EHP4 for SAP ERP 6.0 June 2010 English Production Planning and Control (142) Building Block Configuration Guide SAP AG Dietmar-Hopp-Allee 16 69190 Walldorf Germany SAP Best Practices 142 – Production Planning and Control: Configuration Guide Copyright © Copyright 2008 SAP AG. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation. IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli, and Informix are trademarks or registered trademarks of IBM Corporation in the United States and/or other countries. Oracle is a registered trademark of Oracle Corporation. UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group. Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc. HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology. Java is a registered trademark of Sun Microsystems, Inc. JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. MaxDB is a trademark of MySQL AB, Sweden. SAP, R/3, mySAP, mySAP.com, xApps, xApp, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary. These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty. © SAP AG Page 2 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Icons Icon Meaning Caution Example Note Recommendation Syntax Typographic Conventions Type Style Description Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options. Cross-references to other documentation. Example text Emphasized words or phrases in body text, titles of graphics and tables. EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE. Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools. EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key. Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation. <Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries. © SAP AG Page 3 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Content 1 Purpose......................................................................................................................................... 7 2 Preparation ................................................................................................................................... 7 2.1 Prerequisites .................................................................................................................................. 7 3 Configuration/Installation .............................................................................................................. 7 4 Basic Data .................................................................................................................................... 7 4.1 Defining BOM Usages............................................................................................................ 7 4.2 Defining Modification Parameters .......................................................................................... 8 4.3 Defining Planner Group.......................................................................................................... 8 4.4 Defining Material Types Allowed for BOM Header ................................................................ 9 4.5 Defining Allowed Material Types for BOM Items ................................................................... 9 4.6 Defining Default Values for the Item Status ........................................................................... 9 4.7 Defining Wage Group........................................................................................................... 10 4.8 Defining Suitability................................................................................................................ 11 4.9 Defining Setup Type and Setup Group ................................................................................ 11 4.10 Defining Type of Standard Value Determination ............................................................. 12 4.11 Defining Control Key ........................................................................................................ 13 4.12 Defining Reduction Strategy ............................................................................................ 14 4.13 Defining Move Time Matrix .............................................................................................. 15 4.14 Determining Capacity Planner ......................................................................................... 16 4.15 Determining Person Responsible .................................................................................... 16 4.16 Defining Goods Received Valuation for Order Delivery .................................................. 17 4.17 Define Strategies for Stock Determination ...................................................................... 18 5 Sales and Operations Planning (SOP) ....................................................................................... 19 5.1 Setting Planning Plant for SOP ............................................................................................ 19 6 Material Requirements Planning (MRP) ..................................................................................... 19 6.1 Defining Rescheduling Check – MRP Group ....................................................................... 19 6.2 Defining Range of Coverage Profile (Dynamic Safety Stock).............................................. 20 6.3 Carrying out Overall Maintenance of Plant Parameters ...................................................... 21 6.4 Carrying out Overall Maintenance of MRP Groups ............................................................. 22 6.5 Defining Splitting of Forecast Requirements for MRP ......................................................... 24 6.6 Defining Order Profile ........................................................................................................... 25 6.7 Planning Horizon for MRP Group ........................................................................................ 25 6.8 Activating Runtime Statistics ................................................................................................ 26 6.9 Defining Number of Planned Orders .................................................................................... 26 6.10 Defining External Procurement per MRP Group ............................................................. 27 6.11 Defining Safety Stock Availability .................................................................................... 28 6.12 Defining Period Display for Period Totals ........................................................................ 28 6.13 Reference Plant for Access to Central Master Data Tables ............................................ 29 6.14 Checking Storage Mode for MRP List ............................................................................. 29 6.15 Defining Receipt Elements for Receipt Days’ Supply ...................................................... 30 6.16 Parameters for Determining the Basic Dates .................................................................. 30 6.17 Defining Planning Time Fence and Roll Forward Period................................................. 31 6.18 Defining Creation Indicator .............................................................................................. 31 6.19 Defining Storage Location and Supply Area Determination in BOM ............................... 32 6.20 Defining Key for Performance Efficiency Rate ................................................................ 33 6.21 Maintaining Task List Types and Set SET/GET Parameters........................................... 33 © SAP AG Page 4 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide 6.22 Defining Profiles with Default Values ............................................................................... 34 6.23 Routing Selection – Select Automatically ........................................................................ 35 6.24 Defining Default Values – Task List Selection ................................................................. 35 6.25 Defining Default Values – Control Data for Bills of Material ............................................ 36 6.26 Defining Order of Priority for BOM Usages ..................................................................... 36 6.26.1 Scheduling Planned Orders ........................................................................................ 37 6.26.2 Long Term Planning/ Simulation ................................................................................. 38 6.26.3 Configure scheduling parameters SOP ....................................................................... 39 6.27 Defining Settings for Variant Selection ............................................................................ 39 6.28 Defining Profiles for Order Report ................................................................................... 40 6.29 Defining Variant for Range of Coverage Report .............................................................. 40 6.30 Defining Variant for Multilevel Delay Report .................................................................... 41 7 Shop Floor Control (SFC) ........................................................................................................... 42 7.1 Defining number ranges for orders ...................................................................................... 42 7.2 Defining Status Profile.......................................................................................................... 42 7.3 Defining Applications............................................................................................................ 43 7.4 Settings for Availability Check .............................................................................................. 44 7.4.1 Define Checking Rule .................................................................................................. 44 7.4.2 Define Checking Scope ............................................................................................... 44 7.5 Defining Single Screen Entry for Confirmations .................................................................. 47 7.5.1 Defining Single Screen Entry for Confirmations (DI) ................................................... 47 7.5.2 Defining Single Screen Entry for Confirmations (PI) ................................................... 48 8 Rework ........................................................................................................................................ 50 8.1 Maintain Catalogs ................................................................................................................ 50 8.1.1 Maintaining Catalogs – Catalog Types........................................................................ 50 8.1.2 Maintain Catalogs – Codes ......................................................................................... 50 8.1.3 Defining Catalog Profiles ............................................................................................. 51 8.2 Notification ........................................................................................................................... 51 8.3 Defining Number Ranges ..................................................................................................... 51 8.4 Defining Notification Types .................................................................................................. 52 8.5 Defining Screen Templates .................................................................................................. 52 8.5.1 Simplified View: Screen Areas .................................................................................... 52 8.5.2 Notification Header and Screen Areas ........................................................................ 53 8.5.3 Extended View: Tabstrips and Screen ........................................................................ 54 8.6 Defining Action Box .............................................................................................................. 55 8.6.1 Notification Types ........................................................................................................ 55 8.6.2 Activities ...................................................................................................................... 55 8.6.3 Dependent Follow-up Functions .................................................................................. 56 8.7 Extended View: Tabstrips and Screen ................................................................................. 57 8.8 Defining Priorities ................................................................................................................. 58 9 PP/PP-PI order settings .............................................................................................................. 59 9.1 Copying All SAP Standard Settings for Process Management............................................ 59 9.1.1 Getting Standard PI Characteristics from Client 000 .................................................. 59 9.1.2 Copying Material ID Characteristics from Client 000 .................................................. 59 9.1.3 Copying Standard Settings for Process Messages ..................................................... 60 9.1.4 Copying Message Categories ..................................................................................... 60 The standard settings for process messages have been copied. ......................................................... 60 9.1.5 Transferring Predefined Characteristics ...................................................................... 60 9.1.6 Copying Process Destinations between Plants ........................................................... 61 © SAP AG Page 5 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide 9.2 Basic Data Settings .............................................................................................................. 61 9.2.1 Defining Standard Value Key Definition ...................................................................... 61 9.2.2 Defining Formulas ....................................................................................................... 62 9.2.3 Defining Control Key.................................................................................................... 63 9.2.4 Defining Standard Value Descriptions ......................................................................... 63 10 Capacity Planning ................................................................................................................ 64 10.1 Creating Capacity Planning Profile .................................................................................. 64 10.1.1 Defining Selection Set ................................................................................................. 64 10.1.2 Defining Selection Profile ............................................................................................ 64 10.1.3 Defining Options Profiles ............................................................................................. 65 10.1.4 Defining List Profiles .................................................................................................... 66 10.1.5 Defining Overall Profile ................................................................................................ 66 11 Repetitive Manufacturing ..................................................................................................... 67 11.1 Defining Control Data for Pull List .................................................................................... 67 11.2 Defining Generation of Cost Log ..................................................................................... 67 11.3 Planning ........................................................................................................................... 68 12 Individual BC Sets/ Manual Steps ........................................................................................ 69 12.1 Defining Parallel Processing in MRP (moved to 104) ...................................................... 69 12.2 Activating Batch Management at Material Level ............................................................. 69 13 Evaluation ............................................................................................................................ 70 13.1 Defining Profiles for Order Report ................................................................................... 70 13.2 Defining Settings for Variant Selection ............................................................................ 70 13.3 Defining Variant for Range of Coverage Report .............................................................. 71 13.4 Defining Variant for Multilevel Delay Report .................................................................... 71 13 Evaluation ............................................................................................................................ 70 13.1 Defining Profiles for Order Report ................................................................................... 70 13.2 Defining Settings for Variant Selection ............................................................................ 70 13.3 Defining Variant for Range of Coverage Report .............................................................. 71 13.4 Defining Variant for Multilevel Delay Report 71 © SAP AG Page 6 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Production Planning and Control: Configuration Guide 1 Purpose This configuration guide provides the information you need to set up the configuration of this building block manually. If you do not want to configure manually and prefer an automated installation process using the SAP Best Practices Installation Assistant and other tools, refer to the SAP Best Practices Quick Guide. The technical objects associated to each configuration covered in this document, can be found on the Global Master List spreadsheet, matching according to the title of the activity. 2 Preparation 2.1 Prerequisites Before you start installing this scenario, you must install prerequisite building blocks. For more information, see the Building Block Prerequisites Matrix for SAP Best Practices Baseline Package 3 Configuration/Installation 4 Basic Data 4.1 Defining BOM Usages Use In this step, you define the BOM usages. When you define a BOM usage, you define the configuration of the item status. The item status is made up of a number of indicators in the BOM item (for example, relevant to production, relevant to engineering/design, and so on). The item status controls how the BOM item is processed in related application areas. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Bill of Material General Data BOM Usage Define BOM Usages Menú IMG Producción Datos básicos Lista de materiales Datos generales Utilización de la lista de materiales Definir utilizaciones de lista de materiales Transaction Code OS20 2. Choose New Entries. 3. Make the following entries: BOM Usg Prod. Eng/des. Spare PM CostRel Sales Usage text Y . . 4. Choose Save. 5. Choose Back. © SAP AG . - . - Production Rework EX Stock Page 7 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 4.2 Defining Modification Parameters Use Modification parameters are generally one-time settings for BOM management, which you should not change after you start using BOMs productively. In the standard system, default values are defined. Procedure 1. Access the activity using one of the following navigation options: 2. IMG Menu Production Basic Data Bill of Material Control Data for Bills of Material Define Modification Parameters Menú IMG Producción Datos básicos Lista de materiales Datos de control para listas de materiales Configurar parámetros de modificación Transaction Code OS27 Make the following entries: BOM validity maint. EC management active Mult.BOM inactive Unit ‘piece’ CAD active X X X PC X 3. Choose Save. 4. Choose Back. 4.3 Defining Planner Group Use In this step, you define planner groups per plant. A planner group is a group of people responsible for the maintenance of routings. You can use the planner group as a selection criterion for task list selection. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing General Data Configure Planner Group Menú IMG Producción Datos básicos Hoja de ruta Datos generales Definir grupo de planificación Transaction Code SPRO 2. Choose New Entries. 3. Make the following entries: Plnt PlGrp Planner Group Desc. 1000 1 Group 1 1100 2 Group 2 1000 1 Group 3 1100 2 Group 4 4. Choose Save. 5. Choose Back. © SAP AG Page 8 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 4.4 Defining Material Types Allowed for BOM Header Use In this step, you specify which material types in conjunction with BOM usages are allowed for the BOM header material. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Bill of Material General Data Define Material Types Allowed for BOM Header Menú IMG Producción Datos básicos Lista de materiales Datos generales Especificar tipos material permitidos p.cabecera lista materiales Transaction Code OS24 2. Choose New Entries. 3. Make the following entries: BOM Usg Mat type headr Allowed Y * + 4. Choose Save. 5. Choose Back. 4.5 Defining Allowed Material Types for BOM Items Use In this step, you define which material types you want to allow with which BOM usages and which material types for BOM headers for creating BOM items (material items). Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Bill of Material Item Data Define Allowed Material Types for BOM Items Menú IMG Producción Datos básicos Lista de materiales Datos de posición Especificar tipos material permitidos p.posiciones lista materiales Transaction Code OS14 2. Choose New Entries. 3. Make the following entries: BOM Usg Mat type headr Mtype BOM item +/- Y * * + 4. Choose Save. 5. Choose Back. 4.6 Defining Default Values for the Item Status Use In this step, you can define default values for the various item status indicators for each BOM usage. These values are proposed as defaults when you create new BOM items. © SAP AG Page 9 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Bill of Material General Data BOM Usage Define Default Values for the Item Status Menú IMG Producción Datos básicos Lista de materiales Datos generales Utilización de la lista de materiales Especificar valores propuestos para status de la posición Transaction Code OS21 2. Choose New Entries. 3. Make the following entries: BOM Usg Prod. Relevancy to Costing Indicator Y X X 4. Choose Save. 5. Choose Back. 4.7 Defining Wage Group Use In this step you define wage groups for operations and work centers. By assigning an operation or a work center to a wage group you can evaluate the work to be performed in the operation from a job evaluation point of view (for instance suitable for unskilled labor or requiring special training). When you confirm the operation, you enter the wage group that was actually used. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Operation Data Define Wage Group Menú IMG Producción Datos básicos Hoja de ruta Datos de operación Determinar grupo salarial Transaction Code SPRO In the Determine Work Area: Entry dialog box, in the Plant field, enter 1000, then choose Continue. 3. Choose the New Entries button. 4. Make the following entries: 2. Plant Wage group 1000 1 5. Choose Save. 6. Choose Back. 7. Repeat steps 2 to 6 for the following information: Plant Wage group 1100 1 © SAP AG Page 10 of 72 SAP Best Practices 4.8 142 – Production Planning and Control: Configuration Guide Defining Suitability Use In this menu option, you can define the suitability required in a plant for carrying out certain tasks. In addition, you can determine whether suitability is copied or used as a reference. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Operation Data Define Suitability Menú IMG Producción Datos básicos Hoja de ruta Datos de operación Especificar aptitud Transaction Code SPRO On the Determine Work Area: Entry dialog box, in the Plant field, enter 1000, then choose Continue. 3. Choose the New Entries button. 4. Make the following entries: 2. Plant Suitability 1000 10 1000 20 5. Choose Save. 6. Choose Back. 7. Repeat steps 2 to 6 for the following information: Plnt Suitability 1100 10 1100 20 4.9 Defining Setup Type and Setup Group Use In this step, you define setup. Setup includes: Setup type key: You define the setup type according to plant by using the setup type key. You can print out setup type with shop floor papers. In sequencing, the optimum sequences for setup are determined with the setup type key. Setup group category: The setup group category classifies the setup groups. Setup group categories are plant-dependent. Setup group: The setup group combines operations with the same or similar setup conditions. In capacity levelling, you can optimize the sequence using the setup group. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Operation Data Define Setup Type and Setup Group Menú IMG Producción Datos básicos Hoja de ruta Datos de operación Especificar clase y familia de preparación © SAP AG Page 11 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices OP18 Transaction Code 2. Choose the Setup Type Key button. 3. Choose the New Entries button. 4. Make the following entries: Plant STypeKey Description 1000 1 Setup type 1 1000 2 Setup type 2 1100 1 Setup type 1 1100 2 Setup type 2 5. Choose 6. 7. 8. 9. Choose Back twice. Choose the Setup group category button. Choose the New Entries button. Make the following entries: Plant Setup GrpCategory Description 1000 1 Setup group cat. 1 1000 2 Setup group cat. 2 1100 1 Setup group cat. 1 1100 2 Setup group cat. 2 10. Choose 11. 12. 13. 14. Save. Save. Choose Back. Select the first row you created, then in the Dialog Structure, double-click Setup group key. Choose the New Entries button. Make the following entries: Plant SetpGrpCategory SetupGrp 1000 1 1 1000 1 2 15. Choose Save. 16. Choose Back. 17. Repeat steps 12 to 16 for the following information: Plant SetpGrpCat SetupGrp 1000 2 2 1000 2 3 1100 1 1 1100 1 2 4.10 Defining Type of Standard Value Determination Use The type of standard value calculation specifies how the standard values of an operation are calculated (for example, using CAPP). You define the types of standard value calculation for each plant. © SAP AG Page 12 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Operation Data Define Type of Standard Value Determination Menú IMG Producción Datos básicos Hoja de ruta Datos de operación Definir clase de determinación de valor prefijado Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: Plnt StdVCalc 1000 1 1000 2 1000 3 1100 1 1100 2 1100 3 4. Choose Save. 5. Choose Back. 4.11 Defining Control Key Use In this step, you define the control key of an operation. The control key specifies the business functions you want to carry out with an operation and how the SAP System processes an operation. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Operation Data Define Control Key Menú IMG Producción Datos básicos Hoja de ruta Datos de operación Especificar clave de control Transaction Code OP67 2. Choose the New Entries button. 3. Make the following entries: Control key YBP1 Description No Auto GR , Cost , Sched , Print , Conf Scheduling X Det.Cap. Reqmnts X Aut. goods receipt Print Time Tickets X Print confirmation X © SAP AG Page 13 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Print X Cost X External Processing Confirmations 2 Rework 4. Choose Save. 5. Choose Back. 6. Repeat steps 2 to 5 for the following information: Control key YBP2 YBP3 YB99 YBRW Description No Gr , Cost, Print , Ext Proc, Can Conf Auto Gr,Cost,Prin t,Sched,Con f Dummy operation for Phantoms - No Costs No Auto GR,Cost,Sched,Print ,Conf, Rew Scheduling X X X Det.Cap. Reqmnts X Aut. Goods receipt X Print Time Tickets X X Print confirmation X X Print X X X Cost X X X ExtProc + Confirmations 2 2 Rework X 4.12 Defining Reduction Strategy Use In this step, you specify the reduction strategy to be used when the reduction measures are carried out on operations. Scheduling reduces the lead time automatically if the basic dates given are not adhered to, that is if the scheduled dates lie outside the basic dates. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Operation Data Define Reduction Strategy Menú IMG Producción Datos básicos Hoja de ruta Datos de operación Definir estrategia de reducción Transaction Code OPJS © SAP AG Page 14 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 2. Choose the New Entries button. 3. Make the following entries: Plnt Reduction Strategy Reduction Strategy 1000 01 Reduction strategy 1 1100 01 Reduction strategy 1 4. Choose Save. 5. Choose Back. 6. Select the 1000 row, then in the Dialog Structure, double-click Reduction Levels. RedLevel Red.Queue 1 50 2 100 X 3 100 X X 4 100 X X X Overlap Split 7. Choose Transport Overlap Split Save. 8. Choose Back. 9. Repeat steps 6 to 8 for the following information for the 1100 row: RedLevel Red.Queue Transport 1 50 2 100 X 3 100 X X 4 100 X X X 4.13 Defining Move Time Matrix Use The purpose of this step is to define move time matrix settings. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Work Center General Data Define Move Time Matrix Menú IMG Producción Datos básicos Puesto de trabajo Datos generales Especificar matriz de tiempo de transporte Transaction Code OP30 2. On the Change View “Location Groups”: Overview screen, choose New Entries. 3. Make the following entries: Plnt Loc. group Description 1000 A Location group A 1000 B Location group B 1100 C Location group C 4. Choose Save. 5. Choose Back. © SAP AG Page 15 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 6. On the Change View “Location Groups”: Overview screen, mark the row with the plant and location on the right-hand side of the screen and choose transport time matrix by executing a double click. 7. On the Change View “transport time matrix” overview screen, choose New Entries - F5 button and make the following entries. After entering the settings for the selected plant and location go back twice to the screen Change “transport time matrix”: Overview and choose again New Entries - F5 button if there are several assignments necessary. After assigning all target plants to locations go back to the screen Change View “Location Groups”: Overview and mark the next plant and location on the right-hand side of the screen and choose transport time matrix by executing a double click. 8. Repeat this for all plants and locations from the step before. Plnt Loc. grou p Targ Plnt To loc. Std. move time Min. move time Cal en dar Start Finish 1000 A 1000 B 160,000 MIN 30,000 MIN 1 07:00:00 18:00:0 0 1000 B 1000 B 120,000 MIN 15,000 MIN 1 07:00:00 18:00:0 0 1100 C 1000 A 24,000 H 48,00 H 1 07:00:00 18:00:0 0 4.14 Determining Capacity Planner Use The purpose of this step is to determine a capacity planner. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Capacity Requirements Planning Master Data Capacity data Set up capacity planner Menú IMG Producción Planificación de capacidades Datos maestros Datos de capacidad Definir planificador de capacidad Transaction Code SPRO 2. On the Change View ‘Capacity Planners’: Overview screen, choose New Entries. 3. Make the following entries: Plnnr Description A Planner Group A B Planner Group B C Planner Group C 4. Choose Save. 5. Choose Back. 4.15 Determining Person Responsible Use The purpose of this step is to determine a person responsible. © SAP AG Page 16 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Work Center General Data Determine person responsible Menú IMG Producción Planificación de capacidades Datos maestros Datos de capacidad Especificar responsables Transaction Code SPRO On the Change View “Person Responsible for Work Center”: Overview screen, choose New Entries. 3. Make the following entries: 2. Plnt Pers. Respons. Person responsible for work center 1000 CAP Cap Assembly Supervisor 1000 PCK Packing Supervisor 1000 PEN Pen Assembly Supervisor 1000 PME Plant Maintenance Ele Supervisor 1000 PMM Plant Maintenenance Mech Supervisor 1000 WND Winding Supervisor 1000 001 Sample work center supervisor 4. Choose Save. 5. Choose Back. 4.16 Defining Goods Received Valuation for Order Delivery Use The purpose of this step is to define valuation of goods received. Procedure 1. Access the activity using one of the following navigation options: 2. IMG Menu Production Shop Floor Control Integration Define Valuation of Goods Received Menú IMG Producción Control de planta Integración Fijar valoración de entradas Transaction Code SPRO On the Change View: “Valuation variants for order costing “: Overview screen, make the following entries: Valuation Area Valuation Variant 1000 007 1100 007 © SAP AG Page 17 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices In this Buidling Block we assign a standard valuation variant 007 to the valuation area. The assignment will be changed in CO Buidling Blocks afterwards. 3. Choose Save. 4. Choose Back. 4.17 Define Strategies for Stock Determination Use The purpose of this step is to define strategies for stock determination. The configuration settings are located in MM customizing but required for PP. Procedure 5. Access the activity using one of the following navigation options: 6. IMG Menu EN Materials Management Inventory Management and Physical Inventory Stock Determination Define Strategies for Stock Determination Menú IMG Gestión de materiales Gestión de stocks e inventario Determinación de stocks Definir estrategias para la determinación de stocks Transaction Code OSPX On the Change View: “Stock determination group“: Overview screen, choose in the section for Dialog structure Stock determination group and make the following entries: Plant SDG - Stock Determination group Description 1000 0001 Stock determination group 0001 1100 0001 Stock determination group 0001 7. Choose Save. 8. On the Change View: “Stock determination group“: Overview screen, choose New entries in the section for Dialog structure Stock determination rule and enter the following data: StDR - Stock Determination rule Description 0001 Stock determination rule 0001 9. On the Change View: “Stock determination group“: Overview screen, choose New entries in the section for Dialog structure Stock determination rule and enter the following data: 10. Choose Save. 11. On the Change View: “Stock determination group“: Overview screen, choose New entries in the section for Dialog structure Stock determination Header table and enter the following data: Plant Stock determ. group Stck determation rule Description Sorting – Item table Rank. Ordr Sorting Price Rank.Ordr 1000 0001 0001 Stock determination Select Ascending 1 Select Ascending 2 1100 0001 0001 Stock determination Select Ascending 1 Select Ascending © SAP AG Page 18 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 12. Choose Stock Determination Item Table for each of the entries made above and make the following entries: S -Special stock indicator SLoc – Storage Location Priority Indicator F 1050 1 K 1050 2 13. Choose Save. 14. Choose Back. 5 5.1 Sales and Operations Planning (SOP) Setting Planning Plant for SOP Use The purpose of this step is to set a planning plant for SOP. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Sales & Operation Planning (SOP) Master Data Set planning plant for SOP Menú IMG Producción Planificación global de producción/ventas (SOP) Datos maestros Parametrizar centro de planificación para SOP Transaction Code SPRO 2. Choose the activity Maintain SOP Planning Plant. 3. On the Change View “Plant Table”: Overview screen 4. Make the following entries: Plnt SOP plant 1000 1100 5. Choose Save. 6. Choose Back. 6 6.1 Material Requirements Planning (MRP) Defining Rescheduling Check – MRP Group Use The purpose of this step is to define a rescheduling check. Procedure 1. Access the activity using one of the following navigation options: IMG Menu © SAP AG Production Material Requirements Planning Planning MRP Calculation Define Rescheduling Check Page 19 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 2. Menú IMG Producción Planificación de necesidades Planificación Cálculo necesidades netas Fijar verificación de reprogramación Transaction Code OMDW On the Rescheduling screen, choose MRP group and make the following entries: Plnt MRP Group Rescheduling horizon Tolerance value forward Tolerance value for displacement 1000 0000 000 00 00 1000 0001 000 00 00 1000 0002 000 00 00 1100 0000 000 00 00 1100 0001 000 00 00 1100 0002 000 00 00 3. Choose Save. 4. Choose Back. 6.2 Defining Range of Coverage Profile (Dynamic Safety Stock) Use The purpose of this step is to define range of coverage. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Material Requirements Planning Planning MRP Calculation Define Range of Coverage Profile (Dynamic Safety Stock) Menú IMG Producción Planificación de necesidades Planificación Cálculo necesidades netas Especificar perfil cobertura (stock seguridad dinámico) Transaction Code SPRO 2. On the Change View “Range of coverage profile”: Overview screen, choose New Entries. 3. Make the following entries: Plant 1000 1100 Coverage Profile 001 001 Text 3 days in the next month, then 5 days 3 days in the next month, then 5 days Period ind. M M Determine average requirements - Number of periods 3 3 Type of per.length 1 1 Range of coverage in the first period – target 3 3 © SAP AG Page 20 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Range of coverage in the first period - Number of periods 1 1 Range of coverage in the second period – target 5 5 4. Choose Save. 5. Choose Back. 6.3 Carrying out Overall Maintenance of Plant Parameters Use The purpose of this step is to carry out overall maintenance of plant parameters. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Material Requirements Planning Plant Parameters Carry Out Overall Maintenance of Plant Parameters Menú IMG Producción Planificación de necesidades Parámetros de centro Efectuar actualización total de los parámetros de centro Transaction Code OPPQ 2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Create Plant Parameters dialog box make the following entries: Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants: Plant 1000 1100 4. Choose Maintain. 5. Choose Conversion and in the next screen Planned order production order. 6. Make sure that the following entries have been made: Plnt Production Order Process Order 1000 PP01 PI01 1100 PP01 PI01 7. Save your entries and go back to the previous screen. 8. Choose Planned Order purch. requisition. 9. Make sure that the number of plant orders to be read is 500 for every plant. 10. Save your entries and go back tree times to the Maintain Plant Parameters screen. 11. Choose Reference Plant. 12. Make sure that the same plant is entered for plant 1000 as for the reference plant. No entries need to be made for the other plants. 13. Save your entries and go back to the previous screen. © SAP AG Page 21 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 14. Choose BOM/Routing Selection. 15. Enter 01 in BOM Sel ID for every plant. 16. Save your entries and go back to the previous screen. 17. Choose BOM Explosion. 18. Select the checkbox SOrd/WBS BOM Active only for plant 1000. No entries need to be made for the other plants. 19. Save your entries and go back to the previous screen. 20. Choose Rescheduling in the Maintain Plant Parameters screen. Plnt Resche duling horizon Firmed planned Orders Production Order Fixed Purchase Requisitions PO/SA Schedule LIne QM inspect ion lot Shipping notificatio n 1000 100 X X X X X X 1100 100 X X X X X X 21. Save your entries and go back twice. 22. Choose Direct Procurement in the Maintain Plant Parameters screen: Plnt Direct procuremtn/production Message indicator Acc. Asst unknown: direct procmt 1000 3 X U 1100 3 X U 23. Save your entries and go back to the previous screen. 24. Choose Start in Past in the Maintain Plant Parameters screen: Plnt Start in Past 1000 1100 25. Save your entries and go back to the previous screen. 26. Choose Floats in the Maintain Plant Parameters screen: Plnt Marg. 1000 000 1000 001 1100 000 1100 001 Op. Per. FI Bef. FI After Rel. Per. 10 2 1 5 10 2 1 5 27. Save your entries and go back to the previous screen. 6.4 Carrying out Overall Maintenance of MRP Groups Use The purpose of this step is to create MRP groups and maintain the relevant parameters for these groups. © SAP AG Page 22 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Material Requirements Planning MRP Groups Carry Out Overall Maintenance of MRP Groups Menú IMG Producción Planificación de necesidades Grupos planificación de necesidades Efectuar actualización total de grupos de planificación de necesidades Transaction Code OPPR 2. On the MRP Group screen, enter the relevant plant (see table) and choose Create. 3. In the Create MRP Group dialog box enter the following data. Plant MRP Group Description 1000 0000 External procurement (blank) 1000 0001 In-hse prod. w/o indpt reqmts (initial) 1000 0002 In-house prod. with planned indpt reqmts 1000 0010 Make to Stock Production 1000 0040 Production w. consump. with prel.plan 1000 0052 Production without final assembly 1100 0000 External procurement (blank) 1100 0001 In-hse prod. w/o indpt reqmts (initial) 1100 0002 In-house prod. with planned indpt reqmts 1100 0010 Make to Stock Production 1100 0040 Production w. consump. with prel.plan 1100 0052 Production without final assembly 4. Choose Create and then save your entries. Go back to the previous screen. In the following maintain the parameters for the relevant MRP groups. 5. On the MRP Group screen, enter the relevant plant (see table) and choose Maintain. 6. On the Create Plant Parameters dialog box enter the relevant MRP group (see table) and choose Maintain. Create first the plant parameters for plant 1000 and then for the additional plants. Make the settins according to the table below. The fields from the different areas (pushbuttons are listed in the first column. Plant / Field 1000 1000 1000 1000 1100 1100 1100 1100 MRP Group 0002 0010 0040 0052 0002 0010 0040 0052 10 40 52 10 40 52 Pushbutton: Strategy group Planning Strategy group Pushbutton: Consumption/adjustment Consumption period: backward 30 30 30 30 30 30 30 30 Consumption period: forward 2 2 2 2 2 2 2 2 Consumption mode 2 2 2 2 2 2 2 2 100 100 100 100 100 100 Rescheduling horizon Rescheduling horizon © SAP AG Page 23 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Plant / Field 1000 1000 1000 1000 Tolerance value forward 2 2 Tolerance value for displacent 2 1100 1100 1100 1100 2 2 2 2 2 2 2 2 2 100 100 100 100 100 100 PI01 PI01 PI01 PI01 PI01 PI01 100 100 100 100 100 100 3 3 3 3 3 3 Create Purchase Req. 2 2 2 2 2 2 2 Create MRP list 1 1 1 1 1 1 1 Schedule Lines 2 2 2 2 2 2 2 PP PP PP PP PP Planning horizon Planning horizon Planning Time Fence Planning Time Fence Order Type Process order Safety stock Share of safety stock which can be used for planning Direct Procurement Direct Proc./ Production Creation Indicator Checking Rule for Dependent Requirements Checking Rule PP 7. Save your data and exit the transaction. 6.5 Defining Splitting of Forecast Requirements for MRP Use The purpose of this step is to define splitting of forecast requirements for MRP. Procedure 1. Access the activity using one of the following navigation options: 2. IMG Menu Production Material Requirements Planning Forecast Define Splitting of Forecast Requirements for MRP Menú IMG Producción Planificación de necesidades Pronóstico Fijar reparto de neces.pronóstico para planif.necesidades Transaction Code SPRO On the Change View “Splitting Forecast Requirements”: Overview screen, make the following entries: Plnt Splitting indikatorI Period indicator Period indicator Descr. No.dys No.wks Pds 1000 A M Monthly 1 2 4 1000 A W Weekly 4 1100 A M Monthly 1 © SAP AG 16 2 4 Page 24 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 1100 A W Weekly 4 16 3. Choose Save. 4. Choose Back. 6.6 Defining Order Profile Use In this IMG activity, you define the order profile that specifies the procurement. Procedure 1. Access the activity using one of the following navigation options: 2. IMG Menu Production Material Requirements Planning Procurement Proposals Planned Orders Define Order Profile Menú IMG Producción Planificación de necesidades Propuestas de aprovisionamiento Órdenes previsionales Fijar perfil de orden Transaction Code SPRO Choose the New Entries button. Make the following entries:Object type Order Profile Order type Procurement Type Special Procurement 1 LA LA E E 3. Choose Save. 4. Choose Back. 6.7 Planning Horizon for MRP Group Use In this step, you define the planning horizon. The planning horizon specifies the interval for the planning type, "net change planning in the planning horizon". In this kind of planning run, the system only plans those materials that have undergone a change in the planning horizon that is relevant to MRP. In such cases, the material receives a net change planning indicator in the planning file. You make this specification for a plant. You can determine an alternative planning horizon for the MRP groups. The purpose of this step is to define a planning a planning horizon for the MRP groups. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Materials Management Consumption-Based Planning Planning MRP Calculation Define Planning Horizon Menú IMG Gestión de materiales Planificación de necesidades sobre consumo Planificación Cálculo necesidades netas Especificar horizonte de planificación Transaction Code OMDX 2. On the Planning Horizon screen, choose MRP group. 3. On the Change View “Planning Horizon for MRP” Overview screen, make the following entries: Plnt © SAP AG MRP PlHor Page 25 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide 1000 0000 000 1000 0001 000 1000 0002 000 1100 0000 000 1100 0001 000 1100 0002 000 4. Choose Save. 5. Choose Back. 6.8 Activating Runtime Statistics Use In this step, you define and activate the runtime statistics. These statistics are used to check the runtime of the planning run. For every plant, you can determine: whether a statistic check is to be carried out for which materials an entry should be made in the runtime statistics list during the planning run. An entry is then made for the multiple of this value. An entry in the statistics is made for the multiple of this value. Procedure 1. Access the activity using one of the following navigation options: 2. IMG Menu Materials Management Consumption-Based Planning Planning Activate Runtime Statistics Menú IMG Gestión de materiales Planificación de necesidades sobre consumo Planificación Activar planificación de necesidades Transaction Code SPRO Make the following entries: Plnt Display List Frequency. 1000 001 1100 001 3. Choose Save. 4. Choose Back. 6.9 Defining Number of Planned Orders Use The purpose of this step is to define numbers of planned orders. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Material Requirements Planning Procurement Proposals Conversion of Procurement Proposals Define Conversion of Planned Orders into Purchase Requisitions Menú IMG Producción Planificación de necesidades Propuestas de © SAP AG Page 26 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide aprovisionamiento Conversión de propuestas de aprovisionamiento Fijar conversión órdenes previsionales en solicitud pedido Transaction Code OMDV 2. On the Conversion of Planning Run screen, choose Number of planned orders. 3. On the Change View “Number of Planned Orders”: Overview screen, make the following entries: Plnt Number of planned orders 1000 500 1100 500 4. Choose Save. 5. Choose Back. 6.10 Defining External Procurement per MRP Group Use In this step, you specify default values for externally procured materials which are included in materials planning. You can maintain the GR processing time for purchasing as well as the purchasing group at plant level. The purchasing group maintained here is then taken into account in the planning run, if a purchasing group has been maintained for the material in the master record. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Materials Management Consumption-Based Planning Planning Procurement proposals Define External Procurement Menú IMG Gestión de materiales Planificación de necesidades sobre consumo Planificación Propuestas de aprovisionamiento Fijar aprovisionamiento externo Transaction Code OMDT 2. Choose the MRP group button. 3. On the Change View “External Procurement per MRP Group”: Overview screen, make the following entries: Plnt MRP Group Scheduling: Info/Agreemt DocType Standard DocType DocType Stock purcase order (SPO) Subcontractor transfer (ST) (SC) 1000 0000 1000 0001 1000 0002 1100 0000 1100 0001 1100 0002 4. Choose Save. 5. Choose Back. © SAP AG Page 27 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 6.11 Defining Safety Stock Availability Use In this step, you define the percentage of the safety stock to be available for planning. This function is used to avoid a situation where orders proposals are created unnecessarily by the system to cover small shortage quantities. Procedure 1. Access the activity using one of the following navigation options: 2. IMG Menu Materials Management Consumption-Based Planning Planning MRP Calculation Stocks Define Safety Stock Availability Menú IMG Gestión de materiales Planificación de necesidades sobre consumo Planificación Cálculo necesidades netas Stocks Fijar disponibilidad del stock de seguridad Transaction Code SPRO Make the following entries: Plnt MRP AvSS 1000 0000 000 1000 0001 000 1000 0002 000 1100 0000 000 1100 0001 000 1100 0002 000 3. Choose Save. 4. Choose Back. 6.12 Defining Period Display for Period Totals Use In this step, you specify which periods are to be displayed in the period totals display of the MRP list and the stock/requirements list. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Material Requirements Planning Evaluation Period Totals Define Period Display for Period Totals Menú IMG Producción Planificación de necesidades Evaluación Totales períodos Fijar visualización períodos para totales períodos Transaction Code SPRO 2. Select the 1000 row and choose the Details button. 3. Make the following entries: Days Weeks Months X X X © SAP AG Page 28 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 4. Choose Save. 5. Choose Back. 6. Repeat steps 2 to 5 for 1100: Days Weeks Months X X X 6.13 Reference Plant for Access to Central Master Data Tables Use The reference plant is used to reduce maintenance effort for the following master data: planning calendar planning cycle range of coverage profile rounding profile Using the function reference plant you only need to maintain this master data in one plant (in the reference plant). The other plants that use the same master data only need to refer to the reference plant. In this way, all the master data that has been maintained in the reference plant is automatically available for the assigned plants. Procedure 1. Access the activity using one of the following navigation options: 2. IMG Menu Materials Management Consumption-Based Planning Master Data Reference Plant for Access to Central Master Data Tables Menú IMG Gestión de materiales Planificación de necesidades sobre consumo Datos maestros Centro ref. para acceso a tablas centrales de datos maestros Transaction Code SPRO Make the following entries: Plnt Reference plant 1000 1000 1100 3. Choose Save. 4. Choose Back. 6.14 Checking Storage Mode for MRP List Use In this IMG activity, you can check the storage mode for MRP lists. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Materials Management Consumption-Based Planning Check of performance settings Check Storage Mode for MRP List Menú IMG Gestión de materiales Planificación de necesidades sobre consumo Verificación de opciones de rendimiento © SAP AG Page 29 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Verificar modo almacenamiento lista MRP Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: Plnt Transparent storage: MRP list 1000 Deselect 1100 Deselect 4. Choose Save. 5. Choose Back. 6.15 Defining Receipt Elements for Receipt Days’ Supply Use In this IMG activity, you define which receipt elements are used to calculate receipt days' supplies. The receipt days' supply indicates how many days a material will last. It takes the current plant stock and predefined receipts into consideration. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Materials Management Consumption-Based Planning Evaluation Define Receipt Elements for Receipt Days' Supply Menú IMG Gestión de materiales Planificación de necesidades sobre consumo Evaluación Especificar elementos de entrada para cobertura de entradas Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: Plnt PO/SN/SL QMInsp. Fixed Purch. Req Firm Planned Orders APOrd Receipt Reservations Shipping Safety Notes Stock 1000 X X X X X X X 1100 X X X X X X X 4. Choose Save. 5. Choose Back. 6.16 Parameters for Determining the Basic Dates Use In this step, you can determine per plant, that the system will not automatically switch to forward scheduling in the calculation of the basic dates if the planned start date lies in the past. Procedure 1. Access the activity using one of the following navigation options: IMG Menu © SAP AG Materials Management Consumption-Based Planning Planning Parameters for Determining the Basic Dates Page 30 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 2. Menú IMG Gestión de materiales Planificación de necesidades sobre consumo Planificación Parámetros para determinación de fechas extremas Transaction Code SPRO Make the following entries: Plnt Start in past 1000 1100 3. Choose Save. 4. Choose Back. 6.17 Defining Planning Time Fence and Roll Forward Period Use In this step, you define the planning time fence and the roll forward period. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Material Requirements Planning Planning MRP Calculation Define Planning Time Fence and Roll Forward Period Menú IMG Gestión de materiales Planificación de necesidades sobre consumo Planificación Cálculo necesidades netas Fijar horizonte planific.fijo y horizonte roll forward Transaction Code SPRO 2. Choose the New Entries button. 3. Ensure that the Plan Time Fence and Roll Fwd Period fields are blank: Plnt MRP Group 1000 0000 1000 0001 1000 0002 1100 0000 1100 0001 1100 0002 PlanTime Fence Roll Fwd Period 4. Choose Save. 5. Choose Back. 6.18 Defining Creation Indicator Use On the initial screen for the planning run, you can use creation indicators to determine whether purchase requisitions are always to be created in the planning run or whether they are only to be created in the opening period, or whether schedule lines are to be created, and so on. © SAP AG Page 31 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Material Requirements Planning Consumption-Based Planning Planning Define Creation Indicator Menú IMG Producción Planificación de necesidades Planificación Fijar indicador de creación Transaction Code SPRO 2. Choose the New Entries button. 3. For the following rows, ensure that the Create Purchase Req., Create MRP List, and Schedule Lines fields are blank. To do so, select each row and choose the Details button. Plnt MRP 1000 0000 1000 0001 1000 0002 1100 0000 1100 0001 1100 0002 4. Choose Save. 5. Choose Back. 6.19 Defining Storage Location and Supply Area Determination in BOM Use In this step, you define the strategy the system uses to find the storage location (issue storage location) for the components in BOM explosion, when back flushing and in MRP. This logic is also used in supply area determination. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Repetitive Manufacturing Cross-Process Settings Define Storage Location and Supply Area Determination in BOM Explosion Menú IMG Producción Fabricación repetitiva Parametrizaciones válidas para todos los procesos Especificar determinación almacén y ASP en explosión LMat Transaction Code SPRO 2. Double-click Storage Location Determination for Component Withdrawal. 3. For the following rows, ensure that the PSSel field is blank: Plnt MGr 1000 0000 1000 0001 1000 0002 © SAP AG Page 32 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 1100 0000 1100 0001 1100 0002 4. Choose Save. 5. Choose Back. 6.20 Defining Key for Performance Efficiency Rate Use In this menu option, you define performance efficiency rates. In the SAP system, performance efficiency rates are used in costing and in scheduling. The system uses the performance efficiency rate to correct standard values in the operation to correspond with the actual expected costs. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Work Center Capacity Planning Define key for performance efficiency rate Menú IMG Producción Datos básicos Puesto de trabajo Planificación capacidad Especificar clave grado rendimiento Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: Eff. Description MX1 4. Choose Save. 5. Choose Back. 6. Select the MX1 row, then in the Dialog Structure, double-click Performance efficiency rates and validity. 7. Choose the New Entries button. 8. Make the following entries: Eff. Valid to MX1 31.12.9999 Description Cost. Sched 100 100 9. Choose Save. 10. Choose Back. 6.21 Maintaining Task List Types and Set SET/GET Parameters Use In this step, you assign number ranges previously defined to the respective task list types. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Control Data Maintain Task List Types and Set SET/GET Parameters Menú IMG Producción Datos básicos Hoja de ruta Datos de control Actualizar tipos hoja ruta y configurar parámetros © SAP AG Page 33 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Set/Get SPRO Transaction Code 2. In the Determine Work Area: Entry dialog box, in the Task List Type field, enter N, then choose Continue. 3. Make the following entries: Object name NoRange i NoRange e Document Mat ROUTING_N 01 02 X X 4. Choose Save. 5. Choose Back. 6.22 Defining Profiles with Default Values Use In this step, you define task list profiles. A profile is a collection of default values for task list headers and operations. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing -> Control Data Define Profiles with Default Values Menú IMG Producción Datos básicos Hoja de ruta Datos de control Especificar perfiles con valores propuestos Transaction Code SPRO 2. Choose the Profile/General Data button. 3. Choose the New Entries button. 4. Make the following entries: Appl P Profile 1 Description Routing defaults Predefined Plnt 1000 Usage 1 Stat 4 Unit PC Increment 0010 Base Quantity 100,000 Counter 1 Denominator 1 Crcy EUR Std.val.calcul. 1 Std val.key SAP1 Entry tool X 5. Choose Save. 6. Choose Back. © SAP AG Page 34 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 6.23 Routing Selection – Select Automatically Use In this menu option, you can define selection IDs which identify selection criteria for the automatic selection of routings. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Routing Selection Select Automatically Menú IMG Producción Datos básicos Hoja de ruta Determinación hoja de ruta Seleccionar automáticamente Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: Selection ID Selection Priority (SP) Task List Type Plan Usage Status 01 01 N 1 4 01 02 N 1 2 01 03 R 1 4 01 04 R 1 2 01 05 2 1 4 01 06 2 1 2 01 07 S 1 4 02 01 R 1 4 02 02 R 1 2 03 01 3 1 4 03 02 3 1 2 04 01 2 1 4 04 02 2 1 2 Q1 01 Q 1 4 Y9 01 S 1 4 4. Choose Save. 5. Choose Back. 6.24 Defining Default Values – Task List Selection Use In this step, you specify which data is contained in an operation that is automatically created during order creation. Procedure 1. Access the activity using one of the following navigation options: IMG Menu © SAP AG Production Shop Floor Control Operations Task List Page 35 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Selection Define Default Values Menú IMG Producción Control de planta Operaciones Selección de hoja de ruta Especificar valores propuestos Transaction Code SPRO 2. In the Determine Work Area: Entry dialog box, in the Plant field, enter 1000 and choose Continue. 3. Choose the New Entries button. 4. Make the following entries: Plant Order Control Usage Denominator Counter Base Work Operation Operation type key Quantity center short text 1000 YBM2 YBP1 1 1 100.000 MIXING 0010 5. Choose Save. 6. Choose Back. 7. Repeat steps 3 to 6 for the following information: Plnt Type Ctrl Usage Denom. Counter Base Quantity 1000 YBW1 YBP1 1 1 1 Work ctr Operation short Operation text 100.000 Rework 0010 6.25 Defining Default Values – Control Data for Bills of Material Use In this step, you define the following default values for maintaining bills of material. Procedure 1. Access the activity using one of the following navigation options: 2. IMG Menu Production Basic Data Bill of Material Control Data for Bills of Material Define Default Values Menú IMG Producción Datos básicos Lista de materiales Especificar valores propuestos Transaction Code SPRO Make the following entries: Base quantity BOM Status Size unit Var-size item unit 100.000 01 MM EA 3. Choose Save. 4. Choose Back. 6.26 Defining Order of Priority for BOM Usages Use In this step, you can define different priorities for BOM usages. Procedure 1. Access the activity using one of the following navigation options: IMG Menu © SAP AG Production Basic Data Bill of Material Alternative Page 36 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Determination Define Order of Priority for BOM Usages Menú IMG Producción Datos básicos Lista de materiales Determinación de alternativa Especificar secuencia prioridad de utilizaciones lista materiales Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: SelID SelPr BOM Usg YB 01 Y 4. Choose Save. 5. Choose Back. 6.26.1 Scheduling Planned Orders Use The purpose of this step is to define scheduling parameters for planned orders. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Capacity Requirements Planning Operations Scheduling Define scheduling parameters for planned orders Menú IMG Producción Planificación de capacidades Operaciones Programación Especificar parámetros programación órdenes previsionales Transaction Code OPU5 2. On the Change View “Scheduling planned orders”: Overview screen, choose New Entries. 3. Make the following entries: Field name Values Values Values Values Plnt 1000 1000 1100 1100 Order type * PE * PE ProdScheduler * * * * Sched. Hor.det 550 550 550 550 SellD: Detailed 01 01 01 01 detailed scheduling - Scheduling X X X X detailed scheduling – Generate capacity reqs. X X X X SellD: rate plng 02 02 02 02 Rate-based scheduling Scheduling X X Rate-based scheduling – Generate capacity reqs. X X SellD: roughPlng 03 03 03 03 Sched. level Via detailed scheduling. Via detailed scheduling. Via detailed scheduling. Via detailed scheduling. © SAP AG Page 37 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Adjust dates Adjust basis data, Adjust dep., reqmts to order start Adjust basis data, Adjust dep., reqmts to order start Adjust basis data, Adjust dep., reqmts to order start Adjust basis data, Adjust dep., reqmts to order start For cap. sched. Always basic dates, dep. Reqmts to op. dates Always basic dates, dep. Reqmts to op. dates Always basic dates, dep. Reqmts to op. dates Always basic dates, dep. Reqmts to op. dates Sched. type Back-wards Back-wards Back-wards Back-wards Red. type All oper. In the future will be red. All oper. In the future will be red. All oper. In the future will be red. All oper. In the future will be red. Max. red. level Do not red. Do not red. Do not red. Do not red. 4. Choose Save. 5. Choose Back. 6.26.2 Long Term Planning/ Simulation Use The purpose of this step is to define scheduling parameters for planned orders. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Capacity Requirements Planning Operations Scheduling Define scheduling parameters for planned orders Menú IMG Producción Planificación de capacidades Operaciones Programación Especificar parámetros programación órdenes previsionales Transaction Code OPU5 On the Change View “Scheduling planned orders”: Overview screen, select the entry for 1000, order type *, Prod. Scheduler * and choose Long term planning / simulation. 3. Choose New Entries. 4. Make the following entries: 2. Field name Planning Scenario User action and values User action and values 001 002 Detailed Planning Detailed Planning 01 01 Adjust Dates Adjust basic dates, adjust dep.reqmts to operation date Adjust basic dates, adjust dep.reqmts to operation date For Capacity Scheduling Adjuast basic dates, dep.rqmts to operation dates Adjuast basic dates, dep.rqmts to operation dates 2 - Backwards 2 - Backwards 30 30 0 – Do not reduce 0 – Do not reduce Scheduling Leve SellID LT Plan. Schedulung types Start in Past Maximum Reduction Level © SAP AG Page 38 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide 5. Repeat the steps for for plant 1100, order type *, Prod. Scheduler * . 6. Choose Save. 7. Choose Back. 6.26.3 Configure scheduling parameters SOP 1. Access the activity using one of the following navigation options: IMG Menu Production Sales & Operations Planning (SOP) Functions Resource Planning Configure scheduling parameters Menú IMG Producción Planificación global de producción/ventas (SOP) Funciones Planific.recursos Especificar parámetros de programación Transaction Code OPU4 2. On the Change View “Specify scheduling parameters”: Details, choose New Entries. 3. Make the following entries: Field name Plant Value1 Value 2 1000 1100 * * 01 01 02 02 03 03 Scheduling type 3 3 Automatic log X X ProdScheduler Detailed Scheduling SelID: Detailed Rate based Scheduling SelID: rate plng Rough Cut Scheduling SelID: rough plng Date control for detailed scheduling 4. Choose Save. 5. Choose Back. 6.27 Defining Settings for Variant Selection Use The purpose of this activity is to define the settings for the selection of variants of the Production Order Information System. The settings define which variants can be selected as the basis for the query definition in the Personal Object Worklists (POWL) within the SAP Netweaver Business Client (SAP NWBC) Procedure 1. Access the activity by choosing one of the following navigation options: IMG Menu © SAP AG Integration with other mySAP components Business Packages / Functional Packages Production Scheduler Make Settings for Worklist Specify Settings for Variant Selection for Object Page 39 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Types of Info System Transaction ORPS11 2. On the Change View Settings for Variant Selection: Overview screen, choose New Entries. 3. On the New Entries: Details of Added Entries screen, enter the following values: Field Name Description User action and values Obj. Type PRSP_PRODUCTION_LIST_PP Order Category Production Order List Type Production List 4. Save your entries and go back to the IMG menu. 6.28 Defining Profiles for Order Report Use The purpose of this activity is to define the profile for an order report profile in order to allow Multilevel Delay calculation as the basis query definition in Personal Object Worklists (POWL), within the SAP Netweaver Business Client (SAP NWBC). Procedure 1. Access the activity by choosing one of the following navigation options: IMG Menu Production Material Requirements Planning Evaluation Define Profiles for Order Report Transaction OPPF 2. On the Change View Settings for Order Report Profile – Overview screen, copy the SAP Standard profile SAP000000001 3. On the Maintenance View for Order Report Profile flag the Multilevel Delay Flag. 4. Save your entries and go back to the IMG menu. 6.29 Defining Variant for Range of Coverage Report Use The purpose of this activity is to define a variant for the range of coverage report to allow the evaluation of stock coverage in Personal Object Worklists (POWL) in the SAP Netweaver Business Client (SAP NWBC). Procedure 1. Access the activity using one of the following navigation options: IMG Menu Logistics Production MRP Evaluations Periodic Range-of-Coverage Evaluations Report for Range-ofCoverage Evaluation Transaction MDDS 2. On the Evaln Report Ranges of Cov.: Variants screen choose create variant. 3. On the ABAP: variants popup enter a variant name, e.g. RANGE_COVERAGE and choose create. 4. On the Variants: Change Screen Assignment screen mark For All Selection screens and choose Continue. 5. On the Maintain Variant: Report RMDDSUPLLY01, Variant <your name> screen, enter the following values: © SAP AG Page 40 of 72 SAP Best Practices Field Name 142 – Production Planning and Control: Configuration Guide Description User action and values Plant 1000 Server Group Select a server group via the F4 help 6. Choose Attributes. 7. On the Variant Attributes screen enter a meaning, e.g. Range-of-Coverage Report. 8. Save your entries and go back to the IMG menu. 6.30 Defining Variant for Multilevel Delay Report Use The purpose of this activity is to define a variant for the multilevel delay report to allow the evaluation of sales orders with delay in Personal Object Worklists (POWL) in the SAP Netweaver Business Client (SAP NWBC). Procedure 9. Access the activity using one of the following navigation options: IMG Menu Transaction MDML 10. On the Calculation of Multilev.Delay.: Variants screen choose create variant. 11. On the ABAP: variants popup enter a variant name, e.g. MULTILEVEL_DEL and choose create. 12. On the Variants: Change Screen Assignment screen mark For All Selection screens and choose Continue. 13. On the Maintain Variant: Report RMDMULTILEVELDELAY, Variant <your name> screen, enter the following values: Field Name Description User action and values Plant 1000 Profile for Order Report YSAP00000001 14. Choose Attributes. 15. On the Variant Attributes screen enter a meaning, e.g. Multi-Level-Delay Report. 16. Save your entries and go back to the IMG menu. © SAP AG Page 41 of 72 SAP Best Practices 7 142 – Production Planning and Control: Configuration Guide Shop Floor Control (SFC) 7.1 Defining number ranges for orders Use The purpose of this activity is to define number ranges for production orders. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Shop Floor Control Master Data Order Define number ranges for orders Menú IMG Producción Control de planta Orden Datos maestros Definir rangos de número para órdenes Transaction Code CO82 2. Choose the Intervals button. 3. Choose the Insert Interval button. 4. Make the following entries: Number range number From number To number 01 000001000000 000001999999 04 000002000000 000002999999 05 000000100000 000000199999 08 000000400000 000000499999 10 000000600000 000000699999 11 000000700000 000000799999 14 000003000000 000003999999 15 000004000000 000004999999 16 000005000000 000005999999 17 000006000000 000006999999 5. Choose Save. 6. Choose Back. 7.2 Defining Status Profile Use The purpose of this activity is to define a status profile. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Shop Floor Control Master Data Order Define Status Profile Menú IMG Producción Control de planta Orden Datos maestros Definir esquema de status Transaction Code BS02 © SAP AG Page 42 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 2. Choose the New Entry button. 3. On the New Entry dialog box, enter the following information: StatProf Text Maintenance Language YBPD0001 PP Order status profile EN 4. Choose Continue. 5. Select the YBPD0001 row and choose the Details button. 6. Make the following entries: Status E0001 E0002 7. Choose the button Object Types. 8. Set the flag for PP/PM: order header. 9. Go back to the previous screen and double click the first entry for status E0001. Choose the business transaction Goods receipt for prodn. order. Set the flags „Forbidden“ and „No action“. 10. Repeat step 10 for the second entry. 7.3 Defining Applications Use In this step, you define procedures for the automatic determination of alternative BOMs. Each procedure is represented by an application. This application controls BOM explosion in different areas of the company. For example, different BOM data is relevant to costing than is relevant to work scheduling. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Bill of Material Alternative Determination Define Applications Menú IMG Producción Datos básicos Lista de materiales Determinación de alternativa Definir aplicaciones Transaction Code OS30 2. Choose the New Entries button. 3. Make the following entries: BOM Application YBP1 Description Production Rework - No Original BOM Sel Selection ID YB Alt.det.mult. BOM X Production versions X MRP Explosion X Rel planned orders X Release costing X Rel wk scheduling X Rel Productn orders X 4. Choose © SAP AG Save. Page 43 of 72 SAP Best Practices 5. Choose 7.4 142 – Production Planning and Control: Configuration Guide Back. Settings for Availability Check Use These settings are required for the availaibility check for including batch management. The availaibility check runs automatically during the batch determination. 7.4.1 Define Checking Rule Procedure Define Checking Rule 1. Access the activity using one of the following navigation options: IMG Menu Production Planning for Process Industries Process Order Operations Availability Check Define Checking Rule Menú IMG Planificación de productos industria de procesos Orden de proceso Operaciones Verificación de disponibilidad Definir regla de verificación Transaction SPRO 2. On the Change View Overview screen, choose New entries. 3. On the New Entries: Details of Added Entries screen, enter the following values: Field Description User action and values Checking Rule YP Description BP order check.rule (REL) Checking Rule YO Description BP order check.rule (CRT) 4. Save your entries and go back to the IMG menu. 7.4.2 Define Checking Scope 1. Access the activity using one of the following navigation options: IMG Menu EN Production Planning for Process Industries Process Order Operations Availability Check Define Scope of Check Menú IMG Planificación de productos industria de procesos Orden de proceso Operaciones Verificación de disponibilidad Definir alcance de verificación Transaction OPJJ 2. On the Change View Overview screen, choose New entries. 3. On the New Entries: Details of Added Entries screen, enter the following values: Field Description User action and values Availability Check 02 Checking Rule YP Check without RLT x Include Purchase Orders x © SAP AG Page 44 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Include reservations x Include sales requirements x Include deliveries x Include dependent reservations X Include production orders F 4. Save your entry 5. Maintain as next entry Field Description User action and values Availability Check 02 Checking Rule YO Check without RLT x Include Purchase Orders x Include reservations x Include sales requirements x Include deliveries x Include dependent reservations X Include production orders X No storage location inspection X 6. Save your entry 7. Maintain as next entry Field Description User action and values Availability Check CH Checking Rule YP Check without RLT x Include Purchase Orders x Include reservations x Include sales requirements x Include deliveries x Include dependent reservations X Include production orders F 8. Save your entry 9. Maintain as next entry Field Description User action and values Availability Check CH Checking Rule YO Check without RLT x Include Purchase Orders x Include reservations x © SAP AG Page 45 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Include sales requirements x Include deliveries x Include dependent reservations X Include production orders X No storage location inspection X 10. Maintain as next entry Field Description User action and values Availability Check Y2 Checking Rule YP Check without RLT x Include Purchase Orders x Include reservations x Include sales requirements x Include deliveries x Include dependent reservations X Include production orders F 11. Save your entry 12. Maintain as next entry Field Description User action and values Availability Check Y2 Checking Rule YO Check without RLT x Include Purchase Orders x Include reservations x Include sales requirements x Include deliveries x Include dependent reservations X Include production orders X No storage location inspection X 13. Save your entries 14. Save and go back to the IMG menu. 15. Save your entries 16. Save and go back to the IMG menu. © SAP AG Page 46 of 72 SAP Best Practices 7.5 142 – Production Planning and Control: Configuration Guide Defining Single Screen Entry for Confirmations 7.5.1 Defining Single Screen Entry for Confirmations (DI) Use In this step, you define the single screen entry profile for production order confirmations for discrete manufacturing (MTS / MTO). Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Shop Floor Control Operations Confirmation Define Confirmation Parameters Menú IMG Producción Control de planta Operaciones Notificación Fijar parámetros de notificación Transaction OPK0 2. On the Change View Overview screen, choose enry XXXXX and copy. 3. On the New Entries: Details of Added Entries screen, enter the following values: Field Description User action and values Confirmation Profile YBDI02 Confirmation Profile text Single Entry Processing DI manufacturing 4. On the Area selection screen, enter the following values: Field Description User action and values Header area 0110 Detail Area Line 1 200 Pushbutton Text Line 1 Quantities closed (1) blank Detail Area Line 2 0300 Pushbutton Text Line 2 Activities closed (2) blank Detail Area Line 3 0510 Pushbutton Text Line 3 Prod.Ord. Dates closed (3) X Detail Area Line 4 0800 Pushbutton Text Line 4 Text closed (4) X 5. On the Default screen, enter the following values: Field Description User action and values Confirmation type 1 Automatic final confirmation Post open reservations x Default values quants 1 Immediate proposal Default values services 1 Immediate proposal Service 1 Activity 1 © SAP AG Page 47 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Fix text blanc Service 2 Activity 2 Fix text blanc Service 3 Activity 3 Service 4 Hidden Service 5 Hidden Service 6 Hidden Forecast 1 Forecast 1 Fix text blanc Forecast 2 Forecast 2 Fix text blanc Forecast 3 Forecast 3 Forecast 4 Hidden Forecast 5 Hidden Forecast 6 Hidden 1. Save your entries, set the flag for “Standard profile” for entry YBDI02 2. Save again and go back to the IMG menu. 7.5.2 Defining Single Screen Entry for Confirmations (PI) Use In this step, you define the single screen entry profile for production order confirmations for process manufacturing (MTS). Procedure 6. Access the activity using one of the following navigation options: IMG Menu Production Planning for Process Industries Process Order Operations Confirmation Single Screen Entry Define Single Screen Entry Menú IMG Planificación de productos industria de procesos Orden de proceso Operaciones Notificación Entrada imagen individual Definir entrada imagen individual Transaction OPK1 7. On the Change View Overview screen, choose enry SAP101 and copy. 8. On the New Entries: Details of Added Entries screen, enter the following values: Field Description User action and values Confirmation Profile YBPI01 Confirmation Profile text Single Entry Processing COR6N 9. On the Area selection screen, enter the following values: Field © SAP AG Description User action and values Page 48 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Header area 5117 Order / Phase/ Resourcew Detail Area Line 1 0215 Quantities: yield/scrap/reason/display Pushbutton Text Line 1 Quantities closed (1) blank Detail Area Line 2 0310 Activities: activity 1 – activity 6 (table control) Pushbutton Text Line 2 Times closed (2) blank Detail Area Line 3 5510 Dates: All Dates for Process Order Pushbutton Text Line 3 Process Order Dates closed (3) x 10. On the Default screen, enter the following values: Field Description User action and values Confirmation type 1 Automatic final confirmation Post open reservations x Default values quants 1 Immediate proposal Default values services 1 Immediate proposal Service 1 machine time Fix text x Service 2 labor time Fix text x Service 3 hidden x Service 4 hidden x Service 5 hidden x Service 6 hidden x 3. Save your entries, set the flag for “Standard profile” for entry YBPI01 4. Save again and go back to the IMG menu. © SAP AG Page 49 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 8 Rework 8.1 Maintain Catalogs 8.1.1 Maintaining Catalogs – Catalog Types Use In this section, you define the contents of the notifications while also taking the next step into consideration (defining the catalog profiles). Procedure 1. Access the activity using one of the following navigation options: IMG Menu Quality Management Quality Notifications Notification Creation Notification Content Maintain Catalogs Menú IMG Gestión de calidad Aviso de calidad Apertura de aviso Contenido del aviso Actualizar catálogo Transaction Code QS41 2. Double-click Define Catalogs. 3. Choose the New Entries button. 4. Make the following entries: Catalog Short text Selected sets allowed S BL Coding for Production X 5. Choose Save. 6. Choose Back. 8.1.2 Maintain Catalogs – Codes Use In this section, you define the codes for the catalogs. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Quality Management Quality Notifications Notification Creation Notification Content Maintain Catalogs Menú IMG Gestión de calidad Aviso de calidad Apertura de aviso Contenido del aviso Actualizar catálogo Transaction Code SPRO 2. Double-click Edit Catalogs. 3. On the Edit Catalog: Initial Screen enter the Catalog 2 and choose Enter. 4. On the Change View “Code groups”: Overview screen choose New Entries and make the following entries: Code groups Short text Status of code group QM-G3 General Task for Internal Notification 2 – Released 5. Select the code group and choose Codes. 6. Make the following entries: Code © SAP AG Short text for Code Page 50 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Z001 R2R Component Scrap Z002 R2R Insert Rework Operation Z003 R2R Confirm Parent Rework Z004 R2R Send Email 7. Save your entries. 8.1.3 Defining Catalog Profiles Use In this step, you define the catalog profiles for notifications. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Quality Notifications Notification Creation Notification Content Define Catalog Profile Menú IMG Gestión de calidad Aviso de calidad Apertura de aviso Contenido del aviso Definir esquema de informe Transaction Code SPRO 2. Double-click Define Catalog Profile. 3. Choose the New Entries button. 4. Make the following entries: Cat.Prof. Catalog profile Message type ZQM000001 Cat. prof R2R Q Notifns E 5. Choose Save. 6. Choose Back. 8.2 Notification 8.3 Defining Number Ranges Use The purpose of this activity is to define number ranges for notifications. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Cross-Application Components Notification Notification Creation Notification Type Define Number Ranges Menú IMG Componentes multiaplicaciones Mensaje Apertura de aviso Clase de aviso Especificar rangos de números Transaction Code SPRO 2. Choose the Intervals button. 3. Choose the Insert Interval button. 4. Make the following entries: Number range number From number To number 02 000200000000 000299999999 5. Choose © SAP AG Save. Page 51 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 6. Choose 8.4 Back. Defining Notification Types Use In this step, you define the quality notification types. Each notification type has a reference to a notification category and an origin. The category of a notification is fixed, based on the origin of the notification. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Quality Management Quality Notifications Notification Creation Notification Notification Types Types Define Menú IMG Gestión de calidad Aviso de calidad Apertura de aviso Clase de aviso Definir clases de aviso Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: Notification Notification Notif. Notification Type type description Cat. Origin ZC Prod. Compnt Rework 4. Choose 02 Catalog Profile Update group (Stats) Internal problem ZQM000001 000034 message Number Range 02 Save. 5. Choose Back. 6. Repeat steps 2 to 5 for the following information: Notification Notification Notif. Notification Type type description Cat. Origin ZI 8.5 Prod. Parent Rework 02 Catalog Profile Internal problem ZQM000001 message Update group (Stats) Number Range 02 Defining Screen Templates 8.5.1 Simplified View: Screen Areas Use In this step, you structure the screen templates you want to use for quality notifications. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Cross-Application Components Notification Notification Creation Notification Type Define Screen Templates Menú IMG Componentes multiaplicaciones Mensaje Apertura de aviso Clase de aviso Especificar máscaras de imagen en pantalla Transaction Code SPRO © SAP AG Page 52 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 2. Double-click Define Screen Areas and Tabs. 3. Select the ZC row and in the Dialog Structure, double-click Simplified View: Screen Areas. 4. Choose the New Entries button. 5. Make the following entries: Notification Notification Tab type category Screen Screen area 1 area 2 Screen Screen Screen area 5 area 3 area 4 ZC 02 031 040 6. Choose Save. 00 005 010 037 7. Choose Back twice. 8. Repeat steps 3 to 7 for the ZI row: Notification type Notification category Tab Screen area 1 Screen area 2 Screen area 3 Screen area 4 ZI 02 00 005 015 016 0017 8.5.2 Notification Header and Screen Areas Use In this step, you define the Notification Header and Screen Areas. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Quality Management Quality Notifications Overview of Notification Type Menú IMG Gestión de calidad Aviso de calidad Resumen de clase de aviso Transaction Code SPRO 2. Select the ZC row and in the Dialog Structure, double-click Screen Areas in Notification Header 3. Make the following entries: Notification Type Screen type Header Screen type Object Customer screen area ZC H500 O520 101 4. Choose Save. 5. Choose Back. 6. Select the ZI row and in the Dialog Structure, double-click Screen Areas in Notification Header 7. Make the following entries: Notification Type Screen type Header Screen type Object Customer screen area ZI H500 O520 101 8. Choose Save. 9. Choose Back. © SAP AG Page 53 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide 8.5.3 Extended View: Tabstrips and Screen Use In this step, you define the Tabstrips and the Screen Areas. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Quality Management Quality Notifications Overview of Notification Type Menú IMG Gestión de calidad Aviso de calidad Resumen de clase de aviso Transaction Code SPRO 2. Select the ZC row and in the Dialog Structure, double-click Screen Structure for extended View 3. Select 10\Tab02 and double-click 4. Make the following entries: Notification Type Tab. ZC 10\TAB02 Quantities/MRP Controller 5. Choose Tab header Tab. Screen area X 90 Save. 6. Choose Back. 7. Repeat steps 3 to 6 for the following Tab: 10\Tab04, 10\Tab13, 10\Tab14 and 10\Tab15 Notification Tab. Type Tab. ZC 10\TAB04 X ZC 10\TAB013 X ZC 10\TAB14 X ZC 10\TAB15 X 8. Choose 9. 10. 11. 12. Tab header Screen area Save. Choose Back twice Select the ZI row and in the Dialog Structure, double-click Screen Structure for extended View Select the Tabs in the Register and double-click Make the following entries: Notification Tab. Type Tab header Tab. Screen area 90 ZI 10\TAB02 Quantities/MRP Controller X ZI 10\TAB04 X ZI 10\TAB013 X ZI 10\TAB14 X ZI 10\TAB15 X 13. Choose Save. 14. Choose Back twice © SAP AG Page 54 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 8.6 Defining Action Box 8.6.1 Notification Types Use In this step, you define additional functions (activities) that can be performed during the processing of a notification. You define these functions using a key and an identifier and they are assigned to a notification type. The follow-up functions appear in a separate screen section (action box) in the header, when you process notifications. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Cross-Application Components Notification Notification Processing Additional Notification Functions Define Action Box Menú IMG Componentes multiaplicaciones Mensaje Tratamiento de avisos Funciones de aviso adicionales Definir barra de actividades Transaction Code SPRO 2. Double-click Define Functions for the Action Box. 3. Select the ZC row, then choose the Details button. 4. Make the following entries: Typ Notification Notification Cat.Prof. type type ZC Prod. Compnt Rework 5. Choose 02 Coding Problems Causes Tasks Activities Object Parts ZQM000001 S 9 5 2 8 B Save. 6. Choose Back. 7. Repeat steps 3 to 7 for the ZI row. Typ Notification Notification Cat.Prof. type type 02 ZI Prod. Compnt Rework Coding Problems Causes Tasks Activities Object Parts ZQM000001 S 9 5 2 8 B 8.6.2 Activities Procedure 1. Access the activity using one of the following navigation options: IMG Menu Cross-Application Components Notification Notification Processing Additional Notification Functions Define Action Box Menú IMG Componentes multiaplicaciones Mensaje Tratamiento de avisos Funciones de aviso adicionales Definir barra de actividades Transaction Code SPRO 2. Double-click Define Functions for the Action Box. 3. Select the ZC row and in the Dialog Structure, double-click Activities. © SAP AG Page 55 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 4. Choose the New Entries button. 5. Make the following entries: Typ FK Function Sort Usage Text Num ber And Documentation Function module IC Quickinfo Code Code RC Grp Com pl. ZC 0200 Create 200 Compone nt Rework Orde Any view Notification As task (create, and task change, display) ZQM06_FM_ ICON_ Create RWK_ORDE CREAT R_CREATE_ E IM QM-G3 0006 X ZC 0205 Change 205 Rework Order for Co Any view Notification As task (create, and task change, display) ZQM06_FM_ ICON_ Change TASK_RWK_ CHAN ORDER_CH GE ANGE QM-G3 0006 X ZC 0210 Scrap 210 Compone nt from stock Any view Notification As task (create, and task change, display) ZQM06_CO ICON_ Scrap MPONENT_ DELET SCRAP E QM-G3 Z001 X ZC 0250 Send email Any view Notification As task (create, and task change, display) QM06_FM_T ICON_ Send email QM-G3 Z004 ASK_SEND_ CREAT PAPER_ATT E ACH X 6. Choose 250 Save. 7. Choose Back. 8. Repeat steps 3 to 7 for the following information for the ZI row: Typ FK Function Sort Usage Text Num ber And Documentation Function module IC Quickinfo Code Grp Code RC Com pl. ZI 110 Insert 110 Rework Operation Any view Notification As task (create, and task change, display) ZQM06_FM_ ICON_ Insert TASK_INSE CHAN RT_OPERAT GE ION QM-G3 Z002 X ZI 115 Confirm 115 Parent Order Any view Notification As task (create, and task change, display) ZQM06_PAR ICON_ Confirm ENT_CONFI TRANS RMATION FER QM-G3 Z003 X ZI 120 Create PP Rework Order 120 Any view Notification As task (create, and task change, display) ZQM06_FM_ ICON_ Create TASK_RWK_ CREAT ORDER_CR E EATE QM-G3 0006 X ZI 140 Change 140 PP Rework Order Any view Notification As task (create, and task change, display) ZQM06_FM_ ICON_ Change TASK_RWK_ CHAN ORDER_CH GE ANGE QM-G3 0006 X ZI 150 Scrap 150 Parent Material Any view Notification As task (create, and task change, display) ZQM06_PAR ICON_ Scrap ENT_SCRAP DELET E QM-G3 Z001 X ZI 160 Send email Any view Notification As task (create, and task change, display) QM06_FM_T ICON_ Send email QM-G3 Z004 ASK_SEND_ CREAT PAPER_ATT E ACH X 160 8.6.3 Dependent Follow-up Functions Procedure 1. Access the activity using one of the following navigation options: IMG Menu © SAP AG Cross-Application Components Notification Notification Processing Additional Notification Functions Define Page 56 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Action Box Menú IMG Componentes multiaplicaciones Mensaje Tratamiento de avisos Funciones de aviso adicionales Definir barra de actividades Transaction Code SPRO 2. Double-click Define Functions for the Action Box. 3. Select the ZI row and in the Dialog Structure, double-click Activities. 4. Select the ZI row with FK of 120 and in the Dialog Structure, double-click Dependent Follow-Up Functions 5. Choose the New Entries button. 6. Make the following entries: Typ Funktion FK ZI 120 120 7. Choose Save. 8. Choose Back. 8.7 Extended View: Tabstrips and Screen Procedure 1. Access the activity using one of the following navigation options: IMG Menu Cross-Application Components Notification Notification Type Define Screen Templates Menú IMG Componentes multiaplicaciones Mensaje Apertura de aviso Clase de aviso Especificar máscaras de imagen en pantalla Transaction Code SPRO 2. Double-click Define Screen Areas and Tabs 3. Select the ZC row and in the Dialog Structure, double-click Extended View: Tabstrips and Screen Areas. 4. Select the 10\TAB 01 and double-click 5. Choose the New Entries button. 6. Make the following entries: Typ Notification Tab Category ZC 02 7. Choose Tab 10\TAB01 X Screen area 1 Screen area 2 Screen area 3 005 050 031 Screen area 4 Save. 8. Choose Back twice. 9. Select the ZI row and in the Dialog Structure, double-click Extended View: Tabstrips and Screen Areas. 10. Select the 10\TAB 01 and double-click 11. Choose the New Entries button. 12. Make the following entries: Typ Notification Tab Category header ZI 02 13. Choose © SAP AG Tab Tab Reference 10\TAB01 X Object Screen area 1 Screen area 2 Screen area 3 Screen area 4 005 040 050 031 Save. Page 57 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 14. Choose 8.8 Back twice. Defining Priorities Use In this step, you define the priorities for the notifications. You can define different priority types and assign a priority type to each notification type. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Cross-Application Components Notification Notification Processing Response Control Define Priorities Menú IMG Componentes multiaplicaciones Mensaje Tratamiento de avisos Supervisión de respuestas Definir prioridad Transaction Code SPRO 2. Double-click Priority Types. 3. Choose the New Entries button. 4. Make the following entries: PrTyp PrioType ZQ Rework 5. Choose 6. 7. 8. 9. Choose Back twice. Double-click Priorities by Priority Type. Choose the New Entries button. Make the following entries: PrTyp Prior. Rel.start Rel.end Priority text EDUn. ZQ 1 00 01 1-Very high D 10. Choose 11. 12. 13. 14. Save. Save. Choose Back twice. Double-click Priority Type for Notification Type. Select the ZC row, then choose the Details button. Make the following entries: Typ Notification type Cat Priority Type ZC Prod. Compnt Rework 02 ZQ 15. Choose Save. 16. Choose Back. 17. Repeat steps 13 to 16 for the ZI row: Typ Notification type Cat Priority Type ZI Prod. Parent Rework 02 ZQ © SAP AG Page 58 of 72 SAP Best Practices 9 142 – Production Planning and Control: Configuration Guide PP/PP-PI order settings 9.1 Copying All SAP Standard Settings for Process Management This activity is used for Lean Scope and is also required for Full Scope. 9.1.1 Getting Standard PI Characteristics from Client 000 Use The purpose of this activity is to copy standard PI characteristics from client 000. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Planning for Process Industries Process Management Standard Settings Transport Predefined Characteristics Menú IMG Planificación de productos industria de procesos Coordinación de procesos Parametrizaciones estándar Transferir características predefinidas Transaction Code O23C 2. Execute the activity and check the information message on the Copy Texts Between Clients screen. 3. Choose Back (F3) twice. Result The standard PI characteristics were copied from client 000. 9.1.2 Copying Material ID Characteristics from Client 000 Use The purpose of this activity is to copy material ID characteristics from client 000. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Logistics - General Handling Unit Management Basics Production Production Supply Copy Predefined Characteristics for Material Identification Menú IMG Logística en general Gestión de unidades de manipulación Bases Producción Suministro de producción Tomar características predefinidas para identificación de material Transaction Code O23C_VHUMI 2. Execute the activity and check the information message on the Copy Client-Specific Tables from a Client screen. 3. Choose Back (F3). Result The material ID characteristics have been copied from client 000. © SAP AG Page 59 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide 9.1.3 Copying Standard Settings for Process Messages Use The purpose of this activity is to copy standard settings for process messages. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Planning for Process Industries Process Management Standard Settings Transport Predefined Categories Menú IMG Planificación de productos industria de procesos Coordinación de procesos Parametrizaciones estándar Tomar clases de mensaje de proceso predefinidas Transaction Code O22C 2. On the Copy SAP Standard Settings for Process Messages screen enter the target plant (for example, BP01) in the Target plant field and choose Execute. 3. Choose Back (F3). Result The standard settings for process messages have been copied. 9.1.4 Copying Message Categories Use The purpose of this activity is to copy standard settings for process messages. Procedure 1. Access the activity using one of the following navigation options: Transaction Code O22C_VHUMI IMG Menu 2. On the Adopt Message Types for Material Identification/Balancing screen enter the target plant (for example, BP01) in the To plant field and choose Execute. 3. On the Copy Standard Subsets for Process Messages choose Copy (F5). 4. Confirm the message on the Copy Settings screen. 5. Choose Back (F3). Result The standard settings for process messages have been copied. 9.1.5 Transferring Predefined Characteristics Use The purpose of this activity is to transfer predefined characteristics. Procedure 1. Access the activity using one of the following navigation options: IMG Menu © SAP AG Production Planning for Process Industries Process Management Standard Settings Transfer Predefined Characteristics Page 60 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Menú IMG Planificación de productos industria de procesos Coordinación de procesos Parametrizaciones estándar Transferir características predefinidas Transaction Code RMXT_IMG01 2. Choose Execute (F8). 3. Choose Back (F3). Result The process destinations have been copied between plants. 9.1.6 Copying Process Destinations between Plants Use The purpose of this activity is to copy process destinations between plants. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Planning for Process Industries Process Management Tools Copy Settings Between Plants Menú IMG Planificación de productos industria de procesos Coordinación de procesos Herramientas Copiar parametrizaciones entre centros Transaction Code O20C 2. On the Settings for Process Management: Copy between Plants screen enter the source plant in the Copy from plant field and enter the target plant in the to plant field. 3. Select all objects indicated and choose Execute (F8). 4. On the following Settings for Process Management: Copy between Plants screen select Select all (F5) and Copy (F7). 5. Choose Back (F3). Result The process destinations have been copied between plants. 9.2 Basic Data Settings This chapter contains generic settings for basic data used in the area of process manufacturing. 9.2.1 Defining Standard Value Key Definition Use Via standard value key you determine which parameters and types of activities are to be measured within production Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Work Center General Data Standard Value Define standard value key Menú IMG Producción Datos básicos Puesto de trabajo Datos generales Valor prefijado Especificar clave para valor prefijado Transaction OP19 © SAP AG Page 61 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 2. On the Change View Overview screen, select New entries. 3. On the New Entries: Details of Added Entries screen, enter the following values: Field Description User action and values Standard Value Key YBP1 Description BP: Value key for Process Industry Parameter 1 SAP_02 Parameter 2 SAP_03 generate x 4. Save your entries and go back to the IMG menu. 9.2.2 Defining Formulas Use One formula can be used altogether for calculation, scheduling, capacity requirements and costing, using the parameters given with the standard value key setting. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Planning for Process Industries Master Data Resource Capacity Requirements Planning Formulas for Resources (Work Centers) Define Formulas for Resources (Work Centers) Menú IMG Planificación de productos industria de procesos Datos maestros Recurso Planificación de capacidad Fórmulas recursos (puesto trabajo) Instalar definición fórmula recurso (puesto de trabajo) Transaction OP21 2. On the Change View Overview screen, choose New entries. 3. On the New Entries: Details of Added Entries screen, enter the following values: Field Description User action and values Formula YBPI01 Description BP: Machine time Value SAP_02 * SAP_09 / SAP_08 / SAP_11 generate x allowed for calculation x work center for capacity requirements x allowed for scheduling x 4. Continue with the 2nd new entry: Field Description User action and values Formula YBPI02 Description BP: Labor time © SAP AG Page 62 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Value SAP_03 * SAP_09 / SAP_08 / SAP_11 generate x allowed for calculation x work center for capacity requirements x allowed for scheduling x 5. Save your entries and go back to the IMG menu. 9.2.3 Defining Control Key Use Determines confirmation type. A new entry is required to trigger milestone confirmation within process industry. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Operation Data Define Control Key Menú IMG Producción Datos básicos Hoja de ruta Datos de operación Especificar clave de control Transaction OP00 2. On the Change View Overview screen, choose New entries. 3. On the New Entries: Details of Added Entries screen, enter the following values: Field Description User action and values Control Key YBP4 Description Process manufacturing milestone Scheduling X Det. Cap. Reqmnts X Cost X Confirmations 1 (Milestone confirmation (not PS/PM) 4. Save your entries and go back to the IMG menu. 9.2.4 Defining Standard Value Descriptions Use Allows to use the descriptions of standard values in operation overviews of process orders and process order confirmations. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Basic Data Routing Control Data Define Standard Value Descriptions in Operation Overviews Menú IMG Producción Datos básicos Hoja de ruta Datos de control Especificar denominación valores prefijados en resúmenes © SAP AG Page 63 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide operación Transaction SPRO 2. Select plan type 2 (master recipe) as working area. 3. choose New entries. 4. On the New Entries: Details of Added Entries screen, enter the following values: Field Description User action and values Language DE 1st Standard value text Maschine 2nd Standard value text Personal Language EN 1st Standard value text machine 2nd Standard value text labor 5. Save your entries and go back to the IMG menu. 10 Capacity Planning 10.1 Creating Capacity Planning Profile 10.1.1 Defining Selection Set Use In this step you define the sets for the Capacity Planning Profile. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Capacity Requirements Planning Evaluation Selection Set Define Sets Menú IMG Producción Planificación de capacidades Set de selección Definir sets Transaction Code SPRO 2. In the Choose Activity dialog box choose Create set. 3. Create the following selection set: ZLTP_SEL01, select the Multi Set flag and choose the button Basic entries. 4. On the Create Set: Values screen enter the description LTP: Selection set and then the following Set identifications. Set Identifcation 5KPLSCNV 5KARBPLV 5KPLANRV 5KWERKSV 5. Choose Enter and save your entries. 10.1.2 Defining Selection Profile Use In this step you define selection profiles. A selection profile defines the sets used to generate the various selection screens. © SAP AG Page 64 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Capacity Requirements Planning Evaluation Profiles Define Selection Profiles Menú IMG Producción Planificación de capacidades Evaluación Perfiles Fijar perfiles de selección Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: Sel. profile YBPLNSCR1 Description Access with plan.scenario and routing Work center set 5KARBPL1 Order set 5KAUFTR1 Capacity cat. set 5KKAPAR1 Initial set YBLTP_SEL1 Type of date specificatn. J Start date 2- Finish date 24 Scheduling level 1 Work orders X Planned orders X 4. Choose Save. 5. Choose Back. 10.1.3 Defining Options Profiles Use In this step you define option profiles. They determine some essential characteristics of the lists and graphics. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Capacity Requirements Planning Evaluation Profiles Define Option Profiles Menú IMG Producción Planificación de capacidades Evaluación Perfiles Fijar perfiles de parametrización Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: Option profile YBLTP24 Text Months (24) Cumulate over periods Selected Reymnts type 2 © SAP AG Page 65 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices Starte date 0 Entry type J Finish date 24 BacklogDispDate 0 Entry type J Period type D Period duration 1 From work center / operation selected Distribution SAP060 Int. distr. SAP060 Work center 1 Planned order 1 Production order 1 4. Save your option profile. 10.1.4 Defining List Profiles Use In this step you create the list profiles which define how the detailed capacity list and the variable overview are to be set up. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Capacity Requirements Planning Evaluation Profiles Define list profiles Menú IMG Producción Planificación de capacidades Evaluación Perfiles Fijar perfiles de listas Transaction Code SPRO 2. On the Change View “List Profile”: Overview screen that appears, choose New Entries. 3. On the New Entries: Details of Added Entries screen make the following entries: List profile YBLTPLST1 Description LTP List Detailed capacity list SAPDETC0 Default overview 0 Variable Overview SAP010 4. Save your entries. 10.1.5 Defining Overall Profile Use In this step you define the overall profile which contains the different individual profiles. Procedure 1. Access the activity using one of the following navigation options: IMG Menu © SAP AG Production Capacity Requirements Planning Evaluation Page 66 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide Profiles Define overall profiles Menú IMG Producción Planificación de capacidades Evaluación Perfiles Fijar perfiles generales Transaction Code SPRO 2. On the Change View “Overall Profile”: Overview screen that appears, choose New Entries. 3. On the New Entries: Details of Added Entries screen make the following entries: Overall profile YBLTP01 Description LTP: Capacity requirements for AOP Sel. Profile YBPLNSCR1 Option profile YBLTP24 List profile YBLTPLST1 Graph. profile SAPD030 4. Save your entries. 11 Repetitive Manufacturing 11.1 Defining Control Data for Pull List Use This step contains all the information needed to define control data for the Pull List. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Repetitive Manufacturing Material Staging Define Control Data for Pull List Menú IMG Producción Fabricación repetitiva Puesta a disposición de material Especificar dat.control p.lista puesta disposición material Transaction Code SPRO 2. On the Change View “Pull List Control”: Overview screen that appears, choose New Entries. 3. Make the following entries: Plant Movement Type Stock Determination Group Search Procedure 1000 311 0001 YB0001 Result After performing this activity the necessary settings for control data for pull list are made. 11.2 Defining Generation of Cost Log Use In this step, you control whether a costs log is created in repetitive manufacturing when backflushing activities. © SAP AG Page 67 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices This activity is used for Lean Scope and is also required for Full Scope. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Repetitive Manufacturing Cost Object Controlling -> Define Generation of Cost Log Menú IMG Producción Fabricación repetitiva Contabilidad de objetos de coste Especificar generación del log de costes Transaction Code SPRO 2. Choose the New Entries button. 3. Make the following entries: Plnt Name 1 Log 1000 Production Plant X 1100 Distribution Center X 4. Choose Save. 5. Choose Back. 11.3 Planning Use In this step, you define the parameters for planning the sequence of planned orders. This activity is used for Lean Scope and is also required for Full Scope. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Repetitive Manufacturing Planning Sequencing Planning Menú IMG Producción Fabricación repetitiva Planificación Planificación de secuencia Planificación Transaction Code SPRO 2. Select the Standard profile SAP_STD and choose Planning profile. 3. Choose the New Entries button. 4. Make the following entries: Plng profile Plnt Dispatch period Medium-term planning period Process. profile SAP_STD SAP_STD 5. Choose 1000 1 0 Save. 6. Choose Back. 7. Repeat steps 3 to 5 for the following information: Plng profile Plnt Dispatch period Medium-term planning period Process. profile SAP_STD SAP_STD 1100 1 0 8. Save your entries. © SAP AG Page 68 of 72 142 – Production Planning and Control: Configuration Guide SAP Best Practices 12 Individual BC Sets/ Manual Steps 12.1 Defining Parallel Processing in MRP (moved to 104) Use The purpose of this activity is to define parallel process in MRP. Procedure 1. Access the activity using one of the following navigation options: IMG Menu Production Material Requirements Planning Define Parallel Processing in MRP Menú IMG Producción Planificación de necesidades Especificar tratamiento paralelo en planificación de necesidades Transaction Code SPRO On the Change View ”Destinations for Parallel Processing“: Overview screen, choose New Entries. 3. On the screen New entries: Overview of Added Entries, make the following entries: 2. Field Value Destinat. for parallel processing for example, <PWDF0505_SD7_22> No. of sessions 1 The value of Destinat. for parallel process must include a different value in a different server, if this value is determined by other Customizing steps. In this project, choose PWDF0505_SD7_22. You can use the input help to select the corresponding value. 4. Choose Save and go back. Result You have made the required settings for parallel processing for MRP. 12.2 Activating Batch Management at Material Level Use This activity will ensure batch management is active at material level and that Batch Status Management is active. Procedure 1. Access the transaction using the following method IMG Menu Logistics - General Batch Management Specify Batch Level and Activate Status Management Menú IMG Logística en general Gestión de lotes Determinar nivel de lote y activar gestión de estados Transaction code OMCT or alternatively SPRO 2. On the Batch definition screen, choose Batch Status Management 3. Choose Batch Status Management not active 4. Choose Back 5. Choose Batch Level. © SAP AG Page 69 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide 6. On the Define Batch Level screen, select Batch unique at material level. 7. Choose Save. 8. Choose Back. 13 Evaluation 13.1 Defining Profiles for Order Report Use The purpose of this activity is to define the profile for an order report profile to allow Multilevel Delay calculation as basis query definition in Personal Object Worklists (POWL) in the SAP Netweaver Business Client (SAP NWBC). Procedure 5. Access the activity using one of the following navigation options: IMG Menu Production Material Requirements Planning Evaluation Define Profiles for Order Report Transaction OPPF 6. On the Change View Settings for Order Report Profile – Overview screen, copy the SAP Standard profile SAP000000001 7. Overwrite the profile name SAP000000001 with YSAP00000001. 8. On the Maintenance View for Order Report Profile flag the Multilevel Delay Flag. 9. Save your entries and go back to the IMG menu. 13.2 Defining Settings for Variant Selection Use The purpose of this activity is to define the settings for variant selection of the Production Order Information System. The settings define which variants can be selected as basis for the query definition in Personal Object Worklists (POWL) in the SAP Netweaver Business Client (SAP NWBC) Procedure 5. Access the activity using one of the following navigation options: IMG Menu Integration with other mySAP components Business Packages / Functional Packages Production Scheduler Make Settings for Worklist Specify Settings for Variant Selection for Object Types of Info System Transaction ORPS11 6. On the Change View Settings for Variant Selection: Overview screen, choose New Entries. 7. On the New Entries: Details of Added Entries screen, enter the following values: Field Name Description User action and values Obj. Type PRSP_PRODUCTION_LIST_PP Order Category Production Order List Type Production List 8. Save your entries and go back to the IMG menu. © SAP AG Page 70 of 72 SAP Best Practices 142 – Production Planning and Control: Configuration Guide 13.3 Defining Variant for Range of Coverage Report Use The purpose of this activity is to define a variant for the range of coverage report to allow the evaluation of stock coverage in Personal Object Worklists (POWL) in the SAP Netweaver Business Client (SAP NWBC). Procedure 17. Access the activity using one of the following navigation options: IMG Menu Logistics Production MRP Evaluations Periodic Range-of-Coverage Evaluations Report for Range-ofCoverage Evaluation Transaction MDDS 18. On the Evaln Report Ranges of Cov.: Variants screen choose create variant. 19. On the ABAP: variants popup enter a variant name, e.g. RANGE_COVERAGE and choose create. 20. On the Variants: Change Screen Assignment screen mark For All Selection screens and choose Continue. 21. On the Maintain Variant: Report RMDDSUPLLY01, Variant <your name> screen, enter the following values: Field Name Description User action and values Plant 1000 Server Group Select a server group via the F4 help 22. Choose Attributes. 23. On the Variant Attributes screen enter a meaning, e.g. Range-of-Coverage Report. 24. Save your entries and go back to the IMG menu. 13.4 Defining Variant for Multilevel Delay Report Use The purpose of this activity is to define a variant for the multilevel delay report to allow the evaluation of sales orders with delay in Personal Object Worklists (POWL) in the SAP Netweaver Business Client (SAP NWBC). Procedure 25. Access the activity using one of the following navigation options: IMG Menu Transaction MDML 26. On the Calculation of Multilev.Delay.: Variants screen choose create variant. 27. On the ABAP: variants popup enter a variant name, e.g. MULTILEVEL_DEL and choose create. 28. On the Variants: Change Screen Assignment screen mark For All Selection screens and choose Continue. 29. On the Maintain Variant: Report RMDMULTILEVELDELAY, Variant <your name> screen, enter the following values: Field Name Plant © SAP AG Description User action and values 1000 Page 71 of 72 SAP Best Practices Profile for Order Report 142 – Production Planning and Control: Configuration Guide YSAP00000001 30. Choose Attributes. 31. On the Variant Attributes screen enter a meaning, e.g. Multi-Level-Delay Report. 32. Save your entries and go back to the IMG menu. © SAP AG Page 72 of 72