Uploaded by abdisalam43

Karpowership-SA

advertisement
A Solution Partner to South Africa
Karpowership SA Presentation for NERSA Public Hearing
19/08/2021
C O N F ID E N TIAL
The RMI4P
CONFIDENTIAL
Preferred Bidders
CONFIDENTIAL
Karpowership
A GLOBAL AND UNIQUE INTEGRATED ENERGY COMPANY
Diversified portfolio including renewables around the world
Core business is Powerships and LNG assets
Established in 1948, energy since 1996
2,600 employees from 21 different countries
10,000+ jobs created around the world
ONE STOP SHOP
In-house Design, EPC, O&M, Development and Investment capabilities.
Turn-key solutions covering the entire value chain, fuel supply to power generation.
CONFIDENTIAL
Global Portfolio
LEBANON
INDONESIA
CUBA
SUDAN
GUINEA-BISSAU
THE GAMBIA
GUINEA CONAKRY
SIERRA LEONE
GHANA
SENEGAL
MOZAMBIQUE
CONFIDENTIAL
Karpowership owns and operates 30
Powerships; and owns 5 FSRUs with global
partnerships including Japanese MOL.
LNG to Power
LNG Carrier
Gas Supply
FSRU
Powership
Gridline
Off Taker
SHELL
KARMOL/HOEGH
KARPOWERSHIP
ESKOM
Gas infrastructure.
Strategic Global Partnerships
As Growth Drivers, ships
arrive to refuel each month –
increasing traffic and marine
industry opportunities.
CONFIDENTIAL
New industry driven by
floating power generation,
helps to grow power, marine
and LNG sectors.
Reliable grid supports a
better economy.
The Technology
• LNGC brings in Liquified Natural
Gas (LNG)
• FSRU stores LNG and converts
LNG to gas state before
transferring the fuel to Powership
• Powership converts the gas to
electricity using reciprocating
engines on-board the vessel
• Powership sends out the
electricity to the national grid
CONFIDENTIAL
All our assets are ready to be deployed and
our LNG value chain is ready to serve.
Powerships together with FSRUs will
bolster South Africa’s marine, power and
gas industry.
Environmental Policy
• We are practicing the shift to cleaner energy while minimizing the
environmental impacts caused by the nature of our business.
• Our E&S procedures are prepared according to IFC Performance
Standards and are certified by international lenders as fully compliant
with IFC Performance Standards.
• Our operations are certified to comply with ISO standards: ISO 9001
(quality), ISO 14001 (environment), ISO 45001 (health and safety)
and OHSAS 18001 (health and safety).
CONFIDENTIAL
Sustainability
The Sustainable Development Goals are a universal call from the UN to end poverty, protect the planet and
ensure that all people enjoy peace and prosperity. There are 17 Goals that are interconnected – providing us with
a common plan and agenda to tackle some of the pressing challenges facing our world.
Our aim is to contribute directly or indirectly to all set of goals starting with providing clean and affordable energy
that will support the sustainable growth and development of all economies. Karpowership is proud to make a
change in more than 50 million people’s lives targeting all surrounding communities and people in need.
CONFIDENTIAL
South Africa
CONFIDENTIAL
Delivering Cleaner Energy
Our Mission
Our mission is to facilitate and
accelerate the transition to cleaner
fuels while continuously working
towards improving the environmental
baseline.
Our Vision
• Investing in communities and job
creation
• South Africa becoming our hub for
the continent
• Solar and land-based investments
• Participation to future tender rounds
• Gas downstream
CONFIDENTIAL
Project Partners
Karpowership SA, a 49% South African-Black owned company, is a partnership
among Karpowership and Powergroup SA to respond to the Risk Mitigation
Independent Power Producer Procurement Programme (RMIPPPP) issued by South
African government, Department of Mineral Resources and Energy.
CONFIDENTIAL
Our Priorities
Power Generation and Help
Reduce Load Shedding
Community Investment
Employment
 In excess of 1200 jobs.
 Provide 1220 MW of cleaner,
reliable and affordable
electricity to South Africa.
 R18 Billion dedicated to
local empowerment for the
life of the project.
 While Karpowership SA can
mitigate 1 entire stage, the
entire RMIPPPP will be able
to mitigate 2 stages of load
shedding.
 Community investment is
driven by local needs.
 Ability to create jobs,
preserve jobs, mitigate job
losses across sectors and
repurpose existing skills.
 In all 3 projects we seek to
be a partner to our host
communities.
 Powership Academy to
provide training and skills
transfer to our local teams.
CONFIDENTIAL
Our Initiatives
Our projects will initiate a
new industry centered on
marine power generation
and LNG, with wide
ranging growth potential
for local businesses.
Karpowership SA will
complement the efforts of
the SA government in its
bid to transform provincial
economies through LNG.
CONFIDENTIAL
We are committed to
backing SMEs and
women-empowered
businesses as key parts
of our supply chains.
Coega
Transmission Line
Powerships*
FSRU*
CONFIDENTIAL
*proposed locations for the vessels
Richards Bay
Transmission Line
Powership*
FSRU*
CONFIDENTIAL
*proposed locations for the vessels
Saldanha Bay
Transmission Line
FSRU*
Powership*
CONFIDENTIAL
*proposed locations for the vessels
Thank you.
Contact Us
kps.sa@karpowership.com
CONFIDENTIAL
Download