Uploaded by Enalyn Alde

sad2-3-pdf

advertisement
1. This is concerned with protecting data regarding individuals from being accessed and used
without the permission/knowledge of concerned individuals.
a. Data Privacy
2. The ___________ tag is used to link a web page to another page
a. Anchor tag
3. Arlene was assigned to produce the daily progress report of service contractors. To whom
will Arlene submits the reports?
a. Middle Management
4. Each statement in DTD declares the element of HTML language.
a. False
5. This is the address of a web page on the internet.
a. URL
6. Which of the following is the best hierarchy of design of a report?
a. Control footing, Final footing, Report footing
7. By auditing around the computer we mean
a. the inputs and the corresponding outputs are compared and checked for
correctness
8. A query operation on an object
a. has no side effects
9. Every member of an entity set is described by its ________
a. Attributes
10. Aldrin is the Systems Analyst of the company. As a System Analyst, he need to ensure logs
are kept, who did in critical data entry and processing. What does Aldrin need to implement?
a. An Audit Trail
11. Objects also promote their reuse in many systems.
a. True
12. Which of the following is the best hierarchy of design of a report?
a. Report heading, Page heading, Control heading, Detail lines
13. Buttons which can be clicked using a mouse are placed in screens as
a. they are convenient to use
14. HTTP is a language used to create web pages.
a. False
15. In the ER Diagram, normally entities are
a. Nouns
16. Aldrin want to conduct a testing of the developed information system together with the
manual system using data used from manual system to test system when it is first
implemented. What kind of testing Aldrin will conduct?
a. Pilot Testing
17. In Entity Relationship, a tuple is
a. row of relation
18. Aldrin want to conduct a testing of the developed information system together with the
manual system using live data. What kind of testing Aldrin will conduct?
a. Parallel Test
19. Hiding implementation details of methods from outside world.
a. Encapsulation
20. A subsystem of a complex system must specify
a. how it performs a task
21. In object modelling, special properties of objects are
a. methods, attributes, classes
22. Picking necessary operation and attributes to specify objects.
a. Abstraction
23. In ER Model, student, teacher, professor and school are
a. In ER Model, student, teacher, professor and school are
24. An advantage of symmetric key is easy and fast transformation of plain text to cipher text
a. True
25. A type of testing wherein incorrect inputs, incorrect processing and incorrect outputs will be
detected during operation.
a. System Testing
26. An instance of an object is created by a
a. constructor operation
27. It is also known as information hiding.
a. Encapsulation
28. Which of the following is a control technique during input preparation?
a. Data entry validation
29. New classes are created from current classes by using the idea of ______
a. Polymorphism
30. When sending data from the source to destination, the message is ______
a. converted to ip address during sending
31. The current version of HTML is _____
a. Version 5
32. Computer systems are designed by
a. breaking of the system into smaller self-contained co-operating subsystems
33. Relationships are identified from the word statement of a problem by
a. picking words which are verbs
34. Each computer connected to the internet must
a. have a unique IP address
35. To model an information system using objects the requirements specification is examined
and all _____________ in it are picked as potential operations.
a. Verbs
36. The first step in object oriented modelling is
a. Find objects and their classes
37. Web@AT Corporation is newly established software company. Mr. Ang want to have a fast
and reliable DSL internet connection to his office. He asked his IT Officer to apply for a fast
connection.
Which of the following the IT Office need to do first?
a. Check the telephone line if capable of DSL connection
38. This is acomputer-to-computer exchange of business documents in a standard electronic
format between business partners.
a. Email
39. Errors are found in an operational information system will result to
a. lost of trust in the IS
40. In the ER Diagram, relationships are
a. In the ER Diagram, relationships are
50.
41. To model an information system using objects the requirements specification is examined and all
_____________ in it are picked as potential operations.
Verbs
41. Designing screens uses principles
which are well specified
42. Who among the following uses reports for strategic management
a. Top Management
43. The purpose of parallel run is to
a. to see whether outputs of a newly computerized system matches those of
currently running manual or legacy system
44. Pie charts are normally used when
a. percent use of resources under various heads is to be shown
45. DFD stands for ______
a. Data Flow Diagram
46. Who uses the report for tactical management?
a. Middle Management
47. Designing screens uses principles
a. imilar to those used for printed reports
48. Write the letter that corresponds to the correct answer
Processing the college entrance exam in a university every year is an example of
Select one:
a. None of the choices
b. Batch Processing==
c. OLTP
d. Real time processing
In this stage, glitches of the system are being identified.
Select one:
a. Systems Maintenance
b. System evaluation==
c. Systems Design
d. System Implementation
e. Systems programming
Aldrin is the Sr. Programmer of TRA Global Software Company. He received the list of modules to be fixed.
He is now debugging the system. The software development is in _________________.
Select one:
a. Systems Design
b. System Implementation
c. System evaluation==
d. Systems modification
Identify whether the type of information is Strategic, Tactical, Operational or Statutory:
Marketing techniques of school branches and providing incentives to the best performing branch.
Tactical==
TRA Global Software Company had developed the SRS and XYZ Corp. had approved the document.
What stage the software development is in?
Select one:
a. Systems Design
b. Final Specifications==
c. System Implementation
d. System Evaluation
TRA Global Software Company was contracted to develop a system that would track the procurement
process of XYZ Corporation. The Procurement Manager of XYZ Corp had identified several applications
encompassing the proposed procurement system to TRA Global Software Company. At what stage of the
software development cycle is this activity?
Select one:
a. Systems Design
b. System Implementation
c. Requirements Determinations
d. Feasibility Analysis==
e. Requirements Specifications
Identify whether the type of information is Strategic, Tactical, Operational or Statutory
Corrective maintenance plan or schedule
Strategic==
Choose the letter that corresponds to the correct answer. Which of the following is NOT a major
responsibility of a systems analyst?
Select one:
a. Propose information technology solution through an information system that solves the requirements of an
organization
b. Analyze current systems/applications used by the organization
c. Know the operation and management structure of the organization
d. Write programs to meet specifications==
What stage should be completed before the training of users on how to operate the information system be
conducted?
Select one:
a. Systems Maintenance
b. SystemsTurnover
c. System Implementation
d. Systems Design==
List of volunteers in every barangay.
Operational==
During data gathering, interviews are conducted for the purpose of ___.
Select one:
a. Gathering of input and output forms
b. Familiarization of the data processing
c. Presentation of the proposed information system==
d. Initial introduction of the system requirements
Develop a long questionnaire to capture all the issues and concerns on the system
FALSE==
What is the most important and difficult task of a Systems Analyst?
Select one:
a. Data Gathering
b. Interview the end user of the system
c. Interview the top management
d. SRS development==
Data gathering for system analysis can be done in ______.
Select one:
a. Several interviews and group discussion==
b. Two interviews
c. One interview
d. Continuous throughout the SDLC
Questionnaires can be useful in information gathering when users __.
Select one:
a. All of the choices
b. Are widely distributed geographically..==
c. Are not well informed
d. Do not have time for interviews
Ana is the Procurement Manager of XYZ Corporation. TRA Global Software Corporation had started the
data gathering for XYZ Corporation. Ana has informed TRA that they have an existing running application
system. What is the next step the TRA should do?
Select one:
a. Design an updated information system using new programming technology.
b. Analyze the existing application system....==
c. Interconnect the existing and new application system.
d. Recommend to XYZ Corporation to set a cutoff on using the existing application system.
Which of the following is correct about data gathering?
Select one:
a. Both quantitative data are not collected because these data are biased....==
b. Only qualitative data is collected for analysis
c. Only quantitative data is collected for analysis
d. Both quantitative data are collected for analysis
In a DFD, a line with arrow represents _____.
Select one:
a. Direction of data retrieval
b. Flow of data...==
c. Direction of data entry
d. Control flow
Choose the letter that corresponds to the correct answer: Which of the following describes DFD?
Select one:
a. DFD has entities and data flows
b. DFD specifies which entities generate documents
c. All of the choices....==
d. preliminary step to create an overview of the system
Choose the letter that corresponds to the correct answer:
What is the most important role of a systems analyst in business?
49.
Select one:
a. Specialized in programming technology
b. Technical understanding of information systems
c. Problem solving....==
d. Knowing what data needs to be collected
Jonathan is the programmer of the TRA Global Software Company. He is currently developing the modules
of the information system. What stage is the software development in?
Select one:
a. Systems Modification
b. Systems Specifications
c. System Implementation==
d. Systems Design
________ may include increased sales due to improved customer services or to managers having better
information on which to base decisions.
Select one:
a. Tangible benefits
b. Tangible savings
c. Cost/Benefit Analysis
d. Intangible benefits==
Develop a long questionnaire to capture all the issues and concerns on the system.
Select one:
True
False==
Ferdie is the Systems Analyst of the TRA Global Software Company. He needs to document the complex
decision logic. What tools does he need to use?
Select one:
a. Decision Table==
b. Logic Table
c. Decision Flow Chart
d. Truth Table
Data gathering for system analysis can be done in ______.
Select one:
a. Continuous throughout the SDLC
b. Two interviews
c. One interview
d. Several interviews and group discussion==
Ronnie is the IT Engineer of the TRA Global Software Company. He identified the type of server, desktop
computers needed to implement the proposed information system. What stage is the software development
in?
Select one:
a. Hardware Study==
b. System Implementation
c. Server installation and implementation
d. Server inventory Stage
The software development team of TRA Global Software Company is understanding the existing system.
The team is now in stage ______________________.
Select one:
a. System Design
b. System Implementation
c. Requirements Determinations
d. Requirements Specifications==
Choose the letter that corresponds to the correct answer:
SRS is developed by ______.
Select one:
a. All of the choices
b. the systems analyst==
c. the end user or the system owner
d. the top and midlevel managers where it discusses information management.
TRUE or FALSE. For each alternative solution for the project, it is necessary to evaluate the tangible
benefits only before picking a solution. Intangible benefits do not have cost to be analyzed.
FALSE==
At the end of the feasibility analysis,
Select one:
a. a prototype of the system will be presented to the management which requested the study
b. a meeting should be set to discuss the hardware component of the system
c. systems development will start
d. a document consisting of an executive summary on the feasibility of the project is submitted to the
management which requested the study.==
Choose the letter that corresponds to the correct answer.
Which of the following is a representation of flow of information?
Select one:
a. UML
b. OD
c. DFD==
d. Use Case
Choose the letter that corresponds to the correct answer:
Systems Analyst used DFD as a tool in designing a system. DFD stands for ____.
Select one:
a. Document Flow Diagram
b. Document Flow Design
c. Data Flow Design
d. Data Flow Diagram==
List of volunteers in every barangay.
OPerational==
What stage should be completed before the training of users on how to operate the information system be
conducted?
Select one:
a. Systems Design==
b. Systems Maintenance
c. SystemsTurnover
d. System Implementation
In the analysis a system of the proposed system, The time spent by XYZ Corporation office staff to perform
a task
Select one:
a. Need to be reimbursed to the TRA Software Global Software
b. Need to be charge to the company expenses
c. is a direct cost
d. is an indirect cost==
Report showing the completed, on-going and not yet started projects.
OPERATIONAL==
Mr. Reyes is the Strategic Manager of the company. In the management meeting, he needs to present the
___________________________.
Select one:
a. All of the choices.
b. Day to day policies of the company
c. Long term plan of the company==
d. Improvement plan of the company
Middle Managers use
Select one:
a. Strategic
b. Tactical==
c. Statutory
d. Operational
This system is unstructured and difficult to obtain precise information.
Select one:
a. Management Information System
b. None of the choices
c. Decision Support System==
In the feasibility analysis stage of the SDLC, which of the following activity comes next after setting the
goals?
Select one:
a. Start the development stage
b. Convert the goal to data flow diagram
c. Find alternative methods of meeting the goals==
d. Create a proto type of the system and present to the company
John is estimating the cost and benefit of the proposed procurement system. At what stage of the software
development cycle is this activity?
Select one:
a. Requirements Specifications
b. Feasibility Analysis==
c. Systems Design
d. Requirements Determinations
e. System Implementation
Available stocks in the every warehouse.
OPERATIONAL==
TRUE or FALSE. The “the cost of a hi-end server for application software” a tangible cost.
FALSE==
The
operational==
feasibility examines whether the proposed method can fit in with existing organizational processes.
In evaluating alternative solutions, the methods must be technically, operationally and Answer
economical==
feasible.
What is the most important role of a systems analyst in business?
50.
Select one:
a. Knowing what data needs to be collected
b. Specialized in programming technology
c. Technical understanding of information systems
d. Problem solving==
1-Midterm A category of a DFD that focuses on business activities. Select one: a. Individual DFD b. Physical
DFD c. Relational DFD d. Logical DFD== TRUE or FALSE. Use Structured English when there are large
number of conditions to check and logic is complex. Select one: True False== TRUE OR FALSE: External
entities can process data. False== Which of the following is NOT an advantage of using decision table?
Select one: a. Easy detection of program error== b. Allows systematic creation of test data c. Good
documentation of rules in data processing d. Simple representation of complex decision rules Which of the
following is BEST in sequencing conditions by priority? Select one: a. Decision Trees== b. Any of the
choices c. Decision Table d. Structured English A decision table should be used Select one: a. None of the
choices b. When normalizing the data c. All of the choices d. To document all conditional statements e. To
guide the project manager during the SDLC phases f. When set of rules on conditions with action that needs
to apply== g. When designing prototype The Student Grading Information System needs to compute for the
average grade on 10 quizzes of a student. What is the correct Structured English? Select one: a. for quiz >=
1 to quiz <= 10 do { Total Score = Total Score + Score Average = Total Score / 10 } end for b. for quiz = 1 to
quiz = 10 do { Total Score = + Score } end for Average = Total Score / 10 c. for quiz = 1 to quiz = 10 do {
Total Score = Total Score + Score Average = Total Score / 10 } end for d. for quiz = 1 to quiz = 10 do
SAGOT!! { Total Score = Total Score + Score } end for Average = Total Score / 10 TRUE or FALSE. The for
keyword is a loop structure. Select one: True== False TRUE OR FALSE: Data cannot flow from process to
external entity. FALSE== TRUE OR FALSE: This method of top down analysis and breaking down DFDs to
give more and more detail is known as splitting. FALSE==
Download