Faculty of Engineering Benha University Mechanical Eng. Dept. (Production Mechatronics Eng. Divs.) M 1372 Project Management Instructor: Dr. Ashraf Hassan & 4th Year Facebook: Ashraf Hassan_BHIT Room 404 Training Building (Int. 336 ) SHEET No ( 1 ) WBS 1. Develop a WBS for a birthday party. -1- -2- 2. Develop a WBS for a trip to Malysia. 3. Develop a WBS for your wedding party. 4. Develop a WBS for ship building. -3- SHEET No ( 2 ) Gantt chart 1. Develop a Gantt chart for a birthday party. 2. Develop a Gantt chart for a trip to Malysia. 3. Develop a Gantt chart for your wedding party. 4. Develop a Gantt chart for ship building. -4- SHEET No ( 3 ) Critical Path Method 1. Find the critical path for each of the following network diagrams illustrated in the figures below using the computing algorithm of the CPM method. Compute the expected project duration and the slacks of all activities in tabular form. -5- 2. 3. 4. -6- 5. A small manufacturing firm has developed the following list of activities necessary to release a contract for a new plant. Find the activities with zero slacks using the computing algorithm of the CPM method. Compute the slacks of all activities in tabular form. activity A-B feasibility study B-C acquire site B-D prepare plans B-F marketing strategy C-D soil test D-E legal approval D-F loan application E-F evidence approval E-G obtain bids F-G secure financing G-H release contract Preceding activity none A-B A-B A-B B-C C-D & B-D C-D & B-D D-E D-E D-F & B-F E-G & F-G Time in weeks 4 2 10 4 1 6 2 0 6 2 2 6. The earliest start (ES) and latest start (LS) times for activity 6-7 of a network diagram are as shown in the figure below. Determine the critical path and the project duration using the computing algorithm of the CPM method. Compute the slacks of all activities in tabular form. -7- 7. Find the critical path for the network illustrated in the Figurebelow using the computing algorithm of the CPM method. Compute the slacks of all activities in tabular form. -8- SHEET No ( 4 ) PERT (1) -9- (2) (3) - 10 - (4) (5) - 11 - (6) - 12 - SHEET No ( 5 ) CRASHING (1) (2) - 13 - - 14 - (3) - 15 -