ISO 27001:2013 ISMS - Premises Survey Premises security as surveyed on 10 Jun 19 for building at: 1st Floor Rear Suite Clarendon House Victoria Avenue Harrogate, North Yorkshire HG1 1JD Aspect Findings Notes Doors and Entry Points Access to the premises is obtained through a single front door on the ground floor of the building Windows Windows located around the main office all with double keyed locks. Fire Exits The fire exit is located at the rear of the main office which exits on an adjacent side street. Shutters Not applicable Door lock type The main office door from the public corridor does not have any access controls. Bio Metric entry Not applicable 1 The Organisation is implementing an access control mechanism with the cooperation of the building owner. This will involve an electronic fob system like the main access door to the building but restricted to ManageMy employees for the main office door. Aspect Findings Notes Fire Extinguishers Appropriate classes of fire extinguisher are provided to deal with anticipated fire risks within the proximity of each fire extinguisher. These are maintained by Covent Fire Ltd and are servicing on an annual basis. Servicing and maintenance provided by the building owner/landlord. Fire Alarms Installed and maintained by the landlord of the premises. Smoke Alarms Installed and maintained by the landlord of the premises. Extinguishant gas Not applicable Lighting Standard fluorescent with emergency evacuation lighting. Air extraction Not applicable Burglar alarms External and internal alarm sounders are present. Alarm monitoring The intruder detection system is monitored by KBO Fire and Security Limited for unauthorised triggering of sensors. Visitors signing in No visitor controls currently in place. The Organisation is to implement a visitor logging system and associated procedures. Visitors accompanied No visitor controls currently in place. The Organisation is to implement a visitor logging system and associated procedures including escorting visitors. Electrical Wiring The electrical wiring is installed and maintained in accordance with building regulations. Equipment PAT tests PAT testing is undertaken on an annual basis by PAT Central and records are retained by the Global Operations Manager. 2 Aspect Findings Notes Network cabling type Network cabling is to CAT 5E standards and above. Car park Locked and secure using electronic fobs – fobs are separate from the main office access mechanism. Security perimeter The walls and doors of the premises occupied by the Organisation form the security perimeter. Fences Not applicable Gates Not applicable CCTV No CCTV is installed in the premises. 3 The Organisation does not have any influence over the design of the fabric of the building.