STEAG Energy Services India: Profile & References STEAG Energy Services (India) Pvt. Ltd. (formerly Evonik Energy Services (India) Pvt. Ltd.) is a wholly owned subsidiary of STEAG Energy Services GmbH, Germany (formerly Evonik Energy Services GmbH, Germany). STEAG is Germany’s largest IPP owning and operating over 11,000 MW in Germany and elsewhere. STEAG has over 75 years of experience in the energy business, including Operation & Maintenance of its own plants and of third parties. All power stations of STEAG have been engineered, constructed, commissioned, rehabilitated, modernized and operated by its own engineers. STEAG is proud to call itself as the Consultant with Operational Experience. STEAG Energy Services (India) Pvt. Ltd. (SESI) was set up in 2001 to provide cost-effective consultancy services of international standards by integrating resources of the parent company and those of SESI in India. SESI combines the best of the technology and professionalism of its German principals and a thorough knowledge and understanding of conditions in the power sector in India. It is thus able to synergize its Indian experience with the technological and professional back up of European standards and provide the best possible solutions and services to clients in India and elsewhere. The activities of STEAG Energy Services cover a wide spectrum from concept to commission and thereafter for O&M services including PG testing. 1. Project Development Pre Feasibility Study Detailed Project Report Environmental Studies Assistance in obtaining various permits and clearances Assistance in financial closing 2. Energy Technologies a) Green Field Projects Basic design studies Plot plan & GA drawings Preparation of flow sheets and P&I diagrams Detailed engineering including preparation of tender specifications for: o Mechanical 1 o Electrical o C&I o Civil Balance of Plant (coal, ash & water systems) Tender evaluation & bid recommendation Vendor drawing review Vendor inspection Project management monitoring and expediting Erection and commissioning supervision b) R&M Projects Development of scope of work Preparation of feasibility report including financial analysis and cost benefit analysis Identification of surprises during R&M Preparation of tender specification (technical & commercial) Tender evaluation and bid recommendation Review engineering Inspection Project monitoring Erection supervision Commissioning supervision PG test supervision c) Renewable Energy Solar Biomass 3. System Technologies Online optimization system for power plants Energy management system On line diagnostic system Supply of Simulators SI System 4. Plant Services 2 Operations and Maintenance (O&M) Commissioning Performance Testing RLA / R&M Studies Diagnostic and Auditing services 5. Advisory Services Due diligence of power plants for investment decisions Technology evaluation and comparison Inspection services Third party inspection services Comprehensive solution for power plants based on renewable source of energy which includes solar thermal, solar SPV, wind energy, mine gas, biomass etc. Various studies resulting in specific recommendation(s) as per Client’s requirement Lender’s Engineering Services Asset Evaluation 6. Training Training needs assessment. Initial and refresher training using simulators. Class room training. Onsite training. Customized training programmes for engineers, operators, technicians. Customized training programmes for power plant managers. 3 Employees Strength Staff deployment in 2015 is as follows. Year 2015 O&M 824 Test & System Engg. Comm Technology Services 7 38 84 Services Over Total Heads 7 36 996 Note: O&M staff in Botswana is 263 which is excluded from the above list. Software Available in-house • Ebsilon for thermodynamic process calculations • SR2 for optimal load scheduling in mixed energy plants • Neuro Modeler and G2 • ProTrax Tools and ACSL for Simulation • GAMS for Algebraic Modelling • InTouch and InControl from Wonderware • eSTPE for Steam Path Audit • 2005 Visual Studio from Microsoft • Etap for Electrical Analysis • AutoCAD 2008 • PDMS access available through ROLTA • STAAD Pro Series for Structural Analysis & Design • PRIMAVERA for Project Management • CEASAR II for Stress Analysis • HR Mantra for Project Monitoring & HR Activities • Wrench for Engineering Documentation Management Testing Equipments Available • Boroscopic instruments • Steam Path Audit tools • BOP Energy Audit tools Power Analyser Stroboscope Manometers Hygrometers 4 MI Thermo meters Pitot tubes Ultra sonic flow meter Vibration analyser Sound level meter Etc. Accreditation & Empanelment 1) ISO 9001 : 2008 (for providing Engineering Consultancy and Information Technology services to Power Plants) 2) Quality Council of India (as Member - Large Corporate) 3) Central Boilers Board (as Well Known Remnant Life Assessment Organisation) 4) NABL – National Accreditation Board for Testing and Calibration Laboratories (for Transformer Oil Testing & Electrical Testing) 5) Bureau of Energy Efficiency (as Energy Services Company (ESCO) 6) Bureau of Energy Efficiency (as Accredited Energy Auditor Firm) 7) REC Power Distribution Company Limited (as Consultant for Energy Audit & Residual Life Assessment Studies) 8) Rural Electrification Corporation Ltd. (as Consultant for preparation of DPRs for Decentralised Distributed Generation (DDG) Projects) 9) Power Finance Corporation Ltd. (as Lender’s Engineer for Thermal & Biomass, Wind & other Renewable Energy Power Projects) 10) Bihar Renewable Energy Development Agency (BREDA) (as Consultant for preparation of DPRs for installation of Solar/Biomass Power Plants in the state of Bihar) 11) PFC Consulting Ltd. (as Consultant for Thermal Power Projects) 12) Bharat Heavy Electricals Ltd., Bhopal (as R&M Consultant) 13) National Power Training Institute (for Simulator Training) 14) Central Electricity Authority (as R&M Consultant) 15) Central Electricity Authority (as Power Plant Learning Centre) 5 16) Gujarat Energy Development Agency (as Energy Audit Consultant) 17) Directorate of Factories & Boilers, Odisha (as Boiler Repairer) 18) Energy Efficiency Services Ltd. (as Consultant for Energy Efficiency Projects) 19) India SME Technology Services Ltd. (as Technical Consultant/ESCO for Implementation of 4E (End to End Energy Efficiency) Solutions. 20) Syndicate Bank (as Consultant for Techno-Economic Viability (TEV) study) 21) Ministry of New and Renewable Energy (MNRE) (as Channel Partner for Solar System Integrator (PV). 22) Consultancy Development Centre (as Consultant for Feasibility Report / Detailed Project Report. Sector: Power Plants) Contact Us STEAG Energy Services (India) Pvt. Ltd. Corporate Office: A-29, Sector-16 Noida – 201 301, Uttar Pradesh, India Tel: +91-120-4625000 Fax: +91-120-4625100, 4625333 Email: info@steag.in Website: www.steag.in Registered Office: 903, Bhikaji Cama Bhawan Bhikaji Cama Place New Delhi – 110 066, India Regional Offices: Western Region Eastern Region STEAG Energy Services (India) Pvt. Ltd. 2nd Floor, Kala Chambers, Near Khanpur Post Office, Khanpur, Ahmedabad-380001 Gujarat, India Mr. A.N. Shukla (Email: an.shukla@steag.in) STEAG Energy Services (India) Pvt. Ltd. Premises No: 32/6, Gariahat Road (South), PS: Jadavpur, Kolkata – 700031 West Bengal, India Mr. S. Choudhuri (Email: s.choudhuri@steag.in) Southern Region STEAG Energy Services (India) Pvt. Ltd. Unit “B”, 1st Floor, Brigade Plaza 71/1, S.C.Road, Anandrao Circle Bangalore - 560 009 Karnataka, India Mr. N. Thangarajan (Email: n.thangarajan@steag.in) O&M Site Offices: Hazira (Gujarat) STEAG Energy Services (India) Pvt. Ltd. C/o. GSEG, Village Mora, Post - Bhatha Surat-Hazira Road, Surat - 394 510 Gujarat, India 6 Mr. M.K. Gupta (Email: mk.gupta@steag.in) Bathinda (Punjab) STEAG Energy Services (India) Pvt. Ltd. C/o HPCL – Mittal Energy Limited Village – Phulokhari Taluka – Talwandi Saboo Bathinda – 151302 Punjab, India Mr. Rajiv Dhenge (Email: r.dhenge@steag.in) Vizag (Andhra Pradesh) STEAG O&M Company Pvt. Ltd. Palavalasa Village, T-Devada Post Pedagantayada Mandal Steel Plant (Sub Office) Visakhapatnam – 531031 Andhra Pradesh, India Mr. K. Bhanuprakash (Email: k.bhanuprakash@steag.in) Board of Directors Dr. Wolfgang Benesch Achim Nietzschmann Dr. Ralf Schiele Ulrich Sigel Dr. Jacob T Verghese, Managing Director 7 References Project Development Consultancy Services – Feasibility Study, TEFR, DFR & DPR (Greenfield Projects): 1) IOCL: Preparation of DPR for the 500 MW Refinery Residue Project at Savli, Baroda. 2) Chennai Power Generation Corporation: Preparation of DPR for the 1000 MW LNG Plant. 3) Neyveli Lignite Corporation: Preparation of Master plan for Neyveli Area and performing power development studies – Under this study sites for ST-CMS (1x250 MW), TPS –II extension (500 MW), TPS-I extension (2x210 MW), Station B (4x500 MW), Station III (3x500 MW), Jayamkondam I (3x500 MW), Jayamkondam II (3x500 MW), Vellar (3x500 MW) and Behur (3x500 MW) were identified for development. 4) Moserbaer India Ltd.: Consultancy services for preparation of Feasibility Report for setting up of 1000 MW Coal based power plant in the state of Chattisgarh, India. 5) Coastal Energy Pvt. Ltd.: Consultancy Services for preparation of DPR for setting up of 1000 MW imported coal based power plant at Tuticorin. 6) Karnataka Power Corporation Ltd (KPCL): Consultancy services for preparation of Detailed Project Report for coal based thermal power station at Yermaras in Karnataka. 7) Karnataka Power Corporation Ltd (KPCL): Consultancy services for preparation of Detailed Project Report for coal based thermal power station at Yadgir in Karnataka. 8) Power Company of Karnataka (formerly SPPCC) : Consultancy services for preparation of Detailed Project Report for setting up of 1320 MW coal based power plant at Belgaum District in Karnataka. 9) Power Company of Karnataka (formerly SPPCC): Consultancy services for preparation of Detailed Project Report for setting up of 1320 MW coal based power plant at Jewargi District in Karnataka. 10) CMR Power Projects Pvt. Ltd.: Consultancy services for preparation of Feasibility Study for setting up of 1000 MW imported coal based power plant in the state of Andhra Pradesh. 8 11) Corporate Power Ltd.: Consultancy Services for preparation of Detailed Project Report for Phase II (2x330 MW) of Matrishi Usha Jayaswal Mega Power Plant at Village Chitarpur, Dist. Latehar, Jharkhand. 12) Farouk Sodagar Darvesh & Co.: Consultancy Services for preparation of Feasibility Study Report for setting up of 1000 MW coal based power project either in Maharashtra, Chhattisgarh & Jharkhand. 13) Bhushan Energy Ltd.: Consultancy Services for preparation of Pre-Feasibility Report, Feasibility Report and Detailed Project Report for setting up of 1000 MW coal based Power Project in the State of Chhattisgarh. 14) UPRVUNL: Consultancy Services for preparation of Detailed Project Report for 1x250 MW Panki TPS Extension project. 15) SLS Energy Pvt. Ltd.: Consultancy Services for preparation of Feasibility Report for setting up of 1000 MW coal based power project at Tuticorin, Tamil Nadu. 16) Machilipatnam Power Pvt. Ltd.: Consultancy Services for preparation of Pre-Feasibility Report and Detailed Project Report for setting up of 1000 MW coal based power project in Vijayawada, Andhra Pradesh. 17) GSPC Pipavav Power Company Ltd.: Consultancy Services for preparation of Detailed Project Report for setting up of 1600 – 1800 MW thermal power project at Kovaya in Gujarat. 18) UPRVUNL: Consultancy Services for preparation of Detailed Project Report for Harduaganj Thermal Power Station Extn-II (2x250 MW). 19) UPRVUNL: Consultancy Services for preparation of Feasibility Study Report and Detailed Project Report for 500 MW/660 MW (Supercritical) Units as Anpara Expansion Project. 20) Maharashtra State Power Generation Co. Ltd.: Consultancy services for feasibility study and preparation of DPR for the proposed 1x660 MW Power Station at Lohara, at Tahsil & District Yavatmal. 21) Petronet LNG Ltd.: Consultancy Services for preparation of Detailed Feasibility Report for the 1200 MW Gas based Thermal Power Plant at Dahej in Gujarat. 22) Uttar Pradesh Power Corporation Ltd.: Consultancy services for preparation of Feasibility Report, Environmental Detailed Project Impact Assessment Report and (CEIA) carrying out Comprehensive study for establishing 3x660 MW 9 (Supercritical) Power Project at Dopaha in Uttar Pradesh and securing environmental clearance from the UP Pollution Control Board (UPPCB) and Ministry of Environment and Forest (MOEF), Govt. of India. 23) Uttar Pradesh Power Corporation Ltd.: Consultancy services for preparation of Feasibility Report, Environmental (Supercritical) Detailed Project Impact Assessment Power Project at Report and (CEIA) carrying out Comprehensive study for Jawaharpur in Uttar establishing Pradesh 2x660 and MW securing environmental clearance from the UP Pollution Control Board (UPPCB) and Ministry of Environment and Forest (MOEF), Govt. of India. 24) Action Ispat & Power (P) Ltd.: Engineering consultancy services for setting up 600 MW Coal based Merchant Power Project in Gujarat including preparation of PreFeasibility Report and Detailed Project Report. 25) Uttar Pradesh Power Corporation Ltd.: Consultancy services for preparation of Feasibility Report for establishing 3x660 MW (Supercritical) Power Project at Dist. Lalitpur in Uttar Pradesh. 26) Indiabulls Power Ltd.: Consultancy services for preparation of Detailed Project Report for 5x270 MW Coal based Subcritical Thermal Power Plant at Amravati in Maharashtra. 27) Indiabulls Power Ltd.: Consultancy services for preparation of Detailed Project Report for 5x270 MW Coal based Subcritical Thermal Power Plant at Nashik in Maharashtra. 28) Anant Raj Power Ltd: Consultancy services for preparation of TEFR for 107 MW gas based CCPP at Rai, Sonepat, Haryana. 29) Core Minerals: Preparation of PFR for proposed coal fired power plant in Gujarat. 30) Prakash Industries Ltd.: Preparation of DPR for Gas Based Power Plant at GIDC, Ghajadia, Gujarat. 31) Prakash Industries Ltd.: Detailed Project Report for 1320 MW (2x660 MW) Coal Based Power Plant (CPP) at Village Bhada, Dist. Jhanjgir Champa, Chhattisgarh. 32) Prakash Industries Ltd.: Detailed Project Report for 1320 MW (2x660 MW) Coal Based Power Plant (CPP) at Village Parsi, Dist. Anuppur, Madhya Pradesh. 33) Prakash Industries Ltd.: Preparation of DPR for 219 MW Gas Based Power Plant at Pithampur, Madhya Pradesh. 10 34) Mecwel Power Pvt. Ltd.: Preparation of DPR for 2x150 MW CFBC Project in Nalgonda District in Andhra Pradesh. 35) GAIL (India) Ltd.: Preparation of DFR for setting up Gas Based CCP of around 350 MW capacity at Dibiyapur in Uttar Pradesh and Vijaipur in Madhya Pradesh. 36) Haryana Power Generation Corporation Ltd.: Preparation of DPR for the proposed 2x750 + 5% (1575) MW Gas Based Combined Cycle Power Project at villages Mothuka & Arwa, Tehsil Ballabhgarh, Dist. Faridabad. 37) APGENCO, Hyderabad: Preparation of Pre-Feasibility Report for Kakatiya Thermal Power Project Stage-III (1x800 MW) in Warangal District, Andhra Pradesh. 38) NALCO, Bhubaneswar: Consultancy services for Site Selection Study and Preliminary Land Survey for the proposed Smelter and Power Plant in Sundargarh District, Odisha. 39) Petronet LNG Limited: Consultancy services for preparation of Detailed Feasibility Report (DFR) for the 1200 MW Gas based Thermal Power Plant at Kochi (Kerala). 40) Gujarat Mineral Development Corporation Ltd: Consultancy Engineering Services for preparation of Feasibility Study Report for 250 MW Lignite based Thermal Power Plant as an Extension of Akrimota Thermal Power Station at Village Nani Chher, Ta: Lakhpat, District Kutch. 41) The Kerala Minerals and Metals Ltd: Study and submission of feasibility report and detailed project report for a 20 MW captive power plant from Municipal solid waste and LNG. 42) Bansagar Thermal Power Company Ltd.: Conducting prefeasibility study, preparation of prefeasibility report and obtaining TOR from MoEF for Bansagar Thermal Power Project (2x800 MW) in District Shahdol, M.P. 43) Puducherry Power Corporation Ltd.: Consultancy Services to study and prepare a Detailed Feasibility Report to set up 1x660 MW coal based Thermal Power Plant at Karaikal, U.T. of Puducherry. 44) GIFT Power Company Ltd.: Consultancy Services for preparation of Techno-Economic Feasibility study for setting up gas based power generation plant in the GIFT City. 45) HPGCL, Panchkula: Consultancy services for preparation of Detailed Feasibility Report (DFR) for accommodating supercritical unit at PTPS, Panipat and RGTPP, Khedar, Hisar 11 46) PFC Consulting Ltd.: Consultancy services for preparation of Detailed Project Report (DPR) for extension of one Unit of either 600 MW or 660 MW at Singareni Thermal Power Project (STPP), Jaipur (M), Adilabad District, Telangana State. 47) Puducherry Power Corporation Ltd.: Consultancy services for preparation of Detailed Project Report (DPR) for 1x660 MW coal based Thermal Power Plant at Karaikal. 48) UPRVUNL, Lucknow: Consultancy services for updating the DPR for 2x660 MW Super Critical Power Project at Jawaharpur, Uttar Pradesh. 49) STEAG Energy Services GmbH, Germany: Pre-feasibility Concept Study of a Power Plant for a Nickel Smelter Project in the Island of Pomala, Indonesia. 50) IOCL Guwahati: Feasibility Study for Installation of Refinery Fuel Gas Based Gas Turbine and HRSG Package at Guwahati Refinery. 51) Kyushu Electric Power Co. Inc. Japan.: Topographic Survey and Geotechnical Investigation related to the Preparatory survey on the project for construction of Barauni Supercritical coal fired thermal power station in India. 12 Energy Technologies Consultancy Services – Owner’s Engineer (Greenfield Projects): 1) Raichur Power Corporation Ltd.: Engineering Consultancy and Owner’s Engineer’s Services for establishing Coal fired Thermal Power Plant of capacity 2x800 MW based on Super critical technology at Yermaras, Dist. Raichur, Karnataka. 2) Meenakshi Energy Pvt. Ltd.: Consultancy Services as Owner’s Engineer for setting up of 2x150 MW (Stage-I) Coastal based Power Plant at Thamminapatanam, Nellore Dist., Near Krishnapatanam, Andhra Pradesh. 3) Meenakshi Energy Pvt. Ltd.: Consultancy Services as Owner’s Engineer for setting up of 2x350 MW (Stage-II) Coastal based Power Plant at Thamminapatanam, Nellore Dist., Near Krishnapatanam, Andhra Pradesh. 4) Shree Cement Ltd.: Consultancy Services as Owner’s Engineer for setting up 2x150 MW Thermal Power Plant at Beawar, Rajasthan. 5) Kribhco Shyam Fertilizers Ltd.: Consultancy services for design, engineering, supervision and project management for power sale project at Shahjahanpur plant (2x22.4 MW). 6) Mass Global Investment Co., Jordan: Consultancy services as Owner’s Engineer for setting up of 450 MW gas based power plant at Sulemaniya, in northern province of Iraq (BHEL is EPC contractor). 7) Corporate Power Ltd. (Abhijeet Group): Consultancy Services as Owner’s Engineer for Phase II (2x330 MW) of Matrishi Usha Jayaswal Mega Power Plant at Village Chitarpur, Dist. Latehar, Jharkhand. 8) Prakash Industries Ltd.: Consultancy Services for review of technical specifications of 2x150 MW coal based power project at Champa in the State of Chhattisgarh. 9) Bihar State Electricity Board: Project Management Consultancy Services for 2x250 MW Coal fired Thermal Power Plant at Barauni, Begusarai District in Bihar. 10) Mecwel Power Pvt. Ltd.: Consultancy Services as Owner’s Engineer for establishing 2x150 MW coal based Power Plant at Nalgonda in Andhra Pradesh. 11) EKTON ENERGI, Turkey: Consultancy Services for preparation of Technical Specifications for 15 MWe Biomass Fired (Cotton, Corn, Sunflower Body, Cane etc.) Power Plant in Turkey. 13 12) STEAG Energy Services GmbH: Provision of Site Services for the Owner's Engineer CCPP Kpone, Ghana. 13) Bangladesh Power Development Board: Owner's Engineer consultancy services for extension of Barapukuria coal fired thermal power station by 275 MW (3rd Unit) Project. 14) Bangladesh Power Development Board: Rendering Consultancy Services for Power Plant Projects at Maheshkhali Upazila in Cox's Bazar District of Bangladesh 15) Bihar State Power Generation Company Ltd.: Technical Consultancy and Project Management Services for enabling works associated with 2x110 MW Barauni TPS. 16) Rabigh Arabian Water and Electricity Company (RAWEC): Detailed Engineering Services for Rabigh IWSPP Phase-II Steam Shedding Project. 17) IOCL, Guwahati: PMC Services for Installation of New-Pet-Coke Based CFBC Boiler at Guwahati Refinery. Consultancy Services – Renovation & Modernization: 1) Punjab State Power Corporation Ltd. (PSPCL): Consultancy Services for Renovation & Modernization of 2x110 MW units 3 & 4, Guru Nanak Dev Thermal Plant at Bathinda, Punjab, India. 2) West Bengal Power Development Corporation Ltd. (WBPDCL): Consultancy for Energy audit, preparation of technical specification till finalization of contract for R&M of 210 MW, Unit # 5 of Bandel TPS, West Bengal, India. (World Bank funded project). 3) Maharashtra State Power Generation Company Ltd. (MSPGCL): Consultancy Services to design Renovation & Modernization scheme to improve the Energy Efficiency, Upgrade Capacity and Residual Life of Koradi Thermal Power Station Unit-6 (210 MW), Maharashtra, India (World Bank funded Project). 4) Chhattisgarh State Power Generation Company Ltd. (CSPGCL): Consultancy Services for preparation of Techno-commercial specifications, Evaluation of bids and detail engineering etc. for Renovation & Modernization of 4x210 MW units of Hasdeo TPS, Korba West, Chhattisgarh, India. 14 5) Jharkhand State Electricity Board (JSEB): Consultancy Services for Preparation of DPR, BOQ preparation, tender evaluation & supervision during RM&U works of Unit No.7 & 8 (110/105 MW each) at Patratu TPS, Jharkhand, India. 6) Central Electricity Authority (CEA): Consultancy assignment for preparation of Feasibility Report of three power plants under Energy Efficiency Programme (EEP) in India for Nasik TPS, Unit-3 (210 MW) of MSPGCL; Kolaghat TPS, Units 1, 2 & 3 (3x210 MW) of WBPDCL; Bokaro ‘B’ TPS, Units 1, 2 & 3 (3x210 MW) of DVC. 7) Japan Coal Energy Center (JCOAL): Support and Facilitation work for Preprimary study of Efficiency and Environmental Improvement of Coal Fired Power Stations in India (Stage-I) and Support and Facilitation work for Full Fledged Diagnosis of Efficiency and Environmental Improvement of Coal Fired Power Stations in India (Stage-II). 8) Bokaro Power Supply Co. (P) Ltd. (BPSCL): Consultancy Services for Renovation & Modernization of Boiler # 1 to 5 at BPSCL, Bokaro Steel City, Jharkhand, India. 9) Maharashtra State Power Generation Company Ltd. (MSPGCL): Consultancy Services for providing ‘Implementation Support to Energy Efficient Renovation & Modernization and Life Extension Project of Nasik Thermal Power Station, Unit-3 (210 MW), Maharashtra, India with German Development Co-operation through KfW Entwicklungs Bank. 10) JCOAL(Stage-III): Support and Facilitation work for Full-Fledged Diagnosis of Efficiency and Environmental Improvement of coal fired power stations in India. 11) Maharashtra State Power Generation Company Ltd. (MSPGCL): Consultancy Services for Feasibility Study for Energy Efficient Renovation & Modernization and Life Extension Project (EE R&M) of Unit-5 (210 MW) at Nasik TPS, Maharashtra, India. 12) Toshiba India Private Limited: Consultancy Services for Feasibility Study for Renovation & Modernization of three units of Tuticorin Thermal Power Plant of TANGEDCO, Tamil Nadu, India. 13) Maharashtra State Power Generation Company Ltd. (MSPGCL): Consultancy Services for Feasibility Study for Energy Efficient Renovation & Modernization and Life Extension Project (EE R&M) of Unit-4 (210 MW) at Nasik TPS, Maharashtra, India. 14) JCOAL (Stage-IV): Support and Facilitation Work for the Full-fledged diagnosis of Efficiency and Environmental Improvement of Coal Fired Power Stations. 15 15) Gujarat State Electricity Corporation Ltd. (GSECL): Consultancy Services to undertake the work of Turbine retrofitting of one no. of 200 / 210 MW LMZ Turbines each at Wanakbori TPS and Ukai TPS, Gujarat, India for Heat Rate (efficiency) improvement. 16) JCOAL (Stage-V): Support and Facilitation Work for the Full-fledged diagnosis of Efficiency and Environmental Improvement of Coal Fired Power Stations. 17) WBPDCL, Kolkata: Consultancy Services for Design, Engineering and Preparation of Technical Specification for (i) Up gradation and Renovation of Electro static Precipitators, (ii) Augmentation of capacity of Mills and associated system of Unit No.1, 2 & 3 (3x210 MW), of Kalaghat Thermal Power Station. 18) JCOAL: Support and Facilitation Work for Japan-India Cooperation for Project on Efficiency and Environmental Improvement for Sustainable, Stable and Low-carbon Supply of Electricity – NTPC Dadri R&M. Technical Support Services – BOP & Electrical Systems for R & M: 1) BHEL, Bhopal: 1x110 MW Unit-7 of UPRVUNL at Harduaganj Thermal Power Plant, Uttar Pradesh, India. 2) BHEL, Bhopal: 2x110 MW Unit-3 & 4 of UPRVUNL at Panki Thermal Power Plant, Uttar Pradesh, India. 3) BHEL, Bhopal: 2x110 MW Unit-1 & 2 of UPRVUNL at Parichha Thermal Power Plant, Uttar Pradesh, India. 4) BHEL, Bhopal: 2x110 MW Unit-3 & 4 of HPGCL at Panipat Thermal Power Plant, Haryana, India. 5) BHEL, Bhopal: 2x110 MW Unit-6 & 7 of Barauni TPS, Bihar, India Consultancy Services – Renewable Energy: 1) NTPC Limited: Consultancy Services for “Tendering Phase-I“ and “Project Implementation Phase-II“ for 15MWe Solar Thermal Plant at Anta, Rajasthan. 2) NTPC Limited: Consultancy Services for preparation of Feasibility Report for 15 MW Solar Thermal Power Project at Anta in the State of Rajasthan. 16 3) ACME Tele Power Ltd.: Consultancy services for preparation of Feasibility Report and Detailed Project Report for setting up of 10 MW Solar Thermal Power Project in the State of Rajasthan. 4) ACME Tele Power Ltd.: Consultancy services for preparation of Detailed Project Report for setting up of 50 MW Solar Thermal Power Project in the State of Gujarat. 5) Utthan: Preparation of Feasibility Report for setting up of 1 MW Solar Power Project in Allahabad, UP 6) IL&FS: Consultancy Services for preparation of Detailed Project Report for setting up 12 MW Biomass & Solar Thermal Hybrid (Linear Fresnel) Power Project in Kutch, Gujarat. 7) Avantha Power: Consultancy Services for preparation of Detailed Project Report for 5 MW Solar PV Plant at Pokhran, Rajasthan. 8) Lanco Solar Energy Pvt. Ltd.: Consultancy Services for preparation of Detailed Project Report for Solar Thermal Power Plant in Rajasthan. 9) MEIL Green Power Ltd.: Preparation of Bid Document on EPC basis as per ICB guidelines for 1x50 MW solar thermal power project at Anantapur. 10) North Eastern Electric Power Corporation Ltd. (NEEPCO): Preparation of Feasibility Report for On Grid Solar Power Plant at the Assam Gas Based Power Plant (AGPP), Bokuloni, Tinsukia, Assam. 11) North Eastern Electric Power Corporation Ltd. (NEEPCO): Preparation of Feasibility Report and Detailed Project Report for On Grid Solar Power Plant at the Tripura Gas Based Power Project (TGBP), Monarchak, Tripura. 12) Shree Cement Ltd.: Consultancy services for preparation of Feasibility Study Report including the modeling of the existing WHRB and proposed Solar System. 13) Aurum Renewable Energy Pvt. Ltd.: Technical Due Diligence for Supplier Proposal (Novatec Germany) 14) North Eastern Electric Power Corporation Ltd. (NEEPCO): Consultancy service for preparation of Feasibility Report for Grid Interactive Solar Power Plant at NEEPCO’s premises at Lanka, Nagaon District of Assam. 15) GIZ, New Delhi: Capacity Building at Solar Thermal Power Plant Technology at IIT, Rajasthan. 17 16) Bihar Renewable Energy Development Agency (BREDA): Consultancy Services for preparation of two DPRs for Roof Top Solar Power Project in Patna (40 KW for Chief Justice House & 50 KW for Governor's House). 17) Bihar Renewable Energy Development Agency (BREDA): Consultancy Services for preparation of RFP for selection of EPC contractor, Review of Bids and Recommendation and Review of Contractor's documents for 40 KWp Solar Rooftop at the Chief Justice residence in Patna. 18) Pan Asia Renewables Pvt. Ltd.: Consultancy Services for carrying out Technical Due Diligence of Renewable Energy (PV) Projects 19) Bihar Renewable Energy Development Agency (BREDA): Preparation of DPR for 25 Kwp Rooftop Solar off grid Power Plant at District Collectorate Building, Circuit house & District Hospital in ten districts in South-East region of Bihar (Gaya, Nawada, Jamui, Munger, Sheikhpura, Lakhisarai, Begusarai, Khagaria, Bhagalpur and Banka). 20) Bihar Renewable Energy Development Agency (BREDA): Consultancy Services for preparation of RFP for selection of EPC contractor, Review of Bids and Recommendation and Review of Contractor's documents for 60 KWp Solar Rooftop at the Hon'ble Governor residence in Patna. 21) North Eastern Electric Power Corporation Ltd. (NEEPCO): Consultancy Services for preparation of the Detailed Project Report for Grid Interactive Solar Power Plant within NEEPCO's premises at Lanka, Nagaon District of Assam. 22) Ministry of New and Renewable Energy (MNRE): Consultancy Assignment on "Biomass - Solar thermal hybrid technology for power generation". 23) NEEPCO: Consultancy Services for preparation of the Detailed Project Report for Grid Interactive Solar Power Plant within NEEPCO's premises at Kopili Hydro Electric Project, Umrangso, Assam. 24) IOCL, New Delhi: Consultancy Services for setting up of 100 KW - 2.0 MW scale Solar PV Power Plant(s) (Ground and/or Roof Mounted) in Synchronization with existing power source(s) at various installations across India for Indian Oil Corporation Ltd. 25) NEEPCO, Shillong: Consultancy Services for preparation of the Detailed Project Report for Grid Interactive Solar Power Plant at Assam Don Bosco University, Sonapur, Assam. 26) IOCL, Guwahati: Feasibility Assessment and Design of 200KWp Solar PV System for IOCL, Guwahati Refinery. 18 System Technologies Performance Analysis, Diagnostic and Optimization Software (PADO): S.No. Client Location Unit Size 1. BHEL / NTPC Simhadri 2 x 500 MW Stage-I 2. BHEL / NTPC Sipat 2 x 500 MW 3. BHEL / NTPC Ramagundam 1 x 500 MW 4. BHEL / NTPC Vindhyachal 2 x 500 MW Stage-III 5. BHEL / NTPC Rihand 2 x 500 MW Stage-II 6. BHEL / NTPC Bellary 1 x 500 MW 7. BHEL / NTPC Talcher 4 x 500 MW 8. ILK / RRVUNL Chhabra 1 x 250 MW 9. BHEL / NTPC Kahalgaon 3 x 500 MW 10. Shree Cement Ltd. Beawar 172 MW 11. BHEL / NTPC Dadri 2 x 500 MW 12. BHEL / NTPC Farakka 1 x 500 MW 13. BHEL / NTPC Korba 1 x 500 MW 14. BHEL / MAHAGENCO Khaparkheda 1 x 500 MW 15. BHEL / GSECL Ukai 1 x 500 MW 16. BHEL / MAHAGENCO Bhusawal 2 x 500 MW 17. BHEL / DVC & Tata Power JV Maithan 2 x 500 MW 18. BHEL / NTPC Simhadri 2 x 500 MW Stage-II 19. BHEL / MPPGCL Malwa 2 x 600 MW 20. BHEL / NTPC Jhajjar 3 x 500 MW 21. BHEL / NTPC Vindhyachal 2 x 500 MW Stage-IV 22. BHEL / CSPGCL Marwa 2 x 500 MW 23. BHEL / NTPC Rihand 2 x 500 MW Stage-III 24. BHEL / CSPGCL Korba Extension 1 x 500 MW 25. BHEL / NTPC Bongaigaon 3 x 250 MW 26. ILK / RRVUNL Chhabra 2 x 250 MW Stage-II 27. BHEL / TNEB North Chennai 2 x 600 MW 28. BHEL / MAHAGENCO Chandrapur 2 x 500 MW 29. BHEL / NTPC Mouda 2 x 500 MW 19 30. BHEL / NTPC Vallur 2 x 500 MW 31. BHEL / UPRVUNL Anpara 2 x 500 MW 32. ILK / HPGCL Panipat 1 x 210 MW 33. L&T, Mumbai Koradi 3 x 660 MW 34. L&T, Mumbai Rajpura 2 x 700 MW 35. BHEL / NTPC Barh 2 x 660 MW 36. BHEL / BRBCL Nabinagar 4 x 250 MW 37. BHEL / KBUNL Muzaffarpur 2 x 195 MW 38. BHEL / HNPCL Vizag 2 x 520 MW 39. Siemens / NTPC Kudgi 3 x 800 MW 40. BHEL / KPCL Bellary 1 x 700 MW 41. BHEL / APGENCO Rayalaseema Unit-6 1 x 600 MW 42. CESC Ltd. Budge Budge 3 x 250 MW 43. Siemens / NTPC Lara 2 x 800 MW 44. BHEL / RRVUNL Suratgarh Unit-7 1 x 660 MW 45. Essar Projects / NNTPS Neyveli New TPS 2 x 500 MW Simulator & Simulation Services: S.No. 1. 2. Client Description National Power Training Simulator for V 94.2 Combined Cycle Power Training Institute (NPTI) Plant to NPTI Faridabad, India STEAG Training Centre Training Simulator for 9 FA Combined Cycle Power Plant for STEAG Training Center at Noida 3. 4. National Power Training Simulator for Hydro Power Plant to NPTI Training Institute (NPTI) Faridabad, India for 250 MW Nathpa Jhakri HEP STEAG Germany Training Simulator for Combined Cycle Power Plant supplied to STEAG Germany. 5. STEAG Germany Training Simulator for 500 MW Coal based Thermal Power Plant to STEAG Germany 6. STEAG Training Center Training Simulator (Chinese Design) for 600 MW Coal based Thermal Power Plant for STEAG Training Center 20 at Noida 7. HPL Co-generation Ltd. Steam System Dynamic Simulation Study for 116 MW Gas based CCPP HPL Co-generation Limited, Haldia, West Bengal 8. STEAG Training Center Customized Training program for Power plant professionals: Essar Power Ltd. Gujarat Paguthan Ltd. 9. Sterlite Energy Limited Training Simulator (Chinese Design) for 600 MW Coal based Thermal Power Plant for M/s. Sterlite Energy Ltd., Jharsuguda, Orissa 10. ILK / RRVUNL Training Simulator for 195 MW Coal fired Power Plant supplied to Kota Thermal Power Plant, in India of RRVUNL. 11. ILK / RRVUNL Training Simulator for 250 MW Coal fired Power Plant supplied to Suratgarh Thermal Power Plant, in India of RRVUNL. 12. IIT, Jodhpur Design, Engineering & Supply of 50 MW Solar Power Plant Simulator. 13. L&T, Mumbai Operator Training Simulator for Rajpura Station DCS Project (2x700 MW) 14. L&T, Mumbai Operator Training Simulator for 3x660 MW Koradi Expansion Project 15. CESC Ltd., Kolkata Virtual Based Simulator for 250 MW Turbo-Generator Set for Budge Budge Generating Station at Pujali, 24 Parganas (South), West Bengal. 16. Siemens AG, Germany Operator Training Simulator for 3x800 MW Kudgi Supercritical Thermal Power Project of NTPC. 17. National Power Supply and installation of Combined Cycle Gas Training Institute of Turbine Simulator at AFAM RTC, Nigeria. Nigeria (NAPTIN) 18. Siemens AG, Germany Training Simulator for one unit of 2x800 MW Lara Power Plant of NTPC 19. BHEL, Bangalore GUI Package for 800 MW STPP Simulator for Krishnapatnam, APPDCL. 21 20. Rabigh Arabian Water Design and Supply Contract for IWSPP Integrated & Electricity Company Plant Operator Training Simulator. (RAWEC), Saudi Arabia 21. S&S Water and Power Supply of Custom Built Simulators for 220 MW and Projects Pvt. Ltd. 120 MW units similar to Hwange Power Station and for training for Skill Development of Zimbabwean Engineers and Operators in Zimbabwe. Other Projects: 1) NTPC Noida: Math Modeling & Power Plant Simulation Software for NETRA. 2) Central Power Research Institute (CPRI), Bangalore: Supply of Software for Simulation & Evaluation of Thermal Power Plant – Ebsilon Software. 3) National Productivity Council (NPC), Chennai: Supply of Thermal Power Plant Software – Ebsilon Software. 4) CPRI, Bangalore: Plant Simulation Modeling for optimization of combined cycle plants of NTPC. 5) BHEL, Bangalore: Supply, Erection & Commissioning of Fault Tree (Diagnostic & Water Chemistry Software) for Rihand Units 5 & 6 and Anpara Units 1 & 2). 6) SESG, Germany: Commissioning Support for Advanced Steam Temperature Control at O&M site of 4x600 MW Thermal Power Plant at Jharsuguda, Orissa, India. 7) BHEL, Bangalore: Supply, Erection & Commissioning of Fault Tree (Diagnostic & Water Chemistry Software) for 2x195 MW Muzaffarpur Project of KBUNL, 2x250 MW Nabinagar Project of BRBCL & 2x520 MW Vizag Project of HNPCL. 8) BHEL, Hyderabad: GUI based Sofware Tool (Ebsilon Professional) for generating HBDs of IGCC & Solar Thermal Power Plants. 9) BHEL, Bangalore: Diagnostic & Water Chemistry Software for 1x700 MW Bellary Unit3 of KPCL. 10) BHEL, Bangalore: Diagnostic & Water Chemistry Software for 1x600 MW Rayalaseema Unit-6. 22 11) Aditya Birla Group: Supply of Power Plant Simulation Software & License "Ebsilon Professional" and Ebsilon Boiler Module (EbsBoiler). 12) Aditya Birla Group: Development of models on Ebsilon software for all three units (Boilers & Turbine) of Birla Cellulosic plant. 13) BHEL, Bangalore: Diagnostic and Water Chemistry Software for 660 MW Suratgarh Unit-7. Plant Services Operation & Maintenance Services: 1) Sterlite Energy Ltd.(Vedanta Group): Comprehensive O&M contract for 4x600 MW Coal based Power Plant at Jharsuguda, Orissa. Owner: Sterlite Energy Ltd. Fuel: Coal Steam Turbine: 4 x 600 MW - Dongfang Contract Period: Mar 2010 – July 2015 2) Hinduja National Power Corporation Ltd.: Operation & Maintenance with Consumables for 2x520 MW Coal based Power Plant at Visakhapatnam, Andhra Pradesh. Owner: Hinduja National Power Corporation Ltd. Fuel: Coal Steam Turbine: 2 x 520 MW - BHEL Contract Period: March 2012 – May 2039 (25 years) 3) Botswana Power Corporation: Operation & Maintenance services for 4x150 MW Morupule B Power Station in Botswana. Owner: Botswana Power Corporation Fuel: Coal Steam Turbine: 4 x 150 MW - Dongfang Contract Period: Dec.2013 – Dec. 2018 4) HPCL-Mittal Energy Limited: O&M contract for 165 MW Combined Cycle Captive Power Plant at Guru Gobind Singh Refinery, Bathinda, Punjab 23 Owner: HPCL-Mittal Energy Limited (HMEL) Fuel: Refinery Gas Gas Turbine: GE Frame 6B Model, 2x34.5 MW Condensing Steam Turbine: 2x35 MW with double extraction Back Pressure Steam Turbine: 1x32 MW Contract Period: Jan. 2011 – Dec. 2015 5) Haldia Petrochemicals Ltd.: O&M contract for 116 MW Co-generation Plant at Haldia, West Bengal. Owner: Haldia Petrochemical Ltd. Fuel: Naphtha Gas Turbine: GE Frame 6551B Model, 2x38 MW Condensing Steam Turbine: 1x33 MW Back Pressure Steam Turbine: 1x16.58 MW with dual extraction Contract Period: Jul. 2006 – July 2015 6) Gujarat State Energy Generation Ltd.: O&M contract for 507 MW [156 MW Phase I + 351 MW Phase II] Gas based CCPP at Hazira, Gujarat Owner: Gujarat State Energy Generation Ltd. (GSEG) Fuel: Natural Gas Phase-I: Gas Turbines: 2 x 52 MW GT8C2 – Alstom Steam Turbine: 1 x 52 MW - Alstom Phase-II: Gas Turbine: 1 x 222.43 MW MS9001(FA) – BHEL Steam Turbine: 1 x 129 MW - BHEL Contract Period: Jan. 2011 – Dec. 2015 7) Gujarat State Energy Generation Ltd.: O&M contract for 156 MW Gas based CCPP at Hazira, Gujarat Owner: Gujarat State Energy Generation Ltd. (GSEG) Fuel: Natural Gas Gas Turbines: 2 x 52 MW GT8C2 – Alstom Steam Turbine: 1 x 52 MW - Alstom Contract Period: Jan. 2001 – Dec. 2010 24 8) Oil and Natural Gas Corporation Ltd.: O&M for the power island for 30 MW CCP at Gandhar for ONGC. Owner: Oil and Natural Gas Corporation Ltd. (ONGC) Fuel: Natural Gas Gas Turbine: 1 x PG 5371 PA – GE Frame 5 (21 MW) Steam Turbine: BHEL NK/40/56/25-3 (11 MW) Contract Period: Dec. 2003 – Feb.2007 9) Goa Energy Pvt. Ltd.: O&M advisory services contract for 30 MW WHRP at Amona, Goa. Owner: Videocon Fuel: Coke oven & blast furnace gas. Steam Turbine: One cylinder non-reheat turbine with one stage regenerative heater (steam parameters: 64 ata, 480°C) Two waste heat recovery boilers: 64 t/hr steam Contract Period: 2006-2009 Field Supervisory Services/Pre-Commissioning/Commissioning: 1) Gujarat State Energy Generation Ltd. (GSEG): Pre-commissioning and commissioning of 156 MW Gas based CCPP at Hazira. 2) Cairn Energy India Pty Ltd.: Field Supervisory services for commissioning testing, Reliability Test, PG Test and O&M Support for captive power plant at Barmer, Rajasthan. 3) VS Lignite Power Private Limited (KSK Group): Expert field supervisory services for Commissioning, Testing, Reliability test and PG test of 135 MW Lignite based power plant at Gurha, Bikaner Dist., Rajasthan. 4) Wardha Power Company Limited (KSK Group): Expert field supervisory services for Commissioning, Testing, Reliability test and PG test of 540 MW Coal based power plant at Warora, Wardha, Maharashtra. 5) Sterlite Energy Limited - Field Supervisory services for commissioning testing, Reliability Test, PG Test and O&M services for 4x600 MW IPP at Jharsuguda, Orissa. 6) Gujarat State Energy Generation Ltd. (GSEG): Pre-commissioning and commissioning of 351.43 MW Gas based CCPP (Stage-II) at Hazira. 25 7) HPCL-Mittal Energy Limited: Pre-commissioning and commissioning services leading upto successful commissioning and start-up and O&M of 165 MW CPP for Guru Gobind Singh Refinery at Bathinda, Punjab. 8) Cairn India Limited: Expert field supervisory services for Pre-commissioning and Commissioning activities of Boilers & Turbine at Mangla Processing Terminal, Barmer, Rajasthan. 9) Lanco Infratech Limited: Operation Manpower for pre commissioning and post commissioning activities at 2x600 MW Anuppur Thermal Power Project site, Madhya Pradesh. Project Management Services 1) Maharashtra State Power Generation Co. Ltd. (MSPGCL), Mumbai: Project Management Consultancy Services for 2x500 MW (Unit Nos. 8 & 9) of Chandrapur Thermal Power Project at Chandrapur, Maharashtra. 2) Raichur Power Corporation Ltd.: Project Management Consultancy Services for 2x800 MW coal fired Thermal Power Plant based on Super critical technology at Yermaras, Dist. Raichur, Karnataka. 3) Bihar State Electricity Board: Project Management Consultancy Services for 2x250 MW Coal fired Thermal Power Plant at Barauni, Begusarai District in Bihar. 4) Meenakshi Energy Pvt. Ltd.: Project Management Consultancy Services for setting up 2x150 MW (Stage-I) coal fired Power Plant at Thamminapatanam, Nellore Dist., Near Krishnapatanam, Andhra Pradesh. 5) Meenakshi Energy Pvt. Ltd.: Project Management Consultancy Services for setting up 2x350 MW (Stage-II) coal fired Power Plant at Thamminapatanam, Nellore Dist., Near Krishnapatanam, Andhra Pradesh. 6) Krishna Godavari Power Utilities Ltd.: Project Management (Monitoring & Commissioning) Services for 1x60 MW coal based power project at Wadapalli, Nalgonda District, Andhra Pradesh. 7) GSPC Pipavav Power Company Ltd.: Project Management Services for 2x351.43 MW gas Power Plant Project at Pipavav, Gujarat. 8) Action Ispat & Power Pvt. Ltd.: Project Management Services for 2x40 MW coal based Power Project at Jharsuguda, Orissa. 26 9) Hazira LNG Pvt. Ltd.: Consultancy Services for Project Engg. for GIS substation project at Hazira, Gujarat. Energy Audits & M&V Audits: 1) Haryana Power Generation Corporation Ltd. (HPGCL): Energy Audit of 210 MW (Unit # 5 & 6), 117.8 MW (Unit # 1), 110 MW (Unit # 2, 3 & 4), Panipat TPS, Haryana, India. 2) Maharashtra State Power Generation Corporation Ltd. (MSPGCL): Energy Audit of Unit # 4 (210 MW) Nasik TPS, Maharashtra, India. 3) Maharashtra State Power Generation Corporation Ltd. (MSPGCL): Energy Audit of Unit # 5 (210 MW) Nasik TPS, Maharashtra, India. 4) Maharashtra State Power Generation Corporation Ltd. (MSPGCL): Energy Audit of Unit # 3 (210 MW) Nasik TPS, Maharashtra, India. 5) Damodar Valley Corporation (DVC): Energy Audit of 210 MW (Unit # 1), Bokaro ‘B’ TPS, Jharkhand 6) West Bengal Power Development Corporation Ltd. (WBPDCL): Energy Audit of 210 MW (Unit # 3), Kolaghat TPS, West Bengal, India. 7) West Bengal Power Development Corporation Ltd. (WBPDCL): Energy Audit of 210 MW (Unit # 5), Bandel TPS, West Bengal, India. 8) Maharashtra State Power Generation Corporation Ltd. (MSPGCL): Energy Audit of 210 MW (Unit # 6), Koradi TPS, Maharashtra, India. 9) Haryana Power Generation Corporation Ltd. (HPGCL): Energy Audit of 55 MW (Unit # 3), Faridabad TPS, Haryana, India. 10) Haldia Petrochemicals Ltd.: Energy Audit of 116 MW Captive Cogeneration Plant at Haldia, West Bengal, India. 11) Shree Cement Ltd.: Energy Audit, Efficiency Evaluation and Improvement study of 2x150 MW units at Shree Mega Power plant at Beawar, Rajasthan. 12) Rajasthan Rajya Vidyut Utpadan Nigam Limited: Consultancy Services to RVUN for implementation of Perform, Achieve and Trade (PAT) Scheme under National Mission for Enhanced Energy Efficiency at STPS, Suratgarh (Unit # 1 to 6), CTPP, Chhabra (Unit # 1 & 2), DCCP, Dholpur (3x110 MW), RGTPP, Ramgarh (3x37.5 MW). 27 13) Gujarat State Electricity Corporation Ltd.: Energy Audit and Post verification of Wanakbori Thermal Power Station (7x210 MW Units) by Accredited Energy Auditor. 14) WBPDCL, Bakreswar Thermal Power Project: Mandatory Energy Audit of all units (5x210 MW) of Bakreswar Thermal Power Plant. 15) HPGCL, Panipat TPS: To conduct Energy Audit Test of Unit-1 to 8 (1x117.8 MW + 3x110 MW + 2x250 MW) at PTPS, Panipat. 16) DVC, Chandrapura TPS: Energy Audit of 3x130 MW Units of CTPS, DVC, Chandrapura and support in preparation of PAT and its normalization related documentations. 17) HPGCL Panipat TPS: M&V audit of Unit 1 to 8 (1x117.8 MW + 3x110 MW + 2x210 MW + 2x250 MW) PTPS, Panipat and Unit 1 to 2 (2x300 MW) of DCRTPP, Yamuna Nagar. 18) MSPGCL Nasik TPS: Hiring of Expert services for Monitoring & Verification for PAT Cycle as per BEE at Nasik TPS 19) Neyveli Lignite Corporation Ltd.,TS-II: Monitoring & Verification of TPS-II Cycle-I. 20) Damodar Valley Corporation, Mejia TPS: M&V Audit and Energy Audit of 4x210 MW + 2x250 MW of Mejia Thermal Power Station. 21) CSPGCL, Raipur: M&V Assessment under PAT Scheme for the three thermal Power Stations (Hasdeo TPS, Korba TPS & Dr. SPM TPS) of Chhattisgarh State Power Generation Company Ltd. 22) MSPGCL, Khaperkheda TPS: Hiring of Expert Services for Monitoring & Verification (M&V) for PAT Cycle as per BEE at Khaperkheda TPS (4x210 MW) 23) NTPC Feroz Gandhi Unchahar TPS: PAT M&V Audit at Feroz Gandhi Unchahar Thermal Power Station of NTPC. 24) Power Cell, Ministry of Power, Bangladesh: Technical Audit Study for old power plants of Bangladesh. 25) MSPGCL, Koradi TPS: Monitoring & Verification (M&V) under PAT Scheme of Koradi TPS. Performance Testing: 1) Hasdeo TPS, Korba West, Chhattisgarh (CSPGCL): Performance Testing of 210 MW (Unit # 2). 2) GGSSTP, Ropar, Punjab (PSEB): Performance Testing of 210 MW (Unit # 1). 28 3) Hazira, Gujarat (GSEG): Performance Testing of 156 MW CCPP. 4) GNDTP, Bathinda, Punjab (PSEB): Supervision of PG Test for Stage-1 (Units 1 & 2) and Stage-2 (Units 3 & 4) of 4x110 MW. 5) Koradi TPS (MAHAGENCO): Performance Testing of 210 MW (Unit # 6). 6) Bandel TPS (WBPDCL): Performance Testing of 210 MW (Unit # 5). 7) Faridabad TPS (HPGCL): Performance Testing of 55 MW (Unit # 3). 8) Parichha TPS (UPRVUNL): Checking of Boiler Efficiency & Turbine Heat Rate of 2x210 MW BHEL Make (KWU Design), Parichha TPS. 9) Konaseema Gas Power Ltd.: Performance Testing at 445 MW Combined Cycle Gas Power Plant at Ravulapalem (2 Nos. V94.2 Gas Turbines) 10) Konaseema Gas Power Ltd.: Conducting annual capacity test for 445 MW gas based CCPP at Ravulapalem, Andhra Pradesh (Nov. 2011). 11) Gupta Energy Pvt. Ltd.: Performance Test of 2x60 MW TPP at Village Usegaon, Taluka Ghugus, Dist. Chandrapur, Maharashtra. 12) Shree Cement Ltd.: PG Test Consultancy services for 2x150 MW Thermal Power Plant at Beawar, Rajasthan. 13) Damodar Valley Corporation, Bokaro 'B' TPS: Performance Evaluation Test of DVC, Bokaro 'B' TPS, Unit No.3. 14) Shree Cement Ltd.: Providing Instruments & Engineers for carrying out PG Test of ACC at 2x150 MW Units of Shree Mega Power Plant, Shree Cement Ltd., Beawar, Rajasthan. 15) SKODA Power Pvt. Ltd.: PG Testing of 2x110 MW (E & F Station) of Torrent Sabarmati Project at Ahmedabad. 16) Aries Power Systems (I) Pvt. Ltd., Hyderabad: PG Test of Steam Turbines and Generator of 2x150 MW Meenakshi Power Project at Thamminapatanam, Nellore Dist., Andhra Pradesh. 17) Lanco Infratech Limited: Performance Guarantee Test for Unit # 1 of 2x300 MW Lanco Amarkantak Thermal Power Plant at Pathadi, Korba, Chattisgarh. 18) Lanco Infratech Limited: Performance Guarantee Test for Unit # 2 of 2x600 MW Udupi Thermal Power Plant, Yellur Village, Udupi District, Karnataka. 29 19) Lanco Anpara Power Limited: Performance Guarantee Test for Unit # 1 and Unit # 2 (2x600 MW) of LANPL Plant at Anpara, Sonebhadra, Uttar Pradesh. 20) Lanco Infratech Ltd.: PG Test including Fans and Demonstration of Parameters along with Preparation of PG Test Procedure for Unit # 1 & 2 (2x600 MW) Anuppur Thermal Power Project at District Anuppur, Madhya Pradesh. 21) GMR Rajahmundry Energy Ltd.: Conducting the Performance test and witnessing Reliability test for 2 x 384 MW Combined Cycle Power Plant at Rajahmundry, Andhra Pradesh, India Consultancy Services – Residual Life Assessment/Condition Assessment Studies: 1) Guru Gobind Singh STPP, Ropar of PSEB: RLA, Condition Assessment & Performance Testing of 2x210 MW Units (Scope of Work: RLA of SG & Auxiliaries, TG & Auxiliaries, Material Handling (Ash & Fuel), Electrical and C&I Systems, BOP incl. Civil Structures, Civil & Structural Study of (SG & TG) & Auxiliaries. Boiler: BHEL, Turbine: BHEL) 2) Hasdeo TPS, Korba West of CSPGCL: RLA/Condition Assessment Studies along with Performance Evaluation Test of 4x210 MW Units. (Scope of Work: RLA Study of Turbine, Boiler & Aux., Electrical, I&C, BOP Systems. (Make: U 1 & 2: Boiler-BHEL, Turbine-KWU-BHEL. U 3 & 4: Boiler-ABL, Turbine-KWU-BHEL) 3) Nasik TPS of MSPGCL: RLA Study of Boiler & Turbine of 1x210 MW Unit # 3 (Make: Boiler-BHEL, Turbine-LMW). 4) Kolaghat TPS of WBPDCL: RLA Study of Boiler & Turbine of 3x210 MW Units 1, 2 & 3. (Make: Boiler-BHEL, Turbine-LMW). 5) Bokaro ‘B’ TPS of DVC: RLA Study of Boiler & Turbine of 3x210 MW Units 1, 2 & 3. (Make: Boiler-BHEL, Turbine-LMW). 6) Kahalgaon STPP of NTPC: RLA Study & Steam Path Audit of 210 MW Turbines of Units 2 & 3. (Make: LMZ Russia). 7) Ramagundam STPP of NTPC: RLA Study & Steam Path Audit of Turbines, Unit # 2 (200 MW). (Make: Ansaldo). 8) NTPC-SAIL Power Company (P) Ltd., Rourkela: RLA of Turbine, Generators & Piping of Unit-1 (60 MW). 9) Obra ‘B’ TPS of UPRVUNL: RLA & CA of Electrical Equipments of 5x200 MW Units. 30 10) Koradi TPS of MAHAGENCO: RLA & Life Extension Study of Turbine, Boiler & Aux., Electrical, I&C, BOP Systems of 4x120 MW Units. 11) Panipat TPS of HPGCL: RLA/LE Study of 1x110 MW Unit # 3. 12) Koradi TPS of MAHAGENCO: RLA & CA Study of Boiler & Turbine of 1x210 MW Unit # 6. 13) Parli TPS of MAHAGENCO: RLA/LE Study of Boiler, Turbine & Aux., Electrical, I&C, BOP Systems of 2x30 MW Units 1 & 2. 14) Patratu TPS of JSEB: RLA/LE Study of Boiler of 105 MW Unit # 8. 15) Indian Copper Complex, Ghatsila of Hindustan Copper Ltd.: RLA/LE Study of Boiler (Capacity: 2x30 TPH) 16) Khetri Copper Complex, Khetri of Hindustan Copper Ltd.: RLA/LE Study of WHR Boiler (Capacity: 33 TPH) 17) Essar Power Ltd., Hazira: RLA Study of HRSG # 2 (Capacity: 176 TPH) 18) Essar Steel Ltd., Hazira: RLA Study of HRSG Boiler (Capacity: 32 MW) 19) Indo Gulf Fertilizers Ltd., Jagdishpur: RLA Study of Boilers (6 Nos.) (Capacity: 2x100 TPH, 4 WHRB, 1x55 TPH) 20) Reliance Industries Ltd., Hazira: RLA Study of HRSG-3 Boiler (Make: BHEL), RLA Study of Aux. Boiler (Make: Stork, The Netherlands) (Capacity: HRSG-125 TPH, Aux. Boiler95 TPH) 21) NTPC Vindhyachal: RLA study of LMZ Turbine in one unit of 6x210 MW TPS at Vindhyachal. (April 2011) 22) APGENCO: RLA/LE Study of Boiler, Turbine & auxiliaries and ESP Performance Test of 210 MW Unit No.5 (Stage-III) of Dr. NTTPS, Vijayawada. (Oct.2011) 23) NTPC Vindhyachal: RLA study of LMZ Turbine in one unit of Stage-I during capital overhauling (Feb.2012). 24) Shree Cement Ltd.: RLA Study of Unit-1 Super Heater and Final Super Heater of 2x150 MW Thermal Power Plant at Beawar, Rajasthan (Aug. 2012). 25) SKODA Power Pvt. Ltd. (A Doosan Company): RLA, FEM, Eddy Current Testing & Condenser Cleaning of 2x110 MW (Station F & E) Torrent Sabarmati Project at Ahmedabad. (Nov.2012). 31 26) Neyveli Lignite Corporation Ltd., TPS-I: Residual Life Assessment Study works on Boiler, Turbine, Generator and Civil Zones in Units 3&5 (50 MW) of TPS-I. 27) Neyveli Lignite Corporation Ltd., TPS-II: RLA Study of HP, IP & LP Turbines of Unit V and NFT and other testing of Spare LP Rotor of 210 MW KWU design BHEL make Turbine. 28) Neyveli Lignite Corporation Ltd., TPS-II: RLA Study on Turbine of Unit-1 and Bore sonic test of HP IP rotor. 29) APGENCO, Hyderabad: RLA/LE Study of Turbine & Auxiliaries of 210 MW Unit No.3 (Stage-II) of Dr. Narla Tatarao Thermal Power Station (Dr. NTTPS) 30) Yatagan Power Plant, Turkey: Technical Analysis of 3x210 MW Yatagan Power Plant project in Turkey. Diagnostic Services – Power Plant Simulation & Base line Studies: 1) Baseline studies under the Indo-German Energy Efficiency Program: UPRVUNL Panki 110 MW Parichha 110 MW Harduaganj 110 MW Anpara 210 MW & Obra 200 MW RRVUNL Kota 110 MW MPGENCO Satpura 210 MW NTPC Badarpur 200 MW PSEB Bathinda 110 MW 2) GTZ GmbH: Baseline studies of 85 Units (capacity ranging from 100 MW to 210 MW) by Central Electricity Authority under the Indo-German Energy Efficiency Program. 32 3) Adani Power Ltd.: Services for boiler combustion optimization of 330 MW (Unit1) at Adani Power Ltd., Mundra, Gujarat. Steam Path Audits: 1) NTPC-SAIL Power Company (P) Ltd. Unit #1 (60 MW) at Rourkela 2) WBPDCL Unit #1 (210 MW) at Kolaghat TPP Unit # 3 (210 MW) at Kolaghat TPS 3) PSEB Unit # 1 (210 MW) at GGSTPP, Ropar 4) CSEB Unit # 2 (210 MW) at Korba (West) 5) NTPC Unit # 2 (200 MW) of Ramagundam STPP. 210 MW Turbine (Stage-1) of Kahalgaon STPP. Steam Turbine of Rajiv Gandhi CCPP, Kayamkulam (Kerala) Steam Path Audit of HP & LP Module of Steam Turbine at NTPC, Anta. 6) MAHAGENCO Unit # 3 (210 MW) at Nashik TPS 7) DVC 3x210 MW (Units # 1, 2 & 3) at Bokaro ‘B’ TPS Other Projects: 1) Panipat Thermal Power Station (HPGCL): Dirty Air Flow & Clean Air Flow test of 250 MW Boiler of Unit-7, PTPS Panipat. Advisory Services Consultancy Services – Due Diligence: 1) GMR Energy Ltd: Due Diligence for the Consortium of GMR Energy, India, Macquire, Singapore & NAK, Kuwait for acquisition of TUAS Power Asset of 2x600 MW oil fired Steam Turbine Sets & 4x367.5 MW gas fired CCGT. 33 2) STEAG Energy Services GmbH: Technical Due Diligence study of 96 MW Hydro Power Plant located in the North-Eastern State of Sikkim. 3) Lanco Power: Due Diligence for 2x300 MW coal based Power Plant. 4) Globeleq/Mott MacDonald: Due Diligence for international developer for 2x520 MW coal based Power Plant. 5) Moserbaer India Ltd: Due Diligence for 2x300 MW coal based Power Plant. 6) IL&FS: Technical Due Diligence of Biomass projects in Maharashtra (2x15 MW), Punjab (3x10 MW + 1x20 MW) & Haryana (5x12 MW). 7) Ethiope Power Ltd.: Technical Due Diligence of SAPELE Power Assets in Nigeria for acquisition by the consortium of EPL, GSHL & GSPC. 8) STEAG Energy Services GmbH: Due Diligence of Wind Mill Projects of KS Oils Ltd. in Tamil Nadu, Madhya Pradesh & Rajasthan. Advisory Services/Studies: 1) Central Electricity Regulatory Commission (CERC): Consultancy Services for developing benchmarks of capital cost for thermal power stations and transmission system elements. 2) GTZ GmbH: Assessment of tendering procedures followed by Public Utilities and review of documents of Standard R&M Projects. 3) IDFC Projects Ltd.: Study of various aspects related to design, installation & operation of Supercritical Power Plants. 4) British High Commission / Mott MacDonald: Consultancy services in respect of UMPP Risk Analysis 5) WBPDCL: Study for optimum restructuring in association with Price Waterhouse Cooper. 6) Assam State Electricity Board: Capacity development of Assam Power Sector Utilities in association with Mercados EMI. 7) WBPDCL: Optimization study of generating units with the help of power plant performance mapping software. 8) WBPDCL: Manpower mapping study of Kolaghat Thermal Power Station 34 9) GTZ GmbH: Power plant performance reporting and improvement under the provisions of the Indian Energy Conservation Act. 10) Western U.P. Power Transmission Co. Ltd.: Preparation of Bid Document for selection of EPC Contractor for development of 7 Nos. 765 kV & 400 kV GIS Sub-stations & Transmission lines. 11) Shree Cement Ltd.: O&M Advisory Services for 2x150 MW Thermal Power Plant at Beawar, Rajasthan. 12) Bina Power Supply Company Ltd. (Jaypee Group): Consultancy services for stabilization of water chemistry in Water Treatment Plant of 2x250 MW Jaypee Bina Thermal Power Plant, Bina, M.P. 13) Indiabulls Power Ltd.: Study for ash dyke area requirement for the proposed 1x660 MW coal based Power Project at Nashik in Maharashtra 14) GIZ: Technical Support and assistance for Power Plant Performance Improvement under GIZ’s Indo German Energy Programme. 15) KPMG, Mumbai: Consultancy services to benchmark the costs for BOP Packages. 16) IL&FS Energy Development Company Ltd. (IEDCL): Assessment of 2x300 MW operational units, 2x660 MW supercritical units under construction and 2x660 MW under development in the State of Chhattisgarh. 17) European Commission: Workshops and Training Programme on Renovation and Modernisation (R&M) and operational practices for the Indian thermal power sector. 18) Hitachi India Pvt. Ltd.: Consultancy services to do research of 10 power plants in India to enable Hitachi to participate in Reverse Engineering work. 19) HPGCL, Panchkula: Consultancy services for assessment of operation engineers engaged in operation of thermal power plant at DCRTPP, Yamunanagar and RFTPP, Khedar. 20) Visa Power Ltd.: Assessment of Civil, Structural and Electro-mechanical work carried out by L&T for 2x600 MW BOP package of VISA Raigarh Thermal Power Project, Chhattisgarh. 21) KfW: Consultancy Services for revision of the Economical Analysis of the Detailed Project Report for the Rehabilitation of Unit 3 of WBPDCL's Kolaghat Thermal Power Station. 35 22) Haryana Power Generation Corporation Ltd. (HPGCL): Consultancy Services relating to Assessment of Operation and Maintenance Practices for PTPS, DCRTPP & RGTPP of HPGCL. 23) L&T Power, Vadodara: Consultancy Services for Carrying out Quantity Measurement/ Assessment Study for BOP package of 2x600 MW VISA Thermal Power Project site in Chattisgarh 24) JSW Energy Vijayanagar: Advisory Services during reopening and reassembly of 130 MW JSWEL SBU1 Unit-2 at JSWEL Toranagallu, Bellary, Karnataka. 25) GSPC LNG Ltd.: Consultancy Services for Power and Water System for Mundra LNG Terminal at Mundra, Kutch, Gujarat. 26) Axis Bank Ltd.: Consultancy Services for Techno Economic Viability (TEV) Study of 2x60 MW Power Plant of Gupta Energy Private Limited at Chandrapur 27) GIZ, New Delhi: Consultancy contract on feasibility for installation of Co-Generation unit at Puducherry Co-operative Sugar Mill. 28) Essar Power Gujarat Ltd.: Chemistry Expert Services for 2x600 MW Power Plant at Jamnagar, Gujarat. 29) Hazira LNG Pvt. Ltd.: Consultancy Services for Review of GTG maintenance and operating practice at HLPL, Hazira. 30) JSW Energy Ltd.: Advisory Services for opening and reassembly of HIP rotor of Unit-3 during Capital Overhauling at JSWEL Toranagallu (Bellary Dist.), Karnataka. 31) Adhunik Power and Natural Resource Ltd.: Advisory Services for the supervision of works related to Generator for 2x270 MW MPSTPP near Jamshedpur in the state of Jharkhand. 32) Adhunik Power and Natural Resource Ltd.: Consultancy/Audit Services for Operation & Maintenance of 2x270 MW (Stage-I) MPSTPP at Padampur, Jharkhand. 33) KPMG Advisory Services Pvt. Ltd.: Diagnostic/Design services for Sasan UMPP of Reliance Power. 34) Lanco Anpara Power Ltd.: Technical Audit of 2x600 MW LANPL Plant at Anpara, Uttar Pradesh 35) STEAG Power Minerals GmbH: Advisory Services to assess the potential for SPM products and services in India and to develop a strategy to service identified markets. 36 36) ONGC Tripura Power Company Ltd.: Consultancy Services for Technical System and Performance Audit of 2x363.3 MW Gas Based Combined Cycle Power Plant at Palatana, Tripura. 37) JCOAL: Survey on status of coal fired power stations and coal consumption in India. 38) Meenakshi Energy Pvt. Ltd.: HAZOP study for Coastal Power plant located at Thamminapatnam, A.P. 39) Rosa Power Supply Company Ltd.: Consultancy Services for analyzing root cause of fast erosion of APH outlet to ESP inlet Flue Gas Duct. 40) GMR Energy: TEV Studies of 2x300 MW thermal Power Project EMCO Energy Limited at Warora, Maharashtra 41) KPMG: Advisory Services for conducting technical interview assessment and tool development. 42) Meenakshi Energy Pvt. Ltd.: Preparation of Electrical I/O list for main plant DCS for 2x350 MW (Stage-II) project at Thamminapatnam. 43) Kyushu Electric Power Co., Inc., Japan: Consultancy Services for the planning of Plant Basic Design related to the preparatory survey on the project for construction of Barauni super critical coal fired thermal power station in India. 44) Mitsubishi Hitachi Power Systems India Pvt. Ltd.: Consultancy services to do research of 10 power plants in India to enable Mitsubishi Hitachi to participate in Reverse Engineering work. 45) Gupta Energy Pvt. Ltd.: Preparation of Assessment Report on the present technical status of 2x60 MW power plant at Chandrapur 46) Adhunik Power & Natural Resources Ltd.: Consultancy/Audit services for Monitoring of O&M and Performance improvement activities of 2x270 MW M.P. Super Thermal Power Plant located at Padampur (Saraikela-Kharsawan), Jharkhand. 47) Catalagzi TPP, Turkey: Techno-Economic Study between FBC Boiler Vs PC fired (rehabilitated) Boiler + Seawater FGD + DeNOx System and PC fired (rehabilitated) Boiler + Limestone FGD + DeNOx System. 48) Rabigh Arabian Water and Electricity Company (RAWEC): Engineering Services for CCR1 Power Supply Modification and for T&I - FGD UPS Implementation. 37 Lender Engineer Services: 1) PFC: Lender’s Engineer to PFC for M/s. Indian Metals & Ferro-Alloys Limited’s 2 x 60 MW Coal based Captive Thermal Power Project at Choudwar in the State of Orissa. 2) PFC: Lender’s Engineer for PFC for M/s. KSK Mahanadi Company Ltd’s 6 x 660 MW Coal based Thermal Power Project at Janjgir, District Champa in the State of Chhattisgarh. 3) PTC India Financial Services Ltd.: Lender’s Engineer to PTC India for M/s. Greta Energy Limited’s 15 MW Biomass Power Project at Mul, Maharashtra. 4) IDBI Bank: Lender’s Engineer to IDBI Bank for M/s. GMR Rajahmundry Energy Limited’s 2x384 MW CCPP in the State of Andhra Pradesh. 5) PFC: Lender’s Engineer to PFC for M/s. Bhubaneshwar Power Pvt. Ltd’s 2x67.5 MW (135 MW) Captive Power Plant in Cuttack, Orissa. 6) Axis Bank: Lender’s Engineer to Axis Bank for M/s. GMR Chhattisgarh Energy Ltd’s 2x685 MW (1370 MW) coal based Supercritical Power Plant at Raikheda, Raipur District, Chhattisgarh. 7) Axis Bank: Lenders' Engineer to Axis Bank for M/s. ACME Tele Power Ltd’s 10 MW Solar Power Project in Rajasthan. 8) IFCI Ltd.: Lenders' Engineer to IFCI for M/s. Pioneer Gas Power Ltd.'s project of setting up 388 MW CCPP at MIDC, Raigad Dist., Maharashtra. 9) ICICI Bank: Lenders' Engineer to ICICI Bank for M/s. GMR Energy's Maru Transmission Service Company in Rajasthan. 10) ICICI Bank: Lenders' Engineer to ICICI Bank for M/s. GMR Energy's Aravali Transmission Service Company in Rajasthan. 11) PTC India Financial Services Ltd.: Lenders Independent Engineer (LIE) services for 4.25 MW Cogen Power Plant of M/s. Abellon Cogen Ltd. (ACL) at Ahmedabad, Gujarat. 12) PFC: Lenders' Engineering services for 1x525 MW coal based Thermal Power Plant being set up by M/s. SEPL Power Private Limited (SEPCPPL) in Thoothukudi district of Tamil Nadu. 13) PFC: Lender's Independent Mining Engineer (LIME) for KSK Mahanadi Power Company Limited's 6x660 MW coal based Thermal Power Project at Nariyara, JanjgirChampa District, Chhattisgarh. 38 14) Axis Bank Ltd.: Lenders' Independent Engineer (LIE) for review and monitoring of rail infrastructure from Akaltara station to the power project site of KSK Mahanadi Power Company Ltd. 15) GMR Energy: Assessment of Project Cost of Aravali Transmission Service Company Ltd. and Maru Transmission Service Company Ltd. 16) Pioneer Gas Power Ltd.: Preparation of final time and cost overrun report for 388 MW CCPP at MIDC, Maharashtra. 17) Power Finance Corporation Ltd.: Lenders Engineer for carrying out Phase Segregation work for 6x600 MW Coal based TPP of M/s. KSK Mahanadi Power Co. Ltd. Consultancy Services – Asset Evaluation: 1) Adani Power Ltd.: Evaluating Present Value of Plant & Equipment of 1320 MW (PhaseI & Phase-II) Coal based Thermal Power Plant at Mundra, Gujarat. 2) Haryana Power Generation Corporation Ltd.: Valuation of Assets at 3x60 MW Coal based Units at Faridabad, Haryana.(March 2011) 3) Damodar Valley Corporation: Valuation of Retired Unit # 4, 5 & 6 of 120 MW each of Chandrapura TPS (May 2013). 4) GMR Energy Ltd.: Valuation of 768 MW gas based combined cycle power plant at Rajahmundry (GREL – 2x384 MW). Consultancy Services – Transmission and Distribution Projects: 1) Central Electricity Regulatory Commission (CERC): Development of a model for benchmarking of capital cost for thermal power stations and transmission system elements. 2) Western U.P. Power Transmission Co. Ltd.: Preparation of Bid Document and evaluation of bids for construction of 765/400 kV transmission system project of about 900 km including 7 substations. 3) UP Power Corporation Ltd.: Review of proposed 765/400 kV substation of UPPCL’s Jawaharpur project. 4) Indian Metals & Ferro Alloys (IMFA): Review of power system studies for evacuation of power from 2x60 MW thermal power plant of IMFA, Bhubaneswar. 39 5) HPCL-Mittal Energy Ltd.: Operation and Maintenance of 220/33 kV grid switchyard, 165 MW captive power plant substation and 18 nos. refinery distribution substations of Guru Gobind Singh Refinery at Bathinda. 6) Maru Transmission Service Company Ltd.: Due diligence, construction monitoring, performance test monitoring and annual operations review of 400 kV S/C power transmission Bikaner-Deedwana-Ajmer line, 220 kV D/C Deedwana-Sujangarh power transmission line and the 400 kV/220 kV GSS at Deedwana (265 km in total). 7) Aravali Transmission Service Company Ltd.: Due diligence, construction monitoring, performance test monitoring and annual operations review of 400 kV S/C HinduanAlwar transmission line (85 km) and 2x315 MVA 400/220 kV Grid substation at Alwar. 8) Kribhco Shyam Fertilizers Ltd. (KSFL): Consultancy services for design, engineering, supervision and project management of power for sale project at Shahjahanpur in U.P. 9) Kyushu Electric Power Co., Inc., Japan: Consultancy Services for the planning of power system analysis related to the preparatory survey on the project for construction of Barauni super critical coal fired thermal power station in India. 10) STEAG Energy Services GmbH: Provision of Engineering Services for Impulse International (PTY) LTD. - Refurbishment of Bellevue Substation in South Africa. 40 Training S.No. Name of Assignment Client Name Location Duration 1. NPTI, Faridabad Noida 2 weeks for Power Plant Simulator Training Program for NPTI each batch (4 Batches of 8 trainees each) 2. Power Plant Simulator Training NPTI, Faridabad Noida 2 weeks NPTI, Faridabad Noida 2 weeks NPTI, Faridabad Noida 2 weeks GSECL, Baroda Noida 2 days each NPTI, Faridabad Noida 1 week for 3 Program for NPTI (Batch of 16 trainees) 3. Power Plant Simulator Training Program for NPTI (Batch of 03 trainees) 4. Power Plant Simulator Training Program for NPTI (Batch of 12 trainees) 5. Short Term Power Plant Training Program- 2 batches of 15 Engineers each, on “Advanced Heat Rate Monitoring and Diagnostics” and “ Advanced Level Heat Rate Awareness” 6. 7. Training Course on Use of Eblison Software on Performance Assessment batches of 20 of Thermal Power Stations students each Familiarization and interchange of GTZ, Germany All India 6 months GTZ, Germany All India 2 years GTZ, Germany All India 2 years Best Practices with Power Plant Operators in Europe/Germany 8. Assessment of training need of Energy Managers &Energy Auditors. 9. Training courses of Energy Auditors and Energy Managers. 41 10. Assessment of Human Resource GTZ, Germany All India 2 years GTZ, Germany All India 2 years GTZ, Germany All India 2 years GTZ, Germany All India 2 years Power Plant Simulator training for CL&P Noida 1 week China Light and Power Corporation. Corporation Development Needs in upto 30 Power Plants across India. 11. Mapping of Thermal Power plants upto 85 numbers & Capacity building of upto 4 engineers of the Conservation and Environment Division of CEA in the use of Software. 12. Design of Organization Structure of Energy Efficiency Cell, functions and duties of Energy Managers and personnel working in Energy Efficiency Cell. Seminars and Workshops on Best 13. Practices in power plant performance monitoring in Europe/Germany vis a vis Indian practices 14. engineers 15. Power Plant Familiarization and C&C Energy Pvt. Noida simulator training for unit operators Ltd. 6 weeks of Zimbabwe Power Company, Zimbabwe 16. Training Programme for Middle C&C Energy Pvt. Noida Management & Senior Management Ltd. 15 days officials of Zimbabwe Power Company, Zimbabwe 17. Simulator Training for B. Tech NPTI, Badarpur Noida 2 weeks NPTI, Badarpur Noida 2 weeks Students (62 students) for two weeks 18. Simulator Training for B. Tech 42 Students (72 students) for two weeks in August & September 2013 19. Training for Power Plant Personnel GIZ (Excellence (25 delegates) to improve the Enhancement efficiency and performance of the Centre) Noida 6 days (two batches) sector. 6 Trainings (2 x 3-days training + 4 x 2-days training) 20. Simulator Training for 60 PGDC 18th NPTI, Badarpur Noida 6 weeks (six Batch students (Training in Nov, batches of 10 Dec.2013 & Jan 2014) students each) 21. 22. Training on identified areas to Engineers at HPGCL sites (2x300 MW DCR TPP, Yamuna Nagar and 2x600 MW RGTPP, Khedar) HPGCL, Yamuna 2 weeks for Panchkula Nagar & each location Simulator Training for 26 PGDC 16th NPTI, Badarpur Khedar Noida 2 weeks (two Batch students (Training from 03.2.14 batches of 13 to 13.2.14) students each) 23. Training Program on Power Plant Performance System for engineers at JSW Energy Ltd. Toranagallu, 3 days Karnataka JSW Toranagallu, Karnataka 43