Question 1
Complete
Provides filter fields from where you can define criteria for filtering the data listed in the Defects grid.
Mark 1.00 out of
1.00
Select one:
a. Grid filter
b. Description tab
c. Defects grid
d. Attachment tab
Question 2
Complete
Enable you to create and display a dynamic graphic representation of data related to test plans and test
sets.
Mark 1.00 out of
1.00
Select one:
a. Dashboard View module
b. Live Analysis graphs
c. Analysis Menus tab
d. Analysis View module
Question 3
Complete
Mark 1.00 out of
1.00
You run tests ________ from ALM using HP Sprinter.
Select one:
a. Automatically
b. None of the choices
c. Manually
d. Manually and Automatically
Question 4
Complete
Enables subject matter experts (SMEs) to work with Business Process Testing (BPT), the HP test
automation solution.
Mark 1.00 out of
1.00
Select one:
a. Test Plan
b. Risk-based Quality Management
c. Business Components module
d. Test Resources
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
1/20
10/14/2020
Final Exam: Attempt review
Question 5
Complete
Mark 1.00 out of
1.00
It empowers IT to manage the core application life cycle, from requirements through deployment,
granting application trams the crucial visibility and collaboration needed for predictable, repeatable,
and adaptable delivery of modern applications.
Answer:
Question 6
Complete
Mark 1.00 out of
1.00
ALM
Before you create a report, you can add sub-reports. A sub-report adds an extra layer of information
related to the parent report.
Select one:
True
False
Question 7
This cycle tests the new features with existing features that might have been impacted by the changes.
Complete
Mark 1.00 out of
1.00
Select one:
a. Cycle 1- New Features
b. Cycle 4-User Acceptance Testing
c. Cycle 3-Performance Testing
d. Cycle 2-Integrated System Testing
Question 8
Complete
Mark 1.00 out of
You can use the Project Report reporting tool, available in the Analysis View module, to design and
generate comprehensive reports of project data.
1.00
Select one:
True
False
Question 9
Complete
Mark 0.00 out of
1.00
Contains tests that you can assign to cycles in the Management module. This association allows you to
review the progress of tests, determine the number of resolved and outstanding defects, and enhance
your reporting ability.
Select one:
a. Test Sets Tree
b. Test Set folder
c. Test Set
d. None of the choices
Question 10
Complete
Allows you to capture a group of requirements, tests, or test assets at strategic points in the project
lifecycle to mark specific milestones.
Mark 1.00 out of
1.00
Select one:
a. Tracking
b. Key Benefits
c. Baselining
d Key Capabilities
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
2/20
10/14/2020
d. Key Capabilities
Question 11
Complete
Mark 1.00 out of
Final Exam: Attempt review
Enabled for requirements, tests, and test assets to allow distributed teams to collaborate and manage
multiple versions of assets in parallel while maintaining data integrity and providing an audit history of
changes throughout the project lifecycle.
1.00
Select one:
a. Test Plan
b. Version control
c. Risk-based Quality Management
d. Test Resources
Question 12
Complete
Mark 1.00 out of
1.00
The project administrator for your organization can _______ version control through ALM Site
Administration.
Select one:
a. Disable
b. Enable or Disable
c. Enable
d. None of the choices
Question 13
Complete
Mark 1.00 out of
1.00
If you know that a test in your test set might fail, but you want to make sure that subsequent tests in
the test set still execute, which of the following should you do?
Select one:
a. All of the choices
b. Ensure that the execution condition for the arrow running into the test is set to Finished.
c. Disconnect the test from the flow.
d. Ensure that the execution condition for the arrow running out from the test is set to Finished.
Question 14
What are the physical devices used to identify users in secure system?
Complete
Mark 1.00 out of
1.00
Select one:
a. Card
b. ATM
c. Smart Cards
d. Single-sign On
Question 15
Complete
Mark 1.00 out of
1.00
Provides a tabular list of the defects logged for a project.
Select one:
a. Attachment tab
b. Defects grid
c. History tab
d. Description tab
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
3/20
10/14/2020
Final Exam: Attempt review
Question 16
Complete
Module addresses the need for a stronger connection between business process modeling, quality
assurance management, and requirements definition.
Mark 1.00 out of
1.00
Select one:
a. ALM Business Models
b. CAC Business Models
c. SOS Business Models
d. PPT Business Models
Question 17
Complete
Mark 1.00 out of
1.00
The ______ module allows you to view all test runs for your project in a grid.
Select one:
a. Test Set Tree
b. Test Runs
c. Test Set
d. None of the choices
Question 18
Complete
The Test Plan module enables you to ____ your application according to functionality.
Mark 1.00 out of
1.00
Select one:
a. Divide
b. None of the choices
c. Multiply
d. Plan
Question 19
A physical devices used to identify users in secure systems.
Complete
Mark 1.00 out of
1.00
Select one:
a. Common Access Card
b. Requirement Management
c. Smart Card Authentication
d. Single Sign-on
Question 20
Complete
Mark 1.00 out of
Managing and tracking defects is a critical step in the testing process because it involves a lot of time
and money.
1.00
Select one:
True
False
Question 21
You can define what data appear in a graph and how the data are organized.
Complete
Mark 1.00 out of
1.00
Select one:
True
False
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
4/20
10/14/2020
Final Exam: Attempt review
Question 22
Complete
Mark 0.00 out of
1.00
Question 23
Complete
Mark 1.00 out of
1.00
The ALM Business
ALM Business Mo
module addresses the need for a stronger connection between business process modeling, quality
assurance management, and requirements definition.
You can view a list of all entities in the current module that you have checked out, and check in or undo
the check out for selected entities.
Select one:
True
False
Question 24
Complete
Mark 1.00 out of
Clearly defined requirements help developers set a target for themselves and the testing team to
identify their testing priorities.
1.00
Select one:
a. Sets clear expectations between teams
b. Saves time and money
c. Helps prevent scope creep
d. Aids development and testing
Question 25
Complete
Mark 1.00 out of
1.00
Enables you to record additional details about the actual test execution results.
Select one:
a. None of the choices
b. Actual Field
c. Compact View Button
d. Status Column
Question 26
Complete
Mark 1.00 out of
1.00
Version control enables you to create and manage ALM entities while maintaining previous versions of
these entities.
Select one:
True
False
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
5/20
10/14/2020
Final Exam: Attempt review
Question 27
Complete
Mark 1.00 out of
1.00
Contains tests that you can assign to cycles in the Management module. This association allows you to
review the progress of tests, determine the number of resolved and outstanding defects, and enhance
your reporting ability.
Select one:
a. Test Set
b. Test Sets Tree
c. Test Set folder
d. None of the choices
Question 28
Complete
What is the third stage of the testing process?
Mark 1.00 out of
1.00
Select one:
a. None of the choices
b. Test Execution
c. Test Control
d. Test Planning
Question 29
Changes the speed that it takes for ALM to calculate the KPI data.
Complete
Mark 1.00 out of
1.00
Select one:
a. Override Settings
b. Engines Throttle
c. Scoreboard
d. Advance area
Question 30
This cycle ensures that the new features meet the expectations of the business.
Complete
Mark 1.00 out of
1.00
Select one:
a. Cycle 4-User Acceptance Testing
b. Cycle 1-New Features
c. Cycle 2-Integrated System Testing
d. Cycle 3-Performance Testing
Question 31
This section enables you to open the ALM documentation library and other online resources.
Complete
Mark 1.00 out of
1.00
Select one:
a. Guide section
b. Ask section
c. Help section
d. Action section
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
6/20
10/14/2020
Final Exam: Attempt review
Question 32
Complete
Enables you to view your requirements hierarchically in a tree.
Mark 1.00 out of
1.00
Select one:
a. Requirements Grid
b. Coverage Analysis
c. Requirement Tree
d. Requirement Details
Question 33
Complete
You use the Graph wizard to generate an old graph.
Mark 1.00 out of
1.00
Select one:
True
False
Question 34
It is a translating business goals/objectives into a realized software-enabled business process.
Complete
Mark 1.00 out of
1.00
Select one:
a. Creating plan
b. Creating action plan
c. Creating requirements
d. Creating application
Question 35
Complete
Enables quality assurance managers to track application readiness by defining goals for activities of an
application release.
Mark 1.00 out of
1.00
Select one:
a. Requirements Management
b. ALM project planning and tracking (PPT)
c. Smart Card Authentication
d. Common Access Card
Question 36
Refreshes the scorecard table, so that it displays the most up-to-date information.
Complete
Mark 1.00 out of
1.00
Select one:
a. Scorecard layout
b. None of the choices
c. Scoreboard
d. Generate
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
7/20
10/14/2020
Final Exam: Attempt review
Question 37
Complete
Mark 1.00 out of
1.00
Enables you to create links between requirements and other entities.
Select one:
a. Requirements Grid
b. Requirement Tree
c. Requirements Details
d. Coverage Analysis
Question 38
Contains the Dashboard tree in which you organize dashboard pages.
Complete
Mark 1.00 out of
1.00
Select one:
a. Analysis Menus tab
b. Live Analysis graphs
c. Dashboard View module
d. Live Analysis graphs
Question 39
Complete
Mark 1.00 out of
1.00
Question 40
Complete
Mark 1.00 out of
1.00
baselining
allows you to capture a group of requirements, test, or test assets at strategic points in the project
lifecycle to mark specific milestones.
You can create and manage entities in a version control-enabled project in both tree and grid views.
Select one:
True
False
Question 41
ALM support you through ____.
Complete
Mark 1.00 out of
1.00
Select one:
a. None of the choices
b. All phases of Application Lifecycle Management
c. The development phase
d. The implementing phase
Question 42
Enables you to purge calculations after a specific time period.
Complete
Mark 1.00 out of
1.00
Select one:
a. Advanced Area
b. Purge Area
c. Scheduling Area
d. None of the choices
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
8/20
10/14/2020
Final Exam: Attempt review
Question 43
This is the two modules that have been completely redesigned as part of this release of ALM 12.0.
Complete
Mark 1.00 out of
1.00
Select one:
a. Access Management and Action Management
b. Lifecycle Management and Requirements Management
c. Requirements Management and Defects Management
d. Application Management and Defect Management
Question 44
Complete
Mark 1.00 out of
Enables you to instruct ALM to automatically send a status alert email to the author when the test set
completes execution.
1.00
Select one:
a. Develop the Test Sets tree
b. Organize test runs
c. Set automation options
d. Run the tests
Question 45
Complete
To compare two versions, press the Alt key and select each version. Click the Compare button.
Mark 1.00 out of
1.00
Select one:
True
False
Question 46
Complete
Mark 1.00 out of
You convert requirements to tests to automatically create a one-to-one mapping between ____________
and ______.
1.00
Select one:
a. Requirements and activities
b. Planning and activity
c. Activity and tests
d. Requirements and tests
Question 47
You can _____graphs for viewing in a web browser without downloading an ALM client.
Complete
Mark 1.00 out of
1.00
Select one:
a. Share
b. Share and Download
c. None of the choices
d. Download
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
9/20
10/14/2020
Final Exam: Attempt review
Question 48
The HP’s strategy and software approach for modern application delivery starts with a what?
Complete
Mark 1.00 out of
1.00
Select one:
a. Unified platform
b. Unified information
c. Unified classroom
d. Unified application
Question 49
Enables you to schedule PPT calculations for your entire site.
Complete
Mark 1.00 out of
1.00
Select one:
a. Advanced Area
b. Scheduling Area
c. Purge Area
d. None of the choices
Question 50
Sprinter is not available for ALM Essentials Edition or Performance Center Edition.
Complete
Mark 1.00 out of
1.00
Select one:
True
False
Question 51
Complete
A _______ is an independent business unit within an organization, with its own set of rules, standards,
resources, objectives, and applications.
Mark 1.00 out of
1.00
Select one:
a. Sample Release Tree
b. Releases and Cycles throughout ALM
c. Release Module Icons
d. Line of business (LOB)
Question 52
Complete
Mark 1.00 out of
If you want to make changes to an entity in a version control enabled project, what is the first thing you
must do?
1.00
Select one:
a. Check in the entity
b. Turn off version control
c. Check out the entity
d. Promote the entity
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
10/20
10/14/2020
Final Exam: Attempt review
Question 53
Displays the progress of a release in a Gantt chart.
Complete
Mark 1.00 out of
1.00
Select one:
a. Content tab
b. Master Plan tab
c. Scorecard tab
d. Detailed tab
Question 54
Complete
Enables you to create and edit tests or components directly in Sprinter and save them to ALM.
Mark 1.00 out of
1.00
Select one:
a. None of the choices
b. Button Plan mode
c. Sprinter's Plan mode
d. ALM Plan mode
Question 55
Complete
A dynamic hierarchical structure based on virtual folders allows for flexibility in manipulating the
Requirements view.
Mark 1.00 out of
1.00
Select one:
a. Category views
b. Author views
c. Author mode
d. Category mode
Question 56
Complete
Provides a clear picture of the test building blocks and assists in the execution of the actual tests.
Mark 1.00 out of
1.00
Select one:
a. Develop the Test Sets tree
b. Organize test runs
c. Run the tests
d. Set automation options
Question 57
Complete
The Defect Management module enables subject matter expert to work with Business Process testing,
the HP test automation solution.
Mark 0.00 out of
1.00
Select one:
True
False
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
11/20
10/14/2020
Final Exam: Attempt review
Question 58
Contains the Analysis tree in which you organize all of your analysis items.
Complete
Mark 1.00 out of
1.00
Select one:
a. Analysis View module
b. Live Analysis graphs
c. Dashboard view module
d. Analysis Menus tab
Question 59
You can add ______ to a cycle.
Complete
Mark 1.00 out of
1.00
Select one:
a. Tabs
b. Links
c. Attachments
d. Tests
Question 60
Complete
It supports you through all the phases of application lifecycle management. By integrating the tasks
involved in application management.
Mark 1.00 out of
1.00
Select one:
a. Addition Lifecycle Management
b. Action Lifecycle Management
c. Activity Lifecycle Management
d. Application Lifecycle Management
Question 61
Complete
Enables you to associate the selected requirement with other requirements in the requirements tree
Mark 1.00 out of
1.00
Select one:
a. Requirements Traceability
b. Details
c. Risk assessment
d. Test Coverage
Question 62
Complete
Mark 1.00 out of
After finalizing the testing policy for your requirements, you can ______ a risk report that details your
testing strategy for the analysis requirement.
1.00
Select one:
a. Plan
b. None of the choices
c. Start
d. Generate
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
12/20
10/14/2020
Final Exam: Attempt review
Question 63
Complete
A group of tests designed to achieve specific testing goals.
Mark 1.00 out of
1.00
Select one:
a. Test Set folder
b. None of the choices
c. Test Set
d. Test Sets Tree
Question 64
Complete
Mark 1.00 out of
1.00
A _______ contains the actions that must be performed during test execution.
Select one:
a. Designing test
b. Test planning
c. None of the choices
d. Test script
Question 65
Enables you to increase the number of parallel calculations performed on an entire site.
Complete
Mark 1.00 out of
1.00
Select one:
a. Scheduling Area
b. Purge Area
c. None of the choices
d. Advanced Area
Question 66
Complete
Mark 1.00 out of
If you begin to make changes to an entity in a version control-enabled project, you are prompted to
check in the entity.
1.00
Select one:
True
False
Question 67
Complete
______ are the means for setting objectives on Project Planning and Tracking releases and for planning
and tracking release progress towards these objectives throughout its duration.
Mark 1.00 out of
1.00
Select one:
a. Scoreboard
b. Analysis
c. Scope items
d. Thresholds
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
13/20
10/14/2020
Final Exam: Attempt review
Question 68
Complete
In the dashboard pages, you can arrange and view multiple graphs on a single page.
Mark 1.00 out of
1.00
Select one:
True
False
Question 69
Complete
Enables you to manage resources used by your tests. You can organize your resources by defining a
hierarchical Test Resource tree containing resource folders and resources.
Mark 1.00 out of
1.00
Select one:
a. Test Resources
b. Business Components module
c. Risk-based Quality Management
d. Test Plan
Question 70
The foundation of the Management module is the ______.
Complete
Mark 1.00 out of
1.00
Select one:
a. Release tree
b. Cycles
c. Modules
d. Line of business
Question 71
Complete
Mark 1.00 out of
1.00
Change is constant for applications.
Select one:
True
False
Question 72
Displays KPI calculations that enable you to determine the status of your release.
Complete
Mark 1.00 out of
1.00
Select one:
a. General tab
b. Content tab
c. Detailed tab
d. Scorecard tab
Question 73
Complete
This tab enables you to determine the business criticality, failure probability, and functional complexity
of a requirement by assigning it values directly or by assigning values to a set of criteria.
Mark 1.00 out of
1.00
Select one:
a. Assessment plan tab
b. Assessment Questions tab
c. Assessment Results tab
d A
tt b
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
14/20
10/14/2020
d. Assessment tab
Question 74
Final Exam: Attempt review
Match the missing word/details to complete each statement.
Complete
Mark 1.00 out of
1.00
Question 75
Complete
Mark 1.00 out of
1.00
In the past, before the ________________ was published and before organizations
realized that their previous waterfall approach to software
development was inefficient and prone to scope creep, cost overruns and
missed deadlines, each of the disciplines that made up the overall software
process was completely separate.
Agile Manifesto
__________________ is basically the fusing together of the
disciplines concerned with all aspects of the software delivery process:
ALM
___________________ should have functionality that helps you make sense of your
requirements and ideally the tools should be adaptable to your methodology
and processes rather than the other way around.
ALM tools
Once organizations realized how much more efficient they can be having
_________________ that collaboratively define the requirements, plan the
releases and sprints, test the product during development and deploy the
latest update in a seamless way, the old separate processes didn’t make
sense.
integrated teams
Instead of a set of _______________________ working in a vacuum to define the
vision and requirements, handing off the design to the developers, handing off
the code to the testers, handing off the product to the IT support team to
deploy and maintain, you now have a single ALM process spanning all these
elements continuously delivering new features every X weeks.
business analysts
A group of tests designed to achieve specific testing goals.
Select one:
a. None of the choices
b. Test Set
c. Test Sets Tree
d. Test Set folder
Question 76
Complete
Tests the performance of the application for criteria such as number of concurrent users that the
application supports and the response time of the application.
Mark 1.00 out of
1.00
Select one:
a. Cycle 3-Performance Testing
b. Cycle 4-User Acceptance Testing
c. Cycle 2-Integrated System Testing
d. Cycle 1- New Features
Question 77
Complete
After you make changes to an entity, you _____ the entity.
Mark 1.00 out of
1.00
Select one:
a. Check out
b. Check in
c. Check in and out
d. None of the choices
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
15/20
10/14/2020
Final Exam: Attempt review
Question 78
Complete
Mark 1.00 out of
1.00
If you would like to revert an entity to a previous version, which of the following actions would you
take?
Select one:
a. Promote the entity
b. Check out the entity
c. Change the history of the entity
d. Check in the entity
Question 79
Provides an audit trail of changes made to each defect.
Complete
Mark 1.00 out of
1.00
Select one:
a. Attachment tab
b. Defects grid
c. History tab
d. Description tab
Question 80
Complete
_______are checkpoints on a release timeline used to verify that the release and its interim deliverables
are progressing as planned.
Mark 1.00 out of
1.00
Select one:
a. Analysis
b. Thresholds
c. Scoreboard
d. Milestones
Question 81
Complete
Mark 1.00 out of
1.00
The ________ module addresses the need for a stronger connection between business process modeling,
quality assurance management, and requirement definition.
Select one:
a. Mailing Requirements
b. ALM Business Models
c. Linked Defects
d. Application LifeCycle Intelligence (ALI)
Question 82
What is the module that enables you to manage resources used by your tests?
Complete
Mark 1.00 out of
1.00
Select one:
a. Test Components
b. Testing Resources
c. Test Resources
d. Test Procedure
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
16/20
10/14/2020
Final Exam: Attempt review
Question 83
Complete
Mark 1.00 out of
1.00
You run tests ________ from ALM using HP Sprinter.
Select one:
a. Automatically
b. Manually and Automatically
c. None of the choices
d. Manually
Question 84
You create a _____ to define the hierarchical framework of releases.
Complete
Mark 1.00 out of
1.00
Select one:
a. Link
b. Release tree
c. Attachments
d. Details tab
Question 85
Complete
A _______ is a variable that can be assigned a value during test execution.
Mark 1.00 out of
1.00
Select one:
a. Template
b. Test planning
c. Test
d. Parameter
Question 86
Complete
Mark 1.00 out of
1.00
SCA is a session/user authentication process that permits a user to enter one name and password to
access multiple applications.
Select one:
True
False
Question 87
Complete
Using the _____, you can report flaws in your application and track their repair during all stages of the
application management process.
Mark 1.00 out of
1.00
Select one:
a. Web client
b. CAC
c. SSO
d. ALM Web client
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
17/20
10/14/2020
Final Exam: Attempt review
Question 88
Complete
A document-centric viewing mode that enables you to see a list of requirements in a single document
view and allows for quick editing of descriptions. This helps you to better understand the big picture.
Mark 1.00 out of
1.00
Select one:
a. Requirement View
b. Category Views
c. Authorization view
d. Author mode
Question 89
Complete
Mark 1.00 out of
1.00
A test can cover more than one______ and a requirement can be covered by more than one test.
Select one:
a. Activity
b. Plan
c. Requirement
d. None of the choices
Question 90
Complete
Mark 1.00 out of
1.00
In a version control-enabled project, you can only make changes to an entity by checking it in.
Select one:
True
False
Question 91
Tests the new features of the application implemented in the release.
Complete
Mark 1.00 out of
1.00
Select one:
a. Cycle 2-Integrated System Testing
b. Cycle 4-User Acceptance Testing
c. Cycle 1-New Features
d. Cycle 3-Performance Testing
Question 92
Complete
Mark 1.00 out of
1.00
Contains the Dashboard tree in which you organize dashboard pages.
Select one:
a. Dashboard view module
b. Analysis view module
c. Analysis graphs
d. Dashboard modules
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
18/20
10/14/2020
Final Exam: Attempt review
Question 93
Complete
Mark 1.00 out of
1.00
A group of tests designed to achieve specific testing goals.
Select one:
a. Test Sets Tree
b. Test Set folder
c. None of the choices
d. Test Set
Question 94
Complete
Evaluating defects and defect trends helps you make effective go/no-go decisions.
Mark 1.00 out of
1.00
Select one:
True
False
Question 95
Indicates whether the scheduled calculation is currently running.
Complete
Mark 1.00 out of
1.00
Select one:
a. Apply settings
b. Set Refresh Rate
c. Active/Inactive
d. Enabled/Disabled
Question 96
Complete
Enables you to manage the execution of manual and automated tests and document their results.
Mark 1.00 out of
1.00
Select one:
a. Run the tests
b. Set automation options
c. Develop the Test Set Tree
d. Organize test runs
Question 97
Complete
Mark 1.00 out of
Enables you to control the execution of automated tests by setting test run conditions and creating a
schedule.
1.00
Select one:
a. Develop the Test Set Tree
b. Organize test runs
c. Run the tests
d. Set automation options
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1
19/20
10/14/2020
Final Exam: Attempt review
Question 98
Complete
After the _____, the release goes through further testing cycles to test aspects, such as functionality and
performance of the application.
Mark 1.00 out of
1.00
Select one:
a. first cycle
b. fourth cycle
c. third cycle
d. second cycle
Question 99
After adding a cycle to a release, you specify the details for the cycle using the _____.
Complete
Mark 1.00 out of
1.00
Select one:
a. Details tab
b. Cycle tab
c. Attachment
d. Button
Question 100
Complete
A session/user authentication process that permits a user to enter one name and password to access
multiple applications.
Mark 1.00 out of
1.00
Select one:
a. Smart Card Authentication
b. Single Sign-on
c. Requirements Management
d. Common Access Card