KG32103 DRILLING ENGINEERING SEMESTER 1 2021/2022 DRILLING ENGINEERING PROJECT GROUP 6 LECTURER: MADAM HAFEZA BINTI ABU BAKAR SUBMISSION DATE: 24/01/2022 STUDENT NAME MATRIC NUMBER ABDUL SHAFIQ BIN ABDUL RASIK BK19160443 LIM TEONG LUNG BK19110174 MOHAMAD JAZLI BIN MOHAMAD JALIN BK19110233 MOHAMAD RIDHUAN BIN DURASHID BK19110172 Content Title Task 1 Task 2 Task 3 Task 4 Conclusion Reference Appendix Page Task 1 Determine the potential drilling problem based on the lithological information of the area to be drilled and justify your answer. No. TVD (ft) Lithology Pore Pressure (psi) 1 3000 Soft Sandstone 1320 2 5000 Shale/Clay 2450 3 8300 Shale 4067 4 8500 High Porosity, High Permeability Sandstone 4504 5 9000 Shale/Clay 5984 6 9500 Shaly Sandstone 6810 7 10000 Sandstone 7800 8 11000 Hard Sandstone 10171 Task 2 Propose the well configuration design of the well based on the information given. State your assumptions where necessary. Target location: N 8346500 ft, E 397000 ft Rig location : N 8350000 ft, E 400000 ft Horizontal Departure: = (8350000 − 8346000) = 4609.77 ft = 4610 ft 2 + (400000 − 397000) 2 Bottomhole TVD: 11000 ft Profile = Build and Hold (Type 1) Build-up rate = 2.0°/100 ft KOP = 2500 ft A well with a Build and Hold profile has an initial deflection at a shallow depth which means it has a low Kick Off Point (KOP). For this well configuration the KOP and BUR will be assumed to be 2500 ft and 2.0°/100 ft respectively. Radius of build-up, Drift angle, Measured depth at the end of build-up, TVD at end of build-up section, Horizontal deviation at the end of build-up, Total measured depth to the target, Task 3 Determine the number of casings to be installed and its estimated setting depth. Show your work and methods you use. Use assumptions where necessary. Task 4 Calculate the burst and collapse loads of each casing and propose the casing grade (API) based on the calculations. You may refer to any casing and tubing manufacturing sheet and put as reference in your report.