Purchase Order N0: HEI-05-FPKJS1-0102HT-1#-184 dated 18.08.2021 Day-Wise Testing Schedule for Offered 220VDC,100A Automatic Constant Voltage Battery Charger (for Battery Charger-1 and Standby) Date : 31-01-2022 Ser. Name 0f No. Routine / FAT Test 1 Visual Inspection Description of Test as per approved TDS/Drawings a. Packing List 1st Day Reference of NTDC Specificatio n Clauses Schedul e Time Clause 5 & 6 b. Verification of dimension TDS/Drawings c. Components verification d. PCB Card Verification e. Verification of Sheet thickness, Paint thickness, 09:00 AM to 12:30 PM Earthing Terminals along with Copper Lug with nut and bolts f. Verification of AC/DC MCBs. g. Verification of Indications Lamps h. Verification of Rating Plates for battery charger and choke i. 2 Insulation Test 3 Checking Properties of Protective Devices Verification/dimensions of step-down Power Transformer j. Verification/dimensions of Filter Choke Confirming to NTDC Specification Confirming to NTDC Specification Clause 4.3 Clause 8.3.8 Remar ks Purchase Order N0: HEI-05-FPKJS1-0102HT-1#-184 dated 18.08.2021 4 Checking Properties Of Current Limiter Confirming to NTDC Specification Clause 5.2.8 Zohar Prayer & Lunch Break 5 6 7 8 Checking Properties Of Alarm And Annunciation Checking Properties Of Smoothing Circuit Noise Level Test Confirming to NTDC Specification 12:30 PM to 14:00Pm Clause 5.2.16 14:00 PM to 15:30PM Confirming to NTDC Specification Clause 5.2.10 Confirming to NTDC Specification Clause 5.2.17 Confirming to NTDC Verification of characteristics as Specification per clause 4.4.2 with the help of oscilloscope Clause 4.4.2 15:30 to 17:00PM Purchase Order N0: HEI-05-FPKJS1-0102HT-1#-184 dated 18.08.2021 Day-Wise Testing Schedule for Offered 220VDC 100A Automatic Constant Voltage Battery Charger (for Battery Charger-2 and Standby) Date : 01-02-2022 Ser. Name 0f No. Routine / FAT Test 1 Visual Inspection Description of Test as per approved TDS/Drawings a. Packing List 2nd Day Reference of NTDC Specificatio n Clauses Schedul e Time Clause 5 & 6 b. Verification of dimension TDS/Drawings c. Components verification d. PCB Card Verification e. Verification of Sheet thickness, Paint thickness, 09:00 AM to 12:30 PM Earthing Terminals along with Copper Lug with nut and bolts f. Verification of AC/DC MCBs. g. Verification of Indications Lamps h. Verification of Rating Plates for battery charger and choke i. 2 Insulation Test 3 Checking Properties Of Protective Devices Verification/dimensions of step-down Power Transformer j. Verification/dimensions of Filter Choke Confirming to NTDC Specification Confirming to NTDC Specification Clause 4.3 Clause 8.3.8 Remar ks Purchase Order N0: HEI-05-FPKJS1-0102HT-1#-184 dated 18.08.2021 4 Checking Properties Of Current Limiter Confirming to NTDC Specification Clause 5.2.8 Zohar Prayer & Lunch Break 5 6 7 8 Checking Properties Of Alarm And Annunciation Checking Properties Of Smoothing Circuit Noise Level Test Confirming to NTDC Specification 12:30 PM to 14:00Pm Clause 5.2.16 14:00 PM to 15:30PM Confirming to NTDC Specification Clause 5.2.10 Confirming to NTDC Specification Clause 5.2.17 Confirming to NTDC Verification of characteristics as Specification per clause 4.4.2 with the help of oscilloscope Clause 4.4.2 15:30 to 17:00PM Purchase Order N0: HEI-05-FPKJS1-0102HT-1#-184 dated 18.08.2021 Day-Wise Testing Schedule for Offered 220VDC 100A Automatic Constant Voltage Battery Charger (for Battery Charger-1,2 and Standby Vise versa) Date : 02-02-2022 Ser. No. Name 0f Routine / FAT Test 3rd Day Description of Test as per approved Schematic/ TDS/Drawings Schedule Time Remarks 1 Interconnection / Interlocking Automatic Changeover System automatic system verification of 09:00 AM to 12:30 PM Charger A, B & C testing as per SLD/Drawing/Schematic. . Zohar Prayer & Lunch Break 2 Reports Test reports prepared as per NTDC requirement 12:30 PM to 14:00Pm 14:00 PM to 15:30PM