Uploaded by Sejal Patel

B-BR-010 HIGH LEVEL GAP ANALYSIS

advertisement
AIM
BR.010 HIGH-LEVEL GAP ANALYSIS
<Company Long Name>
<Subject>
Author:
<Author>
Creation Date:
November 28, 2005
Last Updated:
February 8, 2022
Document Ref:
<Document Reference Number>
Version:
DRAFT 1A
Approvals:
<Approver 1>
<Approver 2>
Copy Number
_____
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Document Control
Change Record
3
Date
Author
Version
Change Reference
28-Nov-05
<Author>
Draft 1a
No Previous Document
Reviewers
Name
Position
Distribution
Copy No.
Name
Location
1
2
3
4
Library Master
Project Library
Project Manager
Note To Holders:
If you receive an electronic copy of this document and print it out, please write your
name on the equivalent of the cover page, for document control purposes.
If you receive a hard copy of this document, please write your name on the front cover,
for document control purposes.
<Subject>
File Ref: 231219896
Document Control
(v. DRAFT 1A )
ii
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Contents
Document Control .................................................................................................................. ii
Gap Analysis............................................................................................................................ 1
Solution Options ..................................................................................................................... 2
Application Modifications and Extensions.......................................................................... 3
Updated Change Catalog....................................................................................................... 4
Process Performance Differences .......................................................................................... 5
Operating Cost Differences ................................................................................................... 6
Differences in Working Practices .......................................................................................... 7
Staffing Differences................................................................................................................. 8
Open and Closed Issues for this Deliverable ...................................................................... 9
Open Issues ....................................................................................................................... 9
Closed Issues .................................................................................................................... 9
<Subject>
File Ref: 231219896
Document Control
(v. DRAFT 1A )
iii
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Gap Analysis
The High-Level Gap Analysis describes the differences (gaps) between processes as envisioned in the High-Level Process Design
(BP.070) and the processes supported by Oracle Applicationsīƒ”.
The process models with indications of gap areas are included in Appendix A.
Ref
No.
Process
ID
Requirement
Gap
Financial Management
Human Resource Management
<Subject>
File Ref: 231219896
Gap Analysis
(v. DRAFT 1A )
1 of 9
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Solution Options
This component documents the best efforts to narrow the gap documented in the previous chapter, by providing a balance between
changing the process design and modifying or extending the application.
Ref
No.
Solution
Expected Cost
of Solution
Expected Benefit of Solution
Expected Risk of Solution
Financial Management
Human Resource Management
<Subject>
File Ref: 231219896
Solution Options
(v. DRAFT 1A )
2 of 9
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Application Modifications and Extensions
Ref
No.
Proposed Modification or
Extension
Description of the Modification or
Extension
Description of the Gap that will be Reduced or
Closed as a Result
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
<Subject>
File Ref: 231219896
Application Modifications and Extensions
(v. DRAFT 1A )
3 of 9
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Updated Change Catalog
Ref
No.
Potential Change
<Subject>
File Ref: 231219896
Assessment of Cost
Assessment of Benefit
Assessment of Risk
Relevant Decisions Taken
Date
Decision
Taken
Updated Change Catalog
(v. DRAFT 1A )
4 of 9
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Process Performance Differences
Ref
No.
Process Performance Measure
<Subject>
File Ref: 231219896
Existing
Performance
Expected
Future
Performance
Comments
Process Performance Differences
(v. DRAFT 1A )
5 of 9
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Operating Cost Differences
Ref
No.
Cost Component (Process)
<Subject>
File Ref: 231219896
Existing
Operating Cost
Expected
Future
Operating
Cost
Comments
Operating Cost Differences
(v. DRAFT 1A )
6 of 9
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Differences in Working Practices
<Subject>
File Ref: 231219896
Differences in Working Practices
(v. DRAFT 1A )
7 of 9
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Staffing Differences
Ref
No.
Staffing Change Description
<Subject>
File Ref: 231219896
Numbers
Affected
Role Changes
Skills Needed
Net Staff
Cost
Comments
Staffing Differences
(v. DRAFT 1A )
8 of 9
BR.010 High-Level Gap Analysis
Doc Ref: <Document Reference Number>
June 23, 2008
Open and Closed Issues for this Deliverable
Open Issues
ID
Issue
Resolution
Responsibility
Target Date
Impact Date
Resolution
Responsibility
Target Date
Impact Date
Closed Issues
ID
Issue
<Subject>
File Ref: 231219896
Open and Closed Issues for this Deliverable
(v. DRAFT 1A )
9 of 9
Download