Name of the Work: Work of Strengthening with widening to paved shoulder from km 46 to km 54 of NH- 39 in the
State of Assam under EPC mode under Annual Plan for the year 2021-22.
Sl.
No.
1
34 POINT CHECKLIST
Subject/ Item
Comments
State/ UT Concerned
Assam
2
3
4
5
Zone concerned in RW
Proposal
Existing Carriageway including Width
Proposed Carriageway Including Paved Shoulder
6
7
8
Funding under Plan/Non Plan
Under which Scheme
Last work of original nature done on the stretch
Zone-V
Under AP 2021-22
7m
12 m(2 lane +Paved shoulder + earthen
shoulder)
Plan
NH(O)
9
10
Defect liability period, upto what date/year
Type of maintenance work done last
11
Year during which the above maintenance work was
completed
Is the proposed work premature
If so, the reason for the same
Defect liability period proposed work for the instant
work
Traffic on the stretch
Whether being tolled or proposed to be tolled
Length of the proposed stretch
Major/minor structures been proposed for original
work/repair on the stretch
12
13
14
15
16
17
18
19
20
Total cost of the project
Phasing of expenditure
No Original work in last 5 year. Last
Original work was completed on Feb
2009.
Feb 2012
IRQP which was completed on 08.02.2016.
DLP was upto 07.02.2019.
08.02.2016
No
NA
5 years
1412 CVPD(3500 PCU) per day
No
8.00 km
Extension of 3 Nos. of RCC Single cell Box
Culverts(2*2) at reconstruction of 1 No. of
RCC Single cell Box Culvert(2*2)
26.51 Crores
Year of
Phasing
2021-22
2022-23
2023-28
(Maintena
nce
Period)
21
22
23
24
25
26
27
Per kilometer cost of the project
(Crore/Km)
Per kilometer cost of the Road work including
protection works
(Crore/Km)
Per kilometer cost/Cost of other structures on the
stretch (Crore/Km)
If cost is on the higher side, the reason for the same
Is LA/Utility shifting involve, If so, the details.
Whether feasibility report/DPR available
The status of the adjoining stretch (including last
treatment thereof, length of the stretch, year of
completion of project)
Physical
Phasing (%)
10%
100%
100%
Financial
progress (
In Lakhs)
258.98
2589.80
2651.18
3.31
2.50(excluding road safety items and
repair of culverts )
0.10
Not on higher side
No LA/Utility Shifting involved.
Yes
km 30 to km 46 & km 54 to km 61 on
NH-39 has already been taken up for
widening to 2lane with paved shoulder
with work under progress having
physical progress of more than 85%
which is expected to be completed by
23.02.2022.
28
29
30
31
32
33
34
Whether the stretch is identified under NH DP/NHIP/or
some other scheme
If so, whether, status of proposal under NHDP
indicated, and the file referred
with justification, with the approval of DG (RD) and SS
BOS position (With relevant details)
Whether file seen be IFD earlier (Page no. of the Note
portion)
If so, whether it queries/observation have been duly
responded to
Whether included in approved Annual Plan of the year
Special features, if any, of the Proposal
No
No
NA
No
NA
Yes
Nil