Uploaded by ersumit *

erdjksfkkd

advertisement
Baseband 6630
Baseband 6620
Baseband 6630
baseband 6620
›
LTE, WCDMA and GSM capacity and Mixed Mode capability
– Baseband 6630 capacity & capabilities equivalent to Baseband 5216
– Baseband 6620 capacity & capabilities equivalent to Baseband 5212
– Release June 2017
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 2
Baseband 6630
baseband 6620
›
Optimized for main-remote configurations
– 19 inch wide, 1U high, <352mm deep
– 15 SFP/SFP+ for CPRI inter-connect to Radio Units reducing the need for Baseband
R503
–
–
–
–
–
2 optical 1/10Gbps SFP/SFP+ ports and 2 electrical 1Gbps RJ45 ports
Eight External Alarm ports
Dual 48V DC power feeding
Self-contained environmental control & field replaceable fan unit
Hardware Prepared for NR (5G) and eCPRI
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 3
comparison
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 4
comparison
Main
Unit
6601
Baseband
6620/30
Baseband
5212/16
Baseband
R503
Baseband Main Unit (6601) + Baseband 5216/5212 + dummy
OR
Baseband Main Unit (6601) + Baseband 5216/5212 + Baseband
R503
›
›
›
Baseband 6630/20 is standalone & has its own
climate control
Baseband 6630/20 has 15 CPRI ports & dual
power feeding
Typical power consumption estimated to
(at 25 C and typical load)
Baseband 6630: 123W
Baseband 6620: 93W
°
›
›
›
The RBS 6000 chassis is mandatory for Baseband
5216/12
Baseband R503 needed to increase number of CPRI
ports
Baseband 6630 will have > 50W lower power
consumption compared to the corresponding
Baseband Main Unit (6601) + Baseband 5216 +
Baseband R503 configuration
HWAC to enable more than 6 CPRI ports
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 5
Ericsson baseband most
flexible on the market
High capacity sites
Baseband 6630 1 standard
Capacity sites
Baseband 6630 2-3 standards
Baseband 6620 1 standard
High capacity sites
Capacity sites
Coverage sites
Baseband 6630 2-3 standards
Baseband 6620 1-2 standards
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 6
Coverage sites
Baseband configurations
From 17.Q1 SW
Single Mode
Baseband
Mixed Mode
Baseband
Baseband 6620
GSM
WCDMA
LTE
G+W
Baseband 6630
GSM
WCDMA
LTE
G+W
G+L
G+W+L
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 7
W+L
LTE Configuration examples
›
Baseband 6630
– Up to 3 sector and 6 band sites with 20 MHz 2T2R FDD cells
– Up to 6 sector and 3 band sites with 20 MHz 2T2R FDD cells
– Up to 3 sector and 3 band sites with 20 MHz 8T8R TDD cells
›
Baseband 6620
– Up to 3 sector 4 band sites with 20 MHz 2T2R FDD cells
– Up to 6 sector 2 band sites with 20 MHz 2T2R FDD cells
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 8
DRAN or CRAN
and Elastic RAN
DRAN
with
Baseband 6630/6620
L3
L2
L1
CRAN
with
Baseband 6630/6620
L3
L2
L1
L3
L2
L1
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 9
L3
L2
L1
DRAN
with
Baseband 6630/6620
for small cells
Front panel Interfaces
P orts
Q u an t i t y
C o m me n t s
Power
2
-48V
EC
1
RJ45
LMT
1
TN
IDLe
CPRI
RJ45
2+2
2x10G(SFP/SFP+)
2
2 x 1G (RJ45)
XCede
15
SFP/SFP+
Sync
1
RJ45
Externala larms
8
2xRJ45
SAU
1
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 10
Mounting
›
In controlled environments
›
Mounting in 19 inch racks or in Transmission (TM) compartment in Ericsson enclosures
SCU
PCF
SHU
PDU
D D
U U
x x
R R R R R R
U U U U U U
S S S S S S
Cable management
PDU
Air restrictor plate incl CM
3.5U subrack
TCU 04
TM Space
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 11
Full support
LTE
FDD
TDD
/ LAA
/
WCDMA
Massive IOT
NB
M1
/ EC-GSM
/
GSM
All simultaneously supported on one Baseband 6630 Module
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 12
Baseband5212
Baseband
Baseband5216
Baseband R503
baseband
portfolio
Baseband Radio Interconnect
Baseband Main Unit 6601
Baseband 6630Front
6620 Presentation
| Ericsson
Internal | haul
6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 13
Baseband
haul
& Back
Baseband Main Unit
Radio
Baseband 6303
Radio 2203 / 2205
Baseband 6630
Baseband 6620
Micro-Baseband 6502
Enhanced
baseband
portfolio
Baseband
C608
Baseband 6630
6620 Presentation | Ericsson Internal |
Baseband
Interconnect
Outdoor Baseband
Baseband P614
6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 14
Baseband PIM Mitigation
Baseband
Elastic RAN
Gigabit LTE
Internet of things
FDD/TDD
Spectrum efficiency
Carrier aggregation
Cloud RAN
5G
Reduced TCO
Higher order MIMO
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 15
Ready
Summary
›
High capacity in smallest form factor
›
Lowest power consumption
›
Supporting all major technologies
Ericsson has the strongest baseband portfolio on the road to 5G
Baseband 6630 6620 Presentation | Ericsson Internal | 6/221 09-FGB1010529 Uen, Rev E | 2017-06-29 | Page 16
Download