Cirrus Systems, Inc. INSTALLATION MANUAL BLADE AND SOLO LED DISPLAY SYSTEMS / REV02282019 REV 08212016 BLADE BLADE M M LED LED DISPLAY DISPLAY SYSTEMS SYSTEMS REV03292018 This document is confidential & proprietary to Cirrus Systems for distribution to direct customers and their installers only. © Copyright 2017, Cirrus Systems Inc., All Rights Reserved. CIRRUS CIRRUS SYSTEMS, SYSTEMS, INC. INC. 47 Rd. 47 Spring Spring Hill Rd. Saco, Saco, Maine 04072 (877)636-2331 636-2331 PP//11(877) FE//1contact@cirrusled.com (877) 636-2331 E / contact@cirrusled.com C I R R U S L E D . C O M BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL INDEX A. INTRODUCTION..................................................................................................................................3 1. Purpose ....................................................................................................................................................................... 3 2. Safety Issues ............................................................................................................................................................... 3 3. Equipment Description .............................................................................................................................................. 3 4. Safety Compliance ..................................................................................................................................................... 4 5.EnvironmentalConsiderations..............................................................................................................................................4 6. Shipping/Receiving, Product Storage ........................................................................................................................... 4 7. Warranty ........................................................................................................................................................................ 5 8. FCC Information..........................................................................................................................................................8 B. INSTALLATION................................................................................................................................... 9 1. Basic Handling Instructions .....................................................................................................................................9 2. Aluminum Frame Installation .............................................................................................................................. 10 3. Controller (Mechanical Installation) ....................................................................................................................... 13 4. Controller (Electrical Installation) .........................................................................................................................15 5. Optional Long-Range Wireless Communication ................................................................................................ 18 - EnGenius Wi-Fi Unit Installation .....................................................................................................................18 6. Controller M1 Indicator Light Status ................................................................................................................. 22 7. LED Panel Installation ............................................................................................................................................ 23 C. DISPLAY CONFIGURATION................................................................................................................24 D. DISPLAY CARE.................................................................................................................................25 E. CONTROLLER M1 DIAGRAM ............................................................................................................ 26 THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 2 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL A. INTRODUCTION 1. Purpose This manual explains how to mount and electrically connect a BLADE M LED Display System and is intended for licensed sign installers. This manual covers the following models: Controller-U1, Blade-M 2. Safety Issues HIGH VOLTAGE Contact with high voltage from AC mains may cause death or serious injury. Always disconnect AC power to unit prior to servicing. GROUNDING It is essential to earth-ground the sign before connecting controller. Connecting signs that are not earth grounded may cause damage to the LED Display System and in severe cases cause death or injury. OTHER Other safety messages appear throughout this manual where appropriate. 3. Equipment Description BLADE M LED Displays are modular signs consisting of these components: • Aluminum Frame(s) measuring one foot by two feet. Each Frame mates with another via PEM screws to configure signs into any combination of one by two foot sections. • Water-Proof LED Display Panels which lock into place on the aluminum frame. Each LED Panel has one input cable permanently affixed and a throughput connection to the input of the next daisy-chain connected Panel. • Water-Proof Controller to manage single and dual-sided signs. • Optional WiFi Connection THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 3 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 4. Safety Compliance Cirrus LED components are UL Listed. File #E352796 5. Environmental Considerations The LED Panels are fully encapsulated and water-proof. The Controller system is housed in a waterproofed aluminum enclosure. The LED Panels are rated for an ambient operating temperature range of -40~+70° Celsius (-40 ~ +158° Fahrenheit) and are designed to withstand continuous direct sunlight. If the Panels experience an overtemperature condition, a signal will be sent to the controller to shut down the sign. Once the sign has cooled, it will automatically re-start. The PC Controller is rated for an ambient operating temperature range of -10~+60°C (14~ +140°F) and should be protected from direct sunlight. Operation at colder temperatures is routinely and regularly accomplished, though starting the screen from a powered off state at temperatures below 14°F may not be possible. A controller which is in a powered on state produces ambient heat which can allow it to continuously run at temperatures as low as -30°F (-34°C). All components and connections are sealed and water-tight for protection from the ingress of dust and water, though no components should be subjected to immersion in water. 6. Shipping/Receiving, Product Storage All deliveries shall be FOB Cirrus Systems (Seller), Saco, ME. Methods and routes of shipment, unless Seller specifies in writing otherwise, shall be accepted as chosen by Seller at Seller’s sole discretion. Purchaser shall pay all costs of shipment. Delivery to the carrier shall constitute delivery and passage of title to Purchaser, and risk of loss shall pass to Purchaser concurrently with passage of title. Seller will use reasonable diligence to meet scheduled shipment dates and times. Such dates and times are the best possible estimates, and not guarantees, of when goods will be shipped. In no event shall Seller be liable for any losses or damages of any kind due to delays in shipment, nor may Purchaser cancel its contract because of any such delay. It is the responsibility of the Purchaser to check the product for visible damage prior to accepting delivery from the carrier. Any damage to the Product must be noted on the delivery slip with the carrier and immediately reported to Cirrus. Photographic evidence of damages will be required. Cirrus may assist in seeking remedy with the carrier for damaged goods but does not retain title and therefore is not legally responsible for said damages. Delivered product should be stored in a cool dry place, out of the way of foot/motorized traffic. It is the installer’s responsibility to look over the product before installing to ensure there are no missing parts and there is no visible damage to any parts of the display. If there is any damage, Cirrus must be informed prior to install. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 4 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 7. Limited Warranty Cirrus Systems Inc. warrants that the Blade M. System components will be delivered in good condition and shall be free of defects and workmanship and operate substantially in accordance with their stated functional specifications for a period of five (5) years from delivery, provided that the Buyer installs, tests and maintains the Blade M System components in accordance with this Installation Manual. The sole remedy for any breach of this limited warranty shall be the exchange and replacement of the defective system components in accordance with the component replacement process specified below Exclusions. The following issues are not covered under the limited warranties set forth above. For these issues, Cirrus shall not be obligated to furnish warranty support or maintenance services, nor shall Cirrus be liable hereunder for repairs, replacement or additions: 1. Damage or problems caused during transportation by Customer; 2. Defects or damage that result from use of the Products or Software in other than their normal and customary manner; 3. Damage or problems caused by repairs, changes, modifications, maintenance, relocation or reinstallation by other than Cirrus designated technicians, or without Cirrus’s written permission; 4. Products and Software subject to unauthorized modification, disassembly or repair (including the addition to the Product of non-Cirrus authorized and supplied equipment) which adversely affect Product or Software performance or interfere with Cirrus’s normal warranty inspection and Product or Software testing for warranty verification; 5. Products which, due to illegal or unauthorized alteration of Product software or firmware, do not function in accordance with Cirrus’s published specifications; 6. Damage or problems caused by improper Electro-Static Discharge (“ESD”) precautions when handling Covered Products; 7. Damage or problems caused by improper electrical grounding; 8. Damage or problems caused by improper utility service; 9. Damage or problems caused by use of non-Cirrus supplied equipment or parts; 10. Damage or problems caused by misuse, abuse, neglect or accident; 11. Damage or problems caused by an external electrical fault or any unusual shock; 12. Damage or problems caused by an accident, fire or water; 13. Damage or problems caused by natural disasters such as flood, fire, lightning, earthquake or tornado; 14. Damage or problems caused by failure to maintain the proper operating or storage environment for the Covered Products to include but not limited to air conditioning, humidity control, or corrosive atmosphere harmful to electronic equipment as provided in the Cirrus Installation Manual; 15. Damage or problems caused by strikes, riots, sabotage, or acts of war; 16. Theft; 17. Routine cleaning, or normal and customary wear and tear; THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 5 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 18. Scratches or other cosmetic damage to Product surfaces that do not affect the operation of the Product; 19. Technical support or maintenance of any kind for third-party application or custom software not defined under Covered Products; 20. Technical support associated with programming of Application Program Interfaces (API) of Covered Products except for support on the capabilities of the programming interface; 21. Consumables and supplies (i.e., expendable batteries, recording media, tapes, disks or other consumables); 22. Freight costs to the repair depot; Non-Cirrus manufactured equipment, which carries its original manufacturer’s warranty and which will be provided to Customer upon request. Activation The 5 year product warranty will go into effect upon the date of shipment and transfer of title. Warranty may not be exercised until the display has been installed, powered, connected to the internet and Cirrus has been called to verify the installation. Displays which are stored for extended periods of time and not installed within 90 days of shipment may not qualify for warranty coverage at the discretion of Cirrus Systems Inc. Component Replacement The Blade M System comes complete with a five year limited warranty on all components manufactured by Cirrus Systems, Inc. Replacement components will be dispatched in the event of product failure and, upon replacement, Buyer shall ship the defective components back to Cirrus for repair. All Cirrus Systems terms and conditions and limited warranty shall apply to any such replacement components. Cirrus provides service and support for the lifespan of all Blade M products at its standard rates. Cirrus provides unlimited free software upgrades as they become available for all Blade M System displays. In the event of a reported display outage or parts failure, contact Cirrus Technical Support immediately. 1. DO NOT DISPATCH SERVICE PERSONNEL TO THE SIGN BEFORE CONTACTING CIRRUS. 2. A Cirrus technician will perform remote diagnostics to determine the cause of the problem and will advise the installer as what steps to take. Cirrus may require an installer to go onsite to assist with additional troubleshooting. 3. If the technician determines it to be necessary, a replacement part will be shipped out. 4. Once the replacement part has been received and prior to swapping, contact Cirrus. A technician will provide further instruction on the procedure for swapping. 5. Cirrus will issue an RMA and a return shipping label for the return of the failed part. The failed part can be shipped back in the box the replacement arrived in. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 6 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 6. Once the part is received at Cirrus, it will be inspected to determine the likely cause of the failure. 7. If it is determined the part failed due to misuse or abuse, or any other non-covered event, the Buyer agrees to pay for the replacement part and any freight charges associated with the non-covered parts replacement In the event of defective diodes within the first 6 months, Cirrus will replace the panel under warranty once confirmed that the issue was caused by a warranty covered event. After 6 months of active use, Cirrus will replace the panel under warranty when at least 15% of the diodes are defective. Returning Defective Parts A functioning power cable needs to be intact upon return to Cirrus for warranty credit. EnGenius Warranty Cirrus will cover the first year of warranty of the EnGenius ENH 202 and its power supply. After the first year of use, client must work through the warranty with EnGenius directly. Disclaimer Except as expressly set forth in this Agreement, the Products and Software, including the Hardware, and all related Services shall be provided “as is” without warranty of any kind, and Cirrus hereby disclaims, and Customer hereby waives, any and all warranties whether express, implied or statutory, including all implied warranties of merchantability, fitness for a particular purpose and non-infringement. Further, Cirrus does not warrant, guarantee, or make any representations that any Software provided will be free from all bugs or that its use will be uninterrupted or error-free. Customer understands and agrees that Cirrus is not responsible for and will have no liability for equipment hardware, software, or other items or any services provided by or manufactured by any persons other than Cirrus or its authorized agents. The foregoing constitutes Customer’s sole rights and remedies under this agreement with respect to defects in the products, software or services. Limitation on Liability Buyer understands and agrees that except for instances involving Cirrus’s indemnification obligations set forth in the governing Sales Agreement, Cirrus’s aggregate liability for any damages suffered by Buyer or any other party, whether in contract, in tort, under any warranty theory, or otherwise, shall be limited to the amount paid to Cirrus by Buyer under this Contract for the defective System component(s) giving rise to the indemnified losses or damages covered by this Agreement. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 7 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL FCC Information Blade M This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense. Changes or modifications to this device that are not expressly approved by Cirrus Systems, Inc. could void user’s authority to operate this device. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 8 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL B. Installation B. Installation Cirrus is not responsible for installations or the structural integrity of support structures done by others. The customer is responsible for ensuring that a qualified structural engineer approves the structure and any additional hardware. The installer is responsible for ensuring that the mounting structure and hardware are capable of supporting the display, and the structure follows all local codes. Cirrus is unable to provide consultation or advice on structural design. 1. Basic Handling Instructions 1. Do not open Panels or Controllers unless instructed to do so by Cirrus as you risk voiding the warranty. 2. Do not carry Panels or Controllers by the electrical plugs or cables. This will cause stress on the internal wiring and could cause issues with performance including destroying hardware. 3. Do not drop or throw Panels, Frames or Controllers. 4. Do not drag Panels or Controllers across the ground. 5. If instructed to open Panels or Controllers, make sure they are on a clean, soft surface away from the elements (rain, snow, wind). 6. Avoid touching the internal motherboard and control cards. 7. Use caution when working with the internal power supply and do not make contact with power supplies or wiring while they are powered on. 8. When transporting product to installation site, be sure that product is properly secured to avoid damage. 9. Do not alter the enclosure of the Controller or Panels (painting, removing Controller/Panel tabs...) THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 9 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 2. Aluminum Frame Installation for the 1x2’ and 2x4’ Versions • Each side of the BLADE M LED Display Aluminum Frame Screw “INSTALL UP” Marking Alignment Pins has two screws and two PEM nut inserts for accepting the screws (hex head bolts) of its neighboring Frame. The top and face sides are marked on each frame to simplify integration (see Figure 1). • Screw two Frames together via the hex head bolts (screws) and mating PEM nuts found on each frame. The end result being that each side of each frame has four screw connections for sturdy and reliable mounting (see Figure 2). Screw Pem Nut Fig. 1 • Simply repeat this process to attain any combination of one by two foot (304.8 by 609.6mm) sections desired (see Figure 3). • Secure the completed Frame assembly to mounting brackets. Brackets should be placed horizontally from left to right (as depicted on Figure 4). Four mounting holes are located on the back side of each Frame. • One row of support mounting brackets must be attached for every four rows of Frames. Do not exceed four rows of Frames without attaching an additional mounting bracket. Fig. 2 • Do not apply lateral stress on the Frame system as gaps will form between the Panels. Four mounting holes are on the rear side corners of the Frame and are centered 1” from outside edge with 0.24” diameter. Fig. 3 Fig. 4 THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 10 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL Cirrus 9mm BladeM measurement specifications for new 2x4’ frame Cable pass through hole Top Profile Pre-tapped holes for included 1/4 inch hex bolts Side Profile 4 feet Cable pass through hole 2 feet Pre-tapped holes for included 1/4 inch hex bolts Module alignment holes Cable pass through hole Front Profile Bottom Profile 4.25” Pre-tapped holes for included 1/4 inch hex bolts 4 feet The high-strength aluminum framing system can be manipulated in any fashion to attach brackets, angle iron or to directly drill/attach into a masonry application. Drilling/attaching any neccesary support bracket directly into the frames will not void the warranty. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 11 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL Cirrus 9mm BladeM measurement specifications and overview for a 3x6 display Cable pass through hole Top Profile Pre-tapped holes for included 1/4 inch hex bolts 5 1/8” 6 feet 5 1/8” Pre-tapped holes for 1/4 inch hex bolts 3 feet 3 feet Cable pass through hole LED Panel Aluminum Frame Side Profile Front Profile Cable pass through hole Bottom Profile Pre-tapped holes for included 1/4 inch hex bolts 6 feet 3/4” The high-strength aluminum framing system can be manipulated in any fashion to attach brackets, angle iron or to directly drill/attach into a masonry application. Pre-drilled holes for angle iron mounting Drilling/attaching any neccesary support bracket directly into the frames will not void the warranty. Rear Profile THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 12 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 3. Controller (Mechanical Installation) from exceeding the tempurature rating of the controller, 60 °C (140°F). Please do not alter the outside of the controller in anyway. One Controller is capable of supporting a singlesided or dual-sided sign. The Controller needs to be placed within reach of the input cable affixed to the first LED Panel(s) it will be connected to. Do not mount within the client’s building. This is extremely important if the sign will be set up using the 4G option for communication. If the controller is mounted inside of a building or sign structure; the signal for communication can be interrupted and not as reliable. It can be mounted behind the Panels or outside the Frame system. NETWORK CONNECTION OPTIONS: Option 1: Direct Ethernet The RJ45 connection is provided to connect the sign via direct Ethernet to a router or other network connection, enabling communication with the sign from any other network connected device. Option 2: Wireless Connection using EnGenius Access Point Alternatively, the Controller has two black WiFi antennas to connect wirelessly with the provided EnGenius access point (see page 14). If using the EnGenius, gently screw the wifi antennas (and extender cables if needed) into their corresponding ports on the controller. Do not force them into place as it can break the water-tight seal on the port. This first Panel connection should be in one of the four corners, though the exact connection is unimportant as LED Panel configuration is defined after mechanical integration. The Controller has four mounting tabs for mounting. The Controller contains power supplies, processors and memory devices which are sensitive to heat. The Controller should remain protected from direct sunlight to avoid heat related issues and extend the life of the Controller. It is the installer’s responsibility to install adequate ventilation to keep the space Option 3: Cellular Network M1 Controllers are equipped with cellular modems for mobile connectivity without the need for an on-site internet connection. This service is a paid feature offered at the time of the sale and, upon selection, will be activated at the time of installation once preinstallation paperwork is complete. If the customer does not initially choose to purchase the cellular option but would like to active this service post sale, please contact Cirrus and an Implementation Specialist can review all plan options and THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 13 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL associated fees. *While we do provide equipment that is capable of receiving cellular data signals, we do not provide the cellular service itself and are not responsible for its functionality, coverage, or performance. Like all other cellular coverage, coverage areas can be adversely affected by distance from cell site, network changes, weather, foliage, tower congestion, and other factors. Should the Controller be mounted within a thick structure (brick, .08 inch aluminum...) or between the Panels, it is advised to use the included extender cable for the Wi-Fi antenna (only if the display will be connecting via the EnGenius). Avoid sharply bending or kinking the power cord from the Controller as it puts stress on the internal wiring and will eventually destroy the product. The Controller should be mounted with the ports to the left, as indicated with the “This Side Up” sticker on the front of the controller. Make sure all unused ports are covered to prevent water damage. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 14 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 4. Controller (Electrical Installation) The Controller and power modules are rated for operation from Single-Phase AC rated 90-264VAC. All AC Power is routed through the Controller and then distributed via the harnesses affixed to each LED Panel. Connections are clearly labeled on both the Controller and LED Panels via circular connector. It is the installer’s responsibility to ensure that the installation complies with all national and local codes. All power wiring must have proper protection with fuse / circuit breakers. The table and calculation below will help you to calculate the proper amperage rating to select the proper circuit breaker: LED PANEL BLADE M 9mm Color Full Color (RGB Spectrum) Resolution (Pitch) 9mm Watts Per Panel 105W ( # of LED Panels 100) Watts per Panel Controller Watts VAC Maximum Amperage For example, consider a double sided, 2 by 6 foot Blade M display. This display will have a total of 12 panels. If connecting to 120 VAC then: If connecting to 240 VAC then: Multiply the number of panels by the panel wattage for Blade M, then add 100 watts for the controller: Multiply the number of panels by the panel wattage for Blade M, then add 100 watts for the controller: 12 x 105 = 1260 Watts 12 x 105 = 1260 Watts 1260 + 100 = 1360 Watts 1260 + 100 = 1360 Watts Next, divide that wattage by our AC voltage: Next, divide that wattage by our AC voltage: 1360 ÷ 120 = 11.33 Maximum Amperage 1360 ÷ 240 = 5.66 Maximum Amperage The breaker should be rated to handle at least 11.33 Amps. The breaker should be rated to handle at least 5.66 Amps. Remember, an electrician will recommend that your maximum amperage does not exceed 80% of the breaker’s capacity. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 15 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL Displays may also be powered from 208VAC off of a three-phase system, however, it is up to the installer to ensure a properly balanced load. All power wiring must be from circuit breaker-protected lines. DO NOT connect the sign to a GFI-protected circuit. The sign must be properly grounded according to the applicable national and local electrical codes (for example, NEC Article 250 and 600, and IEEE 1100-1999). Use minimum 80° C copper wire only. ELECTRICAL REQUIREMENTS 1. Displays must be properly grounded (at the breaker or at the display). 2. Displays of sufficient size will require the addition of a power splitter. Enquire with your Cirrus representative for product details and pricing. 3. Breaker usage should not exceed 80% of total breaker rating. 4. Cirrus is unable to provide, consult or advise on the electrical setup on the display. All electrical work must be done by a licensed electrician. 5. IMPORTANT - Improper electrical setup, unstable or inconsistent power, “dirty power”, harmonic feedback, and other abnormal electrical conditions may damage or destroy display hardware and are not the responsibility of Cirrus, nor will part repair or replacement due to such damage be covered under the Cirrus warranty. 6. Displays must be wired on its own dedicated circuit. 7. Displays are never to be run off of generators as it may damage Controller and Panel components. 8. Additional electrical hardware may be required in order for the display to operate (line conditioner, step-down transformer, surge protector...) MODULES PER OUTPUT REQUISITE VOLTAGE 1-8 120V 9-16 240V 17+ 240V w/Power Splitter(s) THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 16 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL ELECTRICAL WIRING The power cord to the Controller will have one of two configurations of wire colors, noted below. Green = ground Black = hot White = neutral Yellow/green = ground Brown = hot Blue = neutral LIGHTNING STRIKE PROTECTION A sign bonded to an earth ground has a means of dissipating the high voltage and current from a lightning strike. The resistance of the grounding electrode must be as low as possible. However, damage can still occur to a sign’s electronic equipment from lightning voltage transients. The earth ground must comply with NEC Article 250. Though some surge protection is incorporated into a sign, to protect a sign from high-voltage lightning transients, surge protectors can be installed in accordance with NEC Articles 280 and 285 and local codes. The cirrus warranty cannot cover damaged caused by lightning transients. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 17 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 5. Optional Long-Range Wireless Communication The EnGenius Wireless Access Point uses 2.4GHz technology to avoid interference from cell phone and other wireless components. Designed for outdoor deployments with an IP65 water-proof housing, these come with mounting hardware, power over Ethernet injector and a cable accessory kit to help protect against damage caused by moisture, rain and dew. Each wireless antenna comes packaged with: • Install & software configuration instructions • EnGenius ENH 202 Wireless Access Point • 24V/1.0A Power Adapter • PoE Injector (EPE-24R) • Mounting Kit with Mast-Mount Strap • Special Screw Set • CD (User Instructions) Ethernet cables are not included. The device requires two cables, one must be 25 feet or less in length. The second must be under 300ft in length. Wireless modules come pre-configured from Cirrus to match with Controllers. Controllers have corresponding WiFi antennas. It is recommended to place the EnGenius less than 300ft from the Controller with a clear view. Even running the signal through a window will decrease the signal strength. If the Engenius is to be placed over 300ft from the display, please contact your Cirrus sales rep for an additional EnGenius unit. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 18 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL To install the EnGenius Wi-Fi Unit, follow these steps: 1. Run an Ethernet cable 300ft or less from your router to the Power over Ethernet device. Plug the cable into the “LAN/Network” port on the Power over Ethernet device. NETWORK 2. Plug the provided power cable into the Power over Ethernet device and then into a power outlet. WATERPROOF ENCLOSURE FOR POE AND POWER SUPPLY 3. The bottom of the access point has a removable cover. Grab the tab at the bottom and push up slightly to release the cover downwards. 4. Use a second Ethernet cable to connect the PoE/AP/ Bridge port on the Power over Ethernet device into the Main LAN port on the access point. This second cable must be less than 25 feet in length to avoid drop in signal. 5. Slide the cover back to seal the bottom of the unit. 6. Finally, mount the access point with clear line of sight to the WiFi antennas on the display’s Controller, pointing the smooth face of the access point at the LED display. DISPLAY CONTROLLER The Controller’s WiFi antennas will automatically connect to the signal being broadcasted by the access point when the display is powered on. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 19 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL Make sure that the Power over Ethernet device is in a dry and environmentally protected enclosure for the Access Point. Do not reset the EnGenius WiFi kit! Settings that allow communication to your Blade/Solo Controller will be removed and may need to be returned to Cirrus to be reprogrammed. Additional fees can occur for reprogramming. Do not log into EnGenius settings unless instructed to do so by Cirrus. If you choose not to use the EnGenius provided by Cirrus, Cirrus will not be responsible for the connection to the Controller or troubleshooting any connectivity issues in the future. When finished, the access point will resemble the following picture: WATER-PROOF ENCLOSURE FOR POE AND POWER SUPPLY Connection to Network PoE Injector ETHERNET CABLE THAT IS 25 FEET OR LESS IN LENGTH Secondary LAN Port Main LAN Port Connects to PoE Injector Verify the 3 lights (WLAN, LAN and PWR) are green behind the WiFi Unit as shown below. WLAN and LAN lights should be blinking. This indicates that the WiFi Unit is receiving internet. Main LAN Port REAR OF AP Enlarge view of Signal Indicators Secondary LAN Port THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 20 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL BASIC NETWORK REQUIREMENTS If there are any firewalls, content filters, etc. in place, they will have to be configured to allow the display to connect in. Any computer accessing the Cirrus LED Cloud (content management website) requires outbound access standard HTTP and HTTPS ports 80 and 443. The Controller also needs access to these ports, as well as unrestricted access to cirrusled.com, screenhub.com and their sub-domains. The display is set to run DHCP so if a static IP is required, please let Cirrus know prior to installation. Cirrus is not responsible for the internet connectivity or network setup onsite. Performance issues arising from poor/inadequate bandwidth, intermittent or weak internet connectivity is not covered under warranty. Cirrus is unable to provide, consult or advise on the end user’s network setup (firewall protocols/ adjustments, content filters, proxy servers...). INTERNET SPEEDS AND BANDWIDTH The sign will use on average 100MB per month of bandwidth. If you are using a large number of LED Cloud apps or frequently updating your content, the bandwidth usage can exceed 400-500MB per month. A minimum download speed of 10Mb/sec and minimum upload speed of 2Mb/sec is required for the sign to operate as intended. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 21 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 6. Controller M1 Indicator Light Power to Controller Software Running Controller Power Switch On Network Connection Automapping Steady Green Blinking Press User Button Hold User Button (5s) Steady Red Blinking Press User Button Hold User Button (5s) NETWORK CONNECTION There will be two indicator light sequences to check network connection. 1st Sequence: Active connection to Network The indicator light blinks GREEN three times followed by a pause. This pattern repeats itself four times or ten seconds. Once the network troubleshooting is complete the indicator light will go back to its prior state. 2nd Sequence: No Active Connection to Network The indication light blinks RED three times followed by a pause. This pattern repeats itself four times or ten seconds. Once the network troubleshooting is complete the indicator light will go back to its prior state. AUTOMAPPING Step 1: Hold the User Button for 5 seconds and release Step 2: There is a pause while the controller attempts to send mapping data to the panels. Step 3: The GREEN and RED light will alternate during the successful auto mapping process. *Please note that if the Automapping is not successful there will be a series of RED lights. At this time you will want to cycle power to the controller and begin the process over. We would recommend only one power cycle attempt. After that we need to make sure that the panels are connected to the controller (the panel indicator lights are blinking green). If they are showing connected, then it most likely means that the panels will not be able to auto-map, and that you will need to call Cirrus Support to have them manually set up the mapping. Step 4: Once the automapping is complete and you are still in the test pattern mode - you will be able to run through different text patterns by pushing in the button one time and watching the test patterns appear on the screen. The patterns are as follows: “Port A mapping pattern, Port B mapping pattern, red, blue, green, white, and then four line screens. If the mapping screens are not correct, it means that auto-map was not able to correctly identify the pattern, and that the mapping needs to be done manually THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 22 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL 7. LED Panel Installation Locking Arms CAUTION! The LED Panels lock into place via a rotating front and rearservice locking arm system. From the rear, tiles may be unlocked by hand by pressing the locking arms in toward the center of the tile (see Figure 5). From the front, tiles may be unlocked by inserting the provided hex key into the two corresponding holes and rotating until the Panel is released (see Figure 6). Fig. 5 Panels are connected at four points to the Frame. Do not forcibly attempt to remove Panels. If locking arms have properly been disengaged, the Panels will easily slide out from the Frames (see Figure 7). Hex Key Locations INSTALLATION PATTERN: The electrical order of installation and connecting is not important to the function of the sign as the Panel order is defined by the controller after mechanical integration, HOWEVER: The affixed harnesses are about 28” long, designed only to reach a neighboring Panel. For this reason, you must follow a logical pattern to ensure all modules can connect in a daisy chain fashion (see Figure 8). It is advised to start in one of the four corners, then traverse horizontally one solid row, then shift to the next row and traverse in the opposite direction and repeat. At right is an example of this installation. Extension cables are available for non-standard configurations. Fig. 6 Panel locked into Frame Fig. 7 Fig. 8: Wiring Pattern Panel 3 Panel 2 Panel 4 Panel 1 Avoid sharply bending or kinking the power cords on the Panels as it puts stress on the internal wiring and will eventually destroy them (Figure 9). Fig. 9 THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 23 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL C. Display Configuration ONCE YOUR SIGN IS INSTALLED AND CONNECTED TO THE NETWORK AND THE WORLD WIDE WEB, CALL CIRRUS AT 1.877.636.2331 TO MAP THE CONNECTION AND ENSURE ACCURATE SETUP OF YOUR DISPLAY. We will need to know: • The number of Panels installed • Single or dual sided sign • Their configuration (rows and columns) • The order in which they are daisy-chain connected • The installed time-zone • Controller serial number With this information, we can map the connection to ScreenHub with all the appropriate settings for your sign. Once the display has been created, you can log in to ScreenHub software for management and control. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 24 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL D. Display Care To enhance the visability and lifetime of your Cirrus System panels, the following steps are recommended: 1. Users must use diverse content that utilizes the whole screen as displaying the same, or similar messages for extended periods of time will cause LED’s to degrade in an unblanaced manner, impacting the visual quality of the display. 2. Wash the Panels with warm water and a sponge. This will help remove dirt/dust/sand/salt buildup and allow your content to shine through brightly. Do not use a power washer as it can damage the display. 3. LEDs do not last forever, it is standard for a small percentage of diodes to fail over time. After 6 months of usage, Cirrus will replace Panels under warranty that have 15% or more of non-working LEDs. THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 25 BLADE M LED DISPLAY SYSTEM INSTALLATION MANUAL E. Controller M1 Diagram THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com 26 THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY. © COPYRIGHT 2016, CIRRUS SYSTEMS INC., ALL RIGHTS RESERVED. Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072 Phone: 1.877.636.2331 | contact@cirrusled.com cirrusled.com