A IFR 27 OCT 2021 LKW Rev Status Date Prepared by Checked by Approved by PO# 23362 JOB SAFETY ANALYSIS FOR ‘TURNKEY SOLUTION FOR FLUSHING WATER SYSTEM Page SP-JSA-05223-CGC-01-00 SYKES AND PARTNERS LIMITED - GHANA 1 of 7 JOB SAFETY ANALYSIS TURNKEY SOLUTION FOR FLUSHING WATER SYSTEM SP-JSA-05223-CGC-01-00 Ошибка! Неизвестное имя свойства документа. 0 HISTORY OF REVISION REVISION NO. DATE A 27 OCT 2021 REVISED INFORMATION New document - IFR JOB SAFETY ANALYSIS JOB STEPS Transportation, mobilization of materials and equipment HAZARDS AND RISKS Collision Mechanical failure Adverse weather Goalposts Overhead electrical cables Contact with live facility/asset Over speeding Loading, offloading and lifting Scaffolding Suspended load Falling load Lifting above live facility Mechanical failure Failure of lifting gear Unauthorized persons Unstable and unlevelled ground Crane collapse Contact with facility/overhead powerlines Manual handling Incompetent operator and rigger/banksman Impact hazards Fall from height Spark/fire hazards Unstable ground Collapse of platform TURNKEY SOLUTION FOR FLUSHING WATER SYSTEM SP-JSA-05223-CGC-01-00 Ошибка! Неизвестное имя свойства документа. 0 PRECAUTIONS/RECOMMENDED ACTION Regular inspection of vehicle and equipment by HSE officer Valid DVLA licence and refresher training Road safety induction training Journey management Use of approved routes Certified equipment and operator Designated flagman in plant Following speed limit Equipment checklist Safe distance from adjacent facilities and overhead cables Stable and levelled ground for crane mobilization Close supervision Safety barrier and signages Maintain safe distance from suspended load Certified lifting equipment and accessories Do not exceed crane’s SWL Competent operator and rigger/banksman Protection of adjacent asset/live facility Proper communication means Crane/equipment safety preuse checklist Position equipment at a safe distance from adjacent facilities and overhead powerlines Safe manual handling Fully extended outriggers on a stable ground Stop work policy Use of full body harness for works 2m and above ground level Wearing of hardhat is mandatory JOB SAFETY ANALYSIS Access Adverse weather Defective scaffold materials Installation/erection of pipe spool and supports Falling of load Mechanical failure Adverse weather Manual handling Slip/trip Trapping and crushing Cutting, grinding and bevelling Sharp edges/Cut Pinch points Electrocution Shattered disk Hot surfaces Spark Flying particles Noise vibration Welding Fire and explosion Arching Trailing cables Electrocution Hot surfaces Burn injury Toxic fumes Gas cylinders Heat-related illness TURNKEY SOLUTION FOR FLUSHING WATER SYSTEM SP-JSA-05223-CGC-01-00 Ошибка! Неизвестное имя свойства документа. 0 Use of non-sparking tools such as brass hammer Competent scaffolders Safe and suitable access Scaffold materials should be in good condition Stop work policy Regular inspection of platform before use Maintain safe distance from load Certified equipment Equipment pre-use checklist Safe handling of load Proper communication Close supervision Use of appropriate PPE such as safety boot and hardhat Competent operator/workers Use of leather gloves and smitten Regular inspection of power tools and cables Proper earthing Install machine guard 100% spark containment Ground fault circuit breaker Fire watcher Provision for first aid Use eye wash to flush off foreign matter in the eyes Use of safety goggles Ear protection Screen off area/use welding booth Combustible gas testing and gas monitoring Fire emergency contacts Double eye protection/use of face shield and dark goggles Proper earthing of welding machine Proper management of electrical cables Use of nose mask Use of leather gloves JOB SAFETY ANALYSIS Radiography/MPI NDT Exposure to radiation Exposure to hazardous chemicals Electricity Bolt loosening and tightening/torquing Manual handling Flying object spark Air under pressure Electricity Hydrotest Water under pressure Pipe rupture Whip Noise Electric shock/electrocution Equipment failure Touch up painting Hazardous chemicals Fire hazards Electrical and instrumentation Electrical hazards Slip, trip and fall Trailing cables TURNKEY SOLUTION FOR FLUSHING WATER SYSTEM SP-JSA-05223-CGC-01-00 Ошибка! Неизвестное имя свойства документа. 0 Use of full body coverall and apron Intermittent resting time Regular rehydration by drinking cold water Proper handling of argon cylinders Designated fire watcher Safety barrier and signages/warning light Use of film badges Certified radiography operators Regular medical check up Maintain safe distance Electrical cables must be in good condition Use appropriate PPE Safe manual handling Wearing of suitable PPE Non-sparking/brass tools Whip arrestor Electrical cables shall be in good condition Electrically safe power tools Proper earthing Safety barrier and signages Stable temporal supports Competent operator Ear protection Whip arrestor Calibrated gauges Proper management of electrical cables Readily available MSDS of chemicals Emergency contacts Close supervision Competent workers Fire watcher Appropriate PPE shall be used Confirm positive isolation of electricity Only competent electrical technicians shall perform task JOB SAFETY ANALYSIS Excavation Concrete/Civil works Cement dust exposure Corrosive chemicals burns Heat-related illness Foot injuring Sharp objects Concrete breaking/drilling Noise Vibration Dust Electrical hazards Stress Hot tapping Water under pressure Electrical hazards Working together, general health and safety COVID-19 Dehydration stress Cave-in Falling materials/tools Underground facilities Access and egress Contaminated soil Water/chemical accumulation Adjacent facilities TURNKEY SOLUTION FOR FLUSHING WATER SYSTEM SP-JSA-05223-CGC-01-00 Ошибка! Неизвестное имя свойства документа. 0 Use of safety harness and ensuring 100% tie-off for cable laying at height Shoring, shielding and sloping of excavation edges Cable detector to identify underground cables Digging of trial pit Use of wellington boot Pump out accumulated water Stop work policy Safety barrier at least 1m away from the edge of excavation Do not store materials/spoil at the edge of excavation Suitable and safe access such as ladder Wearing of hardhat is mandatory Protection of adjacent facilities Use appropriate PPE such as dust mask, wellington boot and rubber gloves. Workers to be encouraged to regularly rehydrate Rest breaks Close supervision Appropriate PPE shall be worn Electrically safe powered tools Regular rest break Rehydration/drinking enough water Standby portable fire extinguisher Safety barrier and signages Electrical cables should be in good condition. Proper earthing system for power tools. Maintain social distance, at least 2m apart Use nose mask at all time JOB SAFETY ANALYSIS TURNKEY SOLUTION FOR FLUSHING WATER SYSTEM SP-JSA-05223-CGC-01-00 Ошибка! Неизвестное имя свойства документа. 0 Checking of body temperature Watch out for symptoms of COVID-19 Regular hand washing and sanitizing Workers to regularly hydrate by drinking enough cold water Rest shelter Toilet facility Maintaining good housekeeping on site NOTE: JSA TO BE REVIEWED ACCORDING TO PROJECT SCOPE AND METHOD STATEMENT