Company name here
Logo1 Here
Logo2 Here
FM 0011
Oil storage tank pre commissioning report
No.
Rev.:
Report Date
Reference link
System:
Name plate/Information
Code:
Location:
MFG.:
S/N.:
Date:
Dwg No.:
Field Pressure testing:
Acceptable standard: API 650 Oil storage tank
Design pressure (Psig):
Design temperature (Celsius):
Design holding time (Hrs.):
Test pressure (Psig):
Test temperature (Celsius):
Test start:
Method
Hydrostatic
Pneumatic
Other
Media
Water
Air
Nitrogen
, end:
, Total
Hrs.
Other
Instrument:
Quality:
Prepare for filling:
Yes No N/A
Comment
By, Date
Internal clean and dry
Confirm nozzle shut
Confirm nozzle open
Ready and approve for filling
Tank overfill Prevention
Filling diesel oil:
1st filling start:
, end:
Maximum capacity (liter):
Commissioning:
Oil supplier:
Filled (liter):
Maximum Cap. > filled =
Yes No N/A
Comment
Yes No N/A
Comment
Accepted
By, Date
Tank level reference checked
Visualized loading effect
Visualized leak
Oil level indicator
Electrical and controller
Drain, overflow
Vent, safety valve
Vacuum vent to outlet flow
Equip/condition no.XX completed
Equip/condition no.XX completed
Total commissioning result:
All criteria passed and accepted
Sign on behalf of:
GFE/PM
Date
AP/PM
Date
THA/PM
Page 1 of 1
Date
Date