ABDUL MUBARAK. S Mobile No: +91-8056670960, +91-7010839713, +974-70517964 Email: abdulmubarak8@gmail.com OBJECTIVE To work effectively and efficiently as well as growth with a prestigious organization in the field of production, maintenance, quality so as to accomplish the organization goal. WORKING EXPERIENCE #1: Company: DIGITAL ENERGY ENGINEERING SERVICES W.L.L Contractor: Mitsubishi Heavy Industries Limited Client: Qatar (Metro Project) Duration: From November 2018 to FEBRUARY 2020 Continue From MAY 2021 to TILL Designation: Sub-Station Operator Project Details: Currently working as, a Substation Isolation Operator in Doha Metro Phase 1 project for MHI in Qatar. Operation and Monitoring of 33kV GIS Medium Voltage Substation in Doha metro phase 1 project (Red line & Green line & Gold line) for MITSUBISHI HEAVYINDUSTRIES LIMITED. Nature of Work: ⮚ As an Electrical Isolation Operator I perform the necessary switching onsite under the instructions of the Line Electrical Controller. ⮚ Perform switching inside the power supply technical rooms (TPS&SPS) and also on some traction power supply cabinets located inside the depot. ⮚ I issue the work permit with electrical isolation to the persons in charge of the works (Permit To Work- PTW). ⮚ Third Rail Earthing Device (TRED) Installation and Removing. ⮚ Perform Electrical Isolation with Lockout Tagout following day by day. 1 | Page ⮚ Inform the Testing Manager or Power Controller about electrical configuration on site. ⮚ Inform the Testing Manager or Power Controller about potential risk detection on site Rules and Responsibilities: ⮚ Operation and Monitoring of 33KV GIS Switchgear in TPS (Track Power Supply Substation) & SPS (Station Power Supply Substation). ⮚ Operation and Monitoring of VCB (Vacuum Circuit Breaker) In 33KV GIS Switchgear and ACB (Air Circuit Breaker), MCCB (Moulded Case Circuit Breaker) in 415V LV Panel. ⮚ Operation and Monitoring of 3250KVA-2no's Rectifier Transformer & 2660KVA-1no's Inverter Transformer in TPS. ⮚ Operation of OVPD (Over Voltage Protection Device), Positive Isolator and Negative Isolator Panel inTPS. Operation of BLS (Blue Light Station) control panel inTPS and Track areas. ⮚ Operation And Monitoring Of HSCB (High Speed Circuit Breaker) Rated at 4000A in 750V DC Switchgear Panel. ⮚ Operation and Monitoring of 50KVA Auxiliary Transformer in TPS & 2500 KVA-4no's Auxiliary Transformer in SPS. ⮚ Operation and Monitoring of 415V LV Panel in TPS&SPS. ϖ Operation and Monitoring of 250KVA2no's UPS. WORKING EXPERIENCE #2: Company: VOLTECH OPERATION AND MAINTENANCE SERVICES PVT LTD Duration: From April 2018 to October 2018 Designation: Electrical Operation and Maintenance (Technician) Client: South East UP Power Transmission Company Ltd Location: 400/200 KV GIS Substation, Rewa Road, Allahabad Responsibilities: ⮚ Operation and Maintenance of 2 X 315 MVA Interconnecting transformers. ⮚ Operation and Maintenance of 125 MVAR Shunt Reactor. ⮚ Operation and Maintenance of 400 KV and 220 KV GIS Switchyards. ⮚ Operation and Maintenance of 250 KVA Diesel Generator set. ⮚ Inspected and monitor safety systems, Electrical equipment and Fire Fighting Systems. 2 | Page ⮚ Responsible for preparing Energy Transferred report via our Substation. ⮚ Performed routine maintenance to ensure all systems worked properly and served on ⮚ call 24x7 in the event of emergency. ⮚ Condition monitoring and predictive maintenance of critical equipment and corrective ⮚ actions to avoid breakdown. WORKING EXPERIENCE #3: Company: STEELOFAB ENGINEERS & COMPANY PVT LTD Duration: From January 2017 to October 2017 Designation: Site Supervisor Location: Kurukshetra Project Project Details: ±800kV 3000MW HVDC Terminal station, Kurukshetra Project value: 1.5 cr. Worked as a Site Supervisor in Steelofab Engineer & Company Pvt Ltd at ± 800KV 3000MW HVDC Terminal Station, Kurukshetra from 13 Jan 2017 to 19th October 2017. Job Responsibilities: ⮚ GIS/GIB erection supervision ⮚ LCC panel erection ⮚ Cable Laying and termination Supervision ⮚ Testing activity and preparing Test reports ⮚ Preparing RA bill and getting certification from Customer ⮚ Cable Reconciliation ⮚ Adherence to the high safety standards put forth by the company. WORKING EXPERIENCE #4: Name of the organization: INDIAN NIPPON ELECTRICAL LTD Duration: From September 2015 To December 2016 Designation: Technician Place: Pondicherry 3 | Page Responsibilities: ⮚ This organization is manufacture of Electronic Ignition systems, for two wheelers, three wheelers and portable engine and supplier to the following customers TVS, Hero Honda, Yamaha, Bajaj, Royal Enfield, Honda, and so on. ⮚ Key responsible for me, in production line. ⮚ Installing and Troubleshooting the electrical and electronics devices in the circuit boards, which was given by company design. ⮚ Assembling & Troubleshooting of each circuit boards. ⮚ Failure analysis, Solving issues, Report preparation & Stock maintenance. ACADEMIC DETAILS Diploma in Electrical & Electronics Engineering (2015- Pass out) College: Elumalai Polytechnic College, Villupuram Percentage: 78% - First Class Diploma Project: The Taipei Rectifier (A New Three Phase Two Switch ZVS PFC DCM Boost Rectifier. PERSONAL DETAILS: Father’s name: Mr. Sheik Hammed Date of birth: 22 November 1995 Sex: Male Nationality: Indian Language Known: Tamil, English, and Urdu Marital status: Single Passport: M7634032 PLACE: DATE: [ S. Abdul Mubarak] 4 | Page