Benha University Shoubra Faculty of Engineering Surveying Engineering Department Answer all the following questions Illustrate your answers with sketches when necessary Surveying 1 ASSIGNMENT ( 5 ) 2021-2022 Dimensions are in meters Assume any missing data 1- Explain what is mean by temporary and permanent adjustment of a level. 2- Explain how you would check a level for adjustment using the two-peg test. 3- Four stations P, Q, R and S were set out in a straight line such that PQ = QR + RS = 30m. A tilting level was set up at P and readings of 2.148m and 1.836m were observe on a staff held vertically at Q and R, respectively. The level was than set up at S and readings of 2.013 m and 1.755 m were observe on the staff held vertically in turn at stations Q and R. The bubble was adjusted to be at centre of its run for each reading. Check the overall adjustment of the level. 4- A Dumpy level was set up at ( E ) exactly midway between two points ( C ) and (D) 120m apart. The readings on the staff held on ( C ) and (D) were 2.00m and 3.00m respectively. The instrument was then moved up and set up at a point (F) such that CF= 140m and DF= 20m. The respective staff readings on ( C ) and ( D) to give a horizontal line of sight. 5- In leveling between two points A and B on opposite banks of a river, the level was set up near A, and the staff readings on A and B were 1.285 and 2.860m respectively. The level was then moved and set up near B and the respective readings on A and B were 0.860 and 2.220m. Find the true difference of level between A and B. 6- The following observations were made during the testing of a Dumpy level. Instrument at Staff reading on A Staff reading on B A 1.722m 2.244m B 2.146m 3.044m Distance AB = 150m. Is the instrument in adjustment? To what reading should the line of collimation e adjusted when the instrument was at B? It the R.L. of A = 432.052m, what should be the R.L. of B? 7- In the two peg test of a Lecia level the following observations are taken: Instrument at Staff reading on A Staff reading on B M 3.612m 3.248m P 1.862m 0.946m M is equidistant from A, B – P is 20m from A and 120m from B. what is the true difference in elevation between the 2 points. With the level in the same position at P what rod reading on B should the line of sight is adjusted. Check these reading against the true difference in elevation previously determined Benha University Shoubra Faculty of Engineering Surveying Engineering Department Answer all the following questions Illustrate your answers with sketches when necessary Surveying 1 ASSIGNMENT ( 5 ) 2021-2022 Dimensions are in meters Assume any missing data 1- Differential leveling observations were taken as shown below, use (HPC) and (Rise and Fall) methods. Applying the usual arithmetic checks and identifies closure error BS 1.548 3.145 2.014 IS FS DISTANCE(m) 000 150 250 350 500 750 800 950 1050 1200 2.487 1.254 2.015 3.598 1.256 3.145 2.148 2.145 2.659 1.568 2.154 1.459 Remarks BM1(95.5m) Staff Inverted Staff Inverted Staff Inverted BM2(93.104m) 2- Calculate the reduced levels of points from the following observations by two methods and do the arithmetic check of this leveling and identifies closure error. Point 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BS 1.558 3.214 2.051 2.658 IS FS 2.540 2.987 0.214 2.148 1.580 1.658 2.547 1.659 1.570 2.365 1.325 2.587 3.254 1.574 1.985 2.356 2.140 1.258 2.365 2.547 2.357 0.257 Distance (m) 0 20 150 300 750 1200 1500 1900 2200 2500 3000 3100 3800 3900 4000 Rem. BM1 (10.25m) Staff Inverted Staff Inverted Staff Inverted BM2 (10.755m) Benha University Shoubra Faculty of Engineering Surveying Engineering Department Answer all the following questions Illustrate your answers with sketches when necessary Surveying 1 ASSIGNMENT ( 5 ) 2021-2022 Dimensions are in meters Assume any missing data 3- The leveling observations were taken as shown below, use (HPC) and (Rise and Fall) method with applying the usual arithmetic checks and identify closure error. BS 1.254 2.148 IS FS DISTANCE REMARKS BM205(25.785m) 1.95 1.547 3.050 Staff Inverted .982 2.48 1.58 1.48 Staff Inverted Staff Inverted 2.458 3.478 2.876 1.68 2.478 0.458 BM205(26.460m) 4- Calculate the levels of points from the following observation by use method (height of instrument) and (rise and fall) also do the arithmetic check of this leveling Point 1 2 3 4 5 6 7 8 9 10 BS 1.579 IS 1.295 1.873 2.018 1.884 1.625 2.441 1.807 1.495 FS Distance (m) 0 20 150 300 750 1200 1.00 1500 1900 2200 1.020 2500 Rem. BM1 (11.25m) Staff Inverted Staff Inverted Staff Inverted BM2 (7.215m) Benha University Shoubra Faculty of Engineering Surveying Engineering Department Answer all the following questions Illustrate your answers with sketches when necessary Surveying 1 ASSIGNMENT ( 5 ) 2021-2022 Dimensions are in meters Assume any missing data 1-Given below the levels on the center line of tunnel. If the proposed construction line begins at a point of (13.30m) level and with 1:50 downword grade up to a distance of(80.0m) and then horizontal up to (120m) and then with 1:50 upword grade to the end of the line. a- draw a longitudinal section to scale 1:2000 horizontal, showing the proposed construction line b- compute the earth work, if the width of tunnel is 25m and the sides are vertical Distance(m) 0 20 40 60 80 100 120 140 160 180 200 Level(m) 15.4 17.2 17.3 16.7 16.9 16.9 17.2 17.3 17.3 17.1 16.6 2- Given below the level taken on the center line of swimming bas in whose breadth is 20m and length 50m. Its depth at zero is 0.8m with a down grade 1:20 from zero to 30m, then 2:5 down grade from 30 to 35m, then horizontal from 35 to 50m. a- Draw longitudinal sec. showing profile of ground and line of construction of the basin taken into consideration that upper edge is at R.L. (28.00) b- Compute volume of cut assuming that sides are vertical c- Area of tiles to cover the sides and base of the basin d- Volume of water in the basin, when the water level is at elevation of 27.75m Distance(m) 0 05 10 15 20 25 30 35 40 45 50 Level(m) 28.1 28.5 28.3 28.3 28.6 28.0 28.1 28.3 27.8 27.9 28.2 3-The following levels were taken on the center line of a part of proposed highway 000 50 100 150 200 250 300 350 400 Distance(m) 16.5 15.9 15.7 16.0 15.2 14.8 15.0 14.3 14.4 Level(m) Draw the profile and the line of construction with suitable horizontal and vertical scales. If the grade of proposed line of construction is 1:400 upwards and it begins from a point at an elevation of (15.0 m) at the zero distance. Calculate the volumes of cut and fill for the proposed highway if its width is 10 m and side slopes 2 horizontal to 1 vertical for both cut and fill. 4- The following staff readings were observed successively with level on the center line of a longitudinal section of a highway. If the grade of the line of construction is 1:400 up to a distance of 100m and horizontal up to 260m, and then 1:500 downwards to the end of the Benha University Shoubra Faculty of Engineering Surveying Engineering Department Answer all the following questions Illustrate your answers with sketches when necessary Surveying 1 ASSIGNMENT ( 5 ) 2021-2022 Dimensions are in meters Assume any missing data line and it beging from a point of an elevation of 10.40m. The width of the highway is 10.00m, and side slope is 3:2 for both cut and fill. a) - Calculate the reduced level of all point by two methods. Showing the arithmetic check and identifies closure error. b) - Draw a longitudinal section to scale 1:2000 horizontal and 1:100 vertical. c) - Compute the quantities of cut and fill. BS 1.254 IS FS 1.254 2.034 3.458 2.48 3.548 2.284 2.028 3.48 1.748 1.078 2.498 0.848 1.958 1.828 0.808 2.514 1.456 2.026 0.897 1.198 3.514 2.226 3.706 1.497 1.537 3.458 1.947 3.417 Distance 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 Remark BM1 (9.56m) BM2 (8.50m) Benha University Shoubra Faculty of Engineering Surveying Engineering Department Answer all the following questions Illustrate your answers with sketches when necessary Surveying 1 ASSIGNMENT ( 5 ) 2021-2022 Dimensions are in meters Assume any missing data 5- Plot the profile of the highway with suitable horizontal and vertical scales from the tabulated levels notes shown above, if the grade of the proposed line of construction is 1:400 downwords and it begins from a point at an elevation of (19.00m). Calculate the volume of earth work if the width of the highway is 8m, and side slope is 2 horizontal : 1 vertical for both fill and cut Distance(m) Level(m) 0 18.4 100 18.35 200 19.1 300 18.55 400 18.3 450 18.1 500 17.75 6- Calculate the reduced level of all point by two methods. Showing the arithmetic check and identifies closure error. b) - Draw a longitudinal and cross sections using suitable horizontal and vertical scales. Id BS 0.64 A 1 2 B CL 3 4 5 C CL 6 7 8 D E IS FS 0.76 0.44 4.20 0.61 CL R 4.6 7.79 0.00 0.00 0.00 1.22 4.08 1.66 4.00 1.28 1.36 60 60 60 60 7.6 2.4 4.00 T.P 3.5 8.0 2.36 0.11 2.44 Remark BM1 (4.76m) T.P. 6.0 1.11 2.00 2.01 2.76 0.08 1.26 L 180 180 180 180 8.0 BM2 (-1.42m)