Norifel O. Llano BSChE – 3 V1 C2 ES036 Assignment 7 EIA – EMP – EMS 1. Provide the meaning of the following acronyms: a) ECC : Environmental Compliance Certificate b) EIA : Environmental Impact Assessment c) ECP : Environmentally Critical Projects d) ECA : Environmentally Critical Area e) EMB : Environmental Management Bureau f) EMS : Environmental Management Systems g) EMP : Environmental Management Plan h) EIS : Environmental Impact Statement i) DENR : Department of Environment and Natural Resources j) PD : Project Description 2. Give 5 examples of ECP and 5 examples of ECA. Environmentally Critical Projects: a) b) c) d) e) Mining Mineral extractions Golf course projects Building highways and road projects Factories producing heavy products and by-products Environmentally Critical Areas: a) b) c) d) e) Areas with critical slopes Areas classified as agricultural lands Water bodies Mangrove areas Coral reefs 3. Write the 10 steps in the preparation of EIA. a) Preparation of the description of projects needs and the project/s b) c) d) e) f) g) h) i) j) Identification of relevant institutional information (national, provincial, and local) Identification of impacts (scoping) Description of the affected environment Prediction of impacts Assessment of the predicted impacts Mitigating measures Comparison of alternatives Documentation Design and implementation of the Environmental Monitoring Program 4. Enumerate the contents of an EMP. a) Targets and standards b) Procedures ➢ Activities ➢ Aspects ➢ Mitigation ➢ KPIs ➢ Reporting c) Organization and responsibilities d) Monitoring and reporting e) Auditing f) Management review g) Specific plans 5. Explain briefly what is an EMS. Environmental Management Systems, also known as EMS, is a combination of systems that consist of laws and policies, plans, people, and constant reviews and checks and balances that are implemented to address environmental issues. It is important to note that the people included in the EMS should be aware of the aspects of the systems that aren’t effective anymore and should be open to change and systemic approach. 6. What are the six (6) elements of ISO14001. a) Management review b) Environmental policy c) Planning ➢ Environmental aspects compliance ➢ Objectives and targets ➢ Environmental management programs d) Implementation ➢ Roles and responsibilities ➢ Training and communication ➢ EMS document control ➢ Emergency preparedness and response e) Checking / Corrective actions ➢ Measurement and monitoring ➢ EMS nonconformance and corrective actions ➢ Records ➢ EMS audits 7. If you are hired as a project engineer to build a new cement manufacturing plant, explain how are you going to handle the environmental compliance for the construction and what permit should you comply and how? Being the project engineer meant that I should be aware of all the facets of the project, and in this case, focus on obtaining the permits needed to make this project come to life. I should also be aware of the different environmental laws that should be observed in order to maintain the sustainability of the project. To get the required permits, I must secure the Environmental Compliance Certificate, also known as ECC, from the Department of the Environment and Natural Resources – Environmental Management Board (DENR – EMB). Having the ECC meant that we are observing the necessary precautions and practices needed to make sure that our project is observing all the environmental laws and practices set to protect our surroundings.