BUSN 3390 – Week 3 Understanding Data – Ch 4/5 Questions from last class? -Type them in the comment field. Definitions • Data values assigned to observations or measurements (information collected) -Each characteristic of interest is called a variable • Information data that are transformed into useful facts that can be used for a specific purpose, such as making a decision Module 1 - Define Phase 2 Central Tendency Symmetric Skewed LeftSkewed Mean < Median Mean = Median Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall 3-3 RightSkewed Median < Mean Measures of Variability • Measures of variability show how much spread is present in the data. Measures of Variability Range Variance Standard Deviation For a sample For a population For a sample For a population Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall 3-4 Introduction • Statistical Quality Control uses statistical techniques & sampling to monitor & test the quality of goods & services. – Acceptance sampling determines to accept or reject a product – Statistical process control determines if process is operating within acceptable limits. • Inspection is the appraisal of goods/services against standards. The best companies design quality into the process, thereby reducing the need for inspection/tests. 5 Managing Quality Acceptance Sampling Process Control INPUTS TRANSFORMATION PROCESS “CONTROL” Acceptance Sampling OUTPUT •Goods •Services http://brians.hubpages.com/hub/Statistical-Process-Control3-6 Product-Sampling Statistical Process Control Planning Process 1. Define important quality characteristics, and how to measure 2. For each characteristic, a. Determine a quality control point b. Plan i. how to inspect ii. how much to inspect iii. where centralized or on-site c. Plan the corrective action process. 7 Inspection • How Much/How Often • Where/When • Centralized vs. On-site 8 Cost Inspection Costs Total Cost Cost of inspection Cost of passing Optimal defectives Amount of Inspection 9 Examples of Inspection Points Type of business Fast Food Inspection points Cashier Counter area Eating area Building Kitchen Hotel/motel Parking lot Accounting Building Main desk Supermarket Cashiers Deliveries Characteristics Accuracy Appearance, productivity Cleanliness Appearance Health regulations Safe, well lighted Accuracy, timeliness Appearance, safety Waiting times Accuracy, courtesy Quality, quantity 10 Statistical Process Control (SPC) Steps Take periodic samples from process Compare to predetermined limits If outside limits, stop process and take corrective action If inside limits, continue process 11 II. Basics of SPC • Random variation: Natural variations in the output of process, created by countless minor factors Main task of SPC is to distinguish assignable from random variation • Assignable variation: A variation whose source can be identified Sampli ng distributio Process n distributio n Non-random Variation Lower control limit Proce ss Mean Random Variation Non-random Variation Upper control limit Control limits 2 or 3 STD DEV of process mean. 12 The Normal Distribution Only a small percentage of sample means fall more than 2 or 3 standard deviations from the process mean. Upper Control Limit Lower Control Limit 95% 99.74% -3 -2 -1 =0 1 2 3 3-13 Control Chart https://www.youtube.com/watch?v=5hSUyEYJdGA 14 II. Basics of SPC When to Apply SPC Critical Processes Harmful, costly History Tendency to variation Critical Point in Process Prior to expensive process Prior to concealment Ease of testing Final Inspection Prior to customer receipt 3-15 Type I and Type II Errors In control In control No Error Out of control Type II Error (consumers risk) Out of control Type I error (producers risk) No error 16 Module 1 - Define Phase 17 Before next class Before coming to next class – self review of slides 20-48 and post responses for the 2 week 3 discussion board threads: 1. After reviewing the following video: https://www.youtube.com/watch?v=2VogtYRc9dA – Consider how the video relates to continuous improvement. If you were to describe it in 3 sentences to someone who had not seen it, how would you describe it? 2. After reviewing the slides and watching the following videos: https://www.youtube.com/watch?v=WY_r2weeJcM https://www.youtube.com/watch?v=RroptWyIPcM – Consider what is the difference between a process being out of control and capable? How are the concepts related? Skim through slides 49-91 to get an idea of what a real company did during the define phase • Make sure you have submitted Assignment # 3 – the 5s ***Make sure you are in class next week***we are doing an exercise that will greatly help you be able to complete the next assignment. Module 1 - Define Phase 18 III. Control Charts https://www.youtube.com/watch?v=WY_r2weeJc M VARIABLES ATTRIBUTES 19 III. Control Charts for Attributes p-Charts – Proportion of Defects • Observations placed into two categories Good or Bad • Pass or Fail • Operate or doesn’t operate • c-Charts – Number of Defects per unit # Occurrences/Unit of Measure are Counted but NOT Non-Occurrences COUNTING EXAMPLES Scratches, chips, dents, or errors per item Bacteria or pollutants per unit of volume Calls, complaints, failures per unit of time n=1 20 III. Control Charts for Attributes • p-Chart – for sample proportion of defectives in a process • c-Chart – for the number of defects per unit UCLp p z p UCLc c z c LCL p p z p LCLc c z c p p1 p n z p p n = = = = # std deviations from process avg sample proportion defective std deviation of sample proportion sample size 21 III. Control Charts for Attributes Data for p-Chart p-Chart NUMBER OF PROPORTION SAMPLEDEFECTIVES DEFECTIVE Average proportion (p) of Defectives? 200 (20*100) .10 = p 1 2 3 : : 20 6 0 4 : : 18 200 .06 .00 .04 : : .18 20 samples of 100 pairs of jeans Copyright 2009 John Wiley & Sons, Inc. 3-22 III. Control Charts for Attributes Construction of p-Chart p= total defectives = 200 / 20(100) = 0.10 total sample observations UCL = p + z p(1 - p) n = 0.10 + 3 0.10(1 - 0.10) 100 = 0.10 - 3 0.10(1 - 0.10) 100 UCL = 0.190 LCL = p - z p(1 - p) n LCL = 0.010 3-23 III. Control Charts for Attributes 0.20 UCL = 0.190 p-Chart Proportion defective 0.18 0.16 0.14 0.12 0.10 p = 0.10 0.08 0.06 0.04 0.02 LCL = 0.010 2 4 6 8 10 12 14 16 18 20 Sample number 3-24 III. Control Charts for Attributes http://www.vertex42.com/Files/download2/ excel.php?file=control-chart.xls SPC with Excel 3-25 III. Control Charts for Attributes c-Chart UCL = c + zc LCL = c - zc c = c c = # of defects per sample 3-26 III. Control Charts for Attributes Number of defects in 15 sample rooms cChart SAM PLE 1 2 3 : : 15 190 NUMBER OF DEFECTS 12 8 16 : : 15 190 c = 15 = 12.67 UCL = c + zc = 12.67 + 3 = 23.35 12.67 LCL = c - zc = 12.67 - 3 = 1.99 12.67 3-27 III. Control Charts for Attributes 24 c-Chart Number of defects UCL = 23.35 21 18 c = 12.67 15 12 9 6 LCL = 1.99 3 2 4 6 8 10 Sample number 12 14 16 3-28 III. Control Charts for Variables Control Charts for Variables Mean chart (x-Chart ) Measures sample Average Range chart (R -Chart ) Measures sample Dispersion 3-29 III. Control Charts for Variables X-Bar Chart = UCL = x + zx = = x = = LCL = x - zx x1 + x2 + ... xn n x = average of sample means Z = Standard Normal deviate (usually z = 3) = Process standard deviation x = Std dev of sampling distrib of sample means = n 3-30 III. Control Charts for Variables R- Chart UCLR = D4R LCLR = D3R R R= k R = range of each sample k = number of samples 3-31 III. Control Charts for Variables X-Bar Chart Example OBSERVATIONS (SLIP- RING DIAMETER, CM) SAMPLE k 1 2 3 4 5 x R 1 2 3 4 5 6 7 8 9 10 5.02 5.01 4.99 5.03 4.95 4.97 5.05 5.09 5.14 5.01 5.01 5.03 5.00 4.91 4.92 5.06 5.01 5.10 5.10 4.98 4.94 5.07 4.93 5.01 5.03 5.06 5.10 5.00 4.99 5.08 4.99 4.95 4.92 4.98 5.05 4.96 4.96 4.99 5.08 5.07 4.96 4.96 4.99 4.89 5.01 5.03 4.99 5.08 5.09 4.99 4.98 5.00 4.97 4.96 4.99 5.01 5.02 5.05 5.08 5.03 0.08 0.12 0.08 0.14 0.13 0.10 0.14 0.11 0.15 0.10 50.09 1.15 Example 15.4 3-32 II. Control Charts R-Chart Example Calculate R Retrieve Factor Values D3 and D4 from Table UCL = D4R = 2.11(0.115) = 0.243 LCL = D3R = 0(0.115) = 0 Example 15.3 3-33 III. Control Charts R-Chart Example 0.28 – Range 0.24 – UCL = 0.243 0.20 – 0.16 – R = 0.115 0.12 – 0.08 – 0.04 – 0– LCL = 0 | | | 1 2 3 | | | | 4 5 6 7 Sample number | 8 | 9 | 10 3-34 III. Control Charts for Variables https://www.youtube.com/watch?v=nEE4SvRd 76g SPC with Excel 3-35 Process Variation – Funnel Experiment https://www.youtube.com/watch?v=2VogtYRc9dA • Variation is natural! • Don’t over react!! 36 V. Process Capability https://www.youtube.com/watch?v=RroptWyIPcM Design Specifications (“Specs”, Tolerances) Range of Acceptable Values Established by: – Engineering Design – Customer Requirements Process Variability-Natural Variation in a Process Process Capability-Process Variation vs. Specification 37 Process Capability Indices specification width Process capability ratio= process width If the process is centered use Cp Cp = Upper specification – lower specification 6 If the process is not centered use Cpk Smaller of: Process mean – Lower specification 3 and Upper specification – Process mean 3 38 Capability Example The design specification for the width of a part is between 101 mm and 101.8 mm (= .8 mm). Which of these machines are capable? Standard Machine Machine Machine Deviation Variability Capability 6 Cp = spec/6 A 0.13 0.78 0.80/0.78 = 1.03 B 0.08 0.48 0.80/0.48 = 1.67 C 0.16 0.96 0.80/0.96 = 0.83 Cp > 1.33 is desirable Cp = 1.00 process is barely capable Cp < 1.00 process is not capable 39 3 9 Real example of Process Capability Ration and Index calculated • https://www.youtube.com/watch?v=fo1CT0DZAsE 40 Process Capability Analysis Lower Specification Upper Specification = 1 Process variability matches specifications Lower Specification Upper Specification Process variability well within specifications >1 Lower Upper Specification Specification What can be done? <1 Process variability exceeds specifications 41 Capability Analysis Capable = process output falls within specifications • If incapable: 1. 2. 3. 4. redesign process or reduce variability, use alternative process, use 100-percent inspection, or relax design specification. 42 Process Capability Example: Cookie Packages • • • A company creates small packages of cookies in a 16 gram package. Government standards state that weights must be within ± 5 percent of the weight advertised on the package. The design specifications are: Upper design specification = 16 + .05(16) = 16.8 grams Lower design specification = 16 – .05(16) = 15.2 grams Inspectors test 1,000 packages of cookies and find an average weight of 15.875 grams with a standard deviation of .529 grams. Is the process capable? 43 Process Capability Example: Cookie Packages • Specification Limits – Upper Spec = 16.8 g – Lower Spec = 15.2 g • Observed Weight – Mean = 15.875 g – Std Dev = .529 g C pk 15.875 15.2 16.8 15.875 Min ; 3(.529) 3(.529) C pk Min.4253; .5829 C pk .4253 44 What does a Cpk of .4253 mean? • An index that shows how well the units being produced fit within the specification limits. • Process considered capable if Cpk 1 • This process will produce a relatively high number of defects. • Many companies look for a Cpk of 1.3 or better… Six-Sigma companies want 2.0! Bigger is Better! 45 Six Sigma Quality • Goal: – Cpk = 2.00 = only 3.4 units per million outside design specification 46 Improving Process Capability Simplify Standard -ize Mistakeproof Upgrade equipment Automate 47 Pre-reading for Week 4 Module 1 - Define Phase 48 Organization Chart - Logistics Module 1 - Define Phase 49 Case Study Summary • CEO requests 15% reduction of operating costs for • • • • company This translates to 10% reduction of operating costs for the Logistics division The Midwest region of Logistics is requested to reduce operating costs by 3.6% to meet CEO’s request Midwest region forms a Lean Six Sigma team Lean Six Sigma team chooses trailer utilization as process to be improved with a goal of cost reduction Module 1 - Define Phase 50 Core Project Team Organization Anita Smith Team Leader Black Belt Midwest VP of Trans. Module 1 - Define Phase Project Champion Joe Thompson Midwest VP of Distribution Master Black Belt Jim Pulls Master Black Belt Process Sponsors Robert Quincy Sr. Dispatch Mgr. 51 Responsibility Matrix (RASIC) – Define Phase Project Champion Joe Thompson Finance Joe Thompson Process Owner Robert Quincy CI Mentor/MBB Jim Pulls Team Leader Anita Smith Form Core Team R I A A C Define Activities and Deliverables For Define Phase R I A A I Responsibility Matrix R I A C I Project Charter R S A C S SIPOC R S A C I Responsible (R) Approval (A) Support (S) Inform (I) Consult (C) Develop Initial Documents Identify Stakeholders & Communication Plan Module 1 - Define Phase Stakeholder Analysis Matrix R S A C S TPC Analysis R S A C S Customers/Stakeholders Matrix R S A C S Communication Plan R S A C S 52 Responsibility Matrix (RASIC) – Define Phase Finance Joe Thompson Project Champion Joe Thompson CI Mentor/MBB Jim Pulls Process Owner Robert Quincey Team Leader Anita Smith R S A C S Team Organization Chart R S A C S Revise Responsibility Matrix R I A C I Items for Resolution (IFR) Form R S A C S Establish Ground Rules R S A C S R S A C S Responsible (R) Approval (A) Support (S) Inform (I) Consult (C) Perform Initial VOC and Identify CTS CTS Summary Select Team and Launch the Project Create Project Plan Macro Project Plan Module 1 - Define Phase 53 Process Improvement Statement • The Logistics Midwest • Region Lean Six-Sigma team will work on improving the utilization of trailers within the region. The basic process for trailer utilization is the same no matter who ships or receives. Store Receiving Vendor Shipping Module 1 - Define Phase Warehouse Receiving And Shipping 54 Logistics Operating Cost by Region Module 1 - Define Phase 55 Project Charter Initial Project Overview Project Name: Trailer Utilization Optimization Project Overview: In alignment with the company’s strategic goals, the Logistics Executive team has jointly set the objective to reduce internal operating costs by 10%. This has translated to a 3.6% reduction of operating costs in the Midwest Logistics Region. The Midwest Logistics Region’s Lean Six Sigma team has examined multiple projects that may impact the breakthrough goal and has identified optimizing trailer utilization as a high priority. Problem Statement: The Midwest Logistics Region needs to reduce operating costs by 3.6% ($324 million). Improving trailer utilization has been identified as the quickest way to reduce costs within their direct control. The Lean Six Sigma team needs to analyze the current state of trailer utilization and then suggest improvements based on an optimized process, within 4-6 months. If the Midwest Logistics Region fails to show an opportunity to reduce operating costs as directed by the company’s strategic plans within 4-6 months, the region would have to reduce operating costs by other means, such as labor cutbacks, procurement freezes, and contract renegotiations. By staying in the current state the Midwest Logistics Region would have to choose unfavorable cost cutting methods which typically impact the productivity of the operation and may not meet the $324 million goal. If productivity is lost, shipments may not make it to the market on-time thus reducing the total sales of the company. The final impact would be a devaluation of Wal-Mart's stock due to its inability to meet the 10% profit increase projection. Customer/Stakeholders: Transportation Personnel, Warehouse Receiving Personnel, Warehouse Shipping Personnel, Driver, Store Receiving Personnel, Vendor Shipping Personnel What is important to these customers – CTS: Up-to-date trailer status, optimized trailer dispatch plan, open communication of critical or jeopardy events, realistic process time estimates Module 1 - Define Phase 56 Project Charter Initial Project Overview Goal of the Project: Reduce trailer utilization costs by 10.3% Scope Statement : The project is limited to the Midwest region which Anita Baker and Joe Thompson are responsible. The Lean Six Sigma team will examine and recommend changes to the major process steps for the use of a trailer: dispatch, load, transport, dispatch update, and unload. The investigation is limited to the two methods of trailer use: live load/unload and drop’n hook. These methods of use may occur at a vendor, distribution center, or store. Projected Financial Benefit (s): Based on an operating budget of $9 billion, this project will attempt to avoid costs connected with trailer use in the Midwest region. The avoidance target is $324 million. Module 1 - Define Phase 57 Project Charter Potential Risks Probability of Risk (H/M/L) Impact of Risk (H/M/L) Risk Mitigation Strategy Lack of Support M H Build Communication Plan Data not Available L H Retain Risk Resistance to Change from Transportation Office M H Include in change strategy Project Resources: Milestones Team Leader: Anita Smith Phase Division and Dept.: Midwest Logistics Region Define 2/2 Process Owner: Robert Quincy, Sr. Dispatch Manager Measure 3/2 Project Champion: Joe Thompson Analyze 4/6 CI Mentor/ MBB: Jim Pulls Improve 4/15 Finance: Joe Thompson Control 4/27 Team Members/Support Resources: Midwest Transportation Office Team Leaders (6) Seek Approval 5/5 Module 1 - Define Phase Est. Completion Date 58 Trailer Transportation Routes Module 1 - Define Phase 59 SIPOC Suppliers Inputs Processes Outputs Customers (Providers of the required resources) (Resources required by the process) (Top level description of the activity) (Deliverables from the process) (Anyone w ho receives a deliverable from the process) Requirem ents Driver Coord. Dispatch Plan, Phone, Tractor, Trailer, Driver Shipping Personnel Packing List, Product Driver Travel Plan, Tractor, Trailer Driver Cell phone Driver Coord. Dispatch Plan, Phone Driver Travel Plan, Tractor, Trailer Receiving Personnel Module 1 - Define Phase Requirem ents Dispatch to Dock Loaction, Shipping Final Destination, Dock Trailer at Dock Arrive On Schedule (AOS) Shipping Personnel Leave On Schedule (LOS) Driver Trailer within staging zone AOS Driver Coord. Trailer Ready to Load Product Transport Travel within legal limits Transport Trailer Driver Reports Status Driver Receives Dispatch Update Arrives at Receiving Dock verbal communication 30 min. before arriving at rec. dock Driver Coord. Rec. Dock Location, Trailer Status, Next Assignment 10 min. before arriving at rec. dock Driver Trailer Ready to Unload AOS Receiving Personnel Product Unload Empty Trailer, Product, Trailer Status Update LOS Driver, W'house/Store, Driver Coord. 60 Stakeholder Analysis Stakeholders Who Are They? Potential Impact or Concerns Transportation P Personnel R I M A R Y Driver Module 1 - Define Phase This includes the general manager, dispatch manager, and driver coordinators for each transportation office in the Midwest region. This includes any driver moving a Wal-Mart owned trailer. Manage optimized plan Clear and timely communication Able to adapt to changing conditions effecting plan + Must champion optimized plan First point of contact in field Clear and timely communication + + - - 61 Stakeholder Analysis Stakeholders Warehouse Receiving/ Shipping Personnel P R I M A R Vendor Shipping Y Personnel Module 1 - Define Phase Who Are They? This includes the warehouse manager, the receiving manager, and the shipping manager. It also includes dock personnel that load and unload the trailer. Potential Impact or Concerns This includes the operations manager, shipping manager, and the dock personnel. Indirect link Must know goal of optimized plan Must have buy in - Indirect link Must know goal of optimized plan Must have buy in - - - 62 Stakeholder Analysis Stakeholders P R I Store Receiving M Personnel A R Y Module 1 - Define Phase Who Are They? Potential Impact or Concerns This includes the store manager and receiving dock personnel. Indirect link Must know goal of optimized plan Must have buy in Needs goods + 63 TPC Analysis Identifying, labeling & understanding sources of resistance Transportation Personnel Source of resistance Technical Political Cultural Definition causes of resistance Aligning and structuring organization •Habit and inertia •Difficulty in learning new skills •Sunk costs •Lack of skills Allocating power and resources •Threat to the old guard from the new guard •Relationships •Power and authority imbalance or self-preservation Articulating the glue or cultural norms •Selective perception •Locked into old “mindset” •Afraid of letting go Examples from our project •Learn a new dispatch planning and execution process 20 •Lean Six Sigma team doesn’t know my business. 40 •Why fix what works? * Rating – Divide 100 points by how often this type of resistance exists in your business. Module 1 - Define Phase Rating* 40 Total = 100 64 TPC Analysis Identifying, labeling & understanding sources of resistance Driver Source of resistance Technical Political Cultural Definition causes of resistance Aligning and structuring organization •Habit and inertia •Difficulty in learning new skills •Sunk costs •Lack of skills Allocating power and resources •Threat to the old guard from the new guard •Relationships •Power and authority imbalance or self-preservation Articulating the glue or cultural norms •Selective perception •Locked into old “mindset” •Afraid of letting go Examples from our project 0 •Doesn’t want to be watched so close •Thinks the schedule may become too rigid 60 •Doesn’t want performance data tied to merit increases * Rating – Divide 100 points by how often this type of resistance exists in your business. Module 1 - Define Phase Rating* 40 Total = 100 65 TPC Analysis Identifying, labeling & understanding sources of resistance Warehouse Rec. and Ship. Personnel Source of resistance Technical Political Cultural Definition causes of resistance Aligning and structuring organization •Habit and inertia •Difficulty in learning new skills •Sunk costs •Lack of skills Allocating power and resources •Threat to the old guard from the new guard •Relationships •Power and authority imbalance or self-preservation Articulating the glue or cultural norms •Selective perception •Locked into old “mindset” •Afraid of letting go Examples from our project 0 •Not happy to have transportation pushing warehouse personnel 20 •Forced to work faster loading or unloading, may be unsafe and reduced quality •Reduced number of personnel per load or unload event * Rating – Divide 100 points by how often this type of resistance exists in your business. Module 1 - Define Phase Rating* 80 Total = 100 66 TPC Analysis Identifying, labeling & understanding sources of resistance Vendor Shipping Personnel Source of resistance Technical Political Cultural Definition causes of resistance Aligning and structuring organization •Habit and inertia •Difficulty in learning new skills •Sunk costs •Lack of skills Allocating power and resources •Threat to the old guard from the new guard •Relationships •Power and authority imbalance or self-preservation Articulating the glue or cultural norms •Selective perception •Locked into old “mindset” •Afraid of letting go Examples from our project •Worried that trailers will be taken at unpredictable or inconsistent times * Rating – Divide 100 points by how often this type of resistance exists in your business. Module 1 - Define Phase Rating* 100 Total = 100 67 TPC Analysis Identifying, labeling & understanding sources of resistance Store Receiving Personnel Source of resistance Technical Political Cultural Definition causes of resistance Aligning and structuring organization •Habit and inertia •Difficulty in learning new skills •Sunk costs •Lack of skills Allocating power and resources •Threat to the old guard from the new guard •Relationships •Power and authority imbalance or self-preservation Articulating the glue or cultural norms •Selective perception •Locked into old “mindset” •Afraid of letting go Examples from our project •Afraid new standards will be set for unloading trailers which are too difficult and dangerous * Rating – Divide 100 points by how often this type of resistance exists in your business. Module 1 - Define Phase Rating* 100 Total = 100 68 Customers/Stakeholder Identify stakeholders and their position on the change initiative Transportation Office Stakeholders Strongly Against Moderate Against Neutral Moderate Support Strongly Support X O General Manager Comm. Strategy Project Launch Keep Informed Advocate within Strategy Mgr. Team Member 1 office Dispatch Manager Driver Coordinator X X O Project Launch Invite at all levels Project Champ. O Project Launch Keep Informed Invite to Reviews Team Member 1 Inform of Project Driver X X= Current Module 1 - Define Phase O Launch Keep Informed Town Hall Team Member 1 O=Future 69 Customers/Stakeholder Identify stakeholders and their position on the change initiative Warehouse Stakeholders Strongly Against Warehouse Manager Dock Personnel Neutral X Receiving Manager Shipping Manager Moderate Against Strongly Support O X O X O X X= Current Module 1 - Define Phase Moderate Support O Comm. Strategy Strategy Mgr. Project Launch Invite at all levels Town Hall Project Champ. Project Launch Keep Informed Invite to Reviews Town Hall Project Launch Keep Informed Invite to Reviews Town Hall Inform of Project Launch Town Hall Team Member 3 Team Member 3 Team Member 3 O=Future 70 Customers/Stakeholder Identify stakeholders and their position on the change initiative Vendor Stakeholders Strongly Against Moderate Against Operations Manager Shipping Manager Dock Personnel Neutral X X X X= Current Module 1 - Define Phase Moderate Support Strongly Support Comm. Strategy O Project Launch Inform of reviews Town Hall Team O Project Launch Inform of reviews Town Hall Team Inform of Project Team O Launch Town Hall Strategy Mgr. Member 4 Member 4 Member 4 O=Future 71 Customers/Stakeholder Identify stakeholders and their position on the change initiative Store Stakeholders Strongly Against Store Manager Receiving Dock Personnel Moderate Against X Neutral Strongly Support X Comm. Strategy Strategy Mgr. Project Launch Inform of Monthly Project meetings & O X= Current Module 1 - Define Phase Moderate Support reviews Town Hall O Inform of Project Launch Town Hall Leader Team Member 2 O=Future 72 Communication Plan - RASIC S A C S S S S S S S S S S S S S S S S S S S S S R S A C S A S S R A R Team Member 6 R Team Member 5 A S Team Member 4 Send out a Copy of the Report S Team Member 3 Project Launch Meeting C Team Member 2 Send out a Copy of the Report A Team Member 1 Milestone Review S Finance Joe Thompson Send out the Agenda & Minutes R CI Mentor/MBB Jim Pulls Monthly Meeting Project Champion Joe Thompson Send out the Agenda & Minutes Process Owner Robert Quincey Weekly Meeting Project Leader Anita Smith Responsible (R) Approval (A) Support (S) Inform (I) Consult (C) S R S R A S A S R Town Hall (WebEx) 1 - Driver S I A/I I I R I I I I I Town Hall (WebEx) 2 - Store S I A/I I I I R I I I I Town Hall (WebEx) 3 Warehouse S I A/I I I I I R I I I Town Hall (WebEx) 4 - Vendor S I A/I I I I I I R I I Final Report R S A C S S S S S S S Send out a Copy of the Report Module 1 - Define Phase A R 73 Communication Plan Matrix - Events X X X X Project Launch Meeting X X X X Town Hall (WebEx) 4 Vendor X X Town Hall (WebEx) 2 Store Town Hall (WebEx) 3 Warehouse Store Rec. Personnel X Store General Mgrs. Vendor Shipping Mgr. X Vendor Dock Personnel Vendor Operations Mgr. X Warehouse Dock Personnel X X Milestone Review Town Hall (WebEx) 1 Driver Warehouse Shipping Mgrs. X Warehouse Rec. Mgrs. Monthly Meeting Warehouse General Mgrs. X Driver Weekly Meeting Transportation Driver Coord. Transportation Dispatch Mgrs. Invited (X) Transportation General Mgrs. Level of Participation X X X X X X X Final Report Presentation Module 1 - Define Phase 74 Communication Plan Matrix - Deliverables Store Rec. Personnel Store General Mgrs. Vendor Dock Personnel Vendor Shipping Mgr. E E E E Transportation Driver Coord. Driver Warehouse General Mgrs. Warehouse Rec. Mgrs. Warehouse Shipping Mgrs. Monthly Meeting Agenda & Minutes E E E E E E E Milestone Report H E E E H E E Project Launch Report H E E E H E E E E Final Report H E E E H E E E E Warehouse Dock Personnel Transportation Dispatch Mgrs. E E Transportation General Mgrs. Vendor Operations Mgr. E E E Hardcopy (H) Email (E) 75 Module 1 - Define Phase E Weekly Meeting Agenda & Minutes Method of Communication Initial Voice of the Customer (VOC) • Perform VOC Needs Brainstorm • Gathered from – Process Sponsor – Core team discussions • Relative to problem statement • Past discussions with customers Module 1 - Define Phase 76 Initial Voice of the Customer (VOC) Customer/Stakeholder Needs Transportation Personnel Accurate information Timely information Standard process Standard language Get inventory to market when/before it demands Driver Accurate assignments Help 24/7 if plan changes Module 1 - Define Phase 77 Initial Voice of the Customer (VOC) Customer/Stakeholder Needs Warehouse Rec/Ship Personnel Accurate arrival times Easy method to update dispatch Correct dock/trailer assignments Vendor Ship Personnel Standard trailer pick-up, window of time Module 1 - Define Phase 78 Initial Voice of the Customer (VOC) Customer/Stakeholder Store Rec. Personnel Module 1 - Define Phase Needs Accurate arrival times Realistic unload cycle times 79 Initial Critical to Satisfaction (CTS) Characteristics Needs CTS Factor Accurate information Timely information Up-to-Date Trailer Status Standard trailer pickup, window of time Accurate assignments Accurate arrival times Correct dock/trailer assignments Optimized Trailer Dispatch Plan Module 1 - Define Phase 80 Initial Critical to Satisfaction (CTS) Characteristics Needs CTS Factor Help 24/7 if plan changes Easy method to update dispatch Open Communication of Critical or Jeopardy Events Realistic unload cycle-times Realistic Process Time Estimates Expectations Module 1 - Define Phase 81 Initial Critical to Satisfaction (CTS) Characteristics Needs CTS Factor Get inventory to market when/before it demands Meet Store Customer’s Demand Standard process Standard language Documented Standard Process Module 1 - Define Phase 82 Initial Critical to Satisfaction (CTS) Characteristics • • • • • • Module 1 - Define Phase Up to Date Trailer Status Optimized Trailer Dispatch Plan Open Communication of Critical or Jeopardy Events Realistic Process Time Estimates/Expectations Meet Store Customer’s Demand Documented Standard Process 83 Project Team Organization Anita Smith Team Leader Black Belt Midwest VP of Trans. Team Member 1 Paul Jones Driver Coord. MW Transpo 1 Team Member 2 Dave Leader Dispatch Mgr. MW Transpo 2 Module 1 - Define Phase Team Member 3 Simone Fillbert General Mgr. MW Transpo 3 Team Member 4 Cindy Patch Dispatch Mgr. MW Transpo 4 Project Champion Joe Thompson Midwest VP of Distribution Master Black Belt Jim Pulls Master Black Belt Process Sponsors Robert Quincy Sr. Dispatch Mgr. Team Member 5 Chris Roberts Driver Coord. MW Transpo 5 Team Member 6 Mike O’Conner Dispatch Mgr. MW Transpo 6 84 Team Member Ground Rules • Everyone is responsible for the success of the project. • Be on time and prepared. • Be a team player. • Respect each other's ideas. • Question and participate. • Respect differences. • Keep an open mind and appreciate other points of view. • Be willing to make mistakes or have a different opinion. • Share your knowledge, experience, and time. • Stay focused on the task and the person speaking. • Communicate openly and don’t assume someone knows what you know. • Don't interrupt. • Keep up-to-date. • Have Fun! Module 1 - Define Phase 85 Responsibility Matrix (RASIC) – Define Phase Define Activities and Deliverables For Define Phase R I A A I Responsibility Matrix R I A C I Project Charter R S A C S SIPOC R S A C I Team Member 6 Mike O’Conner C Team Member 5 Chris Roberts A Team Member 4 Cindy Patch A Team Member 3 Simone Fillbert I Team Member 2 Dave Leader R Team Member 1 Paul Jones Project Champion Joe Thompson Finance Joe Thompson Process Owner Robert Quincey CI Mentor/MBB Jim Pulls Team Leader Anita Smith Form Core Team Responsible (R) Approval (A) Support (S) Inform (I) Consult (C) Develop Initial Documents Identify Stakeholders & Communication Plan Stakeholder Analysis Matrix R S A C S TPC Analysis R S A C S Customers/Stakeholders Matrix R S A C S Communication Plan R S A C S Module 1 - Define Phase 86 Responsibility Matrix (RASIC) – Define Phase (cont.) Team Member 1 John Doe Team Member 2 John Doe Team Member 3 John Doe Team Member 4 John Doe Team Member 5 John Doe Team Member 6 John Doe Finance Joe Thompson Project Champion Joe Thompson CI Mentor/MBB Jim Pulls Process Owner Robert Quincey Team Leader Anita Smith R S A C S Team Organization Chart R S A C S Revise Responsibility Matrix R I A C I S S S S S S Items for Resolution (IFR) Form R S A C S I I I I I I Establish Ground Rules R S A C S S S S S S S R S A C S S S S S S S Responsible (R) Approval (A) Support (S) Inform (I) Consult (C) Perform Initial VOC and Identify CTS CTS Summary Select Team and Launch the Project Create Project Plan Macro Project Plan Module 1 - Define Phase 87 Macro Project Timeline FEB JAN Define Activities • Team Organization Activities • Project Charter •Stakeholder Analysis •SIPOC 2/2 Define Report Due Module 1 - Define Phase MAR Measure Activities •Process Flow Diagrams •Survey Execution •Database Data Collection •CTQs 3/2 Measure Report Due APR Analyze Activities • Cause and Effect Brainstorming •Cost Benefit Analysis MAY Improve/ 4/6 Control Analyze Activities Report • Improvement Due Plans 4/27 Improve/ Control Report •Revised Due Process flow 5/5 Diagrams Final •Control Plan Pres. Recommendati to SVP ons 88 Project Plan - Events Event Dates Form Core Team Jan 4 Project Launch Meeting Jan 23 Define Review Feb 2-3 Town Hall - Driver Feb 5 Town Hall - Store Feb 6 Town Hall - Warehouse Feb 7 Town Hall - Vendor Feb 8 Measure Presentation Mar 2-3 Data Analysis Complete Mar 30 Analyze Presentation Apr 6-7 Cause and Effect Analysis Complete Apr 23 Improve/Control Presentation Apr 27-28 Final Report/Presentation May 5-6 Module 1 - Define Phase 89 Project Plan - Define Activity Status Due Date Deliverables Resource s Define Phase 1 Form Core Team Complete 1/4 Org. Chat 2 Define Activities and Deliverables Complete 1/6 Activities and Deliverables Matrix 3 Define Responsibilities Complete 1/6 Responsibility Matrix 4 Prepare Project Charter Complete 1/10 Project Charter Define High Level Process Flow and Participants Complete 1/10 SIPOC 5 Define Customer / Stakeholder Complete 1/15 Stakeholder Analysis Matrix, TPC Analysis, Customer/Stakeholder Analysis 7 Define Communication Plan Complete 1/16 Communications Plan 8 Perform Initial VOC and Identify CTS Complete 1/17 CTS Summary 9 Select Additional Team Members Complete 1/18 Update Org. Chart 6 Module 1 - Define Phase 90 Project Plan – Define (cont.) Activity Status Due Date Deliverables Revise Responsibilities Complete 1/19 Update Responsibility Matrix Develop Method to Control Change Complete 1/19 Items for Resolution Form 12 Prepare Project Plan Complete 1/20 Project Plan Complete 2/2/05 Define Phase Report 13 Prepare Define Phase Report and Presentation 10 11 Module 1 - Define Phase Resources 91 Next Steps • Measure Phase –Process Maps –Data Collection Plan –Survey Construction –Database Orientation –Data Extraction Sessions Module 1 - Define Phase 92