CADADDA.COM PROJECT PLANNING With PRIMAVERA P6 ABOUT CADADDA CADADDA is an Autodesk Authorized Training Center and ISO 9001:2015 certified company, registered in 2014 and it is a trademark (registered ®) company involved in CAD/CAM software training and consultancy. CADADDA having 8+ years and 3000+ students training experiences. Best customer services are the reasons behind the fast growth of the company. The company founded by Mr. Bhupesh Kumar (Diploma in Mechanical Engineering & BE in Production & Industrial Engineering) in year 2014 covers the all the following fields. Civil / Arch. Mechanical Project Management. Interior design & Furniture Design Etc. CADADDA has shown a great strength though it’s comprehensive, qualitative & updated training programs. It’s vast experience of training of 3000+ individuals, 10 + corporate houses and most importantly great customer satisfaction record has uniquely placed the CADADDA among the other CAD centers. At the CADADDA, we have worked out for the industries requirements, placements criteria and courses of engineering colleges. Broadly the engineering college has major focus on all field our working. CADADDA offers industry oriented and high-quality courses and certification in different field. 30+ courses of different level CADADDA was founded in 2014 with the vision of expend this creative skill development and expertise soon. SCHEDULE Part 1 Introduction to Project Planning Introduction to Primavera user interface User Preference Creating New Units for Measurement Different Types of Views Activity Network Admin Preferences User Preferences Introduction to OBS (Object Breakdown Structure) OBS Creation Introduction to EPS (Enterprise Breakdown Structure) EPS Creation. Linking O.B.S to E.P.S Part 4 Activity Relationship Different Types 1. SS 2. FS 3. SF 4. FF Linking Relationship Between Activities Lead & Lag Float Scheduling Critical Path Risk creation & Assignment Part 5 Resources (Create & Assign) Roles (Create & Assign) Resources Curve Resource Usages profile Resource Leveling Part 6 Introduction to baseline Baseline creation Baseline assignment Managing Baseline Working with Layouts Working with Columns Project updating Project Tracking Progress Line Method of Updating Project & Earn value Analysis Part 7 Project Optimization by various method Changing duration of critical activity By increasing recourse By dividing activity in small segment By changing Relation etc. Project Scheduling. Part 8 Different type of Report creation Report Wizard Print Setup & Printing Import & Export projects Project Issue Project threshold S curve Resource curve etc. INTRO Part 2 Introduction to Calendar Creating a New Calendar (Global, Project, Resource) Creating a New Project Project Parameters Project Note Project Code Project Funding Preferences & Other. Part 3 Introduction to Work Breakdown Structure (W.B.S) Creating W.B.S WBS Code, WBS Notes. Creating new Activity Define Activity Type Activity ID, Description, Duration Activity Code, Activity Notes. Activity Steps Activity Expense Grouping, Sorting & Filtering Bars Timescale N O T E : P R O J E C T W I L L S T A R T P A R A L L E L L Y A L A R G E P R O J E C T W I L L BE A S S I G N E D AT THE END. THANK YOU, AND WE LOOK FORWARD TO WORKING WITH YOU. Contact US +91-9261077888 info@cadadda.com TRAINER PROFILE Autodesk Certified Instructor having More than 8 years of working in this Training field Bhupesh Kumar (Director CADADDA) 8 Behind Mahaveer Complex, C Road Sardarpura, Jodhpur, Rajasthan, 342001