Uploaded by lambert.wemegah

JOB SAFETY ANALYSIS

advertisement
A
IFR
27 OCT 2021
LKW
Rev
Status
Date
Prepared by
Checked by
Approved by
PO# 23362 JOB SAFETY ANALYSIS FOR ‘TURNKEY SOLUTION FOR
FLUSHING WATER SYSTEM
Page
SP-JSA-05223-CGC-01-00
SYKES AND PARTNERS LIMITED - GHANA
1 of 7
JOB SAFETY ANALYSIS
TURNKEY SOLUTION FOR FLUSHING
WATER SYSTEM
SP-JSA-05223-CGC-01-00
Ошибка! Неизвестное имя свойства
документа. 0
HISTORY OF REVISION
REVISION NO.
DATE
A
27 OCT 2021
REVISED INFORMATION
New document - IFR
JOB SAFETY ANALYSIS
JOB STEPS
Transportation, mobilization
of materials and equipment
HAZARDS AND RISKS






Collision
Mechanical failure
Adverse weather
Goalposts
Overhead electrical cables
Contact with live
facility/asset
 Over speeding
Loading, offloading and lifting 










Scaffolding





Suspended load
Falling load
Lifting above live facility
Mechanical failure
Failure of lifting gear
Unauthorized persons
Unstable and unlevelled
ground
Crane collapse
Contact with
facility/overhead powerlines
Manual handling
Incompetent operator and
rigger/banksman
Impact hazards
Fall from height
Spark/fire hazards
Unstable ground
Collapse of platform
TURNKEY SOLUTION FOR FLUSHING
WATER SYSTEM
SP-JSA-05223-CGC-01-00
Ошибка! Неизвестное имя свойства
документа. 0
PRECAUTIONS/RECOMMENDED
ACTION
 Regular inspection of vehicle
and equipment by HSE officer
 Valid DVLA licence and
refresher training
 Road safety induction
training
 Journey management
 Use of approved routes
 Certified equipment and
operator
 Designated flagman in plant
 Following speed limit
 Equipment checklist
 Safe distance from adjacent
facilities and overhead cables
 Stable and levelled ground
for crane mobilization
 Close supervision
 Safety barrier and signages
 Maintain safe distance from
suspended load
 Certified lifting equipment
and accessories
 Do not exceed crane’s SWL
 Competent operator and
rigger/banksman
 Protection of adjacent
asset/live facility
 Proper communication
means
 Crane/equipment safety preuse checklist
 Position equipment at a safe
distance from adjacent
facilities and overhead
powerlines
 Safe manual handling
 Fully extended outriggers on
a stable ground
 Stop work policy
 Use of full body harness for
works 2m and above ground
level
 Wearing of hardhat is
mandatory
JOB SAFETY ANALYSIS
 Access
 Adverse weather
 Defective scaffold materials
Installation/erection of pipe
spool and supports






Falling of load
Mechanical failure
Adverse weather
Manual handling
Slip/trip
Trapping and crushing
Cutting, grinding and
bevelling









Sharp edges/Cut
Pinch points
Electrocution
Shattered disk
Hot surfaces
Spark
Flying particles
Noise
vibration
Welding









Fire and explosion
Arching
Trailing cables
Electrocution
Hot surfaces
Burn injury
Toxic fumes
Gas cylinders
Heat-related illness
TURNKEY SOLUTION FOR FLUSHING
WATER SYSTEM
SP-JSA-05223-CGC-01-00
Ошибка! Неизвестное имя свойства
документа. 0
 Use of non-sparking tools
such as brass hammer
 Competent scaffolders
 Safe and suitable access
 Scaffold materials should be
in good condition
 Stop work policy
 Regular inspection of
platform before use
 Maintain safe distance from
load
 Certified equipment
 Equipment pre-use checklist
 Safe handling of load
 Proper communication
 Close supervision
 Use of appropriate PPE such
as safety boot and hardhat
 Competent operator/workers
 Use of leather gloves and
smitten
 Regular inspection of power
tools and cables
 Proper earthing
 Install machine guard
 100% spark containment
 Ground fault circuit breaker
 Fire watcher
 Provision for first aid
 Use eye wash to flush off
foreign matter in the eyes
 Use of safety goggles
 Ear protection
 Screen off area/use welding
booth
 Combustible gas testing and
gas monitoring
 Fire emergency contacts
 Double eye protection/use
of face shield and dark
goggles
 Proper earthing of welding
machine
 Proper management of
electrical cables
 Use of nose mask
 Use of leather gloves
JOB SAFETY ANALYSIS
Radiography/MPI NDT
 Exposure to radiation
 Exposure to hazardous
chemicals
 Electricity
Bolt loosening and
tightening/torquing





Manual handling
Flying object
spark
Air under pressure
Electricity
Hydrotest






Water under pressure
Pipe rupture
Whip
Noise
Electric shock/electrocution
Equipment failure
Touch up painting
 Hazardous chemicals
 Fire hazards
Electrical and instrumentation  Electrical hazards
 Slip, trip and fall
 Trailing cables
TURNKEY SOLUTION FOR FLUSHING
WATER SYSTEM
SP-JSA-05223-CGC-01-00
Ошибка! Неизвестное имя свойства
документа. 0
 Use of full body coverall and
apron
 Intermittent resting time
 Regular rehydration by
drinking cold water
 Proper handling of argon
cylinders
 Designated fire watcher
 Safety barrier and
signages/warning light
 Use of film badges
 Certified radiography
operators
 Regular medical check up
 Maintain safe distance
 Electrical cables must be in
good condition
 Use appropriate PPE
 Safe manual handling
 Wearing of suitable PPE
 Non-sparking/brass tools
 Whip arrestor
 Electrical cables shall be in
good condition
 Electrically safe power tools
 Proper earthing
 Safety barrier and signages
 Stable temporal supports
 Competent operator
 Ear protection
 Whip arrestor
 Calibrated gauges
 Proper management of
electrical cables
 Readily available MSDS of
chemicals
 Emergency contacts
 Close supervision
 Competent workers
 Fire watcher
 Appropriate PPE shall be
used
 Confirm positive isolation of
electricity
 Only competent electrical
technicians shall perform
task
JOB SAFETY ANALYSIS
Excavation






Concrete/Civil works





Cement dust exposure
Corrosive chemicals burns
Heat-related illness
Foot injuring
Sharp objects
Concrete breaking/drilling





Noise
Vibration
Dust
Electrical hazards
Stress
Hot tapping
 Water under pressure
 Electrical hazards
Working together, general
health and safety
 COVID-19
 Dehydration
 stress
Cave-in
Falling materials/tools
Underground facilities
Access and egress
Contaminated soil
Water/chemical
accumulation
 Adjacent facilities
TURNKEY SOLUTION FOR FLUSHING
WATER SYSTEM
SP-JSA-05223-CGC-01-00
Ошибка! Неизвестное имя свойства
документа. 0
 Use of safety harness and
ensuring 100% tie-off for
cable laying at height
 Shoring, shielding and
sloping of excavation edges
 Cable detector to identify
underground cables
 Digging of trial pit
 Use of wellington boot
 Pump out accumulated
water
 Stop work policy
 Safety barrier at least 1m
away from the edge of
excavation
 Do not store materials/spoil
at the edge of excavation
 Suitable and safe access
such as ladder
 Wearing of hardhat is
mandatory
 Protection of adjacent
facilities
 Use appropriate PPE such as
dust mask, wellington boot
and rubber gloves.
 Workers to be encouraged
to regularly rehydrate
 Rest breaks
 Close supervision
 Appropriate PPE shall be
worn
 Electrically safe powered
tools
 Regular rest break
 Rehydration/drinking
enough water
 Standby portable fire
extinguisher
 Safety barrier and signages
 Electrical cables should be in
good condition.
 Proper earthing system for
power tools.
 Maintain social distance, at
least 2m apart
 Use nose mask at all time
JOB SAFETY ANALYSIS
TURNKEY SOLUTION FOR FLUSHING
WATER SYSTEM
SP-JSA-05223-CGC-01-00
Ошибка! Неизвестное имя свойства
документа. 0
 Checking of body
temperature
 Watch out for symptoms of
COVID-19
 Regular hand washing and
sanitizing
 Workers to regularly hydrate
by drinking enough cold
water
 Rest shelter
 Toilet facility
 Maintaining good
housekeeping on site
NOTE: JSA TO BE REVIEWED ACCORDING TO PROJECT SCOPE AND METHOD STATEMENT
Download