Uploaded by Michelle Bantac

pdfcoffee.com tle-9-12-technical-drafting-nc-ii-matrix-rosalijos-pdf-free

advertisement
Matrix of Curriculum Standards (Competencies) with Corresponding Recommended Flexible
Learning Delivery Mode and Materials per Grading Period
GRADE 9-12 TECHNOLOGY AND LIVELIHOOD EDUCATION
Technical Drafting NC II (160 hours)
Week of the
Quarter/
Grading Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
Link (if available
online)
Assessment
(provide a link if
online)
1st QUARTER
LESSON 3: DRAFTING ARCHITECTURAL LAYOUT AND DETAILS (AL)
LO 1. Prepare architectural
job requirements
1.2.
Prepare tools,
materials, and equipment
in technical drawing
1.4.
Select drawing tools,
materials, and equipment
in accordance with the
SOP
1.6.
Assess architectural
job requirements based
on SOP
Week 1
1.4. Interpret blueprint
according to architectural
layout drawing/job
requirements following SOP
and work instructions
CBLM: Information sheet
1.1
Review on drafting tools,
materials and equipment,
their uses and care
CBLM: Information sheet
1.2 ARCHITECTURAL
WORKING DRAWINGS
DEPED- PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
ACTIVITY SHEET #
1.1
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
SELF-CHECK 1.2
SELF CHECK 1.1
OPERATION
SHEET 1.1
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
Link (if available online)
Assessment
(provide a link if
online)
LO 2. Prepare and set up
tools and materials for
drawing
Week 2
Week 3-5
2.1 Observe OHS policies
and procedures in
setting-up tools and
materials for drawing
CBLM: INFORMATION
SHEET 2.2 important
Practices that must be
observed in the work
station or work place
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
SELF CHECK 2.2
2.2 Prepare drawing tools,
materials and equipment
based on job
requirements
CBLM: INFORMATION
SHEET 2.1
The Importance of
Drawing tools, materials
and equipment
PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
SELF CHECK 2.1
2.3 Set up tools, materials,
and equipment based on the
job requirements
CBLM: INFORMATION
SHEET 2.2 Procedure in
Setting up Drawing tools,
Materials and Equipment
and standard procedure
DEPED PUBLIC
ACTIVITY SHEET #
1.1
3.1 Draw a technical description of a lot according to the
approved lot survey
CBLM: INFORMATION
SHEET 3.2
LOT MENSURATION AND
PLOTTING
DEPED-PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
3.2 Draw a building footprint
according to the architectural
drafting standards
CBLM: INFORMATION
SHEET 3.2
Procedure in Lot Plotting
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
3.3 Draw a title block
according to the architectural
TLE LM: TITLE BLOCK IN
HOUSE PLAN (Page 45)
DEPED- LEARNING
MATERIAL
TECHNICALVOCATIONAL
HIGH SCHOOLS
LO 3. Draft site
development plan
ACTIVITY SHEET #
3.2
(PAGE 54)
Draw title block in
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
drafting standards
3.4 Indicate dimension lines,
dimensions, and drawing titles
according to architectural
drafting standards
Link (if available online)
Assessment
(provide a link if
online)
House Plan
(Page 45)
CBLM:INFORMATION
SHEET 3.1
DRAFT SITE
DEVELOPMENT PLAN
DEPED-PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
3.2
PAGE 56
Operation sheet no.
4.1 Procedure in
drawing a floor
plan.
(Page 83-90)
LO 4. Draft floor plans
4.1 Draw walls, windows,
doors, fixtures, and
fittings according to
architectural design
standards
4.2 Draw grid and dimension
lines according to
architectural design
standards
CBLM:INFORMATION
SHEET 4.1
FLOOR PLAN FEATURES
(Page 65-72)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
CBLM:INFORMATION
SHEET 4.3 Architectural
drafting design standards
(Page 77-78)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
4.3 Use metric scale system
according to the
magnitude of the plan
CBLM: INFORMATION
SHEET 4.2
Use of appropriate scale
in drawing a Floor Plan
(Page 73-75)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
SELF CHECK 4.2
Use of appropriate
scale
(Page 76)
4.4 Identify sizes of doors,
walls, and rooms following the
schedule
CBLM: INFORMATION
SHEET 4.3
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
SELF CHECK 4.3
Architectural
drafting design
standards
(Page 82)
Week 6-10
Architectural drafting
design standards (Page
79-81)
2nd QUARTER
LESSON 3: DRAFTING ARCHITECTURAL LAYOUT AND DETAILS (AL)
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
Link (if available online)
Assessment
(provide a link if
online)
LO 5. Draft roof plans
5.1 Indicate the dimensions of
the roof plan based on the
floor plan
CBLM: OPERATION
SHEET 5.1 Draft a roof
plan Step 1 and 2 (Page
105-106)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
5.2 Draw roof plans according
to drafting standards
CBLM: OPERATION
SHEET 5.1 Draft a roof
plan Step 3 to 7 (Page
106-108)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
5.3 Use standard architectural
symbols in drafting roof plans
CBLM: OPERATION
SHEET 5.1 Draft a roof
plan Step 8 Complete the
drawings with proper
dimensioning and labels,
then finalize the drawing
(Page 109)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
5.4 Layout drawings according
to sheet contents
. Sheet # 3 - Roof Plan,
Truss Diagram, Truss
Connection Details and
Construction Notes
(Page 55)
DEPED-LM
5.5 Draw framing details of
roof plan according to
architectural drafting
standards
CBLM: INFORMATION
SHEET # 2.1
Week 1-3
Draft Structural Roof
Framing Plans (Concrete)
(Page 29-37)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
CBLM: OPERATION
SHEET 5.1
PROCEDURE ON
ROOF PLAN
Layout Roof Plan,
Truss Diagram,
Truss Connection
Details and
Construction Notes
With title block and
contents
OPERATION SHEET
# 2.4 Draft a Roof
Framing Plan
Procedure:
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
Link (if available online)
Assessment
(provide a link if
online)
LO 6. Draft ceiling plans
6.1 Draw vertical heights from
finish floor line to ceiling line
according to architectural
drafting standards
CBLM: INFORMATION
SHEET 6.1 In accordance
with the National Building
Code of the Philippines
(PD 1096) Section 805:
Ceiling Heights
(Page 118)
6.2 Indicate lighting fixtures
and fire protection devices on
the ceiling plan based on
architectural drafting
standards
CBLM: INFORMATION
SHEET 6.1 Important
features that are shown in
the ceiling plan
Week 4 - 6
Week 7-9
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
6.1
Procedure in
drafting ceiling
plans
Step 1-3
(Page 119-120)
OPERATION SHEET
6.1
Procedure in
drafting ceiling
plans
Step 4-5
(Page 121)
LO 7. Draft elevations and
sections
7.1 Draw vertical heights from
grade line according to
architectural drafting
standards
CBLM: INFORMATION
SHEET # 7.1 ELEVATION
PROJECTION (Page 127133)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
7.1
Procedure in
drafting elevations:
Step 1 (page 136)
7.2 Project offsets from right,
left, and rear sides of floor
plan according to
architectural drafting
standards
OPERATION SHEET
7.1
Procedure in
drafting elevations:
Step 2
(page 136)
7.3 Draw roof eaves and
pitch on all elevations and
sections according to
OPERATION SHEET
7.1
Procedure in
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
Assessment
(provide a link if
online)
architectural drafting
standards
drafting elevations:
Step 3-4
(page 137)
7.4 Project doors and
windows in all elevations and
sections
OPERATION SHEET
7.1
Procedure in
drafting elevations:
Step 5
(page 138)
7.5 Project cross and
longitudinal section views
from the floor plans and
elevations
INFORMATION SHEET #
7.2
SECTION VIEWS (Page
139-146)
OPERATION SHEET
# 7.2
Drafting Section
Procedure
Step 1-2 (Page
147-148)
OPERATION SHEET
# 7.2
Drafting Section
Procedure
Step 3-7 (Page
149-150)
7.6 Indicate various material
symbols and specifications in
all elevations and sections
Week 10
Link (if available online)
LO 8. Submit complete
drawings
8.1 Follow the SOP when
submitting the completed
drawing to appropriate
personnel (e.g., Engineer,
Architect)
8.2 Note comments and
corrections for final drawings
following the SOP
CBLM: INFORMATION
SHEET # 8.1
Perform Presentation
Drawings (Page 153-156)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
# 8.1
Perform
Presentation
Drawings
1. Draft the floor
plan according to
the desired size
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
Link (if available online)
8.3 Integrate comments and
corrections into the final
drawing based on job
requirements
8.4 Perform housekeeping
procedures following the SOP
Assessment
(provide a link if
online)
and shape. 2. Draft
the elevation plan
based on the floor
plan. 3. Draft
section drawing
based on the
elevations and floor
plan. 4. Draft the
perspective view.
POWERPOINT:
Workplace
Housekeeping - Basic
Guide
ROSALIJOS,
LITO JR. P.
Perform
housekeeping
procedures
ATTACHED IN PPT.
LALAPROPER IS.
LDN
3rd QUARTER
LESSON 4: DRAFTING STRUCTURAL LAYOUT AND DETAILS (SL)
LO 1. Draft foundation
plans
1.1 Indicate the locations of
wall footings, footings, and
columns in drafting the floor
plan
CBLM: INFORMATION
SHEET # 1.1
Design of Foundation
(Page 6-9)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
# 1.2 Drafting a
Foundation Plans
Procedure:
Step 1-2 (Page 19)
1.2 Draw in a larger scale
details of wall footings,
footings, and columns
CBLM: INFORMATION
SHEET # 1.2
Foundation Members
(Page 12-17)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
# 1.2 Drafting a
Foundation Plans
Procedure:
Step 3-5 (Page 2021)
Week 1 - 2
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
Link (if available online)
Assessment
(provide a link if
online)
LO 2. Draft structural
floors and roof framing
plans
2.1 Draft structural floor and
roof framing plans based on
floor and foundation plans
using timber, concrete, or
steel construction
CBLM: INFORMATION
SHEET # 2.1
Draft Structural Floor
and Roof Framing Plans
(Concrete) (Page 29-37)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
# 2.2
Drafting a concrete
Two-way slab
Procedures
OPERATION SHEET
# 2.3 Drafting a
Structural Timber
Floor Plan
Procedures
Week 3-5
OPERATION SHEET
# 2.4 Draft a Roof
Framing Plan
Procedure:
2.2 Draft structural floor and
roof beams showing sizes,
shapes, and detailed
connections
OPERATION SHEET
# 2.4.1
Draft a Truss Detail
Procedures
LESSON 5: DRAFTING ELECTRICAL AND ELECTRONIC LAYOUT AND DETAILS (EL)
Week 6-7
LO 1. Draft electrical plans
and layouts
1.1 Draft lighting and power
layouts according to electrical
drafting standards
CBLM:INFORMATION
SHEET # 1.3
Lighting and
General Rules to Observe
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
# 1.5 Draft
electrical plans and
layouts
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
in Illumination Planning
Week 8-10
Link (if available online)
Assessment
(provide a link if
online)
Procedure: STEP
1-4
(Page 30)
1.2 Place riser diagram and
circuiting symbols in electrical
plans and layouts according to
Electrical Code
CBLM:INFORMATION
SHEET # 1.1
Electrical Circuits
Circuit Diagram Symbol
(Page 9)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
# 1.5 Draft electricl
plans and layouts
Procedure: STEP
5-6
(Page 30)
1.3 Indicate legend and
general notes according to
local power service provider
CBLM: INFORMATION
SHEET # 1.2
Electrical Legend Electrical
Notes and Specifications
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
# 1.5 Draft electricl
plans and layouts
Procedure: STEP
7-10
(Page 30)
2.1 Layout fire alarm and
protection system symbols in
the auxiliary system and
layout plan according to Fire
Code
CBLM: INFORMATION
SHEET # 2.2
Fire Alarm System
(Page 39-40)
FIRE CODE (Page 41)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
# 2.2
Draft auxiliary
systems and
layout-Fire Alarm
System
(Page 43-44)
2.2 Layout electronic and
communication devices
according to electrical drafting
requirements
CBLM INFORMATION
SHEET # 2.3
Cable Television (Pg. 46)
Intercommunication
Device (Pg. 47-48)
Building Management
Systems (Pg. 49-50)
DEPED -PUBLIC
TECHNICALVOCATIONAL
HIGH SCHOOLS
OPERATION SHEET
# 2.3 Draft
auxiliary systems
and layout Electronic and
communication
devices
(Page 52-53)
LO 2. Draft auxiliary
system and layout
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
Link (if available online)
Assessment
(provide a link if
online)
QUARTER 4
LESSON 6: DRAFTING SANITARY AND PLUMBING LAYOUT AND DETAILS (SP)
LO 1. Draft water
distribution system
1.1 Draft hot and cold water
distribution systems according
to Plumbing and Water Codes
TLE LM:
What to Know:
Draft Water Distribution
System
(Page 296- 300)
DEPED-LEARNING
MATERIALS
TLE LM:
What to Process:
lay-out the
plumbing system in
the floor
plan. Procedure:
Step 1-3 (Page
316)
1.2 Indicate signs and
symbols according to sanitary
and plumbing requirements
TLE LM:
What to Know:
Common Plumbing
Symbols
(Page 302-307)
DEPED-LEARNING
MATERIALS
TLE LM:
What to Process:
Lay-out the
plumbing system in
the floor
plan. Procedure:
Step 4-5 (Page
317)
TLE LM
What to Know:
The Sewage Disposal
System (Page 324-329)
DEPED-LEARNING
MATERIALS
TLE LM:
What to Process:
Week 1 - 2
Week 3-4
LO 2. Draft sanitary and
storm drainage
2.1 Draw sewerage plan
layout according to Plumbing
Code
Draft Household
Sanitary Layout
Procedure Step 1-2
(Page 330-332)
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
2.2 Draft storm drainage plan
according to Plumbing Code
Lesson Exemplar/
Learning resources
available
TLE LM
What to Know:
The Drainage System
(Page333-337)
LR developer
Link (if available online)
DEPED-LEARNING
MATERIALS
Assessment
(provide a link if
online)
Enrichment
Activity: Draft
Septic Vault (Pg.
340-341)
TLE LM:
Reflect and
Understand
Draft Storm
Drainage Plan
(Page 338-339)
Draft Catch Basin
(Page 343)
2.3 Draw details and symbols
according to sanitary and
plumbing requirements
TLE LM:
What to Know:
Common Plumbing
Symbols
(Page 302-307)
DEPED-LEARNING
MATERIALS
TLE LM:
What to Process:
Draft Household
Sanitary Layout
Procedure Step 3-4
(Page 330-332)
LESSON 7: DRAFTING MECHANICAL LAYOUT AND DETAILS (ML)
Week 5-6
LO 1. Draft heating,
ventilating, and airconditioning systems
layout
1.1 Draft HVAC systems
according to Mechanical Code
TLE LM:
Heating, Ventilating, and
Air Conditioning (HVAC)
(page 346-348)
DEPED-LEARNING
MATERIALS
TLE LM: Reflect
and Understand
“Draft a residential
HVAC Layout from
the floor plan
specified in below
and give details on
the following:”
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
1.2 Indicate signs and
symbols according to
mechanical layout and detail
requirements
Week 7-8
LO 2. Draft mechanical
details of conveyor system
2.1 Draw elevator, escalators,
dumbwaiter, and moving
ramp systems according to
Mechanical Code
2.2 Draw details of mechanical
conveyor system according to
mechanical layout and detail
requirements
LO 3. Draft fire protection
systems
3.1 Draw fire sprinkler system
according to Fire Code
Lesson Exemplar/
Learning resources
available
TLE LM:
Mechanical Symbols and
Abbreviations (Page 349)
LR developer
Link (if available online)
DEPED-LEARNING
MATERIALS
TLE LM:
Reflect and
Understand
Draft the existing
illustrated sample
Mechanical plan
(Page 390-391)
TLE LM: What to Know
Requirements for fire
safety (Page 393)
Fire Extinguishing System
(Page 394-395)
DEPED-LEARNING
MATERIALS
TLE LM:
What toTransfer
Drafting Fire
Protection Systems
Procedure
Step 1-2(Pg. 396)
TLE LM: What to Know
Building Classifications
(393-394)
DEPED-LEARNING
MATERIALS
TLE LM:
What toTransfer
Drafting Fire
Protection Systems
Procedure
Step 3-4(Pg. 396)
1st Quarter
LESSON 3: PREPARING COMPUTER-AIDED DRAWING (CA)
Week 1-2
LO 1. Operate CAD
(Page 376)
TLE LM: Give the
meaning of the
following
acronyms/symbols.
(Page 371)
DEPED-LEARNING
MATERIALS
TLE LM: What to Know
Escalators, Conveyors,
and Elevators (Pg. 382386)
Week 9-10
3.2 Draw signs and symbols of
fire protection systems
according to fire protection
requirements
Assessment
(provide a link if
online)
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
software and computer
hardware
1.1 Identify CAD software
features according to the
software provider
Lesson Exemplar/
Learning resources
available
Learner’s Module Entitled:
LR developer
Link (if available online)
Assessment
(provide a link if
online)
DepEd
Quiz is attached in
the Learner’s
Module.
DepEd
Quiz is attached in
the Learner’s
Module.
DepEd
Quiz is attached in
the Learner’s
Module.
OPERATING CAD
SOFTWARE AND
COMPUTER HARDWARE
pp. 43-49
1.2 Explore CAD working
environment
1.3 Manipulate CAD features
as per job requirement
Week 3-10
Learner’s Module Entitled:
INTRODUCTION TO CADD
SYSTEM
pp. 50-57
Learner’s Module Entitled:
BASIC DRAWING TOOLS
AND
MODIFYING OBJECTS
pp. 58-76
2nd Quarter
LESSON 3: PREPARING COMPUTER-AIDED DRAWING (CA)
Week 1-10
LO 2. Prepare plan using
CAD
2.1 Observe OHS policies and
procedures in when preparing
plan using CAD
2.2 Set up drawings according
to standard drawing scale and
paper size
2.3 Prepare working drawings
using CAD software as per
Power Point Presentation
Entitled:
OHS Policies and
Procedures in Preparing
Plan using CAD
Learner’s Module Entitled:
LUCKY REY P.
ROSALIJOS, LALA
NHS, LDN
Quiz is attached in
the Power Point
Presentation
DEPED
Quiz is attached in
the Learner’s
Module.
Quiz is attached in
the Learner’s
Drawing Aids
pp. 77-89
Learner’s Module Entitled:
DEPED
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
building standards
Lesson Exemplar/
Learning resources
available
LR developer
Link (if available online)
Assessment
(provide a link if
online)
Module.
Preparing Plan Using CAD
pp. 90-118
Power Point Presentation
Entitled:
1. Drafting Floor Plan
2. Drafting Roofing Plan
3. Drafting Elevation
Views
Drafting Section Views
LUCKY REY P.
ROSALIJOS, LALA
NHS, LDN
3rd Quarter
LESSON 4: DRAFTING STRUCTURAL LAYOUT AND DETAILS USING CAD (LC)
LO 1. Draft foundation
plans
1.1 Indicate the locations of
Learner’s Module Entitled: DepEd
wall footings, footings, and
DRAFTING FOUNDATION
Week 1-2
columns in drafting the floor
PLAN
plan
pp. 125-131
1.2 Draw on a larger scale
details of wall footings,
footings, and columns
LO 2. Draft structural
floors and roof framing
plans
2.1 Draft structural floor and
Learner’s Module Entitled: DepEd
roof framing plans based on
DRAFTING STRUCTURAL
floor and foundation plans
FLOOR AND ROOF
Week 3-5
using timber, concrete, or
FRAMING PLANS
steel construction
pp. 132-147
2.2 Draft structural floor and
roof beams showing sizes,
shapes, and detailed
connections
Performance Test
and Quiz is
attached in the
Power Point
Presentation
Performance Task
& Quiz is attached
in the Learner’s
Module
Performance Task
& Quiz is attached
in the Learner’s
Module
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
Link (if available online)
Assessment
(provide a link if
online)
LESSON 5: DRAFTING ELECTRICAL AND ELECTRONIC LAYOUT AND DETAILS USING CAD (EC)
Week 6-7
Week 8-10
LO 1. Draft electrical plans
and layouts
1.1.2.
Draft lighting
and power layouts
according to electrical
drafting standards
1.1.4.
Place riser
diagram and circuiting
symbols in electrical
plans and layouts
according to Electrical
Code
1.1.6.
Indicate
legend and general notes
according to local power
service provider
LO 2. Draft auxiliary
system and layout
2.1 Layout fire alarm and
protection system symbols
in the auxiliary system
and layout plan according
to Fire Code
2.2 Layout electronic and
communication devices
according to electrical
drafting requirements
Learner’s Module Entitled:
DepEd
Performance Task
& Quiz is attached
in the Learner’s
Module
DEPED
Performance Task
& Quiz is attached
in the Learner’s
Module
DRAFTING ELECTRICAL
PLANS AND LAYOUT
pp. 149-154
Learner’s Module Entitled:
DRAFTING AUXILIARY
SYSTEM USING CAD
4th Quarter
LESSON 6: DRAFTING SANITARY AND PLUMBING LAYOUT AND DETAILS USING CAD (SC)
Week 1
LO 1. Draft water
distribution system
1.1 Draft hot and cold water
Learner’s Module Entitled:
DepEd
Performance Task
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Lesson Exemplar/
Learning resources
available
LR developer
distribution systems according
DRAFTING WATER
to Plumbing and Water Codes
DISTRIBUTION SYSTEM
1.2 Indicate signs and
pp. 165-169
symbols according to sanitary
and plumbing requirements
LO 2. Draft sanitary and
storm drainage
2.1 Draw sewerage plan
Learner’s Module Entitled: DepEd
layout according to Plumbing
DRAFTING STORM
Code
DRAINAGE
PLAN USING
Week 2-3
2.2 Draft storm drainage plan
CAD
according to Plumbing Code
pp. 170-174
2.3 Draw details and symbols
according to sanitary and
plumbing requirements
LESSON 7: DRAFTING MECHANICAL LAYOUT AND DETAILS USING CAD (DC)
LO 1. Draft HVAC systems
layout
1.2.
Week 4-5
Week 6-7
1.4.
Draft HVAC systems
according to Mechanical
Code
1.2 Indicate signs and
symbols according to
mechanical layout and
detail requirements
LO 2. Draft mechanical
details of conveyor system
2.1 Draw elevator, escalators,
dumbwaiter, and moving
ramp systems according
to Mechanical Code
2.2 Draw details of mechanical
conveyor system according to
mechanical layout and detail
requirements
Learner’s Module Entitled:
DRAFTING MECHANICAL
DETAILS OF CONVEYOR
SYSTEMS USING CAD
pp. 187-188
Assessment
(provide a link if
online)
& Quiz is attached
in the Learner’s
Module
Performance Task
& Quiz is attached
in the Learner’s
Module
DEPED
Performance Task
& Quiz is attached
in the Learner’s
Module
DEPED
Performance Task
& Quiz is attached
in the Learner’s
Module
DRAFTING HEATING,
VENTILATING AND AIRCONDITIONING
(HVAC) SYSTEMS USING
CAD
PP. 180-186
Learner’s Module Entitled:
Link (if available online)
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
Week 8-9
LO 3. Draft fire protection
systems
3.1 Draw fire sprinkler system
according to Fire Code
3.2 Draw signs and symbols of
fire protection systems
according to fire protection
requirements
Week 10
LO 4. Draft gas piping
system
4.1 Draft gas piping layout
according to Mechanical Code
4.2 Draw signs and symbols
according to mechanical
layout and detail requirements
Lesson Exemplar/
Learning resources
available
Learner’s Module Entitled:
LR developer
Link (if available online)
Assessment
(provide a link if
online)
DEPED
Performance Task
& Quiz is
attached in
the Learner’s
Module
POWERPOINT
PRESENTATION:
GAS PIPING SYSTEM
ROSALIJOS,
LITO JR. P.
LALA PROPER
IS. ,LDN
ATTACHED IN PPT
DRAW LAYOUT
GAS PIPING
SYSTEM BASED
ON A PLAN.
TLE LM:
Needs and Wants of
People
PP. 19-20
TLE LM:
Generating Ideas for
Business PP. 19-20
DEPED-LM
Activity 1 Minisurvey
PP. 25
DEPED-LM
Activity 3: Survey
Questionnaire to
Determine Potential
Costumers
PP. 26
DRAFTING FIRE
PROTECTION SYSTEM
USING CAD
PP. 190-195
ENVIRONMENT AND
MARKET
The
specialist
suggests
that these
competencie
s must be
taught on
the latter
part
LO 1. Develop a product/
service in Technical
Drafting
1.1 Identify what is of “Value”
to the customer
1.2 Identify the customer to
sell to
1.3 Explain what makes a
product unique and
competitive
1.4 Apply creativity and
Innovative techniques to
develop marketable product
1.5 Employ a Unique Selling
Proposition (USP) to the
product/service
LO 2. Select a business
idea based on the criteria
Week of the
Quarter/ Grading
Period
Learning competencies
(Grade 9-12 TLE: Technical
Drafting)
and techniques set
2.1 Enumerate various criteria
and steps in selecting a
business idea
2.2 Apply the criteria/steps in
selecting a viable business
idea
2.3 Determine a business idea
based on the
criteria/techniques set
Lesson Exemplar/
Learning resources
available
TLE LM:
ENTITLED: Selecting
the Right Idea
PP. 22
TLE LM:
ENTITLED:
: Environmental Scanning
PP.23
LR developer
DEPED-LM
Link (if available online)
Assessment
(provide a link if
online)
Activity 2
Screening business
ideas
PP. 25
Activity 4: Survey
Questionnaire to
Determine Potential
Competitors
Utilize the
succeeding guide
questions during a
focused group
discussion to
identify potential
competitor.
Download