Name of the Work: Work of Strengthening with widening to paved shoulder from km 46 to km 54 of NH- 39 in the State of Assam under EPC mode under Annual Plan for the year 2021-22. Sl. No. 1 34 POINT CHECKLIST Subject/ Item Comments State/ UT Concerned Assam 2 3 4 5 Zone concerned in RW Proposal Existing Carriageway including Width Proposed Carriageway Including Paved Shoulder 6 7 8 Funding under Plan/Non Plan Under which Scheme Last work of original nature done on the stretch Zone-V Under AP 2021-22 7m 12 m(2 lane +Paved shoulder + earthen shoulder) Plan NH(O) 9 10 Defect liability period, upto what date/year Type of maintenance work done last 11 Year during which the above maintenance work was completed Is the proposed work premature If so, the reason for the same Defect liability period proposed work for the instant work Traffic on the stretch Whether being tolled or proposed to be tolled Length of the proposed stretch Major/minor structures been proposed for original work/repair on the stretch 12 13 14 15 16 17 18 19 20 Total cost of the project Phasing of expenditure No Original work in last 5 year. Last Original work was completed on Feb 2009. Feb 2012 IRQP which was completed on 08.02.2016. DLP was upto 07.02.2019. 08.02.2016 No NA 5 years 1412 CVPD(3500 PCU) per day No 8.00 km Extension of 3 Nos. of RCC Single cell Box Culverts(2*2) at reconstruction of 1 No. of RCC Single cell Box Culvert(2*2) 26.51 Crores Year of Phasing 2021-22 2022-23 2023-28 (Maintena nce Period) 21 22 23 24 25 26 27 Per kilometer cost of the project (Crore/Km) Per kilometer cost of the Road work including protection works (Crore/Km) Per kilometer cost/Cost of other structures on the stretch (Crore/Km) If cost is on the higher side, the reason for the same Is LA/Utility shifting involve, If so, the details. Whether feasibility report/DPR available The status of the adjoining stretch (including last treatment thereof, length of the stretch, year of completion of project) Physical Phasing (%) 10% 100% 100% Financial progress ( In Lakhs) 258.98 2589.80 2651.18 3.31 2.50(excluding road safety items and repair of culverts ) 0.10 Not on higher side No LA/Utility Shifting involved. Yes km 30 to km 46 & km 54 to km 61 on NH-39 has already been taken up for widening to 2lane with paved shoulder with work under progress having physical progress of more than 85% which is expected to be completed by 23.02.2022. 28 29 30 31 32 33 34 Whether the stretch is identified under NH DP/NHIP/or some other scheme If so, whether, status of proposal under NHDP indicated, and the file referred with justification, with the approval of DG (RD) and SS BOS position (With relevant details) Whether file seen be IFD earlier (Page no. of the Note portion) If so, whether it queries/observation have been duly responded to Whether included in approved Annual Plan of the year Special features, if any, of the Proposal No No NA No NA Yes Nil