PROPOSED FITOUT RENOVATION OF CHED AUDITORIUM
NOT TO SCALE
SC
INTERIOR PERSPECTIVE 01
6 000
E
SC
9 000
D
6 000
3D POLYESTER FABRIC ACOUSTIC PANEL CEILING
SYSTEM CLADDED AS SHOWN USING LIGHT GAUGE
METAL CEILING SYSTEM FASTENED USING 1/4 " DIA.
BLIND RIVETS AND 1" SELF DRIVEN BLACK GYPSUM
SCREW SPACED ACCORDINGLY AND SUFFICIENTLY
600 X 600 MM ACOUSTIC CEILING PANELS FISSURED
TYPE INSTALLED WITH TEE RUNNER SUSPENDED
CEILING SYSTEM WITH 9MM GYPSUM BOARD DROP
CEILING AS SHOWN (VERIFY DETAIL OF CEILING ALONG
CORRIDOR)
INTERIOR PERSPECTIVE 01
PROPOSED FITOUT RENOVATION OF CHED AUDITORIUM
NOT TO SCALE
03
AR
SC
AR
AR
AR
(VERIFY BLOW UP DETAIL-01 / SEE
CROSS SECTION DETAILS)
F
SC
12 000
(VERIFY BLOW UP DETAIL OF 3D
POLYESTERDAY FABRIC ACOUSTIC
TEXTURED CEILING PANELINGS
"GEMSTILE" ACOUSTIC PROFILE
DESIGN)
18 000
(VERIFY BLOW UP DETAIL OF 3D
POLYESTERDAY FABRIC ACOUSTIC
TEXTURED CEILING PANELINGS
"GEMSTILE" ACOUSTIC PROFILE
DESIGN)
F
DIFFRRACTIVE TEXTURED ACOSUTIC CEILING
PANELLINGS USING 9MM THK. GYPSUM BOARD
FINISHED WITH TEXTURED WALLPAPER (VERIFY
WALLPAPER SWATCHES PROFILE) WITH LIGHT GAUGE
METAL FURRING ATTACHED AND FASTENED USING
SELF DRILLING BLACK SCREW
0 538
SC
SC
600 X 600 MM ACOUSTIC CEILING PANELS
FISSURED TYPE INSTALLED WITH TEE RUNNER
SUSPENDED CEILING SYSTEM WITH 9MM
GYPSUM BOARD DROP CEILING AS SHOWN
(VERIFY DETAIL OF CEILING ALONG CORRIDOR)
AT RECEPTION LOUNGE
SC
SC
AR
AR
(VERIFY BLOW UP DETAIL OF 3D
POLYESTERDAY FABRIC ACOUSTIC
TEXTURED CEILING PANELINGS
"GEMSTILE" ACOUSTIC PROFILE
DESIGN)
6 000
02
SC
D
D
E
(VERIFY BLOW UP DETAIL OF 3D
POLYESTERDAY FABRIC ACOUSTIC
TEXTURED CEILING PANELINGS
"GEMSTILE" ACOUSTIC PROFILE
DESIGN)
1 000
1 000
1 000
1 000
SC
E
AR
1 824
1 949
0 125
AR
01
ARCHITECTURAL NOTES
22
AR
1.0
ALL ARCHITECTURAL DETAILS ARE TO BE REFERRED IN ACCORDANCE WITH PLANS AND SPECIFICATIONS INDICATED
ON THE PLAN. INSTALLATION, FABRICATIONS, ASSEMBLIES NOT INDICATED ON THE PLAN SHALL BE REFERRED TO THE
TECHNICAL PERSONNEL / CONSTRUCTION SUPERVISION GROUP OF THE GENERAL SERVICES DIVISION; ADMINISTRATIVE,
FINANCIAL & MANAGEMENT SERVICE (GSD-AFMS) AND CHED OFFICIALS IN-CHARGE OF APPROVAL AND ACCEPATANCE.
SC
DN
22
21
20
19
18
17
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
AR
9MM GYPSUM BOARD SUPPORTED USING LIGHT
GAUGE METAL FURRING SYSTEM FINSIHED WITH FLAT
LATEX PAINT WHITE (VERIFY DETAIL OF CEILING
ALONG CORRIDOR) AT WAITING / HOLDING LOUNGE
9MM GYPSUM BOARD SUPPORTED USING LIGHT
GAUGE METAL FURRING SYSTEM FINSIHED WITH FLAT
LATEX PAINT WHITE (VERIFY DETAIL OF CEILING
ALONG CORRIDOR) AT STORAGE ROOMS
2.0 ALL CONSTRUCTION WORKS SHALL BE IN ACCORDANCE WITH THE RESTRICTIONS AS STATED BY THE BUILDING
MANAGEMENT OFFICE, THE NATIONAL BUILDING CODE, LOCAL ORDINANCES ON BUILDING SAFETY AND MINIMUM DESIGN
STANDARDS.
SC
A
AR
SC
FIRE EXIT STAIR 01
23
9MM GYPSUM BOARD SUPPORTED USING LIGHT
GAUGE METAL FURRING SYSTEM FINSIHED WITH FLAT
LATEX PAINT WHITE (VERIFY DETAIL OF CEILING
ALONG CORRIDOR) AT STORAGE ROOMS
3.0 MANUFACTURER SUPPLIED DETAILS SHALL BE PRESENTED TO THE TECHNICAL PERSONNEL / CONSTRUCTION
SUPERVISION GROUP OF THE GENERAL SERVICES DIVISION; ADMINISTRATIVE, FINANCIAL & MANAGEMENT SERVICE
(GSD-AFMS) IN CHARGE OF CONSTRUCTION FOR APPROVAL. SUCH DETAILS SHALL BE MADE IN SHOP DRAWINGS AND SHALL
BE SUBJECTED TO COMMENTS AND SUGGESTIONS BY THE ARCHITECT IN CHARGE OF CONSTRUCTION.
4.0 AS MAY DEEM NECESSARY, ALL STRUCTURAL AND ARCHITECTURAL INSTALLATIONS SHALL BE REFERRRED TO THE
TECHNICAL PERSONNEL / CONSTRUCTION SUPERVISION GROUP, GSD-AFMS PRIOR TO CONSTRUCTION.
EXISTING CHED
BUILDING
5.0 MATERIALS PRESENTED SHALL BE IN COMPLIANCE WITH THE PLAN OUTLINE SPECIFICATIONS AND NOTES. MATERIALS
MAY BE CHANGED OR MAY VARY BUT MUST BE SUBMITTED TO THE TECHNICAL PERSONNEL OF THE GENERAL SERVICES
DIVISION; ADMINISTRATIVE, FINANCIAL & MANAGEMENT SERVICE (GSD-AFMS) IN CHARGE OF CONSTRUCTION FOR APPROVAL.
REFLECTED CEILING PLAN
PROPOSED FITOUT RENOVATION OF CHED AUDITORIUM
SCALE 1:100 METERS
6.0 SCHEDULE OF DOORS SHOULD BE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS PRESENTED. ALTERATIONS
ON THE DIMENSIONS, MATERIAL SPECIFICATIONS, GLASS AND GLAZING AND OTHER PERTINENT CHANGES SHALL BE
SUBJECTED FOR INSPECTION FROM THE THE TECHNICAL PERSONNEL / CONSTRUCTION SUPERVISION GROUP OF THE
GENERAL SERVICES DIVISION; ADMINISTRATIVE, FINANCIAL & MANAGEMENT SERVICE (GSD-AFMS) IN CHARGE OF
CONSTRUCTION FOR APPROVAL.
PROPOSED
AUDITORIUM FIROUT
RENOVATION
7.0
DOUBLE WALLING OR WALL CLADDING SHALL BE IN ACCORDANCE WITH THE PROVISIONS STATED BY THE PROJECT
MANAGEMENT OFFICE, THE NATIONAL BUILDING CODE, LOCAL ORDINANCES AND MUST BE IN RELATION TO THE
INSTALLATION NOTES AS PRESENTED ON THE PLAN. DOUBLE WALLS SHALL BE MADE UP OF 21" TICK FIBERCEMENT BOARD AND
SUPPORTED WITH METAL STUDS (GALVANIZED IRON METAL STUDS AND HORIZONTAL METAL BATTENS WITH METAL TRACKS.)
KEY PLAN
8.0 METAL STUD FASTENERS TO BE USED SHALL BE IMPACT DRIVEN FASTENERS OR EXPANSION SHIELDS AND BOLTS. FOR
WALL CLADDING THAT REQUIRE FIRMER OR STURDIER MOUNTING, DYNA BOLTS OR HEAVY DUTY EXPANSION BOLTS AND
SHIELDS MUST BE USED.
NOT TO SCALE
9.0
CEILING MOUNTINGS SHALL BE HORIZONTALLY SUPPORTED. FOR HEAVY LIGHTING FIXTURES, LOAD (DEAD LOAD)
SHALL BE TRANSFERRED TO THE HORIZONTA STEEL STRUCTURAL SUPPORT.
CHECKED AND REVIEWED BY:
REPUBLIC OF THE PHILIPPINES
COMMISSION ON HIGHER EDUCATION
REPUBLIC OF THE PHILIPPINES
COMMISSION ON HIGHER EDUCATION
RECOMMENDING APPROVAL :
REPUBLIC OF THE PHILIPPINES
COMMISSION ON HIGHER EDUCATION
APPROVED BY:
PROJECT TITLE:
REPUBLIC OF THE PHILIPPINES
COMMISSION ON HIGHER EDUCATION
55 CP GARCIA DILIMAN QUEZON CITY, METRO MANILA
UPGRADING OF THE CHED AUDITORIUM
AND IT'S EQUIPMENTS
DRWN BY:
AR. ALBERT ALLEN
EUSTAQUIO (AAE)
DESD BY:
AR. MICHAEL F.
LUGA (MFL)
CHKD BY:
ENGR. JUAN F.
PURIAN JR. (JFP)
APPD BY:
J. PROSPERO DE
VERA III (JPV)
CHIEF ADMINSITRATIVE OFFICER: AFMS-GSD
ATTY. SEPTON A. DE LA CRUZ
J. PROSPERO E. DE VERA III, DPA
DIRECTOR IV, ADMINISTRTAIVE FINANCIAL AND MANAGEMENT SERVICES
CHAIRMAN, COMMISSION ON HIGHER EDUCATION
NO. 55, C.P. GARCIA AVE. DILIMAN, QUEZON CITY, 1101 METRO
MANILA, REPUBLIC OF THE PHILIPPINES
REFLECTED CEILING PLAN
SHEET NUMBER:
AR-04
DRAWING NUMBER:
PROJECT LOCATION:
ENGR. JUAN F. PURIRAN JR.
REVISONS/REMARKS SHEET CONTENTS:
DATE &
PLACE :