Uploaded by BI PL

pressure build up test

advertisement
Site Menu
Join | Library | Login
How many of the PBUs/PFOs do your team analyse on your
production/injection wells?
When we ask this question, different answers come up:
1. “how
is this useful? Pressure build-up tests are for reservoir characterization with
Exploration and Appraisal wells, not for production.” (moving on…)
2. “We
don’t analyse operations shut-ins. Sometimes when our reservoir engineer is not
too busy with some critical work, he will look at one or two PBUs and perform a
quicklook. But in general most of the opportunistic shut-ins are of bad quality
anyway…” (rings a bell ?)
3. “Just
enough. We spot the shut-ins that are more than 10 hrs, analyse them, and
review every quarter with the subsurface and operations team.” (well done).
4. “We analyse the pressure data for each well, as soon as a PBU test is available. We
share with the subsurface team and give feedback to the operations folks onshore
and offshore. We are pro-active in our surveillance and well management” (are you for
real ? kudos… and you probably end up with lower decline and higher recovery
factor…).
You may have deduced that most of the time, the answers we have are between the first
and second ones. We think it is because of two main reasons: a lack of resources and a
lack of expertise. Derivative, superposition time, deconvolution are not very nice words to
hear and may remind us of some complex maths we took some time ago. Let’s face it: well
test analysis on PBU tests is not too popular.
A free opportunistic shut-in is a snapshot in time of the well and reservoir
performance
Nowadays, most of the production and injection wells are completed with permanent
downhole gauges and pressure data close to the perforations are available to the
production and reservoir engineers. Lots of them.
Pressure and rate history showing 23 opportunistic PBU tests over the first 7 months of production
Every time there is an operational upset, a maintenance or a well work that requires the
wells to be shut-in, pressure build-up and pressure fall-off tests are acquired in the
production and injection wells. These are called “opportunistic” PBU/PFO tests.
For a new well, a baseline PBU test should be planned in the first two weeks of production
to obtain the initial performance and reservoir pressure. Then, during the life of the well, it
is fair to say that about 95% of the PBU tests will be opportunistic.
These free data contain information about the well and the reservoir over time. They
represent a series of snapshots of the well and reservoir performance. The well test
analyst can extract this information so as to monitor production, detect and understand
any performance deviation.
New learning can be made and the development plan can be optimized. This will help to
protect the base oil and gas production and to optimize any new well delivery.
Is your well and reservoir still healthy or starting to show some symptoms?
Check the rate and monitor the well performance
The opportunistic PBU tests can be compared on the same derivative plot. This is called a
derivative overlay. It helps to quality check the rate measurement and allocation, detect any
increase/decrease in well damage, changes in permeability and in compressibility, etc…
All of this without doing any detailed analysis, just by looking at the plot.
Derivative overlay with deconvolution in red.
A performance deviation, such as a change in rate of decline, may be caused by a changing
well damage (skin) or/and by pressure support problems. It may be difficult to detect and
understand this with deliverability tests and IPRs. A derivative overlay with opportunistic
PBUs will help to monitor the well damage and detect some plugging of the perforations,
sand fill, a reduction in tubing diameter, a scale dropout, problem with fines, etc…
The well test analyst can then detect and diagnose a production problem and more
importantly take action before it becomes irreversible. This could lead to well management
strategies and treatments that maximize the well’s production life and increase the
recovery factor.
The derivative overlay could also be used to detect the water front and predict water
breakthrough a couple of months in advance. This can help the production team to be
more prepared, choking back to avoid sand production, taking samples and starting the
tracer sampling programme if tracers were injected into water injection wells. After the
water breakthrough, the opportunistic PBUs could be used to obtain the field-derived
relative permeability curves.
For water injectors, this technique will help to ensure no excessive fracture growth, detect
fracture damage and assess the impact of water quality and temperature when injecting
produced water. Damage in the fracture could increase over time with the accumulation of
debris, oil-in-water contents, etc…, plugging the perforations and closing the fractures.
Assess the impact of the development plan and strategy on the oil and gas
recovery
One way to assess the production and injection strategy is to review the evolution of
reservoir pressure and well performance over time. Do your wells have any problem with
pressure support?
With too much work to do, it is tempting for the reservoir engineer to assume the gauge
pressure at the end of the PBU or after a certain shut-in duration to be the reservoir
pressure. However, this might not represent the true average reservoir pressure.
Average reservoir pressure values are calculated using the MBH method or the
superposition plot. Under some assumptions and data handling, the evolution of P* over
time could reflect the evolution of reservoir pressure over time.
Average reservoir pressure values can be extracted from opportunistic tests and plotted
versus time.
Evolution of reservoir pressure over time
This can give the team some insight on possible problems with pressure support.
How to make this work?
To improve the quality of the data, permanent downhole gauges DHG should be located as
close as possible to the perforations. Rate should be measured on a monthly basis and
quality checked by plotting several PBUs on the same log-log plot. An ops procedure will
guarantee some high quality PBU/PFO tests.
A surveillance plan that is linked with the development plan should be created and
quarterly reviewed with a multi-discipline team. Baseline PBUs should be performed for
every new well in the first weeks of production. The results of PBU analysis should then be
communicated to the subsurface and ops teams.
Some monthly dashboards could be created and communicated to all the teams, showing
the changes in rate of decline, the latest PBU/PFO interpretation and the evolution of
average reservoir pressure over time for each well.
Water injectors should receive the same attention because fracture behaviours need to be
monitored over time. An excessive frac growth could lead to a fracture out-of-zone or a loss
of water containment. Well integrity would then be compromised leading to a well
abandonment and a bad reputation for the company.
Regarding the lack of expertise and resources, a fit-for-purpose training program could be
created. E-learning could help to bring a sustained training in a less disruptive way. A well
test specialist could be brought to the team to update all the PBUs and coach the
engineers so as to become proactive with PBUs/PFOs. An automated system could also be
created to provide a first early quicklook with a derivative overlay for each well,
automatically plotting new PBUs. The permeability-thickness KH, skin S and mathematical
value P* would then be derived from each new PBU. More complex PBUs could be
analysed by the reservoir engineer or the well test specialist.
So how many opportunistic shut-ins do your team analyse? Are you being pro-active and
looking at the free dynamic data to learn more about your wells and reservoir?
More info about well test analysis on producing fields:
For more information or for a discussion on this topic, please don’t hesitate to contact us.
Join the Well Testing Group !
Already a member, walk into the library !
Tagged with: downhole gauge, PBU, PFO, pressure buildup, pressure fall-off test, production shut-ins, productivity, well performance
Posted in: General, Info Room
More Articles
Previous Post: Why a pressure gauge near the perforations ?
Next Post: Real time well testing
Leave a reply
You must be logged in to post a comment.
This site uses Akismet to reduce spam. Learn how your comment data is processed.
Account
Login
Your Subscriptions
You are not logged in.
TestWells Ltd
27 Old Gloucester Street
WC1N 3AX London, UK
E: info@TestWells.com
Registered in London: 8757988
Menu
Home
Well Test Services
Learning Centre
My Account
Secure Transfer
Contact
Popular Posts
The Skin Factor
What is Well Testing ?
Well Testing and Pressure Transient Analysis
Terms and Conditions · Privacy Policy · Cookie Policy
Copyright © 2022 TestWells Ltd. All rights reserved.
Download