Installation Guide
Installation Guide
Fiber Express Ultra HD
Fiber Express Ultra HD
PX105539 Rev. A
Rack Mount Fiber Patch Panel - 1U
Page 4/4
PX105539 Rev. A
Rack Mount Fiber Patch Panel - 1U
A) General
F) Cassette connections (MPO)
1) Install cassettes in the Fiber Patch
Panel.
1) Fiber Patch Panel parts name.
DESCRIPTION
QTY
1
Front Basket
1
2
Connector Housing
1
3
Cable Tray
1
4
Housing Cover
1
5
Cable Tray Cover
1
6
Frame or Cassette
4
ITEM
2) Install Trunk cables in the cassettes.
3) Attach Trunk cables to a anchor point on
Cable Tray with Velcro-Strap as shown.
4) Make sure to leave a sufficient length of
cable between the connections and the
Velcro-Strap while making the curve as
shown. (Length « A » from Figure 1).
the
5
4
3
2
6
7
Hardware Kit
(not shown)
1
1
Material:
- Phillips Screw 10-32x½…..x4
- Phillips Screw 10-32x3/16..x2
- Phillips Screw 8-32………..x2
- Cable Twist-Tie…….……....x4
- Wire Marker (sheet)….........x1
- Phillips Screw 12-24…........x4
- Tie-Wrap………………...……...x6
- Identification Label (Sheet)…...x1
- Velcro-Strap…………………....x2
A) Fiber Patch Panel Preparation
5) Install the Cable Tray Cover.
1) Install the Fiber Patch panel to the Rack with 4 Phillips Screws 10-32 x 1/2 or 12-24 x 1/2 included.
2) Install the labels inside the Front Basket Door.
(Image as Ref.)
3) Install the Front Basket to the Connector Housing with 2 Phillips Screws 8-32 included. (If necessary)
For additional information, call 1-800-belden1
Copyright 2011, Belden Inc.
This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com
Page 1/4
Installation Guide
Installation Guide
Fiber Express Ultra HD
Fiber Express Ultra HD
PX105539 Rev. A
Rack Mount Fiber Patch Panel- 1U
4) Install the Cable Tray to the Connector Housing with 2 Phillips Screws 10-32 x 3/16 included.
(If necessary)
Page 2/4
PX105539 Rev. A
Rack Mount Fiber Patch Panel - 1U
E) Frame Connections
1) Attach fibers together at 6 in. from the frame with the wire markers.
2) Attach the bundles together at 6 in. from the first markers.
1
C) Cable preparation
1) See Figure 1 to prepare the fiber cables properly.
2
2) Make a mark on the outer/distribution sheath at a point “A” from the end of the cable
(if there is no outer sheath, go directly to step 4) for distribution cable.
3) Remove the outer cable sheath up to the mark and, if necessary, clean.
4) Distribution cable
i) Make a mark on the sheaths of the distribution cables at a point “B”.
ii) Remove the cable sheaths up to the mark and, if necessary, clean.
5) Quick reference cables length.
3) Stick the Twist-ties to the as shown.
5) Attach fibers together as shown with the wire markers.
6) Attach fibers together as shown with Tie-Wrap.
4) Insert the fibers inside the Twist-ties.
(Respect management as shown)
5
Figure 1 : Cable length
D
6
A
B
Distribution
cable
Câble
de distribution
Gaine Extérieure
Outer
Sheath
Buffered Fiber
Fibre à revêtement
serré 900µm
Central
Member
Tige
centrale
Buffer
Cable
Tube
de tube
revêtement
A
C
Fiber
FibreBare
dénudée
B
- Distribution Cable
54in
48in
- Trunk Cable (MPO)
24in
-
Laser Radiation
3
4
7) Attach Tie-Wraps around fibers on the Cable Tray anchor points as shown.
8) Attach the rest of the fibers together to have clean bundles.
9) Attach Tie-Wrap around fibers, on the Cable Tray anchor point as shown.
(Respect management as shown)
9
Optical fibers transmit laser radiation of sufficient magnitude to cause injury
to personnel and caution must be exercised to avoid exposure. This caution
applies to any point in the system where the laser signal can be “accessed”
(for example, at the bare fiber ends).
D) Connecting fibers to the loaded frame
1)
2)
10) Install the Cable Tray Cover.