Building a Multi-Stakeholder and Integrated Approach to Disaster Resilience: The Makati Experience Manila Polo Club, Makati City 25 April 2017, 04:00pm MAKATI: FINANCIAL CENTER OF THE PHILIPPINES GENERAL INFORMATION Total Land Area: 27.36 sq. km (4.28% of the total land area of Metro Manila) Partner-Organizations of Makati Local and International Recognitions • One of “East Asia’s Climate Resilient Cities” – World Bank, 2008 • “Role Model City” for Campaign on Making Cities Resilient – UNISDR, 2011 • One of 29 “Model Communities” in the world and “Exemplars in Disaster Risk Management and Reduction” – UN Office for Disaster Reduction, 2012 • “City-to-City Cooperation Award”, CityNet, 2012 • Hall of Fame, Gawad Kalasag, NDRRMC, 2012 Makati City anchors its DRRM plan and strategies on the following international and national frameworks: MAINSTREAMING DRR AND CCA IN URBAN REDEVELOPMENT ∙ o o San Jose del Monte, Bulacan ∙ o o Calauan, Laguna, Makati is the first LGU in the country to craft a “Risk-Sensitive” CLUP and Zoning Ordinance MAKATI DRRM INSTITUTIONAL FRAMEWORK 222 PLANTILLA ITEMS GMMA RISK ANALYSIS PROJECT RAPID EARTHQUAKE DAMAGE ASSESSMENT SYSTEM (REDAS) • • MAKATI CONTINGENCY PLAN FOR EARTHQUAKE AND FLOOD Key Points Tested through Table-top Simulation Exercise ❑Understanding of EQ CP ❑Routes Mobilization ❑Coordination ❑Resource Management ❑Back-up Plans THE WEST VALLEY FAULT IN MAKATI • • • From Fault Line to Green Line MAKATI CITY’S INITIATIVES • • • THE WEST VALLEY FAULT IEC ACTIVITIES THE WEST VALLEY FAULT IN MAKATI MARKER INSTALLATION • • • March 08, 2017 West Valley Fault Dialogue, Brgy. Hall, Comembo March 24, 2017 West Valley Fault Dialogue (Brgy. Pembo) March 30, 2017 West Valley Fault Dialogue (Brgy. East Rembo) MAKATI CITY’S INITIATIVES • • 29,000 Views 506 Shares Facebook post on Earthquake Safety Tips Office of the Building Official has mandated Building Owners and Administrators to: • Submit Certification of Structural Stability for buildings 15 years and older • Install Seismographs on High-rise buildings, existing and under construction Other Initiatives MAKATI PRE-DISASTER RECOVERY PLAN • • • Makati is third in the world and first in the Philippines to have formulated a Pre-Disaster Recovery Plan. It shows mechanisms and vital systems that need to be pre-positioned for smoother and faster recovery. The plan outlines sectoral policies and sectoral activities in pre-disaster and post-disaster phases for short-term and long-term recovery. RESOURCES ENHANCEMENT PROJECT Ladder Fire Truck Command Center Trailer Tent Amphibious Vehicle Super Tanker Fire Truck 5 Units BLS Ambulance 1 unit ACLS Ambulance Mobile Water Treatment Plant with Towing Support Vehicle Upgrading and maintenance of equipment: ▪ 2 units Text Messaging Alert System (TMAS) ▪1 unit Modular Tent for Medical Post ▪1 set of USAR Equipment (Weber) ▪1 set Unified Radio Communication System (500 radios with locator system) ▪1000+ pcs Fire Blanket ▪1 unit Multi-parameter Water Quality Meters (for Waterways Management) ▪Misting Machine/ Vaccine, among others CAPACITY BUILDING & DEVELOPMENT PROGRAM C3 SERVICES ENHANCEMENT CENTRALIZED NUMBER CONNECTS LINES OF EMERGENCY SERVICE PROVIDERS MAKATI RESCUE CLUSTERING MAKATI DRRM VOLUNTEER MANAGEMENT SYSTEM • • • INSTITUTIONALIZED PARTNERSHIPS Regional DRRMC Makati DRRMC • • • • • • • • Makati DRRMO Barangay DRRMC ERPAT, Women’s Watch, among others COMMUNITY-BASED DISASTER RISK REDUCTION AND MANAGEMENT PROJECT conducts community-based capacity-building activities such as but not limited to: Community Risk Assessment Community Planning Community Capacity Building CERT Capacity Enhancement Community Evacuation Drill MOBILE KNOWLEDGE RESOURCE CENTER (MKRC) MKRC Town Watching Conducted in all MKRC Training of Trainers Conducted in 33 barangays EASTSIDE AND NORTHWEST CLUSTER 466 community members trained on town watching 12 PIT Members Trained 9 out of 33 barangays completed (14 pax per brgys) RESULTS AND RECOMMENDATIONS Thank you!