Chapter 1 Assignment Manufacturing cost data for Banta Company are presented below. Direct materials used Direct labor Manufacturing overhead Total manufacturing costs Work in process 1/1/17 Total cost of work in process Work in Process 12/31/17 Cost of goods manufactured Option A $ (82,075) 47,000 46,500 175,575 (21,500) 197,075 (34,231) 162,844 Option B $ 85,500 46,000 45,500 (177,000) 21,500 (198,500) 35,231 (163,269) Option C $ 78,050 (52,575) 47,750 178,375 (21,500) 199,875 35,751 (164,124) Instructions (a) Indicate the missing amounts for each letter (a) through (i). (b) Banta Company must choose between options A, B and C. Evaluate the three options and determine which one is in the best interest of Banta Company. Write a brief paragraph to explain your reasoning. The options differ as follows: Option A uses moderately priced materials from a supplier that usually has the quantities needed by Banta. Option B uses high quality materials that are readily available from a local supplier. Labor and manufacturing costs can be reduced slightly since fewer items fail quality tests during production. Option C uses slight significantly less expensive materials from a local supplier. These lower quality materials result in higher labor and manufacturing overhead costs. a) Missing amounts are indicated above(red ones). b) The option in the best interest of Banta Company is Option A. Because, Option C uses lower quality materials which is not a good idea as the labour and manufacturing overhead costs are high which is causing to an increased burden of extra cost. Option C is the most expensive option with the least quality. Thus, it is not an eligible option. On the other hand, if we look Option A and B, Option A uses moderately priced materials. Nevertheless cost of goods manufactured is 162,844 which is lower than other 2 options. Besides, Option B uses high quality material. Thus, the cost of goods manufactured(163,269) is more than option A. In conclusion, Option A is more preferable as the material cost will be moderate and labor and overhead cost also less.