Company name here Logo1 Here Logo2 Here FM 0011 Oil storage tank pre commissioning report No. Rev.: Report Date Reference link System: Name plate/Information Code: Location: MFG.: S/N.: Date: Dwg No.: Field Pressure testing: Acceptable standard: API 650 Oil storage tank Design pressure (Psig): Design temperature (Celsius): Design holding time (Hrs.): Test pressure (Psig): Test temperature (Celsius): Test start: Method Hydrostatic Pneumatic Other Media Water Air Nitrogen , end: , Total Hrs. Other Instrument: Quality: Prepare for filling: Yes No N/A Comment By, Date Internal clean and dry Confirm nozzle shut Confirm nozzle open Ready and approve for filling Tank overfill Prevention Filling diesel oil: 1st filling start: , end: Maximum capacity (liter): Commissioning: Oil supplier: Filled (liter): Maximum Cap. > filled = Yes No N/A Comment Yes No N/A Comment Accepted By, Date Tank level reference checked Visualized loading effect Visualized leak Oil level indicator Electrical and controller Drain, overflow Vent, safety valve Vacuum vent to outlet flow Equip/condition no.XX completed Equip/condition no.XX completed Total commissioning result: All criteria passed and accepted Sign on behalf of: GFE/PM Date AP/PM Date THA/PM Page 1 of 1 Date Date