items 1 Permanent alarms are working at all levels . 2 Supervisor and foremen started head count of their own workers . 3 5. Results of drill: Opportunity for improvement 1 2 Responsible person Observations Actions to be taken / put in place Two Nos of office staff not came to the assambly point Official warning letter issued for them and TBT conducted about Importance of Fire evacuation drill . HSE Office staff response found slowly as thy were not consider it original emergency . TBT conducted with office staff about Importance ,purpose and procedure of evacuation Fire drill . HSE 6. Observers Name Position 1 Mohammed Wajid Ali HSE Engineer (ZFP) 2 Marloun Manalo HSE Coordinator (SAPL) Due date 25 Aug 2022 25 Aug 2022 EMERGENCY DRILL REPORT Sensitive No Control measure YES NO N/A 1 Means of communication and alarm system 2 Are all persons accounted for? 3 Are all machines switched off? 4 Instructions in case of incidents 5 Availability of fire- fighting equipment in good working order 6 Training of employees for the provision and use of fire extinguishers 7 Availability of emergency respond kits if applicable 8 Inspection of working and storage places. 9 Clearance of exit route/doors. 10 Agreements with the police, civil defense, and emergency response crews. 11 Contact with competent organization 12 Updated emergency contact list 13 Site Nurse contact details displayed Comments Briefing conducted Sensitive EMERGENCY DRILL REPORT PHOTOGRAPH’S Observed visitor was smoking Office staff observed fire in the waste bin Raising the fire alarm Trained fire marshal extinguished the fire First person evacuation towards assembly point Evacuation of personnel from the building EMERGENCY DRILL REPORT Sensitive Fire warden ensuring evacuation of personnel Sum up head counts by HSE Employees reached to the assembly point Post event briefing by HSEM Prepared By : Irfan Shafiq HSE Supervisor Workers evacuating from the parcel Supervisors and foremen leading their respective teams Fire extinguisher training conducted by HSES Attendances sheet Reviewed By : Muhammad Jamshid HSE Manager