4/3/22, 11:45 AM 2022_REVIEW QUESTION: Attempt review Dashboard / My courses / IT PROJECT MANAGEMENT 600(2022S1IPM600B) / Assignments / 2022_REVIEW QUESTION Started on Sunday, 3 April 2022, 11:36 AM State Finished Completed on Sunday, 3 April 2022, 11:37 AM Time taken 52 secs Marks 0.00/207.00 Grade 0.00 out of 100.00 Question 1 A project is ______________ Not answered Marked out of 1.00 Select one: a. A number of ongoing tasks an organisation takes b. Daily organizational operations c. An activity that is continuous and has no end date d. A sequence of unique, complex, and connected activities The correct answer is: A sequence of unique, complex, and connected activities Question 2 ______________ refers to unplanned changes to theoriginal plan in a project. Not answered Marked out of 1.00 Select one: a. Hope Creep b. Effort Creep c. Scope Creep d. Feature Creep The correct answer is: Scope Creep Question 3 Not answered __________ is when an idividual in a project team is behind schedule but report that he or she is on schedule, hoping to get back on schedule by the next report date Marked out of 1.00 Select one: a. Hope Creep b. Feature Creep c. Effort Creep d. Scope Creep The correct answer is: Hope Creep https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 1/51 4/3/22, 11:45 AM Question 4 2022_REVIEW QUESTION: Attempt review A project is defined in terms of scope, time, cost and which other parameter______________ Not answered Marked out of 1.00 Select one: a. Controls b. Teams c. Workload d. Quality The correct answer is: Quality Question 5 __________are the high-business-value, high-complexity and the most challenging projects the organization undertakes. Not answered Marked out of 1.00 Select one: a. Type D b. Type C c. Type A d. Type B The correct answer is: Type A Question 6 A scope triasngle geographic area inside represents the scope and _____of the project Not answered Marked out of 1.00 Select one: a. resources b. cost c. quality d. time The correct answer is: quality Question 7 This is an example of complex activities in a project Not answered Marked out of 1.00 Select one: a. Painting a wall in your home b. Mowing a lawn c. Creating a business proposal d. Designing an intuitive interface to an application system The correct answer is: Designing an intuitive interface to an application system https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 2/51 4/3/22, 11:45 AM Question 8 2022_REVIEW QUESTION: Attempt review The risk level is________ with type B projects Not answered Marked out of 1.00 Select one: a. High b. Very low c. Low d. Medium The correct answer is: Medium Question 9 What are the major constraints of a project? Not answered Marked out of 1.00 Select one: a. quality, cost, time, resources, scope b. cost, customer, resources, quality, scope, time c. resources, cost, time, management, quality, scope d. scope , quality, cost, infrastrucre, time, resources The correct answer is: quality, cost, time, resources, scope Question 10 Project is_____________ Not answered Marked out of 1.00 Select one: a. a sequence of unique,complex and connected activities. b. sequence of unique,complex connected and unconnected tasks c. a goal that should be met on time and within budget. d. deliverable The correct answer is: a sequence of unique,complex and connected activities. Question 11 Scope is a statement that defines the _______________. Not answered Marked out of 1.00 Select one: a. the boundaries of a project b. the budget of the project c. quality process of the project d. the added features of a project The correct answer is: the boundaries of a project https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 3/51 4/3/22, 11:45 AM Question 12 2022_REVIEW QUESTION: Attempt review Change is achieved by making _____ changes Not answered Marked out of 1.00 Select one: a. incremental b. detrimental c. big d. small The correct answer is: small Question 13 Project mind set lays emphasis on flexible ________ Not answered Marked out of 1.00 Select one: a. processes b. people c. timings d. resources The correct answer is: processes Question 14 That which is responsible for changing the input and giving a desired output is a ______ Not answered Marked out of 1.00 Select one: a. process b. project scope c. resources d. project cost The correct answer is: process Question 15 Feature hope is _______ Not answered Marked out of 1.00 Select one: a. changes in the original plan b. a team putting extra effort to finish on time c. a team working behind schedule hoping to finish on time d. a team adding extra features hopiing to impress the client The correct answer is: a team adding extra features hopiing to impress the client https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 4/51 4/3/22, 11:45 AM Question 16 2022_REVIEW QUESTION: Attempt review The time project takes to be completed can be reduced, but cost increases as a ______ Not answered Marked out of 1.00 Select one: a. cost b. result c. quality d. process The correct answer is: result Question 17 Which is not a Project Characteristics Not answered Marked out of 1.00 Select one: a. Plan b. Risk c. Business value d. Cost The correct answer is: Plan Question 18 If the customer specifies a fixed timeframe for the project ,then the cost and time are Not answered Marked out of 1.00 Select one: a. Relate d to each other b. Inversely related to one another c. Both are same d. None of the option The correct answer is: Inversely related to one another Question 19 Scope creep can be a result of: Not answered Marked out of 1.00 Select one: a. poor change control b. weak project manager or executive sponsor c. poor communication between parties d. All of the option The correct answer is: All of the option https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 5/51 4/3/22, 11:45 AM Question 20 2022_REVIEW QUESTION: Attempt review Project Management is______ Not answered Marked out of 1.00 Select one: a. a methodology for defining tasks in a project b. a preliminary and important principles for determining the scope for the project c. a method and a set techniques based on principles of management. d. a principles of traditional management. The correct answer is: a method and a set techniques based on principles of management. Question 21 Various parameters that affect the project in its planning and formulation refers to ________ Not answered Marked out of 1.00 Select one: a. project scope b. project cost c. resources d. process The correct answer is: resources Question 22 The projects occurring most frequently in an organization are called__________ Not answered Marked out of 1.00 Select one: a. Type A b. Type B c. Type D d. Type C The correct answer is: Type C Question 23 Which of the following does not constitute the role of a project manager Not answered Marked out of 1.00 Select one: a. Project delivery b. Business case approval c. Integrator and coordinator d. Project planning and controlling The correct answer is: Business case approval https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 6/51 4/3/22, 11:45 AM Question 24 2022_REVIEW QUESTION: Attempt review The ______ allows determination of the early start, early finish, late start and late finish. Not answered Marked out of 1.00 Select one: a. Flow chart technique b. Precedence diagramming method c. Three-point estimates d. Critical path method The correct answer is: Critical path method Question 25 Quality has two types namely_____ Not answered Marked out of 1.00 Select one: a. budget and product b. process and time c. resources and scope d. process and product The correct answer is: process and product Question 26 The concept of (the) _________ states that changes related to one requirement—scope, time, or cost—will at least influence Not answered one other element. Marked out of 1.00 Select one: a. Three wise men b. Triple constraint c. Three-point estimation d. Three needs theory The correct answer is: Triple constraint Question 27 Not answered Cost is a major consideration throughout the the project management life cycle. How many considerations are we looking at? Marked out of 1.00 Select one: a. 4 b. 10 c. 2 d. 3 The correct answer is: 3 https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 7/51 4/3/22, 11:45 AM Question 28 2022_REVIEW QUESTION: Attempt review Which of the following is an excellent tool to have in the project team tool kit? Not answered Marked out of 1.00 Select one: a. scope b. time c. money d. consensus building The correct answer is: consensus building Question 29 Being assigned as a project manager, you noticed during project execution that conflicts arise in the team on both Not answered technical and interpersonal levels. What is an appropriate way of handling conflicts? Marked out of 1.00 Select one: a. You should use your coercive power to quickly resolve conflicts and then focus on goal achievement. b. Conflicts distract the team and disrupt the work rhythm. You should always smooth them when they surface. c. A conflict should be handled in a meeting so that the entire team can participate in finding a solution. d. Conflicts should be addressed early and usually in private, using a direct, collaborative approach. The correct answer is: Conflicts distract the team and disrupt the work rhythm. You should always smooth them when they surface. Question 30 Which of the following are good general rules to follow in your dealings with project stakeholders? Not answered Marked out of 1.00 Select one: a. All of the option b. Divert attention away any concerns about your project c. Tell external stakeholders les about your project than internal stakeholders d. Don’t assume ask The correct answer is: Don’t assume ask Question 31 Clasiffication of projects include_______ Not answered Marked out of 1.00 Select one: a. quality b. risk c. resources d. process The correct answer is: risk https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 8/51 4/3/22, 11:45 AM Question 32 2022_REVIEW QUESTION: Attempt review Which statement best describes project management? Not answered Marked out of 1.00 Select one: a. Done differently in the USA and Europe b. The planning and controlling of resources for a specific time to achieve pre determined goal c. Just like any other kind of management d. A job that should only be undertaken by technical staff The correct answer is: The planning and controlling of resources for a specific time to achieve pre determined goal Question 33 Which one is not part of the TPM Life Cycle? Not answered Marked out of 1.00 Select one: a. Launch the plan b. Adjust the Plan c. Develop the project plan d. Scope the project The correct answer is: Adjust the Plan Question 34 _________ the project plan is equivalent to authorizing the staff to perform the tasks that define their respective roles. Not answered Marked out of 1.00 Select one: a. Using b. Executing c. Planning d. Crashing The correct answer is: Executing Question 35 Principles of traditional project management are Not answered Marked out of 1.00 Select one: a. 5 b. 6 c. 7 d. 4 The correct answer is: 5 https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 9/51 4/3/22, 11:45 AM Question 36 2022_REVIEW QUESTION: Attempt review Planning reduces_________. Not answered Marked out of 1.00 Select one: a. workload b. lot of questions c. staff turnover d. uncertainty The correct answer is: uncertainty Question 37 Which one is not in the top 10 reasons for a project’s success? Not answered Marked out of 1.00 Select one: a. User involvement b. Executive management support c. Reliable estimates d. Employee Satisfaction The correct answer is: Employee Satisfaction Question 38 How many Variations are there to the TPM life cycle? Not answered Marked out of 1.00 Select one: a. 4 b. 3 c. 5 d. 2 The correct answer is: 3 Question 39 Quality Management Consists of ? Not answered Marked out of 1.00 Select one: a. Process Quality Management b. Process Quality Management and Product Quality Management c. Continuous Quality Management and Process Quality Management d. Product Quality Management The correct answer is: Continuous Quality Management and Process Quality Management https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 10/51 4/3/22, 11:45 AM Question 40 2022_REVIEW QUESTION: Attempt review The planning is very essential for the success of a ________. Not answered Marked out of 1.00 Select one: a. structure b. contracts c. product d. project The correct answer is: project Question 41 Project documentation is done in which phase Not answered Marked out of 1.00 Select one: a. Planning b. Execution c. Closing d. Control The correct answer is: Closing Question 42 _________ is not a Principle of traditional project management Not answered Marked out of 1.00 Select one: a. controlling b. Planning c. Defining task d. Quality The correct answer is: Quality Question 43 As the project manager in a software project which is currently initiated, you want to assess high-level risks. What should Not answered you do? Marked out of 1.00 Select one: a. Discuss the risks documented in your Risk register with the project key stakeholders. b. Identify and analyze risk events using qualitative and quantitative techniques. c. Develop the project charter and a risk management plan to start identifying risks based on those and other documents. d. Develop contingency plans and fallback plans in case the original plan proves wrong. The correct answer is: Develop the project charter and a risk management plan to start identifying risks based on those and other documents. https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 11/51 4/3/22, 11:45 AM Question 44 2022_REVIEW QUESTION: Attempt review _______ process will help you to purchase goods and several from external suppliers Not answered Marked out of 1.00 Select one: a. Process management b. Project management c. Product management d. Procurement management The correct answer is: Procurement management Question 45 Overcoming barriers to communication associated with differing perceptions of the recipients in different divisions Not answered location r parts of a unit, is an essential characteristic of a typical _____ network Marked out of 1.00 Select one: a. communication b. neural c. organization d. information The correct answer is: communication Question 46 Not answered Allow informatio,questions, comments and opinions to travel through the organization is an essentialcharacteristic of a typical ______network. Marked out of 1.00 Select one: a. neural b. information c. organization d. communication The correct answer is: communication Question 47 Processes for Risk Management includes_______steps Not answered Marked out of 1.00 Select one: a. 5 b. 4 c. 2 d. 3 The correct answer is: 4 https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 12/51 4/3/22, 11:45 AM Question 48 2022_REVIEW QUESTION: Attempt review Estimation of start and end dates for each activity is done in________phase of the project Not answered Marked out of 1.00 Select one: a. Execution b. Planning c. Control d. Closing The correct answer is: Planning Question 49 Not answered Marked out of While applying procurement management processes in your project, you identified the need to gain a more objective understanding of sellers’ capabilities in order to rank proposals and develop a negotiating sequence. Which technique may help avoid bias and subjective decisions best? 1.00 Select one: a. Bidder conference b. Letter of intent c. Oral contract d. Weighting system The correct answer is: Weighting system Question 50 In project management a ________ is some future happening that results in a change, either positive or negative, to the Not answered project. Marked out of 1.00 Select one: a. loss b. risk c. estimateTOP d. problem The correct answer is: risk Question 51 Executing the project plan invloves certain steps and one of these is not an option Not answered Marked out of 1.00 Select one: a. Schedule activities with specific start and end b. Establishing a goal c. Assign workers to activities d. Launch the Plan The correct answer is: Establishing a goal https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 13/51 4/3/22, 11:45 AM Question 52 2022_REVIEW QUESTION: Attempt review In most jurisdictions, a legally required order of formal statements establishing a contract is Not answered Marked out of 1.00 Select one: a. Inquiry, bid, order b. Invitation to treat, offer, PO c. MoU, LoI, final agreement d. Offer, acceptance The correct answer is: Offer, acceptance Question 53 __________ is not part of executing the project plan Not answered Marked out of 1.00 Select one: a. Launch the plan b. Identify the specific resources c. Identify the objectives d. Assign workers to activities The correct answer is: Identify the objectives Question 54 ___________ tells us that proper planning is painful but pays off in less pain later in the project. Not answered Marked out of 1.00 Select one: a. Plan curve b. Pain curve c. Project curve d. Plain curve The correct answer is: Pain curve Question 55 _________ is not a Principle of traditional project management Not answered Marked out of 1.00 Select one: a. Quality b. Defining task c. controlling d. Planning The correct answer is: Quality https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 14/51 4/3/22, 11:45 AM Question 56 2022_REVIEW QUESTION: Attempt review _________is to keep the team and management up to date on the project's progress. Not answered Marked out of 1.00 Select one: a. Execution b. Monitoring & control c. Planning d. Defining the task The correct answer is: Monitoring & control Question 57 In project management a risk is some future happening that results in a change, either positive or negative, to the project. Not answered Marked out of 1.00 Select one: a. False b. True The correct answer is: True Question 58 _________ are what the vendors use to determine how they should respond to your needs. Not answered Marked out of 1.00 Select one: a. Pain Curve b. Procurement Management c. Request for Proposal d. Project Goal The correct answer is: Request for Proposal Question 59 Principles of traditional project management are Not answered Marked out of 1.00 Select one: a. 6 b. 5 c. 7 d. 4 The correct answer is: 5 Question 60 Which option is incorrect when defining the scope of the project ____________. Not answered Marked out of 1.00 Select one: a. Schedule work packages b. Establish the project goal c. Define the project objectives d. State the problem / opportunity The correct answer is: Schedule work packages https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 15/51 4/3/22, 11:45 AM Question 61 2022_REVIEW QUESTION: Attempt review The last phase of the Traditional Project Management life cycle is the________ Not answered Marked out of 1.00 Select one: a. launch the plan b. close out the project c. monitor / control project progress d. scope the project The correct answer is: close out the project Question 62 Closing a project is a formal means of signaling the completion of the project work and the delivery of the reults to Not answered the________ Marked out of 1.00 Select one: a. manager b. team c. customer d. stakeholders The correct answer is: customer Question 63 Participants in the Approval Process include______ Not answered Marked out of 1.00 Select one: a. Project team b. CEO c. Client d. Suppliers The correct answer is: Project team Question 64 The POS has _____component Not answered Marked out of 1.00 Select one: a. 7 b. 2 c. 5 d. 3 The correct answer is: 5 https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 16/51 4/3/22, 11:45 AM Question 65 2022_REVIEW QUESTION: Attempt review Reasons for a project's success Not answered Marked out of 1.00 Select one: a. Young and fresh staff b. Big cars c. Bossy manager d. Minimized scope The correct answer is: Minimized scope Question 66 How many parts are involved in the process of developing the COS? Not answered Marked out of 1.00 Select one: a. 8 b. 6 c. 4 d. 2 The correct answer is: 4 Question 67 Projects can fail because__________ Not answered Marked out of 1.00 Select one: a. Stakeholder requirements are too specific b. Project risk identified too early in the project c. The project is planned in too small detail d. The project is not controlled closely The correct answer is: The project is not controlled closely Question 68 The project manager should take the assistance of a _______ and run checks as frequently as possible. Not answered Marked out of 1.00 Select one: a. System administrator b. Project team c. Coordinator d. CEO The correct answer is: Project team Question 69 Success criteria is part of POS Not answered Marked out of 1.00 Select one: a. True b. False The correct answer is: True https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 17/51 4/3/22, 11:45 AM Question 70 2022_REVIEW QUESTION: Attempt review The ________ provides the input you need to generate the POS Not answered Marked out of 1.00 Select one: a. RES b. CRT c. POS d. COS The correct answer is: COS Question 71 Projects frequently do not meet customer expectations for which of the following reasons? Not answered Marked out of 1.00 Select one: a. Poor risk management by the contractor running the project b. Poor technical ability of the contractor running the project for the customer c. Unclear scope definition by the customer for whom the project is performed d. Technical inability and poor risk management by the contractor The correct answer is: Technical inability and poor risk management by the contractor Question 72 ___________ is labour required to complete an activity Not answered Marked out of 1.00 Select one: a. Total Slack b. Half Slack c. Free Slack d. Time Slack The correct answer is: Time Slack Question 73 Which one of the following is least likely to be success criteria? Not answered Marked out of 1.00 Select one: a. The date by which the project is to be completed. b. The awarding of bonuses to senior management. c. Delivery of products that meet required specifications. d. A target for the project to receive zero change requests. The correct answer is: The awarding of bonuses to senior management. https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 18/51 4/3/22, 11:45 AM Question 74 Not answered Marked out of 1.00 2022_REVIEW QUESTION: Attempt review Some organisations require preliminary financial analysis of the project before granting approval to perform the detailed planning. Although such analyses are very rough because not enough information is known about the project at this time, they will offer a tripwire for the project planning approval, that is called__________. Select one: a. Financial analysis b. Feasibility Study c. Break even study d. Risk analysis The correct answer is: Financial analysis Question 75 Once the scope is complete, it is documented in the in the form of the _______. Not answered Marked out of 1.00 Select one: a. TPM b. POS c. PERT d. COS The correct answer is: POS Question 76 At the beginning of project execution, you notice different opinions between team members relating to project work and Not answered deliverables and to the level of overall complexity. What should you do right now? Marked out of 1.00 Select one: a. Give your team members some time to develop a common understanding of the project scope and product scope. Upcoming interface problems may be resolved later. b. Use interviews in private with each individual team member to inform them of your expectations and your requirements in an atmosphere of confidence. c. Organize meetings to identify and resolve misunderstandings between team members in order to avoid interface problems, disintegration and costly rework early in the project. d. Use the risk management processes to identify and assess risks caused by misunderstandings and develop a plan with measures in order to respond to them. The correct answer is: Organize meetings to identify and resolve misunderstandings between team members in order to avoid interface problems, disintegration and costly rework early in the project. Question 77 The POS component parts exclude_______ Not answered Marked out of 1.00 Select one: a. project activities b. problem / opportunity c. slack time d. project goal The correct answer is: slack time https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 19/51 4/3/22, 11:45 AM Question 78 2022_REVIEW QUESTION: Attempt review Perfomance closer or beyond expectation is the degree of _________. Not answered Marked out of 1.00 Select one: a. PERT b. CPM c. RES d. WBS The correct answer is: WBS Question 79 The process of developing the COS involves________parts Not answered Marked out of 1.00 Select one: a. 3 b. 6 c. 5 d. 4 The correct answer is: 4 Question 80 That which formalizes acceptance and brings project to an ordely end is a____ Not answered Marked out of 1.00 Select one: a. closing process b. executing process c. planning process d. control process The correct answer is: control process Question 81 What is defined as “the ability to influence and align others towards a common purpose”? Not answered Marked out of 1.00 Select one: a. Management b. Teamwork c. Leadership d. Motivation The correct answer is: Leadership https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 20/51 4/3/22, 11:45 AM Question 82 2022_REVIEW QUESTION: Attempt review COS Stands for? Not answered Marked out of 1.00 Select one: a. Conditions of Service b. Conditions of Scope c. Conditions of Sequencing d. Conditions of Satisfaction The correct answer is: Conditions of Satisfaction Question 83 The project manager should take the assistance of a _______ and run checks as frequantly as possible. Not answered Marked out of 1.00 Select one: a. Proect team b. System administrator c. CEO d. Coordinator The correct answer is: Proect team Question 84 An objective statement should contain four parts namely: Not answered Marked out of 1.00 Select one: a. action, outcome, measure, resources b. outcome, time frame, measure, date c. date, outcome, action, time frame d. time frame, action, outcome, measure The correct answer is: time frame, action, outcome, measure Question 85 Which of the following is not a Project Cost Estimation Stage? Not answered Marked out of 1.00 Select one: a. Implementation Stage b. Procurement Stage c. Feasibility stage d. Estimation Stage The correct answer is: Estimation Stage https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 21/51 4/3/22, 11:45 AM Question 86 2022_REVIEW QUESTION: Attempt review _____________ analyses are always difficult to do beacuse you need to include intagible benefits in the decision situation. Not answered Marked out of 1.00 Select one: a. Breakeven analysis b. Feasibility Studies c. Return on Investments d. Cost / benefit analyses The correct answer is: Cost / benefit analyses Question 87 Which one of the following statements is true? Not answered Marked out of 1.00 Select one: a. A decrease in the project cost is likely to decrease project time. b. A decrease in the project time is likely to increase project quality. c. An increase in the project quality requirements is likely to decrease project cost. d. An increase in project scope is likely to increase project cost. The correct answer is: An increase in project scope is likely to increase project cost. Question 88 Which section of the POS answer the question “Why do we want to do this project?” Not answered Marked out of 1.00 Select one: a. 3 b. 2 c. 1 d. 4 The correct answer is: 4 Question 89 A rough estimate of the timetable and expected costs is provided in feasibility study Not answered Marked out of 1.00 Select one: a. False b. True The correct answer is: True Question 90 The process of developing the COS involves four parts which are _____________ Not answered Marked out of 1.00 Select one: a. Initialisation,Analysis, Response, Feedback b. Request,Clarification,Response,Agreement c. Initialisation, Clarification, Analysis, Agreement d. Request, Analysis, Clarification , Feedback The correct answer is: Request,Clarification,Response,Agreement https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 22/51 4/3/22, 11:45 AM 2022_REVIEW QUESTION: Attempt review Question 91 This section analyses the total costs as compared with the increase revenue that will accrue over the life of the project Not answered deliverables Marked out of 1.00 Select one: a. Breakeven point b. Quality arrangement c. Return on investment d. Point of sale The correct answer is: Return on investment Question 92 Which of the following is a KEY output of the Verify Scope process? Not answered Marked out of 1.00 Select one: a. An improved project management information system b. Customer acceptance of project deliverables c. Improved schedule estimates d. A more complete scope management plan The correct answer is: Customer acceptance of project deliverables Question 93 Not answered _____________ is a timeline that shows the cumulative cost of the project against the cumulative revenue or savings from the project. Marked out of 1.00 Select one: a. Cost Analysis b. Break-even Assignment c. Break-even Analysis d. Return on Investment The correct answer is: Break-even Analysis Question 94 Which of these is not a component of the Feasibility Report? Not answered Marked out of 1.00 Select one: a. Overheads b. Work cost c. Pre- commissioning Expenses d. Profit Margin The correct answer is: Profit Margin https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 23/51 4/3/22, 11:45 AM Question 95 2022_REVIEW QUESTION: Attempt review The approved POS serves _____________ audiences. Not answered Marked out of 1.00 Select one: a. 1 b. 3 c. 4 d. 2 The correct answer is: 3 Question 96 The methodology to conduct a________is remarkably similar to the problem-solving method Not answered Marked out of 1.00 Select one: a. Financial analysis b. Feasibility study c. Risk analysis d. None of the option The correct answer is: Feasibility study Question 97 Which one is not a function of the Project Definition Statement (PDS)? Not answered Marked out of 1.00 Select one: a. To clarify the project for management b. As an orientation for new team members c. For Feasibility Study d. To obtain an agreement from the customer to move forward The correct answer is: For Feasibility Study Question 98 Participants in the Approval Process include______ Not answered Marked out of 1.00 Select one: a. Business Manager b. Client c. Senior Management d. Supplier The correct answer is: Senior Management https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 24/51 4/3/22, 11:45 AM Question 99 2022_REVIEW QUESTION: Attempt review Which one is not a method for Estimating Activity Duration? Not answered Marked out of 1.00 Select one: a. Expert advice b. Research c. Delphi technique d. Wide-band Delphi technique The correct answer is: Research Question 100 Which one is the main use of the WBS? Not answered Marked out of 1.00 Select one: a. Architectural design tool b. Project status reporting tool c. It is used to breakdown the work to be carried in a project d. Planning tool The correct answer is: It is used to breakdown the work to be carried in a project Question 101 A work package is a complete description of how the tasks that make up an activity will actually be done. It includes a Not answered description of the what, who, when and how of the work Marked out of 1.00 Select one: a. False b. True The correct answer is: True Question 102 A _____________ is a complete description of how the tasks that make up an activity will actually be done. Not answered Marked out of 1.00 Select one: a. Work Package b. Software package c. Work Breakdown Package d. System Package The correct answer is: Work Package https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 25/51 4/3/22, 11:45 AM Question 103 2022_REVIEW QUESTION: Attempt review The approved POS serves three audinces. Outline the incorrect answer: Not answered Marked out of 1.00 Select one: a. Senior Management b. Team c. Project Leader d. Customer The correct answer is: Project Leader Question 104 Scope is a statement that defines the __________ of the project. Not answered Marked out of 1.00 Select one: a. plan b. cost c. boundaries d. outcome The correct answer is: boundaries Question 105 Total constraints operate on every project Not answered Marked out of 1.00 Select one: a. 3 b. 5 c. 4 d. 2 The correct answer is: 5 Question 106 A WBS dictionary is a document which contains _____________ Not answered Marked out of 1.00 Select one: a. Details for each component in the WBS. b. Technical terms used in the project. c. Translation of project terms. d. Translation of functional requirements into technical requirements. The correct answer is: Details for each component in the WBS. https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 26/51 4/3/22, 11:45 AM Question 107 2022_REVIEW QUESTION: Attempt review ___________refers to the quality of the deliverable from the project Not answered Marked out of 1.00 Select one: a. Procurement quality b. None of the option c. Product quality d. Process quality The correct answer is: Product quality Question 108 ________is important to the overall project plan because it allows you to estimate the duration of the project, determine Not answered the required resources, and schedule the work Marked out of 1.00 Select one: a. Implementation b. Execution c. Decomposition d. Demonstration The correct answer is: Decomposition Question 109 How many characteristics does it take to test the completeness in the WBS? Not answered Marked out of 1.00 Select one: a. 6 b. 2 c. 8 d. 4 The correct answer is: 6 Question 110 The ________ approach is more like an organized brainstorming session used to build the WBS Not answered Marked out of 1.00 Select one: a. Decomposition b. Top down c. Composition d. Bottom up The correct answer is: Bottom up https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 27/51 4/3/22, 11:45 AM Question 111 2022_REVIEW QUESTION: Attempt review Which statement best describes a responsibility of the project manager: Not answered Marked out of 1.00 Select one: a. To delegate all accountability for managing time, cost and quality to team leaders. b. To deliver the project objectives to enable benefits to be realized. c. To be the sole source of expertise for estimating techniques on cost and time. d. To take ultimate accountability for the delivery of the business benefits. The correct answer is: To deliver the project objectives to enable benefits to be realized. Question 112 Which option is captured in the WBS? Not answered Marked out of 1.00 Select one: a. The scope of the project b. The life cycle phases c. The logical order of tasks d. Project cost The correct answer is: The scope of the project Question 113 The work breakdown structure can BEST be thought of as an effective aid for_____communications. Not answered Marked out of 1.00 Select one: a. Project manager b. Customer c. Team d. Stakeholder The correct answer is: Stakeholder Question 114 _________is not included in work package description Not answered Marked out of 1.00 Select one: a. Who b. Where c. how d. When The correct answer is: Where https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 28/51 4/3/22, 11:45 AM Question 115 2022_REVIEW QUESTION: Attempt review As a project manager, when should you especially consider cultural differences? Not answered Marked out of 1.00 Select one: a. When you decide upon recognition and awards during team development. b. When you develop acceptance criteria for work results to be achieved by the team members. c. When you assign a human resources to do the work in a schedule activity. d. When you break down scope to create a work breakdown structure (WBS). The correct answer is: When you decide upon recognition and awards during team development. Question 116 A work breakdown structure numbering system allows the project staff to: Not answered Marked out of 1.00 Select one: a. Systematically estimate costs of work breakdown structure elements b. Provide project justification c. Identify the level at which individual elements are found d. Use it in project management software The correct answer is: Identify the level at which individual elements are found Question 117 The scope baseline includes____. Not answered Marked out of 1.00 Select one: a. The various management plans of the project b. WBS dictionary, WBS, scope statement c. Product configuration ID and statement of work d. Schedule baseline and cost baseline The correct answer is: WBS dictionary, WBS, scope statement Question 118 Project risk management is best described as: Not answered Marked out of 1.00 Select one: a. minimising threats and maximising opportunities b. planning responses to threats c. managing responses to threats d. identifying and acknowledging and opportunities The correct answer is: minimising threats and maximising opportunities https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 29/51 4/3/22, 11:45 AM Question 119 2022_REVIEW QUESTION: Attempt review The Continuous Quality Management Model has cycilcal feedback ________. Not answered Marked out of 1.00 Select one: a. results b. quality c. process d. loops The correct answer is: loops Question 120 A communication management plan identifies the relevant information that should be communicated to: Not answered Marked out of 1.00 Select one: a. the project stakeholders b. the project board c. the project sponsor d. the project team The correct answer is: the project stakeholders Question 121 Developing the WBS is the most critical part of the_____. Not answered Marked out of 1.00 Select one: a. POS b. JPP c. WBS d. COS The correct answer is: JPP Question 122 Which structure shows the reporting relationships and communications channels for a project? Not answered Marked out of 1.00 Select one: a. Organisational Breakdown Structure b. Work Breakdown Structure c. Product Breakdown Structure d. Responsility Assignment Structure The correct answer is: Work Breakdown Structure https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 30/51 4/3/22, 11:45 AM Question 123 2022_REVIEW QUESTION: Attempt review What is defined as “ the ability to influence and align others towards a common purpose”? Not answered Marked out of 1.00 Select one: a. Management b. Motivation c. Leadership d. Teamwork The correct answer is: Leadership Question 124 The ________ approach begins at the goal level and successively partitions work down to lower levels of definition until the Not answered perticipants are satisfied that the work has ben sufficiently defined. Marked out of 1.00 Select one: a. Bottom up b. Composition c. Top down d. Decomposition The correct answer is: Top down Question 125 Which one of the following is captured in the Work Breakdown Structure? Not answered Marked out of 1.00 Select one: a. The logical order of tasks b. Project costs c. The scope of the project d. The life cycle phases The correct answer is: The scope of the project Question 126 The team approach is better than the sub team approach but it requires more_____ to complete Not answered Marked out of 1.00 Select one: a. resources b. materials c. time d. money The correct answer is: time https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 31/51 4/3/22, 11:45 AM Question 127 2022_REVIEW QUESTION: Attempt review Which one of the following statements is true? Not answered Marked out of 1.00 Select one: a. A decrease in the project time is likely to increase project quality b. An increase in project scope is likely to increase project cost c. A decrease in the project cost is likely to decrease project time. d. An increase in the project quality requirements is likely to decrease the project cost The correct answer is: An increase in project scope is likely to increase project cost Question 128 The software scope identifies what the product will do and what it will not do, what the end product will contain and what Not answered it will not contain. Marked out of 1.00 Select one: a. No b. Yes The correct answer is: Yes Question 129 _____________ is used to assist in not only resource estimation but also cost estimation. Not answered Marked out of 1.00 Select one: a. UBS b. EBS c. RBS d. WBS The correct answer is: RBS Question 130 Which of the following may generate a milestone list: Not answered Marked out of 1.00 Select one: a. Estimate Activity Resources b. Estimate Activity Durations c. Define Activities d. Sequence Activities The correct answer is: Define Activities https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 32/51 4/3/22, 11:45 AM Question 131 2022_REVIEW QUESTION: Attempt review Basic tool in work study is Not answered Marked out of 1.00 Select one: a. graph paper b. stop watch c. planning chart d. process chart The correct answer is: stop watch Question 132 Critical path method is used in which of the following processes: Not answered Marked out of 1.00 Select one: a. Define Activities b. Sequence Activities c. Develop Schedule d. Estimate Activity Durations The correct answer is: Develop Schedule Question 133 RBS Stands for Not answered Marked out of 1.00 Select one: a. Resource Breakdown Structure b. Report Breakdown Service c. Report Breakdown Structure d. Resource Breakdown Service The correct answer is: Resource Breakdown Structure Question 134 The transit time consists of _____________ Not answered Marked out of 1.00 Select one: a. Time taken to get output b. Time consumed in moving the work between various departments c. Time it takes to receive raw materials from suppliers to when production starts d. Time taken by a worker to operate a machine The correct answer is: Time consumed in moving the work between various departments https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 33/51 4/3/22, 11:45 AM 2022_REVIEW QUESTION: Attempt review Question 135 _____________ is defined as the shortest duration one has had or might expect to experience given that everything happens Not answered as expected. Marked out of 1.00 Select one: a. Most Unlikely Time b. Optimistic Time c. Pessimistic Time d. Most likely Time The correct answer is: Optimistic Time Question 136 Gantt chart provides information about the Not answered Marked out of 1.00 Select one: a. production schedule b. efficient working of machine c. proper utilisation of manpower d. material handling The correct answer is: production schedule Question 137 Which one is the most difficult type of resource to schedule? Not answered Marked out of 1.00 Select one: a. Facilities b. People c. Money d. Equipment The correct answer is: People Question 138 Which of the following is not a main element of the project management process? Not answered Marked out of 1.00 Select one: a. Systems design. b. Plan. c. Estimation. d. Schedule. The correct answer is: Estimation. https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 34/51 4/3/22, 11:45 AM Question 139 2022_REVIEW QUESTION: Attempt review The following BEST describes a subnetwork: Not answered Marked out of 1.00 Select one: a. Activity-On-Node [AON] b. Arrow Diagramming Method [ADM] c. Fragment Network d. Precedence Diagramming Method [PDM] The correct answer is: Fragment Network Question 140 Reserve Analysis is a technique for: Not answered Marked out of 1.00 Select one: a. Define Schedule b. Estimate Activity Durations c. Estimate Activity Resources d. Sequence Activities The correct answer is: Estimate Activity Durations Question 141 Work study is concerned with_____ Not answered Marked out of 1.00 Select one: a. all of the above b. improving production capabilities c. improving present method and finding standard tools d. motivation of workers The correct answer is: improving present method and finding standard tools Question 142 Identification of Mandatory Dependencies is BEST done during which process: Not answered Marked out of 1.00 Select one: a. Develop Schedule b. Estimate Activity Duration c. Define Activities d. Sequence Activities The correct answer is: Sequence Activities https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 35/51 4/3/22, 11:45 AM Question 143 2022_REVIEW QUESTION: Attempt review Loading may be defined as Not answered Marked out of 1.00 Select one: a. Uploading a software in machine control panel b. Sending the finished material to the store c. Sending the raw material to the machine d. Assign the work to the facilities The correct answer is: Assign the work to the facilities Question 144 The correct sequence of operations in production planning and control is Not answered Marked out of 1.00 Select one: a. Dispatching-Routing-Scheduling- Follow up b. Scheduling-Routing- Dispatching-Follow up c. Routing-Scheduling-Dispatching-Follow up d. Routing-Scheduling-Follow up-Dispatching The correct answer is: Dispatching-Routing-Scheduling- Follow up Question 145 A schedule activity may begin 10 days before the predecessor activity finishes. This is an example of: Not answered Marked out of 1.00 Select one: a. ADM b. A dependency with lead c. A dependency with lag d. PDM The correct answer is: A dependency with lead Question 146 A project can be considered to have failed if it: Not answered Marked out of 1.00 Select one: a. does not meet the business requirements. b. was significantly over budget. c. overran significantly on estimated delivery date. d. does not meet the users' requirements. The correct answer is: does not meet the business requirements. https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 36/51 4/3/22, 11:45 AM Question 147 2022_REVIEW QUESTION: Attempt review What-if scenario analysis is done as a part of which process: Not answered Marked out of Select one: 1.00 a. Sequence Activities b. Define Activities c. Develop Schedule d. Control Schedule The correct answer is: Develop Schedule Question 148 Procurement cycle time is time consumed for Not answered Marked out of 1.00 Select one: a. Receiving of raw material b. Inspection of various raw materials c. Inspection of purchased components parts d. All of the options mentioned The correct answer is: All of the options mentioned Question 149 Software project management is the process of managing all activities that are involved in software development, they Not answered are. Marked out of 1.00 Select one: a. All of the options mentioned b. Quality management c. Cost d. Time The correct answer is: All of the options mentioned Question 150 Which is the first stage in the project management model? Not answered Marked out of 1.00 Select one: a. Project planning b. Project definition c. Project control d. Understanding the project environment The correct answer is: Understanding the project environment https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 37/51 4/3/22, 11:45 AM Question 151 2022_REVIEW QUESTION: Attempt review The three phases involved in the management of large projects are Not answered Marked out of 1.00 Select one: a. scheduling, designing, operating. b. planning, scheduling, controlling. c. planning, scheduling, evaluating. d. scheduling, operating, evaluating. The correct answer is: planning, scheduling, controlling. Question 152 Not answered Marked out of 1.00 State if the following are true or false For scheduling a project, it is necessary to.1.Break down the project tasks into smaller, manageable form 2.Find out various tasks and correlate them 3.Estimate time frame required for each task 4.Divide time into work-units Select one: a. Yes b. No The correct answer is: Yes Question 153 A clear hierarchy of objectives in the project definition would not normally contain: Not answered Marked out of 1.00 Select one: a. Control mechanisms b. The purpose c. Success criteria d. Desired end result The correct answer is: Control mechanisms Question 154 Which of the following is true for ‘Routing’? Not answered Marked out of 1.00 Select one: a. Route sheets include list of machine tools that are to be followed b. All of the options mentioned c. It depends upon material handling facilities d. It is flow of work in the plant The correct answer is: All of the options mentioned https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 38/51 4/3/22, 11:45 AM Question 155 2022_REVIEW QUESTION: Attempt review The bill of material does not consists of Not answered Marked out of 1.00 Select one: a. Part number b. Price of the part c. Specifications of part d. Name of the part The correct answer is: Price of the part Question 156 Which of the following is not an activity attribute: Not answered Marked out of 1.00 Select one: a. Leads and Lags b. Time when to perform the activity c. Location where to perform the activity d. Person responsible for the activity The correct answer is: Time when to perform the activity Question 157 Which of the following functions of the project manager is the most difficult and important function? Not answered Marked out of 1.00 Select one: a. planning b. controlling c. organizing d. directing The correct answer is: controlling Question 158 Which of the following are benefits of the network analysis approach? Not answered Marked out of 1.00 Select one: a. Avoid need to use structured approach. b. Eliminate need for management judgement. c. Derive error free forecasts. d. Allows progress to be monitored against plan. The correct answer is: Allows progress to be monitored against plan. https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 39/51 4/3/22, 11:45 AM Question 159 2022_REVIEW QUESTION: Attempt review The early finish time for an activity equals: Not answered Marked out of 1.00 Select one: a. The earliest start time plus the time needed to complete the activity. b. The earliest time an activity can start minus the activity time. c. The latest time an activity can end without delaying the project. d. The earliest possible time that the activity can begin. The correct answer is: The earliest start time plus the time needed to complete the activity. Question 160 The standard deviation of a path through a network is equal to the sum of the standard deviations for each of the Not answered activities that make up that path. Marked out of 1.00 Select one: a. True b. False The correct answer is: False Question 161 Centralized and decentralized are the types of Not answered Marked out of 1.00 Select one: a. Dispatching b. Follow up c. Scheduling d. Routing The correct answer is: Dispatching Question 162 Master schedule is prepared for Not answered Marked out of 1.00 Select one: a. Single product batch production b. Single product continuous production c. Assembly product continuous production d. Multi product batch production The correct answer is: Assembly product continuous production https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 40/51 4/3/22, 11:45 AM Question 163 2022_REVIEW QUESTION: Attempt review AON refers to: Not answered Marked out of 1.00 Select one: a. Arrow Diagramming Method [ADM] b. Precedence Diagramming Method [PDM] c. Mandatory Dependencies d. Fragment Network The correct answer is: Precedence Diagramming Method [PDM] Question 164 The time of activity in a project can be estimated to have a most likely completion time of 7 days, an optimistic time of 6 Not answered days, and a pessimistic time of 9 days. Which of the following is true of the Expected time and the variance for this activity Marked out of 1.00 Select one: a. 7.17 days, 0.25 days b. 3.67 days, 0.25 days c. 0.25 days, 7.17 days d. 7.33 days, 0.25 days The correct answer is: 7.17 days, 0.25 days Question 165 Which of the following is not a reason to reduce project completion time? Not answered Marked out of 1.00 Select one: a. Release resources for other projects. b. Reduce new product development time to market. c. Eliminate project critical path. d. Gain incentives for early completion. The correct answer is: Eliminate project critical path. Question 166 With respect to PERT and CPM, slack Not answered Marked out of 1.00 Select one: a. is the amount of time a task may be delayed without changing the overall project completion time. b. is the latest time an activity can be started without delaying the entire project. c. marks the start or completion of a task. d. is a task or subproject that must be completed. The correct answer is: is the amount of time a task may be delayed without changing the overall project completion time. https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 41/51 4/3/22, 11:45 AM Question 167 2022_REVIEW QUESTION: Attempt review Which of the following is not generally considered a player in the software process? Not answered Marked out of 1.00 Select one: a. customers b. end-users c. sales people d. project managers The correct answer is: sales people Question 168 The time of an activity in a network can be approximated by which distribution? Not answered Marked out of 1.00 Select one: a. Normal b. Exponential c. Beta d. Chi2 The correct answer is: Beta Question 169 A critical path network diagram does not: Not answered Marked out of 1.00 Select one: a. Help determine the amount of float b. Identify the particularly important activities c. Calculate earned-value d. Calculate the duration of the whole project The correct answer is: Calculate earned-value Question 170 Which of the following chart is drawn Machine vs time? Not answered Marked out of 1.00 Select one: a. The progress chart b. The load chart c. Man machine chart d. Curve chart The correct answer is: The load chart https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 42/51 4/3/22, 11:45 AM Question 171 2022_REVIEW QUESTION: Attempt review What is the expected duration of the path BCDEGH? Not answered Marked out of 1.00 Select one: a. 17 b. 26 c. 25 d. 37.33 The correct answer is: 26 Question 172 An activity has an optimistic time of 11 days, a most likely time of 15 days, and a pessimistic time of 23 days. What is its Not answered variance? Marked out of 1.00 Select one: a. 4 b. 16.33 c. 15.6 d. 2 The correct answer is: 4 Question 173 Which of the following is especially useful for monitoring project progress against plan? Not answered Marked out of 1.00 Select one: a. Network diagrams. b. Gantt charts. c. Flow diagrams. d. Capacity loading graphs. The correct answer is: Gantt charts. Question 174 An event is indicated on the network by Not answered Marked out of 1.00 Select one: a. an arrow b. a straight line with circles at the ends c. a straight line d. a number enclosed in a circle or a square The correct answer is: a number enclosed in a circle or a square https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 43/51 4/3/22, 11:45 AM Question 175 2022_REVIEW QUESTION: Attempt review ABC analysis deals with _________ Not answered Marked out of 1.00 Select one: a. controlling inventory costs money b. flow of material c. analysis of process chart d. ordering schedule of job The correct answer is: controlling inventory costs money Question 176 Which of the following are claimed as advantages of the AON method over the AOA method of network diagram Not answered notation? Marked out of 1.00 Select one: a. Most computer software uses the AON approach. b. AON diagrams have a clearer notation than AOA. c. AON do not need dummy activities to maintain the relationship logic. d. The first, second and third answers. The correct answer is: AON diagrams have a clearer notation than AOA. Question 177 A dummy activity is required when Not answered Marked out of 1.00 Select one: a. two or more activities have different ending events. b. two or more activities have the same ending events. c. the network contains two or more activities that have identical starting and ending events. d. two or more activities have the same starting events The correct answer is: the network contains two or more activities that have identical starting and ending events. Question 178 Which of the following is a major disadvantage of the Matrix method of project management? Not answered Marked out of 1.00 Select one: a. Team members report to two bosses - creating a potential conflict. b. Team members must leave their functional "home" - jeopardizing their career path. c. A single project manager is held responsible for the successful completion of the project. d. Communication between functional disciplines is discouraged. The correct answer is: Team members report to two bosses - creating a potential conflict. https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 44/51 4/3/22, 11:45 AM Question 179 2022_REVIEW QUESTION: Attempt review The best person to hire as a project team leader is the most competent software engineering practitioner available. Not answered Marked out of 1.00 Select one: a. False b. True The correct answer is: False Question 180 The best project team organizational model to use when tackling extremely complex problems is the Not answered Marked out of 1.00 Select one: a. random paradigm b. closed paradigm c. open paradigm d. synchronous paradigm The correct answer is: open paradigm Question 181 The critical path of a network is the Not answered Marked out of 1.00 Select one: a. longest time path through the network. b. path with the fewest activities. c. shortest time path through the network. d. path with the most activities. The correct answer is: longest time path through the network. Question 182 In the Empirical Estimation Technique which model is developed by Barry W. Boehm? Not answered Marked out of 1.00 Select one: a. Putnam model and Putnam model b. COCOMO c. Putnam model d. None of the options mentioned The correct answer is: COCOMO Question 183 In PERT chart Not answered Marked out of 1.00 Select one: a. only important activities should be numbered b. all activities should be numbered c. no activity is numbered d. only critical activities are numbered The correct answer is: all activities should be numbered https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 45/51 4/3/22, 11:45 AM Question 184 2022_REVIEW QUESTION: Attempt review What is the critical path through the following network? Not answered Marked out of 1.00 Select one: a. ABCEF b. ABGHIF & ABDEF c. ABCF d. ABGHIF The correct answer is: ABCF Question 185 PERT analysis is based on Not answered Marked out of 1.00 Select one: a. all of the options mentioned b. optimistic time c. pessimistic time d. most likely time The correct answer is: all of the options mentioned Question 186 Pessimistic time is ________ Not answered Marked out of 1.00 Select one: a. the minimum time in which an activity can possibly be accomplished b. the earliest finish c. the average time required for a job d. the maximum time which an activity might require The correct answer is: the maximum time which an activity might require Question 187 What would be the critical path if the duration of activity C increased to 10? Not answered Marked out of 1.00 Select one: a. ABGHIF b. ABDEF c. ABCF d. ABCEF The correct answer is: ABCF https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 46/51 4/3/22, 11:45 AM Question 188 2022_REVIEW QUESTION: Attempt review PERT analysis computes the variance of the total project completion time as Not answered Marked out of 1.00 Select one: a. the sum of the variances of all activities not on the critical path. b. the variance of the final activity of the project. c. the sum of the variances of all activities in the project. d. the sum of the variances of all activities on the critical path. The correct answer is: the sum of the variances of all activities on the critical path. Question 189 Which of the following is a direct responsibility of the project manager? Not answered Marked out of 1.00 Select one: a. Performing all of the activities in the project. b. Calculating completion probabilities for all tasks in the project. c. Drawing the network diagram. d. Making sure that the people assigned to the project receive the motivation, direction, and information needed to do their jobs. The correct answer is: Making sure that the people assigned to the project receive the motivation, direction, and information needed to do their jobs. Question 190 What is the critical path through the following network? Not answered Marked out of 1.00 Select one: a. ABGHIF & ABDEF b. ABDEF c. ABCEF d. ABCF The correct answer is: ABDEF Question 191 Software project manager is engaged with software management activities. He is responsible for. Not answered Marked out of 1.00 Select one: a. Communication among stakeholders b. Monitoring the progress c. Project planning. d. All of the options mentioned The correct answer is: All of the options mentioned https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 47/51 4/3/22, 11:45 AM Question 192 2022_REVIEW QUESTION: Attempt review To identify the financial benefits and costs associated with the development project is the purpose of: Not answered Marked out of 1.00 Select one: a. schedule feasibility b. operational feasibility c. economic feasibility d. technical feasibility The correct answer is: economic feasibility Question 193 Which of the following are features of Belbin’s ‘resource investigator’ role? Not answered Marked out of 1.00 Select one: a. Sober, unemotional and prudent b. Painstaking, orderly and conscientious c. Extroverted, enthusiastic and communicative d. Unorthodox, discerning, single-minded The correct answer is: Extroverted, enthusiastic and communicative Question 194 What is a visual representation of a project’s planned activities against a calendar called? Not answered Marked out of 1.00 Select one: a. A product flow diagram. b. A Pareto chart. c. A Gantt chart. d. A critical path network. The correct answer is: A Gantt chart. Question 195 Tangible benefits would include: Not answered Marked out of 1.00 Select one: a. improved asset control utilization b. improved organizational planning c. lower transaction costs d. ability to investigate more alternatives The correct answer is: lower transaction costs https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 48/51 4/3/22, 11:45 AM Question 196 2022_REVIEW QUESTION: Attempt review Slack of various events on the critical path in PERT / CPM chart Not answered Marked out of 1.00 Select one: a. remain constant b. decreases continuously c. increases continuously d. may increase or decrease depending on various factors The correct answer is: remain constant Question 197 COCOMO stands for Not answered Marked out of 1.00 Select one: a. COmposition COst Model b. COmmon COntrol MOdel c. COnsumed COst MOdel d. COnstructive COst MOdel The correct answer is: COnstructive COst MOdel Question 198 Dummy relationships or dummy activities can be used in which of the following Activity Sequencing techniques: Not answered Marked out of 1.00 Select one: a. Fragment Network b. Arrow Diagramming Method [ADM] c. Precedence Diagramming Method [PDM] d. Schedule Network Templates The correct answer is: Arrow Diagramming Method [ADM] Question 199 The early finish time equals: Not answered Marked out of 1.00 Select one: a. the latest time an activity can end without delaying the project. b. the earliest possible time that the activity can begin. c. the earliest start time plus the time needed to complete the activity. d. the earliest time an activity can start minus the activity time. The correct answer is: the earliest start time plus the time needed to complete the activity. https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 49/51 4/3/22, 11:45 AM Question 200 2022_REVIEW QUESTION: Attempt review The ethical issue of divulging confidential information to some bidders to give them an unfair advantage is known as Not answered Marked out of 1.00 Select one: a. expense account padding. b. bribery. c. low balling. d. bid rigging. The correct answer is: bid rigging. Question 201 The EF of an activity is the Not answered Marked out of 1.00 Select one: a. ES + Activity time. b. Max{EF of all immediate predecessors}. c. LF-Activity time. d. Min{LS of all immediate following activities}. The correct answer is: ES + Activity time. Question 202 Dummy activities Not answered Marked out of 1.00 Select one: a. are found in both AOA and AON networks. b. are used when two activities have identical starting and ending events. c. cannot be on the critical path. d. have a duration equal to the shortest non-dummy activity in the network. The correct answer is: are used when two activities have identical starting and ending events. Question 203 Which of the following is NOT an input to the Sequence Activities process: Not answered Marked out of 1.00 Select one: a. Project Scope Statement b. Activity Attributes c. Change Requests d. Activity List The correct answer is: Change Requests https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 50/51 4/3/22, 11:45 AM Question 204 2022_REVIEW QUESTION: Attempt review Which of the following is a technique for Sequence Activities: Not answered Marked out of 1.00 Select one: a. Rolling Wave Planning b. Arrow Diagramming Method [ADM] c. Precedence Diagramming Method [PDM] d. Mandatory Dependencies The correct answer is: Precedence Diagramming Method [PDM] Question 205 An objective statement should EXCLUDE which following parts: Not answered Marked out of 1.00 Select one: a. An action b. A time frame c. A measure d. PERT The correct answer is: PERT Question 206 How many ways are there to build a project schedule? Not answered Marked out of 1.00 Select one: a. 5 b. 2 c. 4 d. 3 The correct answer is: 2 Question 207 The main function of Gantt chart is Not answered Marked out of 1.00 Select one: a. Quality control b. Cost estimation c. Scheduling d. Perfomance evaluation The correct answer is: Scheduling ◄ 2022 -Contact - Written Assignment 2 Jump to... https://learning.richfield.ac.za/HET/mod/quiz/review.php?attempt=2364616&cmid=136414&showall=1 51/51