Matrix of Curriculum Standards (Competencies) with Corresponding Recommended Flexible Learning Delivery Mode and Materials per Grading Period GRADE 9-12 TECHNOLOGY AND LIVELIHOOD EDUCATION Technical Drafting NC II (160 hours) Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) 1st QUARTER LESSON 3: DRAFTING ARCHITECTURAL LAYOUT AND DETAILS (AL) LO 1. Prepare architectural job requirements 1.2. Prepare tools, materials, and equipment in technical drawing 1.4. Select drawing tools, materials, and equipment in accordance with the SOP 1.6. Assess architectural job requirements based on SOP Week 1 1.4. Interpret blueprint according to architectural layout drawing/job requirements following SOP and work instructions CBLM: Information sheet 1.1 Review on drafting tools, materials and equipment, their uses and care CBLM: Information sheet 1.2 ARCHITECTURAL WORKING DRAWINGS DEPED- PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS ACTIVITY SHEET # 1.1 DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS SELF-CHECK 1.2 SELF CHECK 1.1 OPERATION SHEET 1.1 Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) LO 2. Prepare and set up tools and materials for drawing Week 2 Week 3-5 2.1 Observe OHS policies and procedures in setting-up tools and materials for drawing CBLM: INFORMATION SHEET 2.2 important Practices that must be observed in the work station or work place DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS SELF CHECK 2.2 2.2 Prepare drawing tools, materials and equipment based on job requirements CBLM: INFORMATION SHEET 2.1 The Importance of Drawing tools, materials and equipment PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS SELF CHECK 2.1 2.3 Set up tools, materials, and equipment based on the job requirements CBLM: INFORMATION SHEET 2.2 Procedure in Setting up Drawing tools, Materials and Equipment and standard procedure DEPED PUBLIC ACTIVITY SHEET # 1.1 3.1 Draw a technical description of a lot according to the approved lot survey CBLM: INFORMATION SHEET 3.2 LOT MENSURATION AND PLOTTING DEPED-PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS 3.2 Draw a building footprint according to the architectural drafting standards CBLM: INFORMATION SHEET 3.2 Procedure in Lot Plotting DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS 3.3 Draw a title block according to the architectural TLE LM: TITLE BLOCK IN HOUSE PLAN (Page 45) DEPED- LEARNING MATERIAL TECHNICALVOCATIONAL HIGH SCHOOLS LO 3. Draft site development plan ACTIVITY SHEET # 3.2 (PAGE 54) Draw title block in Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer drafting standards 3.4 Indicate dimension lines, dimensions, and drawing titles according to architectural drafting standards Link (if available online) Assessment (provide a link if online) House Plan (Page 45) CBLM:INFORMATION SHEET 3.1 DRAFT SITE DEVELOPMENT PLAN DEPED-PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET 3.2 PAGE 56 Operation sheet no. 4.1 Procedure in drawing a floor plan. (Page 83-90) LO 4. Draft floor plans 4.1 Draw walls, windows, doors, fixtures, and fittings according to architectural design standards 4.2 Draw grid and dimension lines according to architectural design standards CBLM:INFORMATION SHEET 4.1 FLOOR PLAN FEATURES (Page 65-72) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS CBLM:INFORMATION SHEET 4.3 Architectural drafting design standards (Page 77-78) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS 4.3 Use metric scale system according to the magnitude of the plan CBLM: INFORMATION SHEET 4.2 Use of appropriate scale in drawing a Floor Plan (Page 73-75) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS SELF CHECK 4.2 Use of appropriate scale (Page 76) 4.4 Identify sizes of doors, walls, and rooms following the schedule CBLM: INFORMATION SHEET 4.3 DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS SELF CHECK 4.3 Architectural drafting design standards (Page 82) Week 6-10 Architectural drafting design standards (Page 79-81) 2nd QUARTER LESSON 3: DRAFTING ARCHITECTURAL LAYOUT AND DETAILS (AL) Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) LO 5. Draft roof plans 5.1 Indicate the dimensions of the roof plan based on the floor plan CBLM: OPERATION SHEET 5.1 Draft a roof plan Step 1 and 2 (Page 105-106) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS 5.2 Draw roof plans according to drafting standards CBLM: OPERATION SHEET 5.1 Draft a roof plan Step 3 to 7 (Page 106-108) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS 5.3 Use standard architectural symbols in drafting roof plans CBLM: OPERATION SHEET 5.1 Draft a roof plan Step 8 Complete the drawings with proper dimensioning and labels, then finalize the drawing (Page 109) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS 5.4 Layout drawings according to sheet contents . Sheet # 3 - Roof Plan, Truss Diagram, Truss Connection Details and Construction Notes (Page 55) DEPED-LM 5.5 Draw framing details of roof plan according to architectural drafting standards CBLM: INFORMATION SHEET # 2.1 Week 1-3 Draft Structural Roof Framing Plans (Concrete) (Page 29-37) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS CBLM: OPERATION SHEET 5.1 PROCEDURE ON ROOF PLAN Layout Roof Plan, Truss Diagram, Truss Connection Details and Construction Notes With title block and contents OPERATION SHEET # 2.4 Draft a Roof Framing Plan Procedure: Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) LO 6. Draft ceiling plans 6.1 Draw vertical heights from finish floor line to ceiling line according to architectural drafting standards CBLM: INFORMATION SHEET 6.1 In accordance with the National Building Code of the Philippines (PD 1096) Section 805: Ceiling Heights (Page 118) 6.2 Indicate lighting fixtures and fire protection devices on the ceiling plan based on architectural drafting standards CBLM: INFORMATION SHEET 6.1 Important features that are shown in the ceiling plan Week 4 - 6 Week 7-9 DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET 6.1 Procedure in drafting ceiling plans Step 1-3 (Page 119-120) OPERATION SHEET 6.1 Procedure in drafting ceiling plans Step 4-5 (Page 121) LO 7. Draft elevations and sections 7.1 Draw vertical heights from grade line according to architectural drafting standards CBLM: INFORMATION SHEET # 7.1 ELEVATION PROJECTION (Page 127133) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET 7.1 Procedure in drafting elevations: Step 1 (page 136) 7.2 Project offsets from right, left, and rear sides of floor plan according to architectural drafting standards OPERATION SHEET 7.1 Procedure in drafting elevations: Step 2 (page 136) 7.3 Draw roof eaves and pitch on all elevations and sections according to OPERATION SHEET 7.1 Procedure in Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer Assessment (provide a link if online) architectural drafting standards drafting elevations: Step 3-4 (page 137) 7.4 Project doors and windows in all elevations and sections OPERATION SHEET 7.1 Procedure in drafting elevations: Step 5 (page 138) 7.5 Project cross and longitudinal section views from the floor plans and elevations INFORMATION SHEET # 7.2 SECTION VIEWS (Page 139-146) OPERATION SHEET # 7.2 Drafting Section Procedure Step 1-2 (Page 147-148) OPERATION SHEET # 7.2 Drafting Section Procedure Step 3-7 (Page 149-150) 7.6 Indicate various material symbols and specifications in all elevations and sections Week 10 Link (if available online) LO 8. Submit complete drawings 8.1 Follow the SOP when submitting the completed drawing to appropriate personnel (e.g., Engineer, Architect) 8.2 Note comments and corrections for final drawings following the SOP CBLM: INFORMATION SHEET # 8.1 Perform Presentation Drawings (Page 153-156) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET # 8.1 Perform Presentation Drawings 1. Draft the floor plan according to the desired size Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer Link (if available online) 8.3 Integrate comments and corrections into the final drawing based on job requirements 8.4 Perform housekeeping procedures following the SOP Assessment (provide a link if online) and shape. 2. Draft the elevation plan based on the floor plan. 3. Draft section drawing based on the elevations and floor plan. 4. Draft the perspective view. POWERPOINT: Workplace Housekeeping - Basic Guide ROSALIJOS, LITO JR. P. Perform housekeeping procedures ATTACHED IN PPT. LALAPROPER IS. LDN 3rd QUARTER LESSON 4: DRAFTING STRUCTURAL LAYOUT AND DETAILS (SL) LO 1. Draft foundation plans 1.1 Indicate the locations of wall footings, footings, and columns in drafting the floor plan CBLM: INFORMATION SHEET # 1.1 Design of Foundation (Page 6-9) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET # 1.2 Drafting a Foundation Plans Procedure: Step 1-2 (Page 19) 1.2 Draw in a larger scale details of wall footings, footings, and columns CBLM: INFORMATION SHEET # 1.2 Foundation Members (Page 12-17) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET # 1.2 Drafting a Foundation Plans Procedure: Step 3-5 (Page 2021) Week 1 - 2 Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) LO 2. Draft structural floors and roof framing plans 2.1 Draft structural floor and roof framing plans based on floor and foundation plans using timber, concrete, or steel construction CBLM: INFORMATION SHEET # 2.1 Draft Structural Floor and Roof Framing Plans (Concrete) (Page 29-37) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET # 2.2 Drafting a concrete Two-way slab Procedures OPERATION SHEET # 2.3 Drafting a Structural Timber Floor Plan Procedures Week 3-5 OPERATION SHEET # 2.4 Draft a Roof Framing Plan Procedure: 2.2 Draft structural floor and roof beams showing sizes, shapes, and detailed connections OPERATION SHEET # 2.4.1 Draft a Truss Detail Procedures LESSON 5: DRAFTING ELECTRICAL AND ELECTRONIC LAYOUT AND DETAILS (EL) Week 6-7 LO 1. Draft electrical plans and layouts 1.1 Draft lighting and power layouts according to electrical drafting standards CBLM:INFORMATION SHEET # 1.3 Lighting and General Rules to Observe DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET # 1.5 Draft electrical plans and layouts Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer in Illumination Planning Week 8-10 Link (if available online) Assessment (provide a link if online) Procedure: STEP 1-4 (Page 30) 1.2 Place riser diagram and circuiting symbols in electrical plans and layouts according to Electrical Code CBLM:INFORMATION SHEET # 1.1 Electrical Circuits Circuit Diagram Symbol (Page 9) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET # 1.5 Draft electricl plans and layouts Procedure: STEP 5-6 (Page 30) 1.3 Indicate legend and general notes according to local power service provider CBLM: INFORMATION SHEET # 1.2 Electrical Legend Electrical Notes and Specifications DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET # 1.5 Draft electricl plans and layouts Procedure: STEP 7-10 (Page 30) 2.1 Layout fire alarm and protection system symbols in the auxiliary system and layout plan according to Fire Code CBLM: INFORMATION SHEET # 2.2 Fire Alarm System (Page 39-40) FIRE CODE (Page 41) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET # 2.2 Draft auxiliary systems and layout-Fire Alarm System (Page 43-44) 2.2 Layout electronic and communication devices according to electrical drafting requirements CBLM INFORMATION SHEET # 2.3 Cable Television (Pg. 46) Intercommunication Device (Pg. 47-48) Building Management Systems (Pg. 49-50) DEPED -PUBLIC TECHNICALVOCATIONAL HIGH SCHOOLS OPERATION SHEET # 2.3 Draft auxiliary systems and layout Electronic and communication devices (Page 52-53) LO 2. Draft auxiliary system and layout Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) QUARTER 4 LESSON 6: DRAFTING SANITARY AND PLUMBING LAYOUT AND DETAILS (SP) LO 1. Draft water distribution system 1.1 Draft hot and cold water distribution systems according to Plumbing and Water Codes TLE LM: What to Know: Draft Water Distribution System (Page 296- 300) DEPED-LEARNING MATERIALS TLE LM: What to Process: lay-out the plumbing system in the floor plan. Procedure: Step 1-3 (Page 316) 1.2 Indicate signs and symbols according to sanitary and plumbing requirements TLE LM: What to Know: Common Plumbing Symbols (Page 302-307) DEPED-LEARNING MATERIALS TLE LM: What to Process: Lay-out the plumbing system in the floor plan. Procedure: Step 4-5 (Page 317) TLE LM What to Know: The Sewage Disposal System (Page 324-329) DEPED-LEARNING MATERIALS TLE LM: What to Process: Week 1 - 2 Week 3-4 LO 2. Draft sanitary and storm drainage 2.1 Draw sewerage plan layout according to Plumbing Code Draft Household Sanitary Layout Procedure Step 1-2 (Page 330-332) Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) 2.2 Draft storm drainage plan according to Plumbing Code Lesson Exemplar/ Learning resources available TLE LM What to Know: The Drainage System (Page333-337) LR developer Link (if available online) DEPED-LEARNING MATERIALS Assessment (provide a link if online) Enrichment Activity: Draft Septic Vault (Pg. 340-341) TLE LM: Reflect and Understand Draft Storm Drainage Plan (Page 338-339) Draft Catch Basin (Page 343) 2.3 Draw details and symbols according to sanitary and plumbing requirements TLE LM: What to Know: Common Plumbing Symbols (Page 302-307) DEPED-LEARNING MATERIALS TLE LM: What to Process: Draft Household Sanitary Layout Procedure Step 3-4 (Page 330-332) LESSON 7: DRAFTING MECHANICAL LAYOUT AND DETAILS (ML) Week 5-6 LO 1. Draft heating, ventilating, and airconditioning systems layout 1.1 Draft HVAC systems according to Mechanical Code TLE LM: Heating, Ventilating, and Air Conditioning (HVAC) (page 346-348) DEPED-LEARNING MATERIALS TLE LM: Reflect and Understand “Draft a residential HVAC Layout from the floor plan specified in below and give details on the following:” Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) 1.2 Indicate signs and symbols according to mechanical layout and detail requirements Week 7-8 LO 2. Draft mechanical details of conveyor system 2.1 Draw elevator, escalators, dumbwaiter, and moving ramp systems according to Mechanical Code 2.2 Draw details of mechanical conveyor system according to mechanical layout and detail requirements LO 3. Draft fire protection systems 3.1 Draw fire sprinkler system according to Fire Code Lesson Exemplar/ Learning resources available TLE LM: Mechanical Symbols and Abbreviations (Page 349) LR developer Link (if available online) DEPED-LEARNING MATERIALS TLE LM: Reflect and Understand Draft the existing illustrated sample Mechanical plan (Page 390-391) TLE LM: What to Know Requirements for fire safety (Page 393) Fire Extinguishing System (Page 394-395) DEPED-LEARNING MATERIALS TLE LM: What toTransfer Drafting Fire Protection Systems Procedure Step 1-2(Pg. 396) TLE LM: What to Know Building Classifications (393-394) DEPED-LEARNING MATERIALS TLE LM: What toTransfer Drafting Fire Protection Systems Procedure Step 3-4(Pg. 396) 1st Quarter LESSON 3: PREPARING COMPUTER-AIDED DRAWING (CA) Week 1-2 LO 1. Operate CAD (Page 376) TLE LM: Give the meaning of the following acronyms/symbols. (Page 371) DEPED-LEARNING MATERIALS TLE LM: What to Know Escalators, Conveyors, and Elevators (Pg. 382386) Week 9-10 3.2 Draw signs and symbols of fire protection systems according to fire protection requirements Assessment (provide a link if online) Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) software and computer hardware 1.1 Identify CAD software features according to the software provider Lesson Exemplar/ Learning resources available Learner’s Module Entitled: LR developer Link (if available online) Assessment (provide a link if online) DepEd Quiz is attached in the Learner’s Module. DepEd Quiz is attached in the Learner’s Module. DepEd Quiz is attached in the Learner’s Module. OPERATING CAD SOFTWARE AND COMPUTER HARDWARE pp. 43-49 1.2 Explore CAD working environment 1.3 Manipulate CAD features as per job requirement Week 3-10 Learner’s Module Entitled: INTRODUCTION TO CADD SYSTEM pp. 50-57 Learner’s Module Entitled: BASIC DRAWING TOOLS AND MODIFYING OBJECTS pp. 58-76 2nd Quarter LESSON 3: PREPARING COMPUTER-AIDED DRAWING (CA) Week 1-10 LO 2. Prepare plan using CAD 2.1 Observe OHS policies and procedures in when preparing plan using CAD 2.2 Set up drawings according to standard drawing scale and paper size 2.3 Prepare working drawings using CAD software as per Power Point Presentation Entitled: OHS Policies and Procedures in Preparing Plan using CAD Learner’s Module Entitled: LUCKY REY P. ROSALIJOS, LALA NHS, LDN Quiz is attached in the Power Point Presentation DEPED Quiz is attached in the Learner’s Module. Quiz is attached in the Learner’s Drawing Aids pp. 77-89 Learner’s Module Entitled: DEPED Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) building standards Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) Module. Preparing Plan Using CAD pp. 90-118 Power Point Presentation Entitled: 1. Drafting Floor Plan 2. Drafting Roofing Plan 3. Drafting Elevation Views Drafting Section Views LUCKY REY P. ROSALIJOS, LALA NHS, LDN 3rd Quarter LESSON 4: DRAFTING STRUCTURAL LAYOUT AND DETAILS USING CAD (LC) LO 1. Draft foundation plans 1.1 Indicate the locations of Learner’s Module Entitled: DepEd wall footings, footings, and DRAFTING FOUNDATION Week 1-2 columns in drafting the floor PLAN plan pp. 125-131 1.2 Draw on a larger scale details of wall footings, footings, and columns LO 2. Draft structural floors and roof framing plans 2.1 Draft structural floor and Learner’s Module Entitled: DepEd roof framing plans based on DRAFTING STRUCTURAL floor and foundation plans FLOOR AND ROOF Week 3-5 using timber, concrete, or FRAMING PLANS steel construction pp. 132-147 2.2 Draft structural floor and roof beams showing sizes, shapes, and detailed connections Performance Test and Quiz is attached in the Power Point Presentation Performance Task & Quiz is attached in the Learner’s Module Performance Task & Quiz is attached in the Learner’s Module Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer Link (if available online) Assessment (provide a link if online) LESSON 5: DRAFTING ELECTRICAL AND ELECTRONIC LAYOUT AND DETAILS USING CAD (EC) Week 6-7 Week 8-10 LO 1. Draft electrical plans and layouts 1.1.2. Draft lighting and power layouts according to electrical drafting standards 1.1.4. Place riser diagram and circuiting symbols in electrical plans and layouts according to Electrical Code 1.1.6. Indicate legend and general notes according to local power service provider LO 2. Draft auxiliary system and layout 2.1 Layout fire alarm and protection system symbols in the auxiliary system and layout plan according to Fire Code 2.2 Layout electronic and communication devices according to electrical drafting requirements Learner’s Module Entitled: DepEd Performance Task & Quiz is attached in the Learner’s Module DEPED Performance Task & Quiz is attached in the Learner’s Module DRAFTING ELECTRICAL PLANS AND LAYOUT pp. 149-154 Learner’s Module Entitled: DRAFTING AUXILIARY SYSTEM USING CAD 4th Quarter LESSON 6: DRAFTING SANITARY AND PLUMBING LAYOUT AND DETAILS USING CAD (SC) Week 1 LO 1. Draft water distribution system 1.1 Draft hot and cold water Learner’s Module Entitled: DepEd Performance Task Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Lesson Exemplar/ Learning resources available LR developer distribution systems according DRAFTING WATER to Plumbing and Water Codes DISTRIBUTION SYSTEM 1.2 Indicate signs and pp. 165-169 symbols according to sanitary and plumbing requirements LO 2. Draft sanitary and storm drainage 2.1 Draw sewerage plan Learner’s Module Entitled: DepEd layout according to Plumbing DRAFTING STORM Code DRAINAGE PLAN USING Week 2-3 2.2 Draft storm drainage plan CAD according to Plumbing Code pp. 170-174 2.3 Draw details and symbols according to sanitary and plumbing requirements LESSON 7: DRAFTING MECHANICAL LAYOUT AND DETAILS USING CAD (DC) LO 1. Draft HVAC systems layout 1.2. Week 4-5 Week 6-7 1.4. Draft HVAC systems according to Mechanical Code 1.2 Indicate signs and symbols according to mechanical layout and detail requirements LO 2. Draft mechanical details of conveyor system 2.1 Draw elevator, escalators, dumbwaiter, and moving ramp systems according to Mechanical Code 2.2 Draw details of mechanical conveyor system according to mechanical layout and detail requirements Learner’s Module Entitled: DRAFTING MECHANICAL DETAILS OF CONVEYOR SYSTEMS USING CAD pp. 187-188 Assessment (provide a link if online) & Quiz is attached in the Learner’s Module Performance Task & Quiz is attached in the Learner’s Module DEPED Performance Task & Quiz is attached in the Learner’s Module DEPED Performance Task & Quiz is attached in the Learner’s Module DRAFTING HEATING, VENTILATING AND AIRCONDITIONING (HVAC) SYSTEMS USING CAD PP. 180-186 Learner’s Module Entitled: Link (if available online) Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) Week 8-9 LO 3. Draft fire protection systems 3.1 Draw fire sprinkler system according to Fire Code 3.2 Draw signs and symbols of fire protection systems according to fire protection requirements Week 10 LO 4. Draft gas piping system 4.1 Draft gas piping layout according to Mechanical Code 4.2 Draw signs and symbols according to mechanical layout and detail requirements Lesson Exemplar/ Learning resources available Learner’s Module Entitled: LR developer Link (if available online) Assessment (provide a link if online) DEPED Performance Task & Quiz is attached in the Learner’s Module POWERPOINT PRESENTATION: GAS PIPING SYSTEM ROSALIJOS, LITO JR. P. LALA PROPER IS. ,LDN ATTACHED IN PPT DRAW LAYOUT GAS PIPING SYSTEM BASED ON A PLAN. TLE LM: Needs and Wants of People PP. 19-20 TLE LM: Generating Ideas for Business PP. 19-20 DEPED-LM Activity 1 Minisurvey PP. 25 DEPED-LM Activity 3: Survey Questionnaire to Determine Potential Costumers PP. 26 DRAFTING FIRE PROTECTION SYSTEM USING CAD PP. 190-195 ENVIRONMENT AND MARKET The specialist suggests that these competencie s must be taught on the latter part LO 1. Develop a product/ service in Technical Drafting 1.1 Identify what is of “Value” to the customer 1.2 Identify the customer to sell to 1.3 Explain what makes a product unique and competitive 1.4 Apply creativity and Innovative techniques to develop marketable product 1.5 Employ a Unique Selling Proposition (USP) to the product/service LO 2. Select a business idea based on the criteria Week of the Quarter/ Grading Period Learning competencies (Grade 9-12 TLE: Technical Drafting) and techniques set 2.1 Enumerate various criteria and steps in selecting a business idea 2.2 Apply the criteria/steps in selecting a viable business idea 2.3 Determine a business idea based on the criteria/techniques set Lesson Exemplar/ Learning resources available TLE LM: ENTITLED: Selecting the Right Idea PP. 22 TLE LM: ENTITLED: : Environmental Scanning PP.23 LR developer DEPED-LM Link (if available online) Assessment (provide a link if online) Activity 2 Screening business ideas PP. 25 Activity 4: Survey Questionnaire to Determine Potential Competitors Utilize the succeeding guide questions during a focused group discussion to identify potential competitor.