A C B 6 000 G 6 000 A 6 000 F AR A AR PROPOSED FITOUT RENOVATION OF CHED AUDITORIUM NOT TO SCALE SC INTERIOR PERSPECTIVE 01 6 000 E SC 9 000 D 6 000 3D POLYESTER FABRIC ACOUSTIC PANEL CEILING SYSTEM CLADDED AS SHOWN USING LIGHT GAUGE METAL CEILING SYSTEM FASTENED USING 1/4 " DIA. BLIND RIVETS AND 1" SELF DRIVEN BLACK GYPSUM SCREW SPACED ACCORDINGLY AND SUFFICIENTLY 600 X 600 MM ACOUSTIC CEILING PANELS FISSURED TYPE INSTALLED WITH TEE RUNNER SUSPENDED CEILING SYSTEM WITH 9MM GYPSUM BOARD DROP CEILING AS SHOWN (VERIFY DETAIL OF CEILING ALONG CORRIDOR) INTERIOR PERSPECTIVE 01 PROPOSED FITOUT RENOVATION OF CHED AUDITORIUM NOT TO SCALE 03 AR SC AR AR AR (VERIFY BLOW UP DETAIL-01 / SEE CROSS SECTION DETAILS) F SC 12 000 (VERIFY BLOW UP DETAIL OF 3D POLYESTERDAY FABRIC ACOUSTIC TEXTURED CEILING PANELINGS "GEMSTILE" ACOUSTIC PROFILE DESIGN) 18 000 (VERIFY BLOW UP DETAIL OF 3D POLYESTERDAY FABRIC ACOUSTIC TEXTURED CEILING PANELINGS "GEMSTILE" ACOUSTIC PROFILE DESIGN) F DIFFRRACTIVE TEXTURED ACOSUTIC CEILING PANELLINGS USING 9MM THK. GYPSUM BOARD FINISHED WITH TEXTURED WALLPAPER (VERIFY WALLPAPER SWATCHES PROFILE) WITH LIGHT GAUGE METAL FURRING ATTACHED AND FASTENED USING SELF DRILLING BLACK SCREW 0 538 SC SC 600 X 600 MM ACOUSTIC CEILING PANELS FISSURED TYPE INSTALLED WITH TEE RUNNER SUSPENDED CEILING SYSTEM WITH 9MM GYPSUM BOARD DROP CEILING AS SHOWN (VERIFY DETAIL OF CEILING ALONG CORRIDOR) AT RECEPTION LOUNGE SC SC AR AR (VERIFY BLOW UP DETAIL OF 3D POLYESTERDAY FABRIC ACOUSTIC TEXTURED CEILING PANELINGS "GEMSTILE" ACOUSTIC PROFILE DESIGN) 6 000 02 SC D D E (VERIFY BLOW UP DETAIL OF 3D POLYESTERDAY FABRIC ACOUSTIC TEXTURED CEILING PANELINGS "GEMSTILE" ACOUSTIC PROFILE DESIGN) 1 000 1 000 1 000 1 000 SC E AR 1 824 1 949 0 125 AR 01 ARCHITECTURAL NOTES 22 AR 1.0 ALL ARCHITECTURAL DETAILS ARE TO BE REFERRED IN ACCORDANCE WITH PLANS AND SPECIFICATIONS INDICATED ON THE PLAN. INSTALLATION, FABRICATIONS, ASSEMBLIES NOT INDICATED ON THE PLAN SHALL BE REFERRED TO THE TECHNICAL PERSONNEL / CONSTRUCTION SUPERVISION GROUP OF THE GENERAL SERVICES DIVISION; ADMINISTRATIVE, FINANCIAL & MANAGEMENT SERVICE (GSD-AFMS) AND CHED OFFICIALS IN-CHARGE OF APPROVAL AND ACCEPATANCE. SC DN 22 21 20 19 18 17 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 AR 9MM GYPSUM BOARD SUPPORTED USING LIGHT GAUGE METAL FURRING SYSTEM FINSIHED WITH FLAT LATEX PAINT WHITE (VERIFY DETAIL OF CEILING ALONG CORRIDOR) AT WAITING / HOLDING LOUNGE 9MM GYPSUM BOARD SUPPORTED USING LIGHT GAUGE METAL FURRING SYSTEM FINSIHED WITH FLAT LATEX PAINT WHITE (VERIFY DETAIL OF CEILING ALONG CORRIDOR) AT STORAGE ROOMS 2.0 ALL CONSTRUCTION WORKS SHALL BE IN ACCORDANCE WITH THE RESTRICTIONS AS STATED BY THE BUILDING MANAGEMENT OFFICE, THE NATIONAL BUILDING CODE, LOCAL ORDINANCES ON BUILDING SAFETY AND MINIMUM DESIGN STANDARDS. SC A AR SC FIRE EXIT STAIR 01 23 9MM GYPSUM BOARD SUPPORTED USING LIGHT GAUGE METAL FURRING SYSTEM FINSIHED WITH FLAT LATEX PAINT WHITE (VERIFY DETAIL OF CEILING ALONG CORRIDOR) AT STORAGE ROOMS 3.0 MANUFACTURER SUPPLIED DETAILS SHALL BE PRESENTED TO THE TECHNICAL PERSONNEL / CONSTRUCTION SUPERVISION GROUP OF THE GENERAL SERVICES DIVISION; ADMINISTRATIVE, FINANCIAL & MANAGEMENT SERVICE (GSD-AFMS) IN CHARGE OF CONSTRUCTION FOR APPROVAL. SUCH DETAILS SHALL BE MADE IN SHOP DRAWINGS AND SHALL BE SUBJECTED TO COMMENTS AND SUGGESTIONS BY THE ARCHITECT IN CHARGE OF CONSTRUCTION. 4.0 AS MAY DEEM NECESSARY, ALL STRUCTURAL AND ARCHITECTURAL INSTALLATIONS SHALL BE REFERRRED TO THE TECHNICAL PERSONNEL / CONSTRUCTION SUPERVISION GROUP, GSD-AFMS PRIOR TO CONSTRUCTION. EXISTING CHED BUILDING 5.0 MATERIALS PRESENTED SHALL BE IN COMPLIANCE WITH THE PLAN OUTLINE SPECIFICATIONS AND NOTES. MATERIALS MAY BE CHANGED OR MAY VARY BUT MUST BE SUBMITTED TO THE TECHNICAL PERSONNEL OF THE GENERAL SERVICES DIVISION; ADMINISTRATIVE, FINANCIAL & MANAGEMENT SERVICE (GSD-AFMS) IN CHARGE OF CONSTRUCTION FOR APPROVAL. REFLECTED CEILING PLAN PROPOSED FITOUT RENOVATION OF CHED AUDITORIUM SCALE 1:100 METERS 6.0 SCHEDULE OF DOORS SHOULD BE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS PRESENTED. ALTERATIONS ON THE DIMENSIONS, MATERIAL SPECIFICATIONS, GLASS AND GLAZING AND OTHER PERTINENT CHANGES SHALL BE SUBJECTED FOR INSPECTION FROM THE THE TECHNICAL PERSONNEL / CONSTRUCTION SUPERVISION GROUP OF THE GENERAL SERVICES DIVISION; ADMINISTRATIVE, FINANCIAL & MANAGEMENT SERVICE (GSD-AFMS) IN CHARGE OF CONSTRUCTION FOR APPROVAL. PROPOSED AUDITORIUM FIROUT RENOVATION 7.0 DOUBLE WALLING OR WALL CLADDING SHALL BE IN ACCORDANCE WITH THE PROVISIONS STATED BY THE PROJECT MANAGEMENT OFFICE, THE NATIONAL BUILDING CODE, LOCAL ORDINANCES AND MUST BE IN RELATION TO THE INSTALLATION NOTES AS PRESENTED ON THE PLAN. DOUBLE WALLS SHALL BE MADE UP OF 21" TICK FIBERCEMENT BOARD AND SUPPORTED WITH METAL STUDS (GALVANIZED IRON METAL STUDS AND HORIZONTAL METAL BATTENS WITH METAL TRACKS.) KEY PLAN 8.0 METAL STUD FASTENERS TO BE USED SHALL BE IMPACT DRIVEN FASTENERS OR EXPANSION SHIELDS AND BOLTS. FOR WALL CLADDING THAT REQUIRE FIRMER OR STURDIER MOUNTING, DYNA BOLTS OR HEAVY DUTY EXPANSION BOLTS AND SHIELDS MUST BE USED. NOT TO SCALE 9.0 CEILING MOUNTINGS SHALL BE HORIZONTALLY SUPPORTED. FOR HEAVY LIGHTING FIXTURES, LOAD (DEAD LOAD) SHALL BE TRANSFERRED TO THE HORIZONTA STEEL STRUCTURAL SUPPORT. CHECKED AND REVIEWED BY: REPUBLIC OF THE PHILIPPINES COMMISSION ON HIGHER EDUCATION REPUBLIC OF THE PHILIPPINES COMMISSION ON HIGHER EDUCATION RECOMMENDING APPROVAL : REPUBLIC OF THE PHILIPPINES COMMISSION ON HIGHER EDUCATION APPROVED BY: PROJECT TITLE: REPUBLIC OF THE PHILIPPINES COMMISSION ON HIGHER EDUCATION 55 CP GARCIA DILIMAN QUEZON CITY, METRO MANILA UPGRADING OF THE CHED AUDITORIUM AND IT'S EQUIPMENTS DRWN BY: AR. ALBERT ALLEN EUSTAQUIO (AAE) DESD BY: AR. MICHAEL F. LUGA (MFL) CHKD BY: ENGR. JUAN F. PURIAN JR. (JFP) APPD BY: J. PROSPERO DE VERA III (JPV) CHIEF ADMINSITRATIVE OFFICER: AFMS-GSD ATTY. SEPTON A. DE LA CRUZ J. PROSPERO E. DE VERA III, DPA DIRECTOR IV, ADMINISTRTAIVE FINANCIAL AND MANAGEMENT SERVICES CHAIRMAN, COMMISSION ON HIGHER EDUCATION NO. 55, C.P. GARCIA AVE. DILIMAN, QUEZON CITY, 1101 METRO MANILA, REPUBLIC OF THE PHILIPPINES REFLECTED CEILING PLAN SHEET NUMBER: AR-04 DRAWING NUMBER: PROJECT LOCATION: ENGR. JUAN F. PURIRAN JR. REVISONS/REMARKS SHEET CONTENTS: DATE & PLACE :