10/14/2020 Final Exam: Attempt review Home / My courses / UGRD-CS6302-2013T / WEEK 14: FINAL EXAMINATION / Final Exam Started on Wednesday, 14 October 2020, 7:22 PM State Finished Completed on Wednesday, 14 October 2020, 8:42 PM Time taken 1 hour 19 mins Grade 97.00 out of 100.00 Question 1 Complete Provides filter fields from where you can define criteria for filtering the data listed in the Defects grid. Mark 1.00 out of 1.00 Select one: a. Grid filter b. Description tab c. Defects grid d. Attachment tab Question 2 Complete Enable you to create and display a dynamic graphic representation of data related to test plans and test sets. Mark 1.00 out of 1.00 Select one: a. Dashboard View module b. Live Analysis graphs c. Analysis Menus tab d. Analysis View module Question 3 Complete Mark 1.00 out of 1.00 You run tests ________ from ALM using HP Sprinter. Select one: a. Automatically b. None of the choices c. Manually d. Manually and Automatically Question 4 Complete Enables subject matter experts (SMEs) to work with Business Process Testing (BPT), the HP test automation solution. Mark 1.00 out of 1.00 Select one: a. Test Plan b. Risk-based Quality Management c. Business Components module d. Test Resources https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 1/20 10/14/2020 Final Exam: Attempt review Question 5 Complete Mark 1.00 out of 1.00 It empowers IT to manage the core application life cycle, from requirements through deployment, granting application trams the crucial visibility and collaboration needed for predictable, repeatable, and adaptable delivery of modern applications. Answer: Question 6 Complete Mark 1.00 out of 1.00 ALM Before you create a report, you can add sub-reports. A sub-report adds an extra layer of information related to the parent report. Select one: True False Question 7 This cycle tests the new features with existing features that might have been impacted by the changes. Complete Mark 1.00 out of 1.00 Select one: a. Cycle 1- New Features b. Cycle 4-User Acceptance Testing c. Cycle 3-Performance Testing d. Cycle 2-Integrated System Testing Question 8 Complete Mark 1.00 out of You can use the Project Report reporting tool, available in the Analysis View module, to design and generate comprehensive reports of project data. 1.00 Select one: True False Question 9 Complete Mark 0.00 out of 1.00 Contains tests that you can assign to cycles in the Management module. This association allows you to review the progress of tests, determine the number of resolved and outstanding defects, and enhance your reporting ability. Select one: a. Test Sets Tree b. Test Set folder c. Test Set d. None of the choices Question 10 Complete Allows you to capture a group of requirements, tests, or test assets at strategic points in the project lifecycle to mark specific milestones. Mark 1.00 out of 1.00 Select one: a. Tracking b. Key Benefits c. Baselining d Key Capabilities https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 2/20 10/14/2020 d. Key Capabilities Question 11 Complete Mark 1.00 out of Final Exam: Attempt review Enabled for requirements, tests, and test assets to allow distributed teams to collaborate and manage multiple versions of assets in parallel while maintaining data integrity and providing an audit history of changes throughout the project lifecycle. 1.00 Select one: a. Test Plan b. Version control c. Risk-based Quality Management d. Test Resources Question 12 Complete Mark 1.00 out of 1.00 The project administrator for your organization can _______ version control through ALM Site Administration. Select one: a. Disable b. Enable or Disable c. Enable d. None of the choices Question 13 Complete Mark 1.00 out of 1.00 If you know that a test in your test set might fail, but you want to make sure that subsequent tests in the test set still execute, which of the following should you do? Select one: a. All of the choices b. Ensure that the execution condition for the arrow running into the test is set to Finished. c. Disconnect the test from the flow. d. Ensure that the execution condition for the arrow running out from the test is set to Finished. Question 14 What are the physical devices used to identify users in secure system? Complete Mark 1.00 out of 1.00 Select one: a. Card b. ATM c. Smart Cards d. Single-sign On Question 15 Complete Mark 1.00 out of 1.00 Provides a tabular list of the defects logged for a project. Select one: a. Attachment tab b. Defects grid c. History tab d. Description tab https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 3/20 10/14/2020 Final Exam: Attempt review Question 16 Complete Module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirements definition. Mark 1.00 out of 1.00 Select one: a. ALM Business Models b. CAC Business Models c. SOS Business Models d. PPT Business Models Question 17 Complete Mark 1.00 out of 1.00 The ______ module allows you to view all test runs for your project in a grid. Select one: a. Test Set Tree b. Test Runs c. Test Set d. None of the choices Question 18 Complete The Test Plan module enables you to ____ your application according to functionality. Mark 1.00 out of 1.00 Select one: a. Divide b. None of the choices c. Multiply d. Plan Question 19 A physical devices used to identify users in secure systems. Complete Mark 1.00 out of 1.00 Select one: a. Common Access Card b. Requirement Management c. Smart Card Authentication d. Single Sign-on Question 20 Complete Mark 1.00 out of Managing and tracking defects is a critical step in the testing process because it involves a lot of time and money. 1.00 Select one: True False Question 21 You can define what data appear in a graph and how the data are organized. Complete Mark 1.00 out of 1.00 Select one: True False https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 4/20 10/14/2020 Final Exam: Attempt review Question 22 Complete Mark 0.00 out of 1.00 Question 23 Complete Mark 1.00 out of 1.00 The ALM Business ALM Business Mo module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirements definition. You can view a list of all entities in the current module that you have checked out, and check in or undo the check out for selected entities. Select one: True False Question 24 Complete Mark 1.00 out of Clearly defined requirements help developers set a target for themselves and the testing team to identify their testing priorities. 1.00 Select one: a. Sets clear expectations between teams b. Saves time and money c. Helps prevent scope creep d. Aids development and testing Question 25 Complete Mark 1.00 out of 1.00 Enables you to record additional details about the actual test execution results. Select one: a. None of the choices b. Actual Field c. Compact View Button d. Status Column Question 26 Complete Mark 1.00 out of 1.00 Version control enables you to create and manage ALM entities while maintaining previous versions of these entities. Select one: True False https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 5/20 10/14/2020 Final Exam: Attempt review Question 27 Complete Mark 1.00 out of 1.00 Contains tests that you can assign to cycles in the Management module. This association allows you to review the progress of tests, determine the number of resolved and outstanding defects, and enhance your reporting ability. Select one: a. Test Set b. Test Sets Tree c. Test Set folder d. None of the choices Question 28 Complete What is the third stage of the testing process? Mark 1.00 out of 1.00 Select one: a. None of the choices b. Test Execution c. Test Control d. Test Planning Question 29 Changes the speed that it takes for ALM to calculate the KPI data. Complete Mark 1.00 out of 1.00 Select one: a. Override Settings b. Engines Throttle c. Scoreboard d. Advance area Question 30 This cycle ensures that the new features meet the expectations of the business. Complete Mark 1.00 out of 1.00 Select one: a. Cycle 4-User Acceptance Testing b. Cycle 1-New Features c. Cycle 2-Integrated System Testing d. Cycle 3-Performance Testing Question 31 This section enables you to open the ALM documentation library and other online resources. Complete Mark 1.00 out of 1.00 Select one: a. Guide section b. Ask section c. Help section d. Action section https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 6/20 10/14/2020 Final Exam: Attempt review Question 32 Complete Enables you to view your requirements hierarchically in a tree. Mark 1.00 out of 1.00 Select one: a. Requirements Grid b. Coverage Analysis c. Requirement Tree d. Requirement Details Question 33 Complete You use the Graph wizard to generate an old graph. Mark 1.00 out of 1.00 Select one: True False Question 34 It is a translating business goals/objectives into a realized software-enabled business process. Complete Mark 1.00 out of 1.00 Select one: a. Creating plan b. Creating action plan c. Creating requirements d. Creating application Question 35 Complete Enables quality assurance managers to track application readiness by defining goals for activities of an application release. Mark 1.00 out of 1.00 Select one: a. Requirements Management b. ALM project planning and tracking (PPT) c. Smart Card Authentication d. Common Access Card Question 36 Refreshes the scorecard table, so that it displays the most up-to-date information. Complete Mark 1.00 out of 1.00 Select one: a. Scorecard layout b. None of the choices c. Scoreboard d. Generate https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 7/20 10/14/2020 Final Exam: Attempt review Question 37 Complete Mark 1.00 out of 1.00 Enables you to create links between requirements and other entities. Select one: a. Requirements Grid b. Requirement Tree c. Requirements Details d. Coverage Analysis Question 38 Contains the Dashboard tree in which you organize dashboard pages. Complete Mark 1.00 out of 1.00 Select one: a. Analysis Menus tab b. Live Analysis graphs c. Dashboard View module d. Live Analysis graphs Question 39 Complete Mark 1.00 out of 1.00 Question 40 Complete Mark 1.00 out of 1.00 baselining allows you to capture a group of requirements, test, or test assets at strategic points in the project lifecycle to mark specific milestones. You can create and manage entities in a version control-enabled project in both tree and grid views. Select one: True False Question 41 ALM support you through ____. Complete Mark 1.00 out of 1.00 Select one: a. None of the choices b. All phases of Application Lifecycle Management c. The development phase d. The implementing phase Question 42 Enables you to purge calculations after a specific time period. Complete Mark 1.00 out of 1.00 Select one: a. Advanced Area b. Purge Area c. Scheduling Area d. None of the choices https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 8/20 10/14/2020 Final Exam: Attempt review Question 43 This is the two modules that have been completely redesigned as part of this release of ALM 12.0. Complete Mark 1.00 out of 1.00 Select one: a. Access Management and Action Management b. Lifecycle Management and Requirements Management c. Requirements Management and Defects Management d. Application Management and Defect Management Question 44 Complete Mark 1.00 out of Enables you to instruct ALM to automatically send a status alert email to the author when the test set completes execution. 1.00 Select one: a. Develop the Test Sets tree b. Organize test runs c. Set automation options d. Run the tests Question 45 Complete To compare two versions, press the Alt key and select each version. Click the Compare button. Mark 1.00 out of 1.00 Select one: True False Question 46 Complete Mark 1.00 out of You convert requirements to tests to automatically create a one-to-one mapping between ____________ and ______. 1.00 Select one: a. Requirements and activities b. Planning and activity c. Activity and tests d. Requirements and tests Question 47 You can _____graphs for viewing in a web browser without downloading an ALM client. Complete Mark 1.00 out of 1.00 Select one: a. Share b. Share and Download c. None of the choices d. Download https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 9/20 10/14/2020 Final Exam: Attempt review Question 48 The HP’s strategy and software approach for modern application delivery starts with a what? Complete Mark 1.00 out of 1.00 Select one: a. Unified platform b. Unified information c. Unified classroom d. Unified application Question 49 Enables you to schedule PPT calculations for your entire site. Complete Mark 1.00 out of 1.00 Select one: a. Advanced Area b. Scheduling Area c. Purge Area d. None of the choices Question 50 Sprinter is not available for ALM Essentials Edition or Performance Center Edition. Complete Mark 1.00 out of 1.00 Select one: True False Question 51 Complete A _______ is an independent business unit within an organization, with its own set of rules, standards, resources, objectives, and applications. Mark 1.00 out of 1.00 Select one: a. Sample Release Tree b. Releases and Cycles throughout ALM c. Release Module Icons d. Line of business (LOB) Question 52 Complete Mark 1.00 out of If you want to make changes to an entity in a version control enabled project, what is the first thing you must do? 1.00 Select one: a. Check in the entity b. Turn off version control c. Check out the entity d. Promote the entity https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 10/20 10/14/2020 Final Exam: Attempt review Question 53 Displays the progress of a release in a Gantt chart. Complete Mark 1.00 out of 1.00 Select one: a. Content tab b. Master Plan tab c. Scorecard tab d. Detailed tab Question 54 Complete Enables you to create and edit tests or components directly in Sprinter and save them to ALM. Mark 1.00 out of 1.00 Select one: a. None of the choices b. Button Plan mode c. Sprinter's Plan mode d. ALM Plan mode Question 55 Complete A dynamic hierarchical structure based on virtual folders allows for flexibility in manipulating the Requirements view. Mark 1.00 out of 1.00 Select one: a. Category views b. Author views c. Author mode d. Category mode Question 56 Complete Provides a clear picture of the test building blocks and assists in the execution of the actual tests. Mark 1.00 out of 1.00 Select one: a. Develop the Test Sets tree b. Organize test runs c. Run the tests d. Set automation options Question 57 Complete The Defect Management module enables subject matter expert to work with Business Process testing, the HP test automation solution. Mark 0.00 out of 1.00 Select one: True False https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 11/20 10/14/2020 Final Exam: Attempt review Question 58 Contains the Analysis tree in which you organize all of your analysis items. Complete Mark 1.00 out of 1.00 Select one: a. Analysis View module b. Live Analysis graphs c. Dashboard view module d. Analysis Menus tab Question 59 You can add ______ to a cycle. Complete Mark 1.00 out of 1.00 Select one: a. Tabs b. Links c. Attachments d. Tests Question 60 Complete It supports you through all the phases of application lifecycle management. By integrating the tasks involved in application management. Mark 1.00 out of 1.00 Select one: a. Addition Lifecycle Management b. Action Lifecycle Management c. Activity Lifecycle Management d. Application Lifecycle Management Question 61 Complete Enables you to associate the selected requirement with other requirements in the requirements tree Mark 1.00 out of 1.00 Select one: a. Requirements Traceability b. Details c. Risk assessment d. Test Coverage Question 62 Complete Mark 1.00 out of After finalizing the testing policy for your requirements, you can ______ a risk report that details your testing strategy for the analysis requirement. 1.00 Select one: a. Plan b. None of the choices c. Start d. Generate https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 12/20 10/14/2020 Final Exam: Attempt review Question 63 Complete A group of tests designed to achieve specific testing goals. Mark 1.00 out of 1.00 Select one: a. Test Set folder b. None of the choices c. Test Set d. Test Sets Tree Question 64 Complete Mark 1.00 out of 1.00 A _______ contains the actions that must be performed during test execution. Select one: a. Designing test b. Test planning c. None of the choices d. Test script Question 65 Enables you to increase the number of parallel calculations performed on an entire site. Complete Mark 1.00 out of 1.00 Select one: a. Scheduling Area b. Purge Area c. None of the choices d. Advanced Area Question 66 Complete Mark 1.00 out of If you begin to make changes to an entity in a version control-enabled project, you are prompted to check in the entity. 1.00 Select one: True False Question 67 Complete ______ are the means for setting objectives on Project Planning and Tracking releases and for planning and tracking release progress towards these objectives throughout its duration. Mark 1.00 out of 1.00 Select one: a. Scoreboard b. Analysis c. Scope items d. Thresholds https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 13/20 10/14/2020 Final Exam: Attempt review Question 68 Complete In the dashboard pages, you can arrange and view multiple graphs on a single page. Mark 1.00 out of 1.00 Select one: True False Question 69 Complete Enables you to manage resources used by your tests. You can organize your resources by defining a hierarchical Test Resource tree containing resource folders and resources. Mark 1.00 out of 1.00 Select one: a. Test Resources b. Business Components module c. Risk-based Quality Management d. Test Plan Question 70 The foundation of the Management module is the ______. Complete Mark 1.00 out of 1.00 Select one: a. Release tree b. Cycles c. Modules d. Line of business Question 71 Complete Mark 1.00 out of 1.00 Change is constant for applications. Select one: True False Question 72 Displays KPI calculations that enable you to determine the status of your release. Complete Mark 1.00 out of 1.00 Select one: a. General tab b. Content tab c. Detailed tab d. Scorecard tab Question 73 Complete This tab enables you to determine the business criticality, failure probability, and functional complexity of a requirement by assigning it values directly or by assigning values to a set of criteria. Mark 1.00 out of 1.00 Select one: a. Assessment plan tab b. Assessment Questions tab c. Assessment Results tab d A tt b https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 14/20 10/14/2020 d. Assessment tab Question 74 Final Exam: Attempt review Match the missing word/details to complete each statement. Complete Mark 1.00 out of 1.00 Question 75 Complete Mark 1.00 out of 1.00 In the past, before the ________________ was published and before organizations realized that their previous waterfall approach to software development was inefficient and prone to scope creep, cost overruns and missed deadlines, each of the disciplines that made up the overall software process was completely separate. Agile Manifesto __________________ is basically the fusing together of the disciplines concerned with all aspects of the software delivery process: ALM ___________________ should have functionality that helps you make sense of your requirements and ideally the tools should be adaptable to your methodology and processes rather than the other way around. ALM tools Once organizations realized how much more efficient they can be having _________________ that collaboratively define the requirements, plan the releases and sprints, test the product during development and deploy the latest update in a seamless way, the old separate processes didn’t make sense. integrated teams Instead of a set of _______________________ working in a vacuum to define the vision and requirements, handing off the design to the developers, handing off the code to the testers, handing off the product to the IT support team to deploy and maintain, you now have a single ALM process spanning all these elements continuously delivering new features every X weeks. business analysts A group of tests designed to achieve specific testing goals. Select one: a. None of the choices b. Test Set c. Test Sets Tree d. Test Set folder Question 76 Complete Tests the performance of the application for criteria such as number of concurrent users that the application supports and the response time of the application. Mark 1.00 out of 1.00 Select one: a. Cycle 3-Performance Testing b. Cycle 4-User Acceptance Testing c. Cycle 2-Integrated System Testing d. Cycle 1- New Features Question 77 Complete After you make changes to an entity, you _____ the entity. Mark 1.00 out of 1.00 Select one: a. Check out b. Check in c. Check in and out d. None of the choices https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 15/20 10/14/2020 Final Exam: Attempt review Question 78 Complete Mark 1.00 out of 1.00 If you would like to revert an entity to a previous version, which of the following actions would you take? Select one: a. Promote the entity b. Check out the entity c. Change the history of the entity d. Check in the entity Question 79 Provides an audit trail of changes made to each defect. Complete Mark 1.00 out of 1.00 Select one: a. Attachment tab b. Defects grid c. History tab d. Description tab Question 80 Complete _______are checkpoints on a release timeline used to verify that the release and its interim deliverables are progressing as planned. Mark 1.00 out of 1.00 Select one: a. Analysis b. Thresholds c. Scoreboard d. Milestones Question 81 Complete Mark 1.00 out of 1.00 The ________ module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirement definition. Select one: a. Mailing Requirements b. ALM Business Models c. Linked Defects d. Application LifeCycle Intelligence (ALI) Question 82 What is the module that enables you to manage resources used by your tests? Complete Mark 1.00 out of 1.00 Select one: a. Test Components b. Testing Resources c. Test Resources d. Test Procedure https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 16/20 10/14/2020 Final Exam: Attempt review Question 83 Complete Mark 1.00 out of 1.00 You run tests ________ from ALM using HP Sprinter. Select one: a. Automatically b. Manually and Automatically c. None of the choices d. Manually Question 84 You create a _____ to define the hierarchical framework of releases. Complete Mark 1.00 out of 1.00 Select one: a. Link b. Release tree c. Attachments d. Details tab Question 85 Complete A _______ is a variable that can be assigned a value during test execution. Mark 1.00 out of 1.00 Select one: a. Template b. Test planning c. Test d. Parameter Question 86 Complete Mark 1.00 out of 1.00 SCA is a session/user authentication process that permits a user to enter one name and password to access multiple applications. Select one: True False Question 87 Complete Using the _____, you can report flaws in your application and track their repair during all stages of the application management process. Mark 1.00 out of 1.00 Select one: a. Web client b. CAC c. SSO d. ALM Web client https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 17/20 10/14/2020 Final Exam: Attempt review Question 88 Complete A document-centric viewing mode that enables you to see a list of requirements in a single document view and allows for quick editing of descriptions. This helps you to better understand the big picture. Mark 1.00 out of 1.00 Select one: a. Requirement View b. Category Views c. Authorization view d. Author mode Question 89 Complete Mark 1.00 out of 1.00 A test can cover more than one______ and a requirement can be covered by more than one test. Select one: a. Activity b. Plan c. Requirement d. None of the choices Question 90 Complete Mark 1.00 out of 1.00 In a version control-enabled project, you can only make changes to an entity by checking it in. Select one: True False Question 91 Tests the new features of the application implemented in the release. Complete Mark 1.00 out of 1.00 Select one: a. Cycle 2-Integrated System Testing b. Cycle 4-User Acceptance Testing c. Cycle 1-New Features d. Cycle 3-Performance Testing Question 92 Complete Mark 1.00 out of 1.00 Contains the Dashboard tree in which you organize dashboard pages. Select one: a. Dashboard view module b. Analysis view module c. Analysis graphs d. Dashboard modules https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 18/20 10/14/2020 Final Exam: Attempt review Question 93 Complete Mark 1.00 out of 1.00 A group of tests designed to achieve specific testing goals. Select one: a. Test Sets Tree b. Test Set folder c. None of the choices d. Test Set Question 94 Complete Evaluating defects and defect trends helps you make effective go/no-go decisions. Mark 1.00 out of 1.00 Select one: True False Question 95 Indicates whether the scheduled calculation is currently running. Complete Mark 1.00 out of 1.00 Select one: a. Apply settings b. Set Refresh Rate c. Active/Inactive d. Enabled/Disabled Question 96 Complete Enables you to manage the execution of manual and automated tests and document their results. Mark 1.00 out of 1.00 Select one: a. Run the tests b. Set automation options c. Develop the Test Set Tree d. Organize test runs Question 97 Complete Mark 1.00 out of Enables you to control the execution of automated tests by setting test run conditions and creating a schedule. 1.00 Select one: a. Develop the Test Set Tree b. Organize test runs c. Run the tests d. Set automation options https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 19/20 10/14/2020 Final Exam: Attempt review Question 98 Complete After the _____, the release goes through further testing cycles to test aspects, such as functionality and performance of the application. Mark 1.00 out of 1.00 Select one: a. first cycle b. fourth cycle c. third cycle d. second cycle Question 99 After adding a cycle to a release, you specify the details for the cycle using the _____. Complete Mark 1.00 out of 1.00 Select one: a. Details tab b. Cycle tab c. Attachment d. Button Question 100 Complete A session/user authentication process that permits a user to enter one name and password to access multiple applications. Mark 1.00 out of 1.00 Select one: a. Smart Card Authentication b. Single Sign-on c. Requirements Management d. Common Access Card ◄ Final Quiz 2 Jump to... https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=905604&cmid=1070&showall=1 20/20