Version 2.1.9
1|P a g e
TABLE OF CONTENTS
User Interface ................................................................................................................................. 7
Menu ............................................................................................................................................... 8
File ............................................................................................................................................... 8
New Project ............................................................................................................................................................................. 8
Open Project ........................................................................................................................................................................... 8
Recent Projects ....................................................................................................................................................................... 8
Import Project ......................................................................................................................................................................... 8
Export Project.......................................................................................................................................................................... 8
Admin ...................................................................................................................................................................................... 8
Tech Options ........................................................................................................................................................................... 8
Exit .......................................................................................................................................................................................... 8
Edit............................................................................................................................................... 8
Undo/Redo .............................................................................................................................................................................. 8
Multiple Component Parts ...................................................................................................................................................... 8
Multiple Test Plans .................................................................................................................................................................. 8
Criteria .................................................................................................................................................................................... 9
Transducers ............................................................................................................................................................................. 9
Project Properties ................................................................................................................................................................... 9
Report Options ........................................................................................................................................................................ 9
View ............................................................................................................................................. 9
Reset Zoom ............................................................................................................................................................................. 9
Zoom In ................................................................................................................................................................................... 9
Zoom Out ................................................................................................................................................................................ 9
Full Screen ............................................................................................................................................................................... 9
Help ............................................................................................................................................. 9
BOPX Help ............................................................................................................................................................................... 9
BOPX Best Practices ................................................................................................................................................................ 9
BOPX What’s New ................................................................................................................................................................... 9
About BOPX ............................................................................................................................................................................. 9
Creating New Test Project ............................................................................................................ 10
New Project ............................................................................................................................... 10
Project Name ........................................................................................................................................................................ 10
New Rig ................................................................................................................................................................................. 10
2|P a g e
New Well ............................................................................................................................................................................... 10
Type....................................................................................................................................................................................... 10
Import Project Configuration ................................................................................................................................................ 10
Schematic Legend ......................................................................................................................... 11
Project Properties ......................................................................................................................... 12
Max RWP ............................................................................................................................................................................... 12
Max RWP-CFR ....................................................................................................................................................................... 12
Signatures .................................................................................................................................. 13
New Signature Tab ................................................................................................................................................................ 13
Existing Signature Tab ........................................................................................................................................................... 13
Build Tab ....................................................................................................................................... 14
Schematic Creation ................................................................................................................... 14
Navigation ............................................................................................................................................................................. 14
Adding Components .............................................................................................................................................................. 14
Removing Components ......................................................................................................................................................... 14
Positioning Components ....................................................................................................................................................... 14
Connecting BOP Components ............................................................................................................................................... 14
Rotating Components ........................................................................................................................................................... 14
Adding Links .......................................................................................................................................................................... 15
Changing/Deleting Links ........................................................................................................................................................ 15
Renaming Links ..................................................................................................................................................................... 15
Configure Component ............................................................................................................... 16
Name ..................................................................................................................................................................................... 16
Long Name ............................................................................................................................................................................ 16
Max Pressure......................................................................................................................................................................... 16
Validation Pressure ............................................................................................................................................................... 16
Directional ............................................................................................................................................................................. 16
Properties Tab ....................................................................................................................................................................... 16
Edit Multiple Parts ..................................................................................................................... 17
Build Configuration ................................................................................................................... 17
New Build Configuration ....................................................................................................................................................... 17
Copy Build Configuration ...................................................................................................................................................... 17
Remove Build Configuration ................................................................................................................................................. 17
Test Pipe Options .................................................................................................................................................................. 17
Plan Tab......................................................................................................................................... 18
3|P a g e
Edit Transducers ........................................................................................................................ 18
Add/Edit Transducers ............................................................................................................................................................ 18
Existing Transducers .............................................................................................................................................................. 18
New Transducers................................................................................................................................................................... 18
Enable ................................................................................................................................................................................... 18
Name ..................................................................................................................................................................................... 18
Serial Number ....................................................................................................................................................................... 18
Transducer Values ................................................................................................................................................................. 19
Add/Change Transducer Certificate ...................................................................................................................................... 19
Edit Criteria................................................................................................................................ 19
Criteria - Admin ......................................................................................................................... 19
Add Criteria ........................................................................................................................................................................... 19
Criteria Tabs .......................................................................................................................................................................... 19
Criteria Parameters ............................................................................................................................................................... 20
Test Plan .................................................................................................................................... 20
Create New Test Plan ............................................................................................................................................................ 20
Activating Test Plan ................................................................................................................... 20
Plan Properties .......................................................................................................................... 21
Test Number ......................................................................................................................................................................... 21
Test Pressure ......................................................................................................................................................................... 21
Max Pressure Warning .......................................................................................................................................................... 21
Min Pressure Warning........................................................................................................................................................... 21
Test Criteria ........................................................................................................................................................................... 21
Transducer ............................................................................................................................................................................ 21
Critical Path ........................................................................................................................................................................... 21
Pipe Size ................................................................................................................................................................................ 21
Tested Parts .......................................................................................................................................................................... 21
Test instructions .................................................................................................................................................................... 21
Simulate Test Plan ..................................................................................................................... 22
Pressurize System ................................................................................................................................................................. 22
Close/Open Components ...................................................................................................................................................... 22
Tested Components .............................................................................................................................................................. 22
Copy Plan ................................................................................................................................... 23
Remove...................................................................................................................................... 23
4|P a g e
Rename Plan.............................................................................................................................. 23
Live Warnings ............................................................................................................................ 23
Missing Pressure ................................................................................................................................................................... 23
Over Pressure ........................................................................................................................................................................ 23
Validation Pressure ............................................................................................................................................................... 24
Untested Components .......................................................................................................................................................... 24
Edit Multiple Plans .................................................................................................................... 24
Create Test Plan Report ............................................................................................................ 24
Test Plan Report .................................................................................................................................................................... 24
Test Tab ......................................................................................................................................... 25
Connected Status ...................................................................................................................... 25
PT Connect ............................................................................................................................................................................ 25
COM Connect ........................................................................................................................................................................ 25
X-FACTOR .............................................................................................................................................................................. 25
Tare Pressure............................................................................................................................. 26
Pressure Testing ........................................................................................................................ 26
Select Test ............................................................................................................................................................................. 26
Start Test ............................................................................................................................................................................... 26
Graph Scale ........................................................................................................................................................................... 26
Seek ....................................................................................................................................................................................... 26
Low Pressure Seek................................................................................................................................................................. 27
High Pressure Seek ................................................................................................................................................................ 27
Passing Seek Confirmation .................................................................................................................................................... 27
End Test................................................................................................................................................................................. 27
Visible Leak............................................................................................................................................................................ 27
Decreasing Trend .................................................................................................................................................................. 27
Seeking Sequence ................................................................................................................................................................. 28
Report Tab..................................................................................................................................... 29
Report Options ...................................................................................................................................................................... 29
Report Header Title and Subtitle ........................................................................................................................................... 29
Schematic Label Size ............................................................................................................................................................. 29
Report Attachments .............................................................................................................................................................. 29
Report Cover Image .............................................................................................................................................................. 29
Company Logo....................................................................................................................................................................... 29
5|P a g e
Include/Exclude Information or Pages From Report ............................................................................................................. 30
Test Report ............................................................................................................................................................................ 30
Test Plan Report .................................................................................................................................................................... 30
Chart Report .......................................................................................................................................................................... 30
TPT TBPT Report .................................................................................................................................................................... 30
State Changes Report ............................................................................................................................................................ 30
Remove From Report ................................................................................................................ 32
Include In Report ....................................................................................................................... 32
Time Between Pressure Test Options ....................................................................................... 32
Troubleshooting COM Connections .............................................................................................. 36
SetUp Network Installation ....................................................................................................... 36
SetUp Local Installation ............................................................................................................. 36
Powering The Unit ..................................................................................................................... 36
Password ............................................................................................................................................................................... 36
Checking The Ethernet Connection ........................................................................................... 37
Ping Test .................................................................................................................................... 38
Open Command Prompt (cmd) ............................................................................................................................................. 38
Pairing Laptop And DAQ ............................................................................................................ 38
Change Laptop IP Addresses ................................................................................................................................................. 40
Support Contact Information ........................................................................................................ 41
General Support 8:00 AM to 5:00 PM ................................................................................................................................... 41
24 Hour Technical Support Hotline, Available With Support Package .................................................................................. 41
Support Email ........................................................................................................................................................................ 41
6|P a g e
WELCOME TO BOPX
THIS TRAINING MANUAL IS DESIGNED TO TAKE YOU THROUGH A STANDARD TEST SEQUENCE USING
THE BOPX SYSTEM.
USER INTERFACE
7|P a g e
MENU
FILE
NEW PROJECT
CREATES A NEW PROJECT
OPEN PROJECT
OPENS AN EXISTING PROJECT
RECENT PROJECTS
LIST OF PREVIOUS PROJECTS
IMPORT PROJECT
IMPORTS A SAVED PROJECT FROM YOUR FILE FOLDER SYSTEM
*MUST CONTACT ENGENUITY SUPPORT TO UTILIZE THIS FEATURE
EXPORT PROJECT
EXPORTS THE CURRENT PROJECT FROM THE APPLICATION
ADMIN
*ENGENUITY SUPPORT OPTIONS AND TOOLS TO ASSIST USERS
TECH OPTIONS
*ENGENUITY AND BOPX TECHNICIAN OPTIONS AND TOOLS TO ASSIST USERS
EXIT
CLOSES BOPX PROGRAM
EDIT
UNDO/REDO
ALLOWS USERS TO UNDO OR REDO ACTIONS IN THE CURRENT
SESSION.
MULTIPLE COMPONENT PARTS
OPENS THE “EDIT MULTIPLE COMPONENT PARTS” PAGE, HERE A
USER CAN UPDATE THE SETTINGS OF COMPONENT PARTS IN THE
CURRENT PROJECT.
MULTIPLE TEST PLANS
OPENS THE “EDIT MULTIPLE TEST PLANS” PAGE, HERE A USER CAN
UPDATE THE SETTINGS OF TEST PLANS IN THE CURRENT PROJECT.
8|P a g e
CRITERIA
OPENS THE “EDIT CRITERIA” PAGE, HERE A USER CAN DEFINE OR EDIT CRITERIA USED FOR TESTING.
THIS IS A GLOBAL SETTING AND WILL BE USABLE FOR ALL PROJECTS.
TRANSDUCERS
OPENS THE “EDIT TRANSDUCERS” PAGE, HERE A USER CAN DEFINE OR EDIT TRANSDUCERS USED FOR
TESTING. THIS IS A GLOBAL SETTING AND WILL BE USABLE FOR ALL PROJECTS.
PROJECT PROPERTIES
PROVIDES DETAILS OF THE CURRENTLY OPENED PROJECT. THIS INFORMATION WILL BE INCLUDED IN
THE GENERATED REPORT. A PROJECT PROPERTIES ICON IS INCLUDED IN THE COMMAND LINE WHEN
USING THE BUILD MODE.
REPORT OPTIONS
ALLOWS USER TO CHANGE COVER IMAGE, COMPANY LOGO IMAGE, ADJUST THE SCHEMATIC LABEL
SIZES TO BEST FIT THE PLAN AND REPORT, UPDATE THE REPORT HEADER AND SUBHEADERS, AND ADD
OR REMOVE PAGES FROM THE REPORTS.
VIEW
RESET ZOOM
RESETS THE SCHEMATIC BACK TO THE CENTER OF THE DESIGN AREA
ZOOM IN
ALLOWS USERS TO ZOOM IN ON A SCHEMATIC IN THE DESIGN AREA
ZOOM OUT
ALLOWS USERS TO ZOOM OUT ON A SCHEMATIC IN THE DESIGN AREA
FULL SCREEN
WILL EXPAND THE PROGRAM TO THE FULL VIEWING EXTENTS OF THE MONITOR
HELP
BOPX HELP
PROVIDES A DETAILED HELP FILE TO HELP NAVIGATE THE PROGRAM.
BOPX BEST PRACTICES
PROVIDES AN OVERVIEW OF BEST PRACTICES IN USING THE
SOFTWARE FOR PRESSURE TESTING.
BOPX WHAT’S NEW
PROVIDES AN UPDATE ON THE NEWEST FEATURES AND UPDATES TO THE SOFTWARE.
ABOUT BOPX
PROVIDES CRITICAL PROGRAM INFORMATION SUCH AS VERSION AND REGISTRATION INFORMATION.
9|P a g e
CREATING NEW TEST PROJECT
NEW PROJECT
TO CREATE A NEW PROJECT, NAVIGATE TO THE MENU RIBBON AND SELECT FILE > NEW
PROJECT NAME
PROJECT NAME IS
THE NAME OF THE
ENTIRE PROJECT
NEW RIG
SELECT FROM THE
DROP DOWN OF
AVAILABLE RIGS OR
ENTER THE RIG IF
NOT AVAILABLE
NEW WELL
SELECT FROM THE
DROP DOWN OF
AVAILABLE RIGS OR
ENTER THE WELL IF
NOT AVAILABLE
TYPE
SELECT FROM THE DROP DOWN OF AVAILABLE TEST TYPES OR SELECT CUSTOM AND PROVIDE A
DESCRIPTION OF THE CUSTOM TEST TYPE
IMPORT PROJECT CONFIGURATION:
IMPORT PROJECT CONFIGURATION ALLOWS THE USER TO
PRELOAD DATA PERFORMED IN AN EXISTING TEST OR PULL IN THE
DEFAULT TEMPLATE “EXAMPLE PROJECT”.
TO PRELOAD AN EXISTING TEST SIMPLY FILTER BY RIG OR BY WELL
TO LOCATE A TEST PREVIOUS RAN WITH THE DESIRED DATA. THIS
WILL PRELOAD THE SCHEMATIC AND TEST PLANS RAN IN THE
SELECTED TEST TO LOAD FROM.
10 | P a g e
SCHEMATIC LEGEND
11 | P a g e
PROJECT PROPERTIES
ONCE YOUR
PROJECT IS
CREATED, CLICK THE
MATCHING ICON IN
THE UPPER LEFT
CORNER OF SCREEN
TO ACTIVATE THE
PROJECT PROPERTIES
WINDOW. THIS
INFORMATION WILL
BE INCLUDED IN THE
GENERATED REPORT.
THE WELL NAME AND
RIG NAME ARE
PREPOPULATED FROM
THE PROJECT
CREATION.
MAX RWP
THIS ADJUSTABLE VALUE IS THE MAX RATED WORKING
PRESSURE FOR YOUR BUILD. IF THIS VALUE IS NOT SET, YOU
WILL RECEIVE A WARNING WHEN NAVIGATING TO THE TEST
COMMAND TAB.
MAX RWP-CFR
THIS VALUE IS CREATED AUTOMATICALLY BASED OFF OF THE VALUE OF YOUR MAX RWP AND THE
CALCULATIONS FROM SECTION 6.5.3.2.3 OF THE CFR .
IMPORTANT NOTE
MAX RWP-CFR WILL ONLY GENERATE A WARNING IT WILL NOT AUTOMATICALLY END SEEK.
12 | P a g e
SIGNATURES
INSERTS AND MANAGES THE SIGNATURE(S) REQUIRED FOR REPORT SIGNOFF REQUIREMENTS.
SIGNATURES CAN BE ADDED OR DELETED TO THE LIST. SIGNATURES REQUIRED FOR THE REPORT CAN
THEN BE SELECTED FROM THE LIST WHEN THE REPORT IS GENERATED.
NEW SIGNATURE TAB
EXISTING SIGNATURE TAB
13 | P a g e
BUILD TAB
SCHEMATIC CREATION
SELECT THE BUILD TAB ON THE COMMAND MANAGER TO START
THE BUILD PROCESS.
NAVIGATION
USE THE MOUSE TO PAN AND ZOOM IN THE DESIGN AREA. TO PAN
WITH THE MOUSE, LEFT CLICK AND DRAG ON THE WHITE
BACKGROUND OF THE DESIGN AREA. USE THE MIDDLE MOUSE
WHEEL TO ZOOM IN/OUT OF AN AREA. POSITION THE CURS OR IN
THE DESIRED AREA WHILE SCROLLING THE MIDDLE MOUSE WHEEL.
ADDING COMPONENTS
TO ADD A COMPONENT, LEFT CLICK AND DRAG A COMPONENT IN THE DESIGN LIBRARY INTO THE
DESIGN AREA.
*IT IS RECOMMENDED TO BUILD THE BOP STACK FIRST THEN ADD ADDITIONAL COMPONENTS.
REMOVING COMPONENTS
TO REMOVE A COMPONENT, DOUBLE CLICK THE COMPONENT AND SELECT THE RED “X” OR HIT DELETE
ON THE KEYBOARD.
POSITIONING COMPONENTS
LEFT CLICK AND DRAG THE COMPONENT IN THE DESIGN AREA TO MOVE COMPONENTS TO THE DESIRED
LOCATION. BE SURE TO SELECT THE COMPONENT AND NOT THE CONNECTIO N POINT (DOT) ON THE
COMPONENT.
CONNECTING BOP COMPONENTS
BOP COMPONENTS CAN CONNECT TO OTHER BOP COMPONENTS. TO DO THIS, LEFT CLICK AND DRAG A
BOP COMPONENT ON TOP OF ANOTHER BOP COMPONENT. WHEN THE TWO COMPONENTS TOUCH
THE SINGLE CONNECTION POINT ON EACH WILL CONVERT TO HAVE CONNECTION POINTS ON BOTH
SIDES WHERE THE 2 COMPONENTS MEET. THIS INDICATES THAT THE TWO COMPONENTS ARE
CONNECTED AS DEPICTED IN THE IMAGE BELOW. WELL HEAD COMPONENT IS ABLE TO BE DELETED IF
DESIRED.
Connected
ROTATING COMPONENTS
COMPONENTS SUCH AS VALVES, TEES, AND ELBOWS CAN BE ROTATED . TO DO THIS
DOUBLE CLICK A COMPONENT TO ACTIVATE IT. NOW SELECT THE ROTATE ICON ABOVE
THE COMPONENT TO ROTATE.
14 | P a g e
ADDING LINKS
LINKS REPRESENT FLOW PATHS BETWEEN COMPONENTS. TO CREATE A LINK, HOLD LEFT CLICK ON A
CONNECTION POINT OF A COMPONENT, THEN DRAG TO A CONNECTION POINT OF ANOTHER
COMPONENT. IF THE LINK IS NOT CONNECTED PROPERLY THE COLOR OF THE LINK WILL BE YELLOW, A
CONNECTED LINK WILL BE GREY.
CHANGING/DELETING LINKS
LINKS WILL AUTOMATICALLY SELECT A DIRECT PATH FROM ONE COMPONENT TO
ANOTHER. IF THE PATH IS NOT DESIRABLE YOU CAN CHANGE THE PATH. TO DO THIS
LEFT CLICK, HOLD, AND DRAG THE PATH TO THE DESIRED LOCATION.
IF YOU DRAG A PATH TO AN UNDESIRED POSITION HOVER OVER THE LINK AND
SELECT THE BLACK “X” TO REMOVE THAT MOVE.
REMOVING A LINK IS DONE IN A SIMILAR MANNER, JUST HOVER OVER THE LINK AND
SELECT THE RED “X” TO REMOVE THE LINK COMPLETELY.
RENAMING LINKS
LINKS CAN HAVE PROPERTIES EDITED BY CLICKING ON THE COG ICON. THIS WILL ALLOW
THE USER TO CHANGE THE LINK NAME, LONG NAME, MAX PRESSURE AND VALIDATION
PRESSURE.
*IF THE USER ELECTS TO EDIT THESE FIELDS
THE LINK WILL BE CONSIDERED A TESTED
COMPONENT.
15 | P a g e
CONFIGURE COMPONENT
CONFIGURING COMPONENTS IS AN
IMPORTANT STEP IN THE PROCESS BECAUSE
IT SERVES MULTIPLE PURPOSES.
IT PROVIDES TEST INFORMATION SUCH AS
NAMES AND DIRECTION TYPE.
IT ALSO ENABLES THE USER TO PROVIDE
CRITICAL TESTING INFORMATION ABOUT THE
COMPONENT TO ENSURE IT IS TESTED
CORRECTLY.
TO CONFIGURE A COMPONENT, DOUBLE CLICK THE COMPONENT AND SELECT THE COGWHEEL.
NAME
THE REPORTED ABBREVIATION OF THE COMPONENT, THIS HAS A LIMIT OF 5 CHARACTERS
LONG NAME
FULL DESCRIPTIVE NAME OF THE COMPONENT
MAX PRESSURE
THE MAX PRESSURE THE COMPONENT IS RATED FOR
VALIDATION PRESSURE
THE PRESSURE AT WHICH A COMPONENT WILL BE VALIDATED TO FOR THAT TEST. THIS IS A REPORTED
VALUE AND WILL NEED TO BE UPDATED FOR EACH TEST IF THE VALUE CHANGES.
DIRECTIONAL
*THIS OPTION IS ONLY AVAILABLE ON VALVES
AN INDICATION THAT THE VALVE IS TESTED ON BOTH SIDES.
TO ENABLE THIS OPTION, CLICK ON THE ABOVE THE VALVE ICON, THEN SELECT THE CHECK BOX
AND PROVIDE UP TO A FIVE-DIGIT IDENTIFIER FOR EACH SIDE.
ONCE SELECTED, THE WHITE CONNECTION POINT WILL FILL WITH COLOR.
USERS CAN ALSO DEFINE SEPARATE VALIDATION PRESSURES.
PROPERTIES TAB
HERE YOU CAN PROVIDE MODEL AND SERIAL NUMBER INFORMATION TO TRACK ASSETS.
16 | P a g e
EDIT MULTIPLE PARTS
EDIT MULTIPLE PARTS ALLOWS USERS TO CHANGE
MULTIPLE COMPONENT PROPERTY VALUES AT ONE TIME.
CLICK THIS ICON TO OPEN THE DIALOG BOX, HERE
A USER CAN SELECT A PROPERTY AND SET A
VALUE TO BE APPLIED TO COMPONENTS
SELECTED IN THE BELOW LIST.
BUILD CONFIGURATION
BUILD CONFIGURATION ALLOWS USERS TO CREATE OR COPY SCHEMATICS AND
PLANS ASSOCIATED WITH A COPIED SCHEMATIC. IT CONTROLS OVERALL TEST
PARAMETERS SUCH AS “TEST PIPE INSERTED”, “NOT TEST PIPE”, AND “RISER TEST”.
NEW BUILD CONFIGURATION
CLICK ON THE ‘NEW’ BUTTON TO
CREATE A NEW EMPTY BUILD
CONFIGURATION.
COPY BUILD CONFIGURATION
CLICK ON THE ‘COPY’ BUTTON TO
CREATE A COPY OF THE CURRENT
BUILD CONFIGURATION.
REMOVE BUILD CONFIGURATION
CLICK ON THE ‘REMOVE’ BUTTON TO DELETE THE CURRENT BUILD CONFIGURATION.
TEST PIPE OPTIONS
LEFT CLICK THE OPTION FOR THE DESIRED BUILD CONFIGURATION SETTING.
“TEST PIPE INSERTED” WILL SIMULATE A BUILD CONFIGURATION WITH TEST PIPE IN THE BOP STACK.
“OPEN, NO TEST PIPE” WILL SIMULATE A BUILD CONFIGURATION WITH NO TEST PIPE IN THE BOP
STACK.
WHEN THE TEST PIPE OPTION IS CHANGED, THE SOFTWARE WILL NAVIGATE YOU TO THE BUILD TAB
UPON CLOSING THE WINDOW.
IMPORTANT NOTE
BUILD CONFIGURATIONS SHOULD NOT BE USED TO CREATE COPIES OF ALL TEST PLANS. IF A PROJECT
HAS MORE THAN 32 TESTS IT WILL CAUSE REPORTING ERRORS.
IMPORTANT NOTE
BUILD CONFIGURATIONS THAT HAVE TEST PLANS THAT HAVE TEST DATA ASSOCIATED WITH THEM
WILL NOT BE ALLOWED TO BE DELETED.
17 | P a g e
PLAN TAB
EDIT TRANSDUCERS
MULTIPLE TRANSDUCERS CAN BE ASSIGNED TO THE SOFTWARE GLOBALLY .
THE CERTIFICATION EXPIRATIONS ARE TRACKED TO ENSURE
ALL TRANSDUCERS ARE IN CERTIFICATION. WHEN THE
SOFTWARE IS OPEN ANY TRANSDUCER WITHIN 60 DAYS OF
EXPIRING WILL POPULATE A WARNING IN THE UPPER RIGHT
HAND CORNER OF THE SOFTWARE.
ADD/EDIT TRANSDUCERS
TO ADD OR EDIT EXISTING
TRANSDUCER SELECT THE MANAGE
TRANSDUCER ICON. THIS WILL OPEN
A DIALOG BOX WHERE USERS CAN ADD OR
EDIT TRANSDUCERS.
EXISTING TRANSDUCERS
THE LIST OF TRANSDUCERS MAY CONSIST OF
CURRENT AND EXPIRED TRANSDUCERS OUT
FOR CERTIFICATION. IF THE TRANSDUCER
CERTIFICATION IS CURRENT, SELECT THE BOX
NEXT TO THE TRANSDUCER TO ENABLE IT
FOR SELECTION DURING TEST PLANNING.
NEW TRANSDUCERS
SELECT THE NEW TAB IN THE MANAGE TRANSDUCER DIALOG BOX TO
ADD A NEW TRANSDUCER.
ENABLE
SELECT ENABLE TO ADD IT TO THE LIST OF SELECTABLE TRANSDUCERS
NAME
THE NAME OF THE TRANSDUCER
*THE NAME FIELD IS IMPORTANT AS IT WILL BE WHAT IS SHOWN IN THE
DROPDOWN OF SELECTIONS FOR TRANSDUCERS IN PLAN PROPERTIES
SERIAL NUMBER
THE USER WILL INPUT THE SERIAL NUMBER OF THE TRANSDUCER IN THIS
FIELD
18 | P a g e
TRANSDUCER VALUES
THE USER WILL INPUT THE VALUES LISTED IN EACH TRANSDUCER’S CERTIFICATE TO
COMPLETE THESE VALUES IN THE FORM.
THE 0% REPRESENTS 0 PRESSURE AND 100% REPRESENTS THE MAXIMUM WORKING
PRESSURE RATING FOR THE TRANSDUCER.
ADD/CHANGE TRANSDUCER CERTIFICATE
THE SOFTWARE WILL INCLUDE ALL TRANSDUCER CERTIFICATES FOR EACH
TRANSDUCER USED DURING THE TESTS IN THE REPORTS.
TO ADD AND CHANGE A CERTIFICATE SELECT THE CHANGE ICON
THIS WILL OPEN A FILE EXPLORER WINDOW WHERE YOU CAN BROWSE TO THE CER TIFICATE TO
ASSOCIATE WITH THE TRANSDUCER. THE TRANSDUCER CERTIFICATE IS COPIED AND STORED IN A FILE
ONLY USED BY THE SOFTWARE.
EDIT CRITERIA
SELECT THE EDIT
CRITERIA ICON IN THE
PLAN TAB COMMAND
MANAGER TO EDIT, VIEW OR
CREATE NEW TEST CRITERIA.
THIS WILL OPEN THE EDIT
CRITERIA DIALOG BOX. BY
DEFAULT, THE ENGENUITY
CRITERIA IS LISTED AND CANNOT
BE CHANGED OR DELETED.
CRITERIA - ADMIN
ADMIN USERS CAN SELECT THE
BUTTON IN THE TOP LEFT CORNER TO ENTER A PASSWORD. ONCE ENTERED, THE CRITERIA UNLOCKS
AND ALLOWS THE ADMIN TO ENTER NEW CRITERIA OR ADJUST PREVIOUSLY ENTERED CRITERIA.
ADD CRITERIA
TO ADD CRITERIA, SELECT THE ADD CRITERIA BOX ON THE TOP RIGHT OF THE LIST OF CRITERIA. THIS
ADDS A NEW ROW WHERE USERS CAN INPUT THE NAME, DESCRIPTION AND PARAMETERS FOR THE
CRITERIA.
CRITERIA TABS
SELECT BETWEEN LOW PRESSURE, HIGH PRESSURE AND SINGLE PRESSURE PARAMETERS BY SELECTING
THE TABS ABOVE THE CRITERIA.
19 | P a g e
CRITERIA PARAMETERS
•
MINIMUM DURATION - THE MINIMUM TIME IN WHICH A TEST MUST BE VALIDATED
•
MAX ALLOWABLE ∆P – THE ALLOWABLE DECAY OF THE TEST PRESSURE. THE NUMBER
CALCULATED FROM PERCENTAGE IS THE MAX CHANGE OF PRESSURE + OR – THAT IS
ACCEPTABLE WITHIN THE VALIDATION PERIOD. IF THE NUMBER IS SET TO STATIC, THERE IS NO
CALCULATION NECESSARY.
O
EXAMPLE: 5% OF 250 PSI LOW PRESSURE TEST = 12.5 PSI
•
MIN WARNING PRESSURE – THE MINIMUM PRESSURE A TEST CAN BE VALIDATED IN
•
MAX WARNING PRESSURE – THE MAXIMUM PRESSURE A TEST CAN BE VALIDATED IN
•
TEST PRESSURE – THE TARGET OR MINIMUM PRESSURE DESIRED FOR THE TEST
•
DECAY TYPE (% OR STATIC) – THE USER CAN SELECT TO DETERMINE THE ALLOWABLE ∆P AS A
STATIC NUMBER OR PERCENTAGE BASED NUMBER.
•
DECREASING TREND – ENABLES ENGENUITY’S METHOD TO MONITOR FOR CONSTANT
IMPROVEMENT THROUGHOUT THE VALIDATION PERIOD. IF THE TEST DOES NOT MEET THE
DECREASING TREND REQUIREMENT THEN THE TEST WILL NOT PASS.
•
PASSWORD REQUIRED – WITH PASSWORD SELECTED THE OPERATOR WILL NEED TO GET
APPROVAL TO PERFORM THE CRITERIA. THE PASSWORD IS ENTERED WHEN SELECTING THE
CRITERIA IN THE PLANNING PHASE.
TEST PLAN
SELECT THE PLAN TAB ON THE COMMAND MANAGER TO CREATE AND
SIMULATE INDIVIDUAL TEST PLANS.
CREATE NEW TEST PLAN
TO CREATE A NEW TEST PLAN SIMPLY CLICK THE PLUS ICON
LOCATED IN THE COMMAND MANAGER. A POP-UP WINDOW
WILL APPEAR WHERE YOU CAN ENTER THE TEST PLAN NAME.
THE TEST PLAN NAME MUST START WITH “T” FOLLOWED BY NUMERIC
VALUE. IT CAN END IN AN ALPHA CHARACTER FOR RETEST. E.G. T1, T2, T2A, T2B, T3
IMPORTANT NOTE
BE SURE TO HAVE THE CORRECT BUILD CONFIGURATION ACTIVE WHEN CREATING A NEW TEST PLAN .
THE TEST PLAN WILL ONLY BE ASSOCIATED WITH THE ACTIVE BUILD CONFIGURATION. ANY CHANGES
TO THAT BUILD WILL BE UPDATED IN ANY ASSOCIATED TEST PLANS.
ACTIVATING TEST PLAN
TO ACTIVATE A TEST PLAN SIMPLY SELECT THE DESIRED PLAN IN THE
PLAN TREE. WHEN THE PLAN IS SELECTED THE BUILD WILL POPULATE IN
THE DESIGN AREA. THE PROPERTIES OF THE TEST PLAN WILL ALSO BE
AVAILABLE ON THE RIGHT-HAND SIDE OF THE DESIGN AREA.
20 | P a g e
PLAN PROPERTIES
TEST NUMBER
THE NAME OF THE TEST SEQUENCE.
TEST PRESSURE
THE PRESSURE TO BE TESTED TO DURING TESTING. IF THIS VALUE IS
ADJUSTED ABOVE THE MAX PRESSURE WARNING OR BELOW THE MIN
PRESSURE WARNING, IT WILL ADJUST THE VALUES AUTOMATICALLY. IT
WILL SET THE MAX PRESSURE TO 100 ABOVE PLAN PRESSURE, AND MIN
PRESSURE TO MATCH PLAN PRESSURE.
MAX PRESSURE WARNING
THE MAX PRESSURE THAT THE SOFTWARE CAN BE IN A SEEKING
CONDITION. VALUE CAN NOT BE SET LOWER THAN TEST PRESSURE.
MIN PRESSURE WARNING
THE MINIMUM PRESSURE THAT THE SOFTWARE CAN BE IN A SEEKING
CONDITION. VALUE CAN NOT BE SET HIGHER THAN TEST PRESSURE.
TEST CRITERIA
A DROP DOWN OF AVAILABLE TEST CRITERIA. SELECT THE CRITERIA IN WHICH THE TEST NEEDS TO BE
VALIDATED FROM.
TRANSDUCER
A DROP DOWN OF AVAILABLE TRANSDUCERS. SELECT THE TRANSDUCER IN WHICH THE TEST NEEDS TO
BE VALIDATED FROM.
CRITICAL PATH
AN OPTION FOR WHETHER THE TEST IS IN CRITICAL PATH OR IF IT IS A NON-CRITICAL PATH TEST.
PIPE SIZE
THE ACTUAL PIPE SIZE USED IN THE TEST.
TESTED PARTS
THE LIST OF TESTED COMPONENTS OR LINE UP FOR THAT TEST .
TEST INSTRUCTIONS
THE INSTRUCTIONS FOR THE TEST.
IMPORTANT NOTE
TEST INSTRUCTIONS WILL ONLY SHOW UP IN THE TEST PLAN REPORT. THE TEST PLAN REPORT DOES
NOT INCLUDE ANY INFORMATION ON PASSED OR FAILED TESTS. IN THE TEST TAB THERE IS A SECTION
FOR REPORT COMMENTS THAT WILL SHOW UP IN THE TEST, CHART AND TPT/TPBT REPORTS.
21 | P a g e
SIMULATE TEST PLAN
PRESSURIZE SYSTEM
*YOU MUST HAVE A PRESSURE SOURCE TO START THE SIMULATION.
LOCATE THE PUMPING UNIT AND DOUBLE CLICK THE ICON . YOU WILL NOW HAVE A SELECTION BOX
AROUND THE ICON, HOVER OVER THE BUTTON IN THE TOP RIGHT CORNER AND SELECT IT. NOTICE THE
PUMP ICON COLOR WILL CHANGE TO RED ALONG WITH THE LINK TO INDICATE PRESSURIZATION.
CLOSE/OPEN COMPONENTS
ALL COMPONENTS ARE SET TO THE OPEN STATE BY
DEFAULT. THE FLOW PATH WILL CONTINUE UNTIL IT
REACHES A CLOSED COMPONENT.
*IF FLOW CONTINUES PAST A COMPONENT AFTER IT IS
CLOSED ENSURE FLOW IS NOT REACHING THE COMPONENT
FROM THE OPPOSITE DIRECTION.
TESTED COMPONENTS
AS PRESSURE REACHES NEW
COMPONENTS, THEY WILL BE
CONSIDERED TESTED COMPONENTS OF
THAT PLAN. A LIST OF ALL TESTED
COMPONENTS IS AUTOMATICALLY
POPULATED IN REAL TIME AS
COMPONENTS ARE OPENED AND CLOSED
UNDER THE PROPERTIES BOX RIGHT OF THE DESIGN AREA. THE COMPONENTS IN
THIS LIST ARE SELECTABLE. ONCE A COMPONENT IS SELECTED, IT WILL HIGHLIGHT
THE CORRESPONDING COMPONENT IN THE SCHEMATIC.
22 | P a g e
COPY PLAN
TO COPY A TEST PLAN SIMPLY RIGHT CLICK THE TEST PLAN YOU WISH TO COPY
IN THE PLAN TREE AND SELECT “COPY PLAN”.
*REMEMBER THAT TEST PLANS ARE ONLY CREATED IN THE ACTIVE CONFIGURATION.
REMOVE
TO REMOVE A TEST PLAN RIGHT CLICK THE PLAN AND SELECT DELETE.
RENAME PLAN
WHEN A TEST PLAN HAS DATA THE SYSTEM WILL CHANGE THE REMOVE BUTTON TO
A RENAME BUTTON TO PREVENT THE USER FROM DELETING TESTS WITH DATA. THE
NAMING CONVENTION IN THE SOFTWARE IS TO START EVERY TEST WITH THE
LETTER “T” FOLLOWED BY THE TEST PLAN NUMBER. TESTS CAN NOT HAVE THE
SAME NAME.
*TEST PLANS THAT HAVE DATA WILL BE HIGHLIGHTED IN GRAY .
IMPORTANT NOTE
WHEN COPYING A PLAN, A TEST PLAN NAME CANNOT BE DUPLICATED. THE TEST PLAN NAME WHEN
COPIED WILL APPEND A LETTER AFTER THE TEST NAME. THIS FUNCTIONALITY WAS INTENDED TO
QUICKLY CREATE TEST PLANS FOR FAILED TEST.
LIVE WARNINGS
TO ACCESS LIVE WARNINGS, SELECT THE IMAGES AT THE BOTTOM ON THE STATUS BAR.
ONCE THE WARNING IS CLICKED, A SELECTABLE LIST WILL POPULATE.
THE USER MAY CLICK ON THE COMPONENT LISTED IN THE WARNING AND IT WILL HIGHLIGHT THE
COMPONENT IN THE DESIGN AREA.
MISSING PRESSURE
IF A COMPONENT IS MISSING A MAX PRESSURE IN IT’S COMPONENT SETTINGS, A MISSING PRESSURE
WARNING WILL POPULATE.
SELECT THE “MISSING PRESSURE” ICON IN THE STATUS BAR TO VIEW COMPONENTS MISSING
PRESSURE.
TO RESOLVE THIS, INPUT A MAX PRESSURE TO THE COMPONENT TO RESOLVE THE WARNING.
OVER PRESSURE
IF A TESTED COMPONENT’S “MAX PRESSURE” IS LOWER THAN THE TEST’S PLAN PRESSURE IT WILL
GENERATE A “OVER PRESSURE” WARNING.
SELECT THE “OVER PRESSURE” ICON IN THE STATUS BAR TO VIEW COMPONENTS WITH OVER
PRESSURE CONDITIONS.
TO RESOLVE THIS, REDUCE THE TEST PLAN PRESSURE OR INCREASE THE COMPONENT’S MAX PRESSURE.
23 | P a g e
VALIDATION PRESSURE
IF A TEST PLAN IS NOT CREATED TO TEST THE COMPONENT’S VALIDATION PRESSURE PROPERTIES, IT
WILL GENERATE A “VALIDATION PRESSURE” WARNING.
THE “VALIDATION PRESSURE” ICON IN THE STATUS BAR TO VIEW COMPONENTS WITH
VALIDATION PRESSURE WARNING.
TO RESOLVE THIS, CHANGE THE VALIDATION PRESSURE OF THE COMPONENT TO MATCH THE TEST PLAN
OR CHANGE THE TEST PLAN PRESSURE TO MATCH THE COMPONENT’S VALIDATION PRESSURE.
UNTESTED COMPONENTS
IF A COMPONENT HAS NOT BEEN CLOSED WITH PRESSURE APPLIED TO THE COMPONENT IN A TEST
PLAN IT WILL GENERATE AN “UNTESTED COMPONENTS” WARNING.
SELECT THE “UNTESTED COMPONENTS” ICON IN THE STATUS BAR TO VIEW UNTESTED
COMPONENTS.
TO RESOLVE THIS, ADD THE COMPONENT TO AN EXISTING TEST PLAN OR CREATE A NEW TEST PLAN
WITH THE COMPONENT CLOSED WITH PRESSURE FLOWING TO ONE SIDE OF THE COMPONENT.
EDIT MULTIPLE PLANS
EDIT MULTIPLE PLANS ALLOWS USERS TO CHANGE MULTIPLE PLAN PROPERTIES’ VALUES AT
ONE TIME. SELECT THE COGS ICON ON THE PLAN TAB TO OPEN THE DIALOG BOX . HERE A
USER CAN SELECT A PROPERTY AND SET A VALUE TO BE APPLIED TO COMPONENTS SELECTED
IN THE BELOW LIST.
IMPORTANT NOTE
MAX PRESSURE CAN NEVER BE BELOW PLAN PRESSURE. THE SYSTEM WILL AUTOMATICALLY UPDATE
THE MAX PRESSURE TO BE 100 PSI HIGHER THAN THE TEST PLAN PRESSURE AS A DEFAULT.
CREATE TEST PLAN REPORT
TEST PLAN REPORT
THIS IS A REPORT THAT CAN BE
SHARED WITH THE TEAM
BEFORE/DURING TESTING.
SELECT THE REPORT TAB ON THE COMMAND MANAGER.
NEXT SELECT THE “TEST PLAN REPORT” ICON IN THE COMMAND MANAGER AND SELECT “OPEN
REPORT” IN THE DESIGN AREA.
24 | P a g e
TEST TAB
ALL THE NECESSARY
SETTINGS TO RUN A TEST
ARE STORED FOR EACH
TEST FROM THE PLAN
PROPERTIES OF EACH TEST
PLAN. IT IS IMPORTANT
TO REVIEW THE TEST PLAN
PROPERTIES OF EACH TEST
BEFORE RUNNING THE
TEST.
IMPORTANT NOTE
BEFORE STARTING ANY
TEST CHECK THAT THE
PRESSURE IS CORRECT ON
THE DISPLAY, AND THAT
THE DATE AND TIME ON
THE PC ARE SET
CORRECTLY.
CONNECTED STATUS
PT CONNECT
THE PT CONNECT INDICATOR CAN EITHER BE
GREEN OR RED.
GREEN INDICATES THE SYSTEM IS RECEIVING SIGNAL FROM THE TRANSDUCER AS INTENDED.
RED INDICATES A FAULT IN THE TRANSDUCER SIGNAL. THIS FAULT CAN BE CAUSED BY THE COM
CONNECT INDICATOR IN A RED STATUS, TRANSDUCER CABLE, FAULT IN TRANSDUCER, OR A FAULT IN
THE A-D CONVERTOR.
COM CONNECT
THE COM CONNECT INDICATOR CAN EITHER BE GREEN OR RED.
GREEN INDICATES THE SYSTEM IS RECEIVING SIGNAL FROM THE UNIT AS INTENDED.
RED INDICATES A FAULT IN THE IN SIGNAL CONNECTING THE UNIT TO THE LAPTOP. THIS FAULT CAN BE
CAUSED BY INCORRECT IP ADDRESSES, DAMAGED ETHERNET CABLE, POOR NETWORK CONNECTION, OR
AN INTERNAL PROBLEM WITH ELECTRONICS OF THE UNIT.
X-FACTOR
X-FACTOR IS A VERY QUICK AND ROUGH LOOK AT THE CURRENT PRESSURE OF THE TEST TO HELP
DETERMINE WEATHER OR NOT A TEST CAN PASS.
A GREEN INDICATION MEANS THE TEST IS STABLE OR THERE IS A DETECTABLE IMPROVEMENT THAT
INDICATES THE TEST COULD PASS. IT IS NOT REQUIRED TO SEEK FOR A PRESSURE IT IS ONLY AN
INDICATOR.
25 | P a g e
TARE PRESSURE
SELECT THE TARE PRESSURE ICON IN THE TEST
TAB COMMAND MANAGER. A POPUP WILL
APPEAR ENTER THE CORRECT PRESSSURE VALUE AND
SELECT APPLY, THE PRESSURE READING SHOULD
ADJUST TO THE PRESSURE ENTERED IN POPUP. THIS
TARE VALUE WILL BE STORED UNTIL CHANGED AGAIN.
PRESSURE TESTING
SELECT TEST
SELECT A TEST FROM THE DROP DOWN IN THE TEST PROPERTIES PANE L. IF THE
DESIRED TEST IS NOT IN THE DROP-DOWN LIST BE SURE TO HAVE THE CORRECT
BUILD CONFIGURATION SELECTED.
*TEST THAT HAVE ALREADY BEEN RAN WILL NOT BE SELECTABLE.
IMPORTANT NOTE
ONCE THE TEST IS SELECTED, ENSURE THE PROPER TEST CRITERIA AND
TRANSDUCER POPULATE IN THE FIELDS BELOW. IF THE VALUE S ARE INCORRECT
GO BACK TO THE PLAN TAB AND ENSURE THE CORRECT VALUES ARE SET IN THE
PROPERTIES FOR THAT TEST.
START TEST
TO BEGIN A TEST, SELECT THE START MONITORIN G ICON IN THE COMMAND MANAGER. THIS
WILL BEGIN THE RECORDING PROCESS, AT THIS TIME PRESSURE CAN BE APPLIED TO THE
SYSTEM.
GRAPH SCALE
TO SCALE THE PRESSURE AND ROC VALUES IN THE GRAPH USE THE
FUNCTIONS LOCATED BELOW THE SEEK FUNCTION.
ZOOM FOR PRESSURE SCALE WILL CONTINUOUSLY UPDATE BASED OFF OF
THE CURRENT PSI VALUE. FOR ROC SCALE IT WILL CENTER THE ZOOM
AROUND A VALUE OF “0”.
DEFAULT GRAPH WILL AUTO SCALE OVER THE CURRENT PSI AND ROC VALUES.
SEEK
ONCE THE SYSTEM HAS REACHED THE APPROPRIATE PSI , SEEK CAN BE SELECTED TO DETERMINE IF A
PASSING CONDITION CAN BE FOUND. IF THE PASSING CONDITIONS SET IN THE CRITERIA ARE REACHED
THE SYSTEM WILL PASS THE SEEK. DEPENDING ON THE CRITERIA, A TEST CAN REQUIRE A SINGLE SEEK
OR A LOW AND HIGH PRESSURE SEEK. ALL SEEK CONDITIONS MUST PASS FOR THE OVERALL TEST TO BE
CONSIDERED PASSED.
IMPORTANT NOTE
26 | P a g e
USERS MUST USE THE INDICATORS PROVIDED TO DETERMINE IF THE TEST WILL PASS, THE SYSTEM
WILL NOT FAIL A TEST.
LOW PRESSURE SEEK
TO SEEK A LOW-PRESSURE TEST, SELECT THE START LP SEEK ICON .
WHEN SEEK IS SELECTED, THE SYSTEM WILL COMPARE THE RECORDED RESULTS AGAINST THE CRITERIA
TO DETERMINE IF A PASSING CONDITION IS PRESENT. ONCE A PASSING CONDITION IS FOUND THE
SEEK WILL AUTOMATICALLY END AND A GREEN PASS ICON WILL APPEAR NEXT TO THE SEEK BUTTON.
HIGH PRESSURE SEEK
TO SEEK A HIGH-PRESSURE TEST, SELECT THE START LP SEEK ICON .
WHEN SEEK IS SELECTED, THE SYSTEM WILL COMPARE THE RECORDED RESULTS AGAINST THE CRITERIA
TO DETERMINE IF A PASSING CONDITION IS PRESENT. ONCE A PASSING CONDITION IS FOUND THE
SEEK WILL AUTOMATICALLY END AND A GREEN PASS ICON WILL APPEAR NEXT TO THE SEEK BUTTON.
PASSING SEEK CONFIRMATION
TO CONFIRM THAT PRESSURE WAS NOT
MANIPULATED DURING SEEKING, THIS POPUP WAS INTEGRATED ONCE A SEEK PASSES.
SELECT “PASS SEEK” TO CONFIRM
PRESSURE WAS NOT MANIPULATED, SELECT
“CANCEL PASSING SEEK” TO CONFIRM
PRESSURE WAS MANIPULATED.
END TEST
TO END A TEST, SELECT THE STOP MONITORING ICON IN THE COMMAND MANAGER. THIS WILL
END THE RECORDING PROCESS.
*BE SURE THE SYSTEM IS BLED DOWN BEFORE ENDING THE TEST.
VISIBLE LEAK
DURING THE TEST IF A VISIBLE LEAK IS FOUND PRESS THE VISIBLE LEAK ICON TO STOP THE TEST
INDICATING A VISIBLE LEAK WAS FOUND.
DECREASING TREND
DECREASING TREND IS AN ENGENUITY PROPRIETARY METHOD TO IDENTIFY IMPROVING CONDITIONS
DURING PRESSURE TESTS. WHEN SELECTED IT APPLIES A “TREND FACTOR” NUMBER RANGING FROM 0 1.
ONE (1) REPRESENTS A RATE CONSISTENT WITH A CONSTANT LEAK.
ZERO (0) WOULD INDICATE THE BEST IMPROVING RATE WHERE NO CONSTANT LEAK IS FOUND.
A TREND FACTOR OF .9 OR BELOW WOULD INDICATE A TEST WITH GOOD IMPROVING CONDITIONS.
*DECREASING TREND ONLY APPLIES TO HIGH PRESSURE TESTS AND IT IS NOT APPLIED WITH A ROC
OF 2.5 PSI/MIN OR BELOW.
IMPORTANT NOTE
A SEEK CANNOT BE ACTIVE WHILE MANUALLY MANIPULATING PRESSURE E.G. IF THE SYSTEM IS
BEING PRESSURIZED OR BLED DOWN.
27 | P a g e
SEEKING SEQUENCE
HP Seek Automatically
Ended
Start HP Seek
Start LP Seek
LP Seek Automatically
Ended
Start Monitoring
End Monitoring
28 | P a g e
REPORT TAB
SELECT REPORT TAB TO GENERATE AND VIEW
COMPLETED TEST DATA
TO ENSURE THE REPORT IS COMPLETE, THE FOLLOWING
DIALOG BOXES AND USER FIELDS SHOULD HAVE ALL OF
THEIR CORRECT VALUES INPUTTED.
• PROJECT PROPERTIES
• COMPONENT PROPERTIES
• REPORT COMMENTS
*BE SURE TO CHECK ALL LIVE WARNINGS FOR ACCURACY BEFORE GENERATING A REPORT.
REPORT OPTIONS
TO ACCESS REPORT OPTIONS SELECT EDIT>REPORT
OPTIONS FROM THE FILE MENU BAR.
REPORT HEADER TITLE AND SUBTITLE
FILL IN THE BOX WITH THE DESIRED TITLE AND SUBTITLE
FOR THE REPORT. THIS WILL BE LOCATED AT THE TOP OF
EACH PAGE OF THE REPORT.
SCHEMATIC LABEL SIZE
USERS CAN ADJUST THE SIZE OF THE LABELS ON THE
SCHEMATIC WITHIN THE BUILD AND REPORT TABS, AND
IN THE REPORTS.
REPORT ATTACHMENTS
SELECT THE ADD ATTACHMENT ICON TO ADD ANY ATTACHMENT TO THE REPORT.
THIS WILL OPEN A DIALOG BOX WHERE USERS CAN NAVIGATE TO THE DESIRED ATTACHMENT.
REPORT COVER IMAGE
SELECT ADD COVER IMAGE. THIS OPENS A DIALOG BOX TO NAVIGATE TO THE
DESIRED COVER IMAGE. SELECT THE DESIRED IMAGE AND SELECT OPEN IN THE
DIALOG BOX. THIS CREATES A PREVIEW UNDER COVER IMAGE.
COMPANY LOGO
SELECT ADD COMPANY REPORT LOGO. THIS OPENS A DIALOG BOX TO
NAVIGATE TO THE DESIRED COVER IMAGE. SELECT THE DESIRED IMAGE AND
SELECT OPEN IN THE DIALOG BOX. THIS CREATES A PREVIEW UNDER COVER IMAGE.
29 | P a g e
INCLUDE/EXCLUDE INFORMATION OR PAGES FROM REPORT
WHEN SELECTED THE
FOLLOW PAGES WILL BE
ADDED TO THE FINAL
REPORT.
•
INCLUDE
FAILING TESTS – THIS WILL INCLUDE FAILING TEST’S SCHEMATICS AND GRAPH RESULTS.
•
INCLUDE COVER PAGE – THIS INCLUDES A COVER PAGE WITH THE COVER PAGE IMAGE
ATTACHED.
•
INCLUDE TPT/TBPT PAGE – THIS PAGE HAS INFORMATION ON THE TIME DURING PRESSURE
TESTS, TIME BETWEEN PRESSURE TESTS AND TOTALS AND AVERAGES FROM THAT DATA.
•
INCLUDE TP PAGE – THIS PAGE HAS INFORMATION ON THE TIME TO PUMP UP TO PRESSURE.
•
INCLUDE ST PAGE – THIS PAGE HAS INFORMATION ON THE TIME SEEKING DURING PRESSURE
TESTS.
•
INCLUDE STATE CHANGES MATRIX PAGE – THIS PAGE HAS INFORMATION ON WHEN A VALVE’S
STATE HAS TO CHANGE FROM OPEN TO CLOSED OR VICE VERSA BETWEEN TESTS.
•
INCLUDE TEST WARNING SUMMARY – THIS PAGE HAS INFORMATION OF THE WARNINGS
ASSOCIATED WITH PARTS IN THE SCHEMATIC.
TEST REPORT
SELECT THE REPORT TAB ON THE COMMAND MANAGER THEN CLICK THE TEST REPORT ICON .
THIS WILL GENERATE THE REPORT. ONCE THE REPORT IS GENERATED “OPEN REPORT” WILL
APPEAR IN THE DESIGN AREA. SELECT “OPEN REPORT ” TO VIEW THE PDF VERSION OF THE REPORT.
TEST PLAN REPORT
SELECT THE REPORT TAB ON THE COMMAND MANAGER THEN CLICK THE TEST PLAN ICON . THIS
WILL GENERATE THE REPORT. ONCE THE REPORT IS GENERATED “OPEN REPORT” WILL APPEAR
IN THE DESIGN AREA. SELECT “OPEN REPORT” TO VIEW THE PDF VERSION OF THE REPORT.
CHART REPORT
SELECT THE REPORT TAB ON THE COMMAND MANAGER THEN CLICK THE CHART REPORT ICON.
THIS WILL GENERATE A TBPT REPORT. ONCE THE REPORT IS GENERATED “OPEN REPORT” WILL
APPEAR IN THE DESIGN AREA. SELECT “OPEN REPORT ” TO VIEW THE PDF VERSION OF THE REPORT.
TPT TBPT REPORT
SELECT THE REPORT TAB ON THE COMMAND MANAGER THEN CLICK THE TPT/TBPT REPORT ICON
THIS WILL GENERATE A TBPT REPORT. ONCE THE REPORT IS GENERATED “OPEN REPORT” WILL
APPEAR IN THE DESIGN AREA. SELECT “OPEN REPORT ” TO VIEW THE PDF VERSION OF THE REPORT.
STATE CHANGES REPORT
SELECT THE REPORT TAB ON THE COMMAND MANAGER THEN CLICK THE STATE CHANGES
REPORT ICON. THIS WILL GENERATE A STATE CHANGES REPORT WHICH COVERS ALL TEST TIME
DATA AND VALVE STATE CHANGE INFORMATION. ONCE THE REPORT IS GENERATED “OPEN REPORT”
WILL APPEAR IN THE DESIGN AREA. SELECT “OPEN REPORT ” TO VIEW THE PDF VERSION OF THE
REPORT.
30 | P a g e
REPORT FOLDER
REPORTS FOLDER
THE REPORTS FOLDER CAN BE FOUND AT THE FOLLOWING FILE PATH WITHIN THE PC.
WITHIN THIS FOLDER YOU WILL FIND ALL OF THE
PROJECTS THAT HAVE BEEN REPORTED, AND ALL OF THE
REPORTS THAT HAVE BEEN RUN FOR THEM.
OPEN REPORTS FOLDER
SELECT THE REPORT TAB ON THE COMMAND MANAGER THEN CLIC K THE OPEN REPORTS
FOLDER ICON. THIS WILL OPEN THE FOLDER THAT STORES ALL OF THE REPORTS THAT HAVE
BEEN GENERATED FOR THE CURRENT PROJECT.
IMPORT AND EXPORT TEST DATA
IMPORT TEST DATA
SELECT THE REPORT TAB ON THE COMMAND MANAGER THEN CLICK THE IMPORT TEST DATA
ICON. THIS WILL ALLOW YOU TO IMPORT RAW CSV DATA ONTO A CURRENTLY SELECTED TEST
PLAN THAT DOES NOT CURRENTLY HAVE DATA ASSOCIATED WITH IT.
EXPORT TEST DATA
SELECT THE REPORT TAB ON THE COMMAND MANAGER THEN CLICK THE EXPORT TEST DATA
ICON. THIS EXPORTS ALL OF THE TEST DATA FROM THE PLANS WITHIN THE CURRENT PROJECT
TO THE FOLDERS WITHIN THE COMPUTER THAT HAVE BEEN SET AS THE LOCAL PATH OR REMOTE PATH
WITHIN THE CSV EXPORT SETTINGS.
CSV EXPORT SETTINGS
SELECT THE REPORT TAB ON THE COMMAND
MANAGER THEN CLICK THE CSV EXPORT SETTINGS
ICON. THIS WILL OPEN CSV EXPORT SETTINGS DIALOG.
LOCAL PATH
SELECT THE FOLDER ICON ON THE RIGHT SIDE TO CHANGE THE
LOCAL FOLDER PATH SETTINGS TO EXPORT THE RAW CSV DATA
FROM THE TEST PLANS.
REMOTE PATH
SELECT THE FOLDER ICON ON THE RIGHT SIDE TO CHANGE THE REMOTE FOLDER PATH SETTINGS TO
EXPORT THE RAW CSV DATA FROM THE TEST PLANS.
AUTO-EXPORT
WHEN THIS OPTION IS ENABLED THE RAW CSV DATA IS EXPORTED ONCE A TEST HAS BEEN COMPLETED
INSTEAD OF HAVING TO MANUALLY EXPORT THE DATA WITH THE EXPORT TEST DATA ICON ON THE
REPORT MODE’S COMMAND MANAGER.
THIS OPTION IS ENABLED BY DEFAULT.
31 | P a g e
REMOVE FROM REPORT
RIGHT CLICK A TEST PLAN IN THE PLAN TREE TO SELECT THE REMOVE FROM
REPORT BUTTON. THIS WILL FLAG THE TEST PLAN TO NOT BE INCLUDED IN
REPORT GENERATION.
FLAGGED TESTS WILL SHOW UP IN RED WITH THE MESSAGE “NOT INCLUDED
IN REPORT” IN THE PLAN TREE.
INCLUDE IN REPORT
TO INCLUDE THE TEST PLAN IN REPORT GENERATION SIMPLY RIGHT CLICK
AND SELECT INCLUDE IN REPORT.
TIME BETWEEN PRESSURE TEST OPTIONS
TO REMOVE TBPT
TIMES FROM THE
TOTAL CALCULATIONS,
THIS POP UP ALLOW
YOU TO SEE THE TBPT
TIME, TOGGLE IT TO
BE REMOVED, AND
ADD A COMMENT
EXPLAINING WHY IT
NEEDS TO BE
REMOVED. ONCE ALL
TBPT TIMES HAVE
BEEN CHECKED YOU
CAN SELECT GENERATE
REPORT OR CANCEL
ON THE BOTTOM.
32 | P a g e
EZ VALVE
EZ VALVE CONTROL
OPEN EZ VALVE CONTROLS
CLICK THE EZ VALVE
CONTROL ICON. THIS
WILL OPEN THE EZ VALVE
CONTROL WINDOW.
VALVE NAME
THE VALVE NAMES IN THIS
COLUMN ARE ASSOCIATED
WITH THE VALVE IDS ON THE
HARDWARE IN THE FIELD. IF
THE HARDWARE IS CHANGED
TO A NEW VALVE, THEN AN
ADMINSTRATOR CAN GO IN
WITH THE ADMIN BUTTON ON
TOP TO CHANGE THE VALVE
NAME.
VALVE STATE
THE STATE THAT THE VALVE IS IN IS LISTED IN THIS COLUMN. THERE ARE SEVERAL OPTIONS OF VALVE
STATES.
AUTO/MANUAL SETTINGS
THE PREFIX FOR THE VALVE STATE WILL EITHER BE “AUTO” OR “MANUAL” TO SHOW WHICH SETTING
THE EZ VALVE HAS ENABLED IN THE FIELD. WHILE MANUAL MODE IS ACTIVE, THE AUTOMATED
CONTROLS WILL NOT WORK.
NOT CONNECTED
THE BOPX APPLICATION IS NOT CONNECTED WITH THE CONTROLLER TO RECEIVE THE INFORMATION
FROM THE SENSORS
OPEN
THE VALVE SENSOR INDICATES THAT THE VALVE IS OPEN IN THE FIELD.
CLOSED
THE VALVE SENSOR INDICATES THAT THE VALVE IS CLOSED IN THE FIELD.
TRANSITION
THE VALVE SENSOR INDICATES THAT THE VALVE IS IN BETWEEN OPENED OR CLOSED AND STATIONARY
IN THE FIELD.
IN MOTION OR IN CALIBRATION
THE VALVE SENSOR INDICATES THAT THE VALVE IS IN MOTION OR IN CALIBRATION MODE IN THE FIELD.
33 | P a g e
VALVE CONTROL ACTIONS
SEND COMMANDS TO AUTOMATICALLY OPEN, CLOSE OR STOP THE MOTION OF AN EZ VALVE BY
CLICKING THE DESIRED BUTTON OR BUTTONS.
CLICKING THE BUTTONS SELECTS THEM FOR ACTIVATION . SELECTED BUTTONS ARE
HIGHLIGHTED IN YELLOW AND DARKENED IN COLOR.
CLICKING THE BUTTON AGAIN WILL DESELECT THE BUTTON.
SEND VALVE COMMANDS
THIS BUTTON WILL SEND ALL VALVE COMMANDS THAT HAVE
BEEN CLICKED IN THE VALVE CONTROL ACTIONS SECTION.
A POP-UP CONFIRMATION WINDOW WILL APPEAR WHEN
CLICKED. SELECT “SEND COMMANDS” TO SEND THE
COMMANDS, OR SELECT “CANCEL” TO GO BACK AND REVISE
WHICH COMMANDS YOU WOULD LIKE TO SEND.
STOP ALL
THIS BUTTON WILL IMMEDIATELY STOP ALL MOTION FOR VALVES THAT ARE IN AUTOMATED MODE .
THIS WILL NOT HAVE A POP-UP WHEN CLICKED.
VALVE ID
THIS COLUMN SHOWS THE ID VALUES OF THE EZ VALVE HARDWARE IN THE FIELD.
VALVE ALARMS
THE BUTTON IN THE TOP RIGHT CORNER WILL SHOW ALARM ALERTS RECEIVED FROM
THE CONTROLLER IN THE FIELD THAT ARE BEING RECEIVED FROM THE EZ VALVE.
WHEN THIS HAPPENS, CHECK THE CONTROLLER’S INTERFACE OR CONTACT ENGENUITY FOR SUPPORT.
34 | P a g e
EZ VISION
EZ VALVE VISION SENSOR STATUS
OPEN EZ VISION SENSOR STATUS
CLICK THE EZ VISION SENSOR STATUS ICON. THIS WILL
OPEN THE EZ VISION SENSOR STATUS WINDOW.
VISION SENSOR NAME
THE VISION SENSOR ARE ATTACHED TO SPECIFIC VAL VES, AND
THOSE VALVE NAMES ARE LISTED IN THIS. IF THE HARDWARE IS
CHANGED TO A NEW VALVE, THEN AN ADMINSTRATOR CAN GO IN
WITH THE ADMIN BUTTON ON TOP TO CHANGE THE VALVE NAME.
VISION SENSOR STATE
THE STATE THAT THE VISION SENSOR IS IN IS LI STED IN THIS COLUMN. THERE ARE SEVERAL OPTIONS
OF VISION SENSOR STATES.
LOW LEAK PROBABILITY
THE STATE WILL DISPLAY AS GREEN AND WILL MEAN THAT THE VISION SENSOR DATA IS SHOWING A
LOW CHANCE THAT THERE IS A LEAK ON THAT VALVE.
MEDIUM LEAK PROBABILITY
THE STATE WILL DISPLAY AS YELLOW AND WILL MEAN THAT THE VISION SENSOR DATA IS SHOWING A
MEDIUM CHANCE THAT THERE IS A LEAK ON THAT VALVE.
HIGH LEAK PROBABILITY
THE STATE WILL DISPLAY AS GREEN AND WILL MEAN THAT THE VISION SENSOR DATA IS SHOWING A
HIGH CHANCE THAT THERE IS A LEAK ON THAT VALVE.
CONNECTION ISSUE
THE STATE WILL DISPLAY AS BLACK AND WILL MEAN THAT THE VISION SENSOR HAS A CONNECTION
ISSUE WITH THE CONTROLLER.
VISION ID
THIS COLUMN SHOWS THE ID VALUES OF THE EZ VISION SENSOR IN THE FI ELD.
VISION SENSOR ALARMS
THE BUTTON IN THE TOP RIGHT CORNER WILL SHOW ALARM ALERTS RECEIVED
FROM THE CONTROLLER IN THE FIELD THAT ARE BEING RECEIVED FROM THE EZ
VISION SENSOR. WHEN THIS HAPPENS, CHECK THE CONTROLLER’S INTERFACE OR CONTACT ENGENUITY
FOR SUPPORT.
35 | P a g e
TROUBLESHOOTING COM CONNECTIONS
SETUP NETWORK INSTALLATION
ENSURE YOU HAVE THE SYSTEM PROPERLY INSTALLED BEFORE STARTING THE PRESSURE TEST.
SETUP LOCAL INSTALLATION
POWERING THE UNIT
TURN BOTH THE PC AND EZ CHART UNIT ON, BOTH MUST BE OPERATIONAL TO PERFORM TESTING.
PASSWORD
THE GENERIC (DEFAULT) PASSWORD FOR THE LAPTOP IS ENGENUITY1.
36 | P a g e
CHECKING THE ETHERNET CONNECTION
ON THE WINDOWS TASKBAR, RIGHT-CLICK ON THE COMPUTER ICON AND SELECT OPEN NETWORK AND
SHARING CENTER.
NEXT SELECT CHANGE ADAPTER OPTIONS
IF THE ETHERNET CABLE IS NOT CONNECTED OR THE DEVICE THE ETHERNET CABLE IS PLUGGED INTO IS
NOT POWERED ON, THERE WILL BE A RED “X” NEXT TO THE ETHERNET ICON.
IMPORTANT NOTE
YOUR LAPTOP MAY HAVE A DIFFERENT ETHERNET CONNECTION NAME . E.G. “ETHERNET” OR
“ETHERNET 1”
37 | P a g e
PING TEST
IMPORTANT NOTE
BOTH THE LAPTOP AND DAQ MUST BE SET TO THE SAME IP SCHEMA TO COMMUNICATE PROPERLY.
ALWAYS SET THE IP ADDRESS ON THE DAQ (PELICAN CASE) FIRST. TO ENSURE THE UNITS ARE SET TO
THE CORRECT IP ADDRESS, THE USER MUST RUN A PING TEST FIRST.
OPEN COMMAND PROMPT (CMD)
IN THE WINDOWS SEARCH BAR TYPE CMD, THE “COMMAND PROMPT” APP SHOULD APPEAR. ONCE
SELECTED THE BLACK COMMAND PROMPT SCREEN WILL OPEN.
NEXT TYPE PING AND THEN THE IP ADDRESS OF THE DAQ (PELICAN CASE) . E.G. “PING 192.168.1.110”
THE RESULTS SHOULD BE SIMULAR TO THE BELOW EXAMPLE WITH 4 SENT AND 4 RECEIEVED PACKETS.
IF ALL PACKETS ARE LOST, THEN THE LAPTOP IS NOT SET TO THE SAME IP SCHEMA AS THE DAQ . THIS
CAN ALSO HAPPEN WHEN THERE IS A PROBLEM WITH THE NETWORK CONNECTION.
PAIRING LAPTOP AND DAQ
CLICK THE WINDOWS START BUTTON AND BROWSE TO NI MAX .
YOU CAN ALSO TYPE “NI MAX” IN SEARCH BAR AS WELL.
MEASUREMENT AND AUTOMATION EXPLORER WINDOW WILL OPEN.
BROWSE TO MY SYSTEM > DEVICES AND INTERFACES > NETWORK DEVICES.
YOU WILL SEE ALL AVAILABLE CDAQ’ S LISTED HERE. SELECT THE CDAQ AND
CLICK ADD DEVICE IN THE MENU BAR.
38 | P a g e
NI MAX WILL BEGIN INSTALLING
THE NECESSARY DRIVERS FOR
YOUR DEVICE. ONCE INSTALLED,
YOU WILL SEE THE CDAQ
BECOME BOLD IN THE
NAVIGATION TREE. THIS
INDICATES THAT THE DEVICE IS
NOW ADDED TO NI MAX AND
RESERVED FOR TESTING. CLICK
SELF-TEST IN MENU BAR TO
PERFORM A CONNECTIVITY TEST
WITH CDAQ.
CLICK NETWORK SETTINGS IN
SYSTEM MENU AT BOTTOM OF NI
MAX. HERE YOU WILL SEE YOUR
NETWORK ADAPTERS.
CLICK THE DROP-DOWN NEXT TO
CONFIGURE IPV4 ADDRESS AND
SELECT THE STATIC OPTION.
ASSIGN THE IP INFORMATION TO
ALL FOUR FIELDS. RTOC PROVIDES
THE IP SETTINGS FOR THIS
CONFIGURATION. CLICK SAVE
ONCE ALL INFORMATION HAS
BEEN PROPAGATED.
YOUR CDAQ’ S NETWORK
SETTINGS ARE COMPLETE.
EXAMPLE ONLY
39 | P a g e
CHANGE LAPTOP IP ADDRESSES
ON YOUR WINDOWS TASKBAR, RIGHT-CLICK ON THE
COMPUTER ICON AND SELECT OPEN NETWORK AND
SHARING CENTER.
CLICK ON YOUR LOCAL ETHERNET CONNECTION.
THE NAME WILL VARY, DEPENDING ON WHAT
CONNECTION WINDOWS HAS CREATED.
CHECK TO MAKE SURE THAT YOU ARE ON A LOCAL
CONNECTION AND NOT ON WIFI. IT WILL SHOW A
WIRELESS CONNECTION IF IT IS WIFI INSTEAD OF THE
ETHERNET.
THE ETHERNET STATUS WINDOW WILL BE DISPLAYED. CLICK PROPERTIES. NEXT THE ETHERNET
PROPERTIES WILL BE DISPLAYED, SELECT INTERNET PROTOCOL VERSION 4 (TCP/IP) AND CLICK
PROPERTIES.
40 | P a g e
TOGGLE THE OPTION FOR USE THE FOLLOWING IP
ADDRESS. ASSIGN YOUR IP ADDRESS, SUBNET MASK,
GATEWAY, AND DNS SERVER ADDRESSES. CLICK OK WHEN
COMPLETE AND CLOSE OUT OF ANY REMAINING WINDOWS.
YOUR CDAQ AND LAPTOP SHOULD NOW BE ABLE TO SEE
EACH OTHER. DOUBLE-CLICK THE EZ CHART ICON ON YOUR
DESKTOP. BE SURE YOUR PELICAN UNIT OR STANDALONE
CDAQ ARE TURNED ON. IN THE EZ CHART SOFTWARE, YOU
SHOULD SEE A MESSAGE APPEAR STATING CDAQ
SUCCESSFULLY CONNECTED!
SUPPORT CONTACT INFORMATION
GENERAL SUPPORT 8:00 AM TO 5:00 PM
OFFICE: 936-756-2020
24 HOUR TECHNICAL SUPPORT HOTLINE, AVAILABLE WITH SUPPORT PACKAGE
800-818-3234
SUPPORT EMAIL
SUPPORT@ENGENUITYINC.COM
41 | P a g e
Download