RCB SITGES ENGINEERING SDN BHD ON SITE / MONTHLY INSPECTION CHECKLIST FOR EARTH MOVING EQUIPMENT ON SITE MOBILIZATION MONTHLY MONTH : ____________20__ (Please tick appropriate box) EQUIPMENT CONTRACTOR PROJECT DATE OF INSPECTION No 1 Check Items Do the indicators of temperature of cooling water, oil and oil pressure correctly operate? 2 3 Does the engine start smoothly without abnormal sound? Is there any trouble for fuel supplying devices? (jet pump, smudge, leakage) 4 Is there any trouble for lubricant devices? (oil volume, smudge, leakage) 5 Is there any defect for cooling effect? (water volume, tension belts, blocking of cores) 6 Is the exhaust gas system in good condition? 7 Are level handles, brake pedals, brake lock in good operating condition? 8 9 10 11 12 13 Are the clutch and brake for driving in good condition? Are the main clutch and transmission in good condition? Is the winch in good operatable condition? Are cables, lamps, alarms free from damage? Are hoses, pipes not damaged and no leakage? Are there no crack, defacement, or deformation in soil plates, bucket frame, ripper and arms? 14 15 Are all bolts and fastener surely tightened? Reverse / slew audio / visual alarms and side mirrors available? 16 Fire Extinguisher in Cab 17 18 Crane Hook with Safety Latch Ropes Sleeves Condition 19 Slings Condition 20 PMA Certificate Inspected by (Name) Witnessed by (Name) Company Name Result Signature Signature Date Remarks