Health & Safety Inspection report Site Name Helwan Plant - Egypt Date: OCT 2021 Name of Inspector Alaa Nagie Selim Area Cement area+ Conv Area owner Eng. Mohamed Ashmawy Outstanding Items from Previous Visit or H & S Inspection Action/s requiring Photograph reference 1 2 3 This is the second inspection report for me in Helwan plant to identify the key priorities to assist the plant in moving forward to a new level of Health & Safety performance. This is not a full site inspection; the intention was to sample the site and assess the state of the H&S culture of the team and the site as a whole. Any report such as this can list hundreds of items that the plant teams need to address but that is not the purpose of our inspection report. We as inspectors have to identify root cause analysis for plant and management behaviors’ together with systemic issues to allow the plant to develop its culture and move the site forward. Finally, we look after our plant better. Priority – Major (1,2) Minor Safety (3) Good Practice (6) On local data base New H & S item/s identified during Proposed corrective this visit. action required for No (Positive or negative items Negative) Photo reference Photo After Priority – Major (1,2) Minor Safety (3) Good Practice (6) On local data base 2 1 Negative Unsafe Condition 2 2 Negative Unsafe Condition Unsafe Condition 3 Negative 2 2 4 Negative Cover is required New H & S item/s identified during Proposed corrective this visit. action required for No (Positive or negative items Negative) Photo reference Photo After Priority – Major (1,2) Minor Safety (3) Good Practice (6) On local data base 2 5 Negative Cover is required 2 6 Negative Material removal is required 2 7 Negative Unsafe Condition 2 8 Negative Unsafe Condition New H & S item/s identified during Proposed corrective this visit. action required for No (Positive or negative items Negative) 9 Negative Unsafe Condition Photo reference Photo After Priority – Major (1,2) Minor Safety (3) Good Practice (6) On local data base 2 2 10 11 12 Negative Unsafe Condition H & S inspector general summary and comments : There were issues that were identified even during the site tour that require addressing and I am confident that the site will put together an action plan to deal with the issues. We will also look at competence of staff in critical rules with regards to H&S knowledge and training. Record Date Oct 2021 Alaa Nagie Selim Inspector Signature Health & Safety Visit Note : 1. Major Non Conformance / Incident: (Immediate Action is required) an event, audit finding, noncompliance, breach of legislation or a breach of any site specific legal requirements (permits, licenses, planning conditions etc.), which has caused or has the potential to result in a serious health, safety, environmental, quality or business accident/incident/disruption and / or has the realistic potential to lead to legal or enforcement action and those outstanding issues that were previously CAT 1’s but have not been actioned since the last visit. 2. Action must be completed within 5 working days, (Major Safety, Health or Environmental issues with imminent risk leading to serious injury or potential enforcement action by external agencies). If the action cannot be completed in this time, the matter must be discussed and agreed with the plant manager and agreed timescales set. 3. Action should be completed within a month, (Minor Safety, Health or Environmental issues with probable risk leading to serious injury or potential enforcement action by external agencies). 4. Action should be completed within three months, (items that the H & S inspector believes could cause injury to persons or harm to the environment if not addressed). 5. Item for long term development (i.e. capital requirements) 6. Good Practice – enter wording in the text of the document. The health & safety site inspection report should be issued to the plant manager & plant safety manager, together with the area owner concerned. Any Major Non Conformance, Category 1 and Category 2 defects must be entered into a local action plan or database by the responsible manager within the following timelines i.e. Category 1 & 2 defects uploaded within 7 days, Category 3 & 4 defects uploaded in 14 days.