Cirrus Systems, Inc.
INSTALLATION MANUAL
BLADE AND
SOLO
LED DISPLAY
SYSTEMS / REV02282019
REV 08212016
BLADE
BLADE
M
M LED
LED
DISPLAY
DISPLAY
SYSTEMS
SYSTEMS
REV03292018
This document is confidential & proprietary to Cirrus Systems for distribution to direct customers and their installers only.
© Copyright 2017, Cirrus Systems Inc., All Rights Reserved.
CIRRUS
CIRRUS SYSTEMS,
SYSTEMS, INC.
INC.
47
Rd.
47 Spring
Spring Hill Rd.
Saco,
Saco, Maine 04072
(877)636-2331
636-2331
PP//11(877)
FE//1contact@cirrusled.com
(877) 636-2331
E / contact@cirrusled.com
C I R R U S L E D . C O M
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
INDEX
A. INTRODUCTION..................................................................................................................................3
1. Purpose ....................................................................................................................................................................... 3
2. Safety Issues ............................................................................................................................................................... 3
3. Equipment Description .............................................................................................................................................. 3
4. Safety Compliance ..................................................................................................................................................... 4
5.EnvironmentalConsiderations..............................................................................................................................................4
6. Shipping/Receiving, Product Storage ........................................................................................................................... 4
7. Warranty ........................................................................................................................................................................ 5
8. FCC Information..........................................................................................................................................................8
B. INSTALLATION................................................................................................................................... 9
1. Basic Handling Instructions .....................................................................................................................................9
2. Aluminum Frame Installation .............................................................................................................................. 10
3. Controller (Mechanical Installation) ....................................................................................................................... 13
4. Controller (Electrical Installation) .........................................................................................................................15
5. Optional Long-Range Wireless Communication ................................................................................................ 18
- EnGenius Wi-Fi Unit Installation .....................................................................................................................18
6. Controller M1 Indicator Light Status ................................................................................................................. 22
7. LED Panel Installation ............................................................................................................................................ 23
C. DISPLAY CONFIGURATION................................................................................................................24
D. DISPLAY CARE.................................................................................................................................25
E. CONTROLLER M1 DIAGRAM ............................................................................................................ 26
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
2
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
A. INTRODUCTION
1. Purpose
This manual explains how to mount and electrically connect a BLADE M LED Display System and is
intended for licensed sign installers.
This manual covers the following models: Controller-U1, Blade-M
2. Safety Issues
HIGH VOLTAGE
Contact with high voltage from AC mains may cause death or serious injury. Always disconnect
AC power to unit prior to servicing.
GROUNDING
It is essential to earth-ground the sign before connecting controller. Connecting signs that are
not earth grounded may cause damage to the LED Display System and in severe cases cause
death or injury.
OTHER
Other safety messages appear throughout this manual where appropriate.
3. Equipment Description
BLADE M LED Displays are modular signs consisting of these components:
• Aluminum Frame(s) measuring one foot by two feet. Each Frame mates with another via PEM screws
to configure signs into any combination of one by two foot sections.
• Water-Proof LED Display Panels which lock into place on the aluminum frame. Each LED Panel has
one input cable permanently affixed and a throughput connection to the input of the next daisy-chain
connected Panel.
• Water-Proof Controller to manage single and dual-sided signs.
• Optional WiFi Connection
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
3
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
4. Safety Compliance
Cirrus LED components are UL Listed. File #E352796
5. Environmental Considerations
The LED Panels are fully encapsulated and water-proof. The Controller system is housed in a waterproofed aluminum enclosure.
The LED Panels are rated for an ambient operating temperature range of -40~+70° Celsius (-40 ~ +158°
Fahrenheit) and are designed to withstand continuous direct sunlight. If the Panels experience an overtemperature condition, a signal will be sent to the controller to shut down the sign. Once the sign has
cooled, it will automatically re-start.
The PC Controller is rated for an ambient operating temperature range of -10~+60°C (14~ +140°F) and
should be protected from direct sunlight. Operation at colder temperatures is routinely and regularly
accomplished, though starting the screen from a powered off state at temperatures below 14°F may
not be possible. A controller which is in a powered on state produces ambient heat which can allow it to
continuously run at temperatures as low as -30°F (-34°C).
All components and connections are sealed and water-tight for protection from the ingress of dust and
water, though no components should be subjected to immersion in water.
6. Shipping/Receiving, Product Storage
All deliveries shall be FOB Cirrus Systems (Seller), Saco, ME. Methods and routes of shipment,
unless Seller specifies in writing otherwise, shall be accepted as chosen by Seller at Seller’s sole discretion.
Purchaser shall pay all costs of shipment. Delivery to the carrier shall constitute delivery and passage of
title to Purchaser, and risk of loss shall pass to Purchaser concurrently with passage of title. Seller will use
reasonable diligence to meet scheduled shipment dates and times. Such dates and times are the best
possible estimates, and not guarantees, of when goods will be shipped. In no event shall Seller be liable
for any losses or damages of any kind due to delays in shipment, nor may Purchaser cancel its contract
because of any such delay.
It is the responsibility of the Purchaser to check the product for visible damage prior to accepting delivery
from the carrier. Any damage to the Product must be noted on the delivery slip with the carrier and
immediately reported to Cirrus. Photographic evidence of damages will be required. Cirrus may assist in
seeking remedy with the carrier for damaged goods but does not retain title and therefore is not legally
responsible for said damages.
Delivered product should be stored in a cool dry place, out of the way of foot/motorized traffic.
It is the installer’s responsibility to look over the product before installing to ensure there are no missing
parts and there is no visible damage to any parts of the display. If there is any damage, Cirrus must be
informed prior to install.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
4
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
7. Limited Warranty
Cirrus Systems Inc. warrants that the Blade M. System components will be delivered in good condition
and shall be free of defects and workmanship and operate substantially in accordance with their stated
functional specifications for a period of five (5) years from delivery, provided that the Buyer installs, tests
and maintains the Blade M System components in accordance with this Installation Manual. The sole
remedy for any breach of this limited warranty shall be the exchange and replacement of the defective
system components in accordance with the component replacement process specified below
Exclusions. The following issues are not covered under the limited warranties set forth above. For
these issues, Cirrus shall not be obligated to furnish warranty support or maintenance services, nor
shall Cirrus be liable hereunder for repairs, replacement or additions:
1. Damage or problems caused during transportation by Customer;
2. Defects or damage that result from use of the Products or Software in other than their normal and
customary manner;
3. Damage or problems caused by repairs, changes, modifications, maintenance, relocation or reinstallation
by other than Cirrus designated technicians, or without Cirrus’s written permission;
4. Products and Software subject to unauthorized modification, disassembly or repair (including the
addition to the Product of non-Cirrus authorized and supplied equipment) which adversely affect Product
or Software performance or interfere with Cirrus’s normal warranty inspection and Product or Software
testing for warranty verification;
5. Products which, due to illegal or unauthorized alteration of Product software or firmware, do not
function in accordance with Cirrus’s published specifications;
6. Damage or problems caused by improper Electro-Static Discharge (“ESD”) precautions when handling
Covered Products;
7. Damage or problems caused by improper electrical grounding;
8. Damage or problems caused by improper utility service;
9. Damage or problems caused by use of non-Cirrus supplied equipment or parts;
10. Damage or problems caused by misuse, abuse, neglect or accident;
11. Damage or problems caused by an external electrical fault or any unusual shock;
12. Damage or problems caused by an accident, fire or water;
13. Damage or problems caused by natural disasters such as flood, fire, lightning, earthquake or tornado;
14. Damage or problems caused by failure to maintain the proper operating or storage environment for the
Covered Products to include but not limited to air conditioning, humidity control, or corrosive atmosphere
harmful to electronic equipment as provided in the Cirrus Installation Manual;
15. Damage or problems caused by strikes, riots, sabotage, or acts of war;
16. Theft;
17. Routine cleaning, or normal and customary wear and tear;
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
5
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
18. Scratches or other cosmetic damage to Product surfaces that do not affect the operation of the
Product;
19. Technical support or maintenance of any kind for third-party application or custom software not
defined under Covered Products;
20. Technical support associated with programming of Application Program Interfaces (API) of Covered
Products except for support on the capabilities of the programming interface;
21. Consumables and supplies (i.e., expendable batteries, recording media, tapes, disks or other
consumables);
22. Freight costs to the repair depot;
Non-Cirrus manufactured equipment, which carries its original manufacturer’s warranty and which will be
provided to Customer upon request.
Activation
The 5 year product warranty will go into effect upon the date of shipment and transfer of title. Warranty
may not be exercised until the display has been installed, powered, connected to the internet and Cirrus
has been called to verify the installation. Displays which are stored for extended periods of time and not
installed within 90 days of shipment may not qualify for warranty coverage at the discretion of Cirrus
Systems Inc.
Component Replacement
The Blade M System comes complete with a five year limited warranty on all components manufactured
by Cirrus Systems, Inc. Replacement components will be dispatched in the event of product failure and,
upon replacement, Buyer shall ship the defective components back to Cirrus for repair. All Cirrus Systems
terms and conditions and limited warranty shall apply to any such replacement components. Cirrus
provides service and support for the lifespan of all Blade M products at its standard rates. Cirrus provides
unlimited free software upgrades as they become available for all Blade M System displays. In the event
of a reported display outage or parts failure, contact Cirrus Technical Support immediately.
1. DO NOT DISPATCH SERVICE PERSONNEL TO THE SIGN BEFORE CONTACTING CIRRUS.
2. A Cirrus technician will perform remote diagnostics to determine the cause of the problem and will
advise the installer as what steps to take. Cirrus may require an installer to go onsite to assist with
additional troubleshooting.
3. If the technician determines it to be necessary, a replacement part will be shipped out.
4. Once the replacement part has been received and prior to swapping, contact Cirrus. A technician will
provide further instruction on the procedure for swapping.
5. Cirrus will issue an RMA and a return shipping label for the return of the failed part. The failed part can
be shipped back in the box the replacement arrived in.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
6
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
6. Once the part is received at Cirrus, it will be inspected to determine the likely cause of the failure.
7. If it is determined the part failed due to misuse or abuse, or any other non-covered event, the Buyer
agrees to pay for the replacement part and any freight charges associated with the non-covered parts
replacement
In the event of defective diodes within the first 6 months, Cirrus will replace the panel under warranty once
confirmed that the issue was caused by a warranty covered event. After 6 months of active use, Cirrus will
replace the panel under warranty when at least 15% of the diodes are defective.
Returning Defective Parts
A functioning power cable needs to be intact upon return to Cirrus for warranty credit.
EnGenius Warranty
Cirrus will cover the first year of warranty of the EnGenius ENH 202 and its power supply. After the first
year of use, client must work through the warranty with EnGenius directly.
Disclaimer
Except as expressly set forth in this Agreement, the Products and Software, including the Hardware, and
all related Services shall be provided “as is” without warranty of any kind, and Cirrus hereby disclaims,
and Customer hereby waives, any and all warranties whether express, implied or statutory, including all
implied warranties of merchantability, fitness for a particular purpose and non-infringement. Further,
Cirrus does not warrant, guarantee, or make any representations that any Software provided will be free
from all bugs or that its use will be uninterrupted or error-free. Customer understands and agrees that
Cirrus is not responsible for and will have no liability for equipment hardware, software, or other items or
any services provided by or manufactured by any persons other than Cirrus or its authorized agents. The
foregoing constitutes Customer’s sole rights and remedies under this agreement with respect to defects
in the products, software or services.
Limitation on Liability
Buyer understands and agrees that except for instances involving Cirrus’s indemnification obligations set
forth in the governing Sales Agreement, Cirrus’s aggregate liability for any damages suffered by Buyer or
any other party, whether in contract, in tort, under any warranty theory, or otherwise, shall be limited to the
amount paid to Cirrus by Buyer under this Contract for the defective System component(s) giving rise to
the indemnified losses or damages covered by this Agreement.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
7
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
FCC Information
Blade M
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against
harmful interference when the equipment is operated in a commercial environment. This equipment
generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance
with the instruction manual, may cause harmful interference to radio communications. Operation of
this equipment in a residential area is likely to cause harmful interference in which case the user will be
required to correct the interference at his own expense.
Changes or modifications to this device that are not expressly approved by Cirrus Systems, Inc. could
void user’s authority to operate this device.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
8
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
B. Installation
B. Installation
Cirrus is not responsible for installations or the structural integrity of support structures done by others.
The customer is responsible for ensuring that a qualified structural engineer approves the structure
and any additional hardware. The installer is responsible for ensuring that the mounting structure and
hardware are capable of supporting the display, and the structure follows all local codes. Cirrus is
unable to provide consultation or advice on structural design.
1. Basic Handling Instructions
1. Do not open Panels or Controllers unless instructed to do so by Cirrus as you risk voiding the
warranty.
2. Do not carry Panels or Controllers by the electrical plugs or cables. This will cause stress on the
internal wiring and could cause issues with performance including destroying hardware.
3. Do not drop or throw Panels, Frames or Controllers.
4. Do not drag Panels or Controllers across the ground.
5. If instructed to open Panels or Controllers, make sure they are on a clean, soft surface away from
the elements (rain, snow, wind).
6. Avoid touching the internal motherboard and control cards.
7. Use caution when working with the internal power supply and do not make contact with power
supplies or wiring while they are powered on.
8. When transporting product to installation site, be sure that product is properly secured to avoid
damage.
9. Do not alter the enclosure of the Controller or Panels (painting, removing Controller/Panel tabs...)
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
9
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
2. Aluminum Frame Installation for
the 1x2’ and 2x4’ Versions
• Each side of the BLADE M LED Display Aluminum Frame
Screw
“INSTALL UP” Marking
Alignment Pins
has two screws and two PEM nut inserts for accepting
the screws (hex head bolts) of its neighboring Frame.
The top and face sides are marked on each frame to
simplify integration (see Figure 1).
• Screw two Frames together via the hex head bolts
(screws) and mating PEM nuts found on each frame. The
end result being that each side of each frame has four
screw connections for sturdy and reliable mounting (see
Figure 2).
Screw
Pem Nut
Fig. 1
• Simply repeat this process to attain any combination of
one by two foot (304.8 by 609.6mm) sections desired
(see Figure 3).
• Secure the completed Frame assembly to mounting
brackets. Brackets should be placed horizontally from
left to right (as depicted on Figure 4). Four mounting
holes are located on the back side of each Frame.
• One row of support mounting brackets must be
attached for every four rows of Frames. Do not
exceed four rows of Frames without attaching
an additional mounting bracket.
Fig. 2
• Do not apply lateral stress on the Frame system
as gaps will form between the Panels.
Four mounting
holes are on the rear
side corners of the
Frame and are centered
1” from outside edge
with 0.24” diameter.
Fig. 3
Fig. 4
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
10
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
Cirrus 9mm BladeM measurement specifications for new 2x4’ frame
Cable
pass through hole
Top Profile
Pre-tapped holes for
included 1/4 inch hex bolts
Side Profile
4 feet
Cable pass
through hole
2 feet
Pre-tapped
holes for
included 1/4
inch hex bolts
Module alignment holes
Cable
pass through hole
Front Profile
Bottom Profile
4.25”
Pre-tapped holes for
included 1/4 inch hex bolts
4 feet
The high-strength aluminum
framing system can be
manipulated in any fashion to
attach brackets, angle iron or to
directly drill/attach into a masonry
application.
Drilling/attaching any neccesary
support bracket directly into the
frames will not void the warranty.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
11
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
Cirrus 9mm BladeM measurement specifications and overview for a 3x6 display
Cable
pass through hole
Top Profile
Pre-tapped holes for
included 1/4 inch hex bolts
5 1/8”
6 feet
5 1/8”
Pre-tapped
holes for
1/4 inch
hex bolts
3 feet
3 feet
Cable
pass
through
hole
LED Panel
Aluminum
Frame
Side Profile
Front Profile
Cable
pass through hole
Bottom Profile
Pre-tapped holes for
included 1/4 inch hex bolts
6 feet
3/4”
The high-strength aluminum
framing system can be
manipulated in any fashion to
attach brackets, angle iron or to
directly drill/attach into a masonry
application.
Pre-drilled
holes for angle
iron mounting
Drilling/attaching any neccesary
support bracket directly into the
frames will not void the warranty.
Rear Profile
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
12
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
3. Controller (Mechanical
Installation)
from exceeding the tempurature rating of the
controller, 60 °C (140°F). Please do not alter the
outside of the controller in anyway.
One Controller is capable of supporting a
singlesided or dual-sided sign.
The Controller needs to be placed within reach
of the input cable affixed to the first LED Panel(s)
it will be connected to. Do not mount within the
client’s building. This is extremely important if
the sign will be set up using the 4G option for
communication. If the controller is mounted
inside of a building or sign structure; the signal
for communication can be interrupted and not
as reliable. It can be mounted behind the Panels
or outside the Frame system.
NETWORK CONNECTION OPTIONS:
Option 1: Direct Ethernet
The RJ45 connection is provided to connect
the sign via direct Ethernet to a router or other
network connection, enabling communication
with the sign from any other network connected
device.
Option 2: Wireless Connection using EnGenius
Access Point
Alternatively, the Controller has two black
WiFi antennas to connect wirelessly with the
provided EnGenius access point (see page 14).
If using the EnGenius, gently screw the wifi
antennas (and extender cables if needed) into
their corresponding ports on the controller. Do
not force them into place as it can break the
water-tight seal on the port.
This first Panel connection should be in one of
the four corners, though the exact connection
is unimportant as LED Panel configuration is
defined after mechanical integration.
The Controller has four mounting tabs for
mounting.
The Controller contains power supplies,
processors and memory devices which
are sensitive to heat. The Controller should
remain protected from direct sunlight to avoid
heat related issues and extend the life of the
Controller. It is the installer’s responsibility to
install adequate ventilation to keep the space
Option 3: Cellular Network
M1 Controllers are equipped with cellular
modems for mobile connectivity without the
need for an on-site internet connection. This
service is a paid feature offered at the time of
the sale and, upon selection, will be activated
at the time of installation once preinstallation
paperwork is complete. If the customer does not
initially choose to purchase the cellular option
but would like to active this service post sale,
please contact Cirrus and an Implementation
Specialist can review all plan options and
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
13
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
associated fees.
*While we do provide equipment that is capable of receiving cellular data signals, we do not provide the
cellular service itself and are not responsible for its functionality, coverage, or performance. Like all other
cellular coverage, coverage areas can be adversely affected by distance from cell site, network changes,
weather, foliage, tower congestion, and other factors.
Should the Controller be mounted within a thick structure (brick, .08 inch aluminum...) or between the
Panels, it is advised to use the included extender cable for the Wi-Fi antenna (only if the display will be
connecting via the EnGenius).
Avoid sharply bending or kinking the power cord from the Controller as it puts stress on the internal wiring
and will eventually destroy the product.
The Controller should be mounted with the ports to the left, as indicated with the “This Side Up” sticker on
the front of the controller. Make sure all unused ports are covered to prevent water damage.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
14
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
4. Controller (Electrical Installation)
The Controller and power modules are rated for operation from Single-Phase AC rated 90-264VAC. All AC
Power is routed through the Controller and then distributed via the harnesses affixed to each LED Panel.
Connections are clearly labeled on both the Controller and LED Panels via circular connector.
It is the installer’s responsibility to ensure that the installation complies with all national and local codes.
All power wiring must have proper protection with fuse / circuit breakers. The table and calculation below
will help you to calculate the proper amperage rating to select the proper circuit breaker:
LED PANEL
BLADE M 9mm
Color
Full Color (RGB Spectrum)
Resolution (Pitch)
9mm
Watts Per Panel
105W
(
# of LED Panels
100)
Watts per Panel
Controller Watts
VAC
Maximum Amperage
For example, consider a double sided, 2 by 6 foot Blade M display. This display will have a total of
12 panels.
If connecting to 120 VAC then:
If connecting to 240 VAC then:
Multiply the number of panels by the panel wattage for
Blade M, then add 100 watts for the controller:
Multiply the number of panels by the panel wattage for
Blade M, then add 100 watts for the controller:
12 x 105 = 1260 Watts
12 x 105 = 1260 Watts
1260 + 100 = 1360 Watts
1260 + 100 = 1360 Watts
Next, divide that wattage by our AC voltage:
Next, divide that wattage by our AC voltage:
1360 ÷ 120 = 11.33 Maximum Amperage
1360 ÷ 240 = 5.66 Maximum Amperage
The breaker should be rated to handle at least 11.33
Amps.
The breaker should be rated to handle at least 5.66 Amps.
Remember, an electrician will recommend that your maximum amperage does not exceed 80% of the
breaker’s capacity.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
15
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
Displays may also be powered from 208VAC off of a three-phase system, however, it is up to the installer
to ensure a properly balanced load.
All power wiring must be from circuit breaker-protected lines. DO NOT connect the sign to a GFI-protected
circuit. The sign must be properly grounded according to the applicable national and local electrical codes
(for example, NEC Article 250 and 600, and IEEE 1100-1999). Use minimum 80° C copper wire only.
ELECTRICAL REQUIREMENTS
1. Displays must be properly grounded (at the breaker or at the display).
2. Displays of sufficient size will require the addition of a power splitter. Enquire with your Cirrus
representative for product details and pricing.
3. Breaker usage should not exceed 80% of total breaker rating.
4. Cirrus is unable to provide, consult or advise on the electrical setup on the display. All electrical work
must be done by a licensed electrician.
5. IMPORTANT - Improper electrical setup, unstable or inconsistent power, “dirty power”, harmonic
feedback, and other abnormal electrical conditions may damage or destroy display hardware and are
not the responsibility of Cirrus, nor will part repair or replacement due to such damage be covered
under the Cirrus warranty.
6. Displays must be wired on its own dedicated circuit.
7. Displays are never to be run off of generators as it may damage Controller and Panel components.
8. Additional electrical hardware may be required in order for the display to operate (line conditioner,
step-down transformer, surge protector...)
MODULES PER OUTPUT
REQUISITE VOLTAGE
1-8
120V
9-16
240V
17+
240V w/Power Splitter(s)
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
16
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
ELECTRICAL WIRING
The power cord to the Controller will have one of two configurations of wire colors, noted below.
Green = ground
Black = hot
White = neutral
Yellow/green = ground
Brown = hot
Blue = neutral
LIGHTNING STRIKE PROTECTION
A sign bonded to an earth ground has a means of dissipating the high voltage and current from a lightning
strike. The resistance of the grounding electrode must be as low as possible. However, damage can still
occur to a sign’s electronic equipment from lightning voltage transients. The earth ground must comply
with NEC Article 250.
Though some surge protection is incorporated into a sign, to protect a sign from high-voltage lightning
transients, surge protectors can be installed in accordance with NEC Articles 280 and 285 and local
codes. The cirrus warranty cannot cover damaged caused by lightning transients.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
17
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
5. Optional Long-Range Wireless
Communication
The EnGenius Wireless Access Point uses 2.4GHz technology
to avoid interference from cell phone and other wireless
components.
Designed for outdoor deployments with an IP65 water-proof
housing, these come with mounting hardware, power over
Ethernet injector and a cable accessory kit to help protect
against damage caused by moisture, rain and dew.
Each wireless antenna comes packaged with:
• Install & software configuration instructions
• EnGenius ENH 202 Wireless Access Point
• 24V/1.0A Power Adapter
• PoE Injector (EPE-24R)
• Mounting Kit with Mast-Mount Strap
• Special Screw Set
• CD (User Instructions)
Ethernet cables are not included. The device requires two
cables, one must be 25 feet or less in length. The second
must be under 300ft in length.
Wireless modules come pre-configured from Cirrus to
match with Controllers. Controllers have corresponding WiFi
antennas.
It is recommended to place the EnGenius less than 300ft
from the Controller with a clear view. Even running the signal
through a window will decrease the signal strength. If the
Engenius is to be placed over 300ft from the display, please
contact your Cirrus sales rep for an additional EnGenius unit.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
18
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
To install the EnGenius Wi-Fi Unit,
follow these steps:
1. Run an Ethernet cable 300ft or less from your router to
the Power over Ethernet device. Plug the cable into the
“LAN/Network” port on the Power over Ethernet device.
NETWORK
2. Plug the provided power cable into the Power over Ethernet
device and then into a power outlet.
WATERPROOF
ENCLOSURE
FOR POE AND
POWER SUPPLY
3. The bottom of the access point has a removable cover.
Grab the tab at the bottom and push up slightly to release
the cover downwards.
4. Use a second Ethernet cable to connect the PoE/AP/
Bridge port on the Power over Ethernet device into the
Main LAN port on the access point. This second cable
must be less than 25 feet in length to avoid drop in signal.
5. Slide the cover back to seal the bottom of the unit.
6. Finally, mount the access point with clear line of sight
to the WiFi antennas on the display’s Controller, pointing
the smooth face of the access point at the LED display.
DISPLAY CONTROLLER
The Controller’s WiFi antennas will automatically
connect to the signal being broadcasted by the access
point when the display is powered on.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
19
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
Make sure that the Power over Ethernet device is in a dry and environmentally protected enclosure for the
Access Point.
Do not reset the EnGenius WiFi kit! Settings that allow communication to your Blade/Solo
Controller will be removed and may need to be returned to Cirrus to be reprogrammed. Additional
fees can occur for reprogramming. Do not log into EnGenius settings unless instructed to do so
by Cirrus.
If you choose not to use the EnGenius provided by Cirrus, Cirrus will not be responsible for the connection
to the Controller or troubleshooting any connectivity issues in the future.
When finished, the access point will resemble the following picture:
WATER-PROOF
ENCLOSURE FOR POE
AND POWER SUPPLY
Connection to
Network
PoE Injector
ETHERNET CABLE
THAT IS 25 FEET OR
LESS IN LENGTH
Secondary
LAN Port
Main LAN Port
Connects to
PoE Injector
Verify the 3 lights (WLAN, LAN and PWR) are green behind the WiFi Unit as shown below.
WLAN and LAN lights should be blinking. This indicates that the WiFi Unit is receiving internet.
Main LAN Port
REAR OF AP
Enlarge view of Signal Indicators
Secondary LAN Port
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
20
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
BASIC NETWORK REQUIREMENTS
If there are any firewalls, content filters, etc. in place, they will have to be configured to allow the display
to connect in. Any computer accessing the Cirrus LED Cloud (content management website) requires
outbound access standard HTTP and HTTPS ports 80 and 443. The Controller also needs access to these
ports, as well as unrestricted access to cirrusled.com, screenhub.com and their sub-domains. The display
is set to run DHCP so if a static IP is required, please let Cirrus know prior to installation.
Cirrus is not responsible for the internet connectivity or network setup onsite. Performance issues arising
from poor/inadequate bandwidth, intermittent or weak internet connectivity is not covered under warranty.
Cirrus is unable to provide, consult or advise on the end user’s network setup (firewall protocols/
adjustments, content filters, proxy servers...).
INTERNET SPEEDS AND BANDWIDTH
The sign will use on average 100MB per month of bandwidth. If you are using a large number of LED
Cloud apps or frequently updating your content, the bandwidth usage can exceed 400-500MB per month.
A minimum download speed of 10Mb/sec and minimum upload speed of 2Mb/sec is required for the sign
to operate as intended.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
21
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
6. Controller M1 Indicator Light
Power to
Controller
Software
Running
Controller
Power Switch
On
Network
Connection
Automapping
Steady Green
Blinking
Press User
Button
Hold User
Button (5s)
Steady Red
Blinking
Press User
Button
Hold User
Button (5s)
NETWORK CONNECTION
There will be two indicator light sequences to
check network connection.
1st Sequence: Active connection to Network
The indicator light blinks GREEN three times
followed by a pause. This pattern repeats itself
four times or ten seconds. Once the network
troubleshooting is complete the indicator light
will go back to its prior state.
2nd Sequence: No Active Connection to
Network
The indication light blinks RED three times
followed by a pause. This pattern repeats itself
four times or ten seconds. Once the network
troubleshooting is complete the indicator light
will go back to its prior state.
AUTOMAPPING
Step 1: Hold the User Button for 5 seconds and
release Step
2: There is a pause while the controller attempts
to send mapping data to the panels. Step
3: The GREEN and RED light will alternate during
the successful auto mapping process.
*Please note that if the Automapping is not
successful there will be a series of RED lights.
At this time you will want to cycle power to the
controller and begin the process over. We would
recommend only one power cycle attempt. After
that we need to make sure that the panels are
connected to the controller (the panel indicator
lights are blinking green). If they are showing
connected, then it most likely means that the
panels will not be able to auto-map, and that
you will need to call Cirrus Support to have them
manually set up the mapping. Step 4: Once
the automapping is complete and you are still
in the test pattern mode - you will be able to
run through different text patterns by pushing
in the button one time and watching the test
patterns appear on the screen. The patterns
are as follows: “Port A mapping pattern, Port
B mapping pattern, red, blue, green, white, and
then four line screens. If the mapping screens
are not correct, it means that auto-map was not
able to correctly identify the pattern, and that the
mapping needs to be done manually
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
22
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
7. LED Panel Installation
Locking Arms
CAUTION!
The LED Panels lock into place via a rotating front and rearservice locking arm system. From the rear, tiles may be
unlocked by hand by pressing the locking arms in toward
the center of the tile (see Figure 5). From the front, tiles may
be unlocked by inserting the provided hex key into the two
corresponding holes and rotating until the Panel is released
(see Figure 6).
Fig. 5
Panels are connected at four points to the Frame. Do not
forcibly attempt to remove Panels. If locking arms have
properly been disengaged, the Panels will easily slide out from
the Frames (see Figure 7).
Hex Key Locations
INSTALLATION PATTERN:
The electrical order of installation and connecting is not
important to the function of the sign as the Panel order
is defined by the controller after mechanical integration,
HOWEVER: The affixed harnesses are about 28” long,
designed only to reach a neighboring Panel. For this reason,
you must follow a logical pattern to ensure all modules can
connect in a daisy chain fashion (see Figure 8). It is advised
to start in one of the four corners, then traverse horizontally
one solid row, then shift to the next row and traverse in the
opposite direction and repeat. At right is an example of this
installation. Extension cables are available for non-standard
configurations.
Fig. 6
Panel locked into Frame
Fig. 7
Fig. 8: Wiring Pattern
Panel 3
Panel 2
Panel 4
Panel 1
Avoid sharply bending or kinking the power cords on the Panels
as it puts stress on the internal wiring and will eventually
destroy them (Figure 9).
Fig. 9
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
23
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
C. Display Configuration
ONCE YOUR SIGN IS INSTALLED AND CONNECTED TO THE NETWORK AND THE WORLD WIDE WEB,
CALL CIRRUS AT 1.877.636.2331 TO MAP THE CONNECTION AND ENSURE ACCURATE SETUP OF
YOUR DISPLAY.
We will need to know:
• The number of Panels installed
• Single or dual sided sign
• Their configuration (rows and columns)
• The order in which they are daisy-chain connected
• The installed time-zone
• Controller serial number
With this information, we can map the connection to ScreenHub with all the appropriate settings for your
sign.
Once the display has been created, you can log in to ScreenHub software for management and control.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
24
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
D. Display Care
To enhance the visability and lifetime of your Cirrus System panels, the following steps are
recommended:
1. Users must use diverse content that utilizes the whole screen as displaying the same, or similar
messages for extended periods of time will cause LED’s to degrade in an unblanaced manner,
impacting the visual quality of the display.
2. Wash the Panels with warm water and a sponge. This will help remove dirt/dust/sand/salt buildup
and allow your content to shine through brightly. Do not use a power washer as it can damage the
display.
3. LEDs do not last forever, it is standard for a small percentage of diodes to fail over time. After 6 months
of usage, Cirrus will replace Panels under warranty that have 15% or more of non-working LEDs.
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
25
BLADE M LED DISPLAY SYSTEM
INSTALLATION MANUAL
E. Controller M1 Diagram
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com
26
THIS DOCUMENT IS CONFIDENTIAL & PROPRIETARY TO CIRRUS SYSTEMS FOR DISTRIBUTION TO DIRECT CUSTOMERS AND THEIR INSTALLERS ONLY.
© COPYRIGHT 2016, CIRRUS SYSTEMS INC., ALL RIGHTS RESERVED.
Cirrus Systems Inc. | 47 Spring Hill Road, Saco, Maine 04072
Phone: 1.877.636.2331 | contact@cirrusled.com
cirrusled.com