CLASS ASSIGNMENT –OPERATIONS MANAGEMENT TOSHIBA OME WORKS Objective : Increase Productivity and lower Costs in conjunction to introduction of new subnotebook computer model. Aim : Initial Production of new model to be 150 units per day and later to be increased to 300 units per day in the following week. Key Points to Note : (a) (b) (c) (d) (e) (f) (g) Total Workforce- 2600 employees out of which 440 direct factory workers & 1050 were design engineers. Category of Factory worker- Full time, Part time, Temporary & Affiliates. Wages- Full time worker (X1) and overtime (X1+30% of X2) after 7.5 hrs of daily worktime. Part Time worker (X2) for 6 hrs daily Total Models as per existing line- 8 different model with 6 different variations i.e 48 model types Daily lots – 20 Total units – 300 units per line (3 working lines + 1 idle line) Average time taken for assembly- 2minutes per 10 worker in a line Existing Assembly Line process IDLE LINE, which could be utilised Solution Individual Burn racks for 24 hrs + preinstalled software test and Time of production notebook foreach 300 line units in a day per line for a total of 7.5 working pallet forper finished goods for hours per day. Therefore per unit production in minutes comes to 1.5 Min (90 secs) (=300/ 450 min) , which is our cycle time. So total time among 10 workers in existing line is = 10*90 secs = 900 secs Current Note book line assuming all workers are experienced Station No. 1 2 3 4 5 6 7 8 9 Total Time taken in secs 110 114 101 107 103 107 108 93 310 10 Total 105 1258 secs Actual Remark 110 114 101 107 103 107 108 93 103.33 rounded Three operations are to 104 performed in parallel 105 1052 secs being Total Time from station 1 to 10 = 1052 secs Therefore total stations required = 1052 secs/ 90 secs= 11.68 i.e rounded off to 12 stations Hence the no. of stations need to be increased by 02 and will need to hire additional 04 temporary workers. Analysis For increase in cost – 10* 7.5* (X1) + 4*6*(X2) or 10* 7.5* (X1) + 4*6*(X1), where X1 being salary of Permanent workers and X2 being salary of Temporary workers. Correct decision on hiring between permanent or temporary workers on the basis of salary of both for cost effectiveness. By increasing the total stations efficiency will be = 1052/(12*90)= 97% Further to improve the assembly line the following measures can be undertaken:a) b) c) d) Kits of the screw drivers can be pre-assembled which can reduce 30 (4+6+4+4+6+6) secs from the process. Total time saved is 30*300units/line* 3 lines=27000 secs of the assembly line time. Total time required to produce one unit is 1228 secs(1258-30). Total additional units produced =27000/1258=22 unit. Hence it will be optimal for additional station and workers to be introduced. This will increase productivity and quality and also decrease dependability on working skills