Table below represents Manufacturing Process of Side, Roof, Floor, Front and Rear Frame S/N Description of Operation Oper’n 1. Receive stock materials and procure utilities o 2. Measure, Mark and Trim Profiles to size o 3. Clamp sections on the fixture o 4. Weld all set-up section joints o 5. Inspection of the web frame o 6. Kit the web frame according to production lots o 7. Delivery of kitted web frames to Kiira Vehicle Plant o Insp. Move Delay Storage Time Req’d 2 hr Equipment\Tooling Used Scribes, Mechanical Toolbox 0.5 hr Hold Down Cam Clamps 3 hr MIG Welding Machine 0.5 hr Dial Gauges 1hr 8 hr Table below represents Manufacturing Process Chart for Seat Base Die Guide Pins, Fasteners S/N Description of Operation Oper’n 1. Requisition from Stores o 2. Work Set up on Lathe Machine o 3. Time to Engage, Tooling Set Up o Insp. Move Delay Storage Dist. Moved 200m Time Req’d Equipment\Used 0.5 h 1.2 h 0.3 h DMG eco Turn 310 (CNC Lathe) 4. Cylindrical Turning o 5. Facing Turning o 6. Parting or Cutting Off o 7. Surface finishing o 8. Move to the Galvanizing line o 9. Galvanizing and Curing o 0.2 DMG eco Turn 310, Indexable Cutter 0.1 DMG eco Turn 310, Indexable Cutter 0.2 DMG eco Turn 310, Indexable Cutter 3h Universal Tool Grinder 24h Zinc Plating Equipment 100m Table below represents Seat Base Mold Set Assembly S/N 1. Description of Operation Receive machined cavity , core plates, fasteners , bushings and guide pins 4. 5. 6. 7. 8. o Work Set up o Inspection of geometrical tolerances and dimensions o Press Fitting of Guide Pins Bushings o Press Fitting of Fastener Bushing o Press Fitting of Sprue Bushing o Press Fitting of Ejector Pin Bushings o Assembly of all subassemblies o 2. 3. Oper’n Insp. Move Delay Storage Dist. Moved 150m Time Req’d 0.5 h Equipment\Used Forklift 1h 5h Inspector 686 Bridge Coordinate Measuring Machine 0.5h Manual Hydraulic Press 3h Manual Hydraulic Press 0.5h Manual Hydraulic Press 2h Manual Hydraulic Press 4h Table below represents Injection Molding S/N 1. 2. 3. Description of Operation Move assembled mold to the Injection Molding Shop Mount the mold on the Injection molding machine Work Set up and Trouble shooting Oper’n o o o 4. Curing & Drying Plastic Material o 5. Preparation of Cooling System o 6. Injection Molding Trials o 7. Injection Molding of Thermoplastics of Seat Base o Apply adhesive bonding of the Seat Rest Thermoplastics Allow for adhesive curing o 10. Assemble Seat Rest and Seat Base o 11. Inspect the finished thermo plastic assembly o Package the seat thermo plastics o 8. 9. 12. o Insp. Move Delay Storage Dist. Moved Time Req’d 200m 0.5h Fork Lift 5h Work Holding Crane Equipment\Used Inspector 686 Bridge Coordinate 0.3 h Measuring Machine 2h Injection Molding Machine 260F2VII 0.5h Injection Molding Machine 260F2VII 0.25h Injection Molding Machine 260F2VII 0.1 h per thermo plastic Injection Molding Machine 260F2VII 0.5 h 1.5 h 0.5 h Assembly Jig and Fixture Inspector 686 Bridge Coordinate 0.35h Measuring Machine 0.3h per thermoplastic Table below represents Urethane and Foaming Process S/N Description of Operation Oper’n 1. Receive foam at LIL o 2. Trim the foam to required shape o 3. Apply stitching to the urethane o 4. Assemble Urethane and Foam o 5. Package the dressed cushion for transportation o Insp. Move Storage Delay Dist. Moved Time Req’d 0.5 h Equipment\Used Foam Cutter Heavy Duty Portable 1.2 h Sewing Machine 0.25 h 0.2h Table below represents Support Frame Fabrication S/N 1. 2. 3. 4. 5. 6. 7. Oper’n Insp. Receive angle bars at LIL o Measure, Mark and Trim profiles o Assemble the trimmed profiles o Description of Operation MIG weld the joints according to assembly drawings o Package the frame according to modularized break down o Pre-Delivery Inspection of the Seat Items Deliver seat thermoplastic, frame and dressed cushion to KMC premises in Jinja o o Move Storage Delay Dist. Moved Time Req’d 136 km 1-2 weeks after ordering Truck 0.2 h Scriber and Band Saw Equipment\Used 0.5h 0.5h MIG Welding Machine 0.5h 0.5h per seat set Inspector 686 Bridge Coordinate 8h Pallets Measuring Machine Table below represents Final Assembly S/N Description of Operation Oper’n Inspect the delivered 1. items and Procurement Control o Assemble the thermo 2. plastic onto the support frame o 3. Assemble the entire seat o Inspect the quality of the assembled seat o 4. 5. Deliver to the customer o Insp. Move Storage Delay Dist. Moved Time Req’d 136 km 2h Hand Held Dial Gauges 0,8h Assembly Jig and Fixture 0.5 h Foam Cutter Equipment\Used Heavy Duty Portable 0.25 Sewing Machine 0.5h