STEAG Energy Services India: Profile & References
STEAG Energy Services (India) Pvt. Ltd. (formerly Evonik Energy Services (India) Pvt.
Ltd.) is a wholly owned subsidiary of STEAG Energy Services GmbH, Germany (formerly
Evonik Energy Services GmbH, Germany). STEAG is Germany’s largest IPP owning and
operating over 11,000 MW in Germany and elsewhere. STEAG has over 75 years of
experience in the energy business, including Operation & Maintenance of its own plants
and of third parties. All power stations of STEAG have been engineered, constructed,
commissioned, rehabilitated, modernized and operated by its own engineers. STEAG is
proud to call itself as the Consultant with Operational Experience.
STEAG Energy Services (India) Pvt. Ltd. (SESI) was set up in 2001 to provide cost-effective
consultancy services of international standards by integrating resources of the parent
company and those of SESI in India. SESI combines the best of the technology and
professionalism of its German principals and a thorough knowledge and understanding
of conditions in the power sector in India. It is thus able to synergize its Indian
experience with the technological and professional back up of European standards and
provide the best possible solutions and services to clients in India and elsewhere.
The activities of STEAG Energy Services cover a wide spectrum from concept to
commission and thereafter for O&M services including PG testing.
1. Project Development
Pre Feasibility Study
Detailed Project Report
Environmental Studies
Assistance in obtaining various permits and clearances
Assistance in financial closing
2. Energy Technologies
a) Green Field Projects
Basic design studies
Plot plan & GA drawings
Preparation of flow sheets and P&I diagrams
Detailed engineering including preparation of tender specifications for:
o
Mechanical
1
o
Electrical
o
C&I
o
Civil
Balance of Plant (coal, ash & water systems)
Tender evaluation & bid recommendation
Vendor drawing review
Vendor inspection
Project management monitoring and expediting
Erection and commissioning supervision
b) R&M Projects
Development of scope of work
Preparation of feasibility report including financial analysis and cost benefit
analysis
Identification of surprises during R&M
Preparation of tender specification (technical & commercial)
Tender evaluation and bid recommendation
Review engineering
Inspection
Project monitoring
Erection supervision
Commissioning supervision
PG test supervision
c) Renewable Energy
Solar
Biomass
3. System Technologies
Online optimization system for power plants
Energy management system
On line diagnostic system
Supply of Simulators
SI System
4. Plant Services
2
Operations and Maintenance (O&M)
Commissioning
Performance Testing
RLA / R&M Studies
Diagnostic and Auditing services
5. Advisory Services
Due diligence of power plants for investment decisions
Technology evaluation and comparison
Inspection services
Third party inspection services
Comprehensive solution for power plants based on renewable source of energy
which includes solar thermal, solar SPV, wind energy, mine gas, biomass etc.
Various studies resulting in specific recommendation(s) as per Client’s requirement
Lender’s Engineering Services
Asset Evaluation
6. Training
Training needs assessment.
Initial and refresher training using simulators.
Class room training.
Onsite training.
Customized training programmes for engineers, operators, technicians.
Customized training programmes for power plant managers.
3
Employees Strength
Staff deployment in 2015 is as follows.
Year
2015
O&M
824
Test &
System
Engg.
Comm
Technology
Services
7
38
84
Services
Over
Total
Heads
7
36
996
Note: O&M staff in Botswana is 263 which is excluded from the above list.
Software Available in-house
•
Ebsilon for thermodynamic process calculations
•
SR2 for optimal load scheduling in mixed energy plants
•
Neuro Modeler and G2
•
ProTrax Tools and ACSL for Simulation
•
GAMS for Algebraic Modelling
•
InTouch and InControl from Wonderware
•
eSTPE for Steam Path Audit
•
2005 Visual Studio from Microsoft
•
Etap for Electrical Analysis
•
AutoCAD 2008
•
PDMS access available through ROLTA
•
STAAD Pro Series for Structural Analysis & Design
•
PRIMAVERA for Project Management
•
CEASAR II for Stress Analysis
•
HR Mantra for Project Monitoring & HR Activities
•
Wrench for Engineering Documentation Management
Testing Equipments Available
•
Boroscopic instruments
•
Steam Path Audit tools
•
BOP Energy Audit tools
Power Analyser
Stroboscope
Manometers
Hygrometers
4
MI Thermo meters
Pitot tubes
Ultra sonic flow meter
Vibration analyser
Sound level meter
Etc.
Accreditation & Empanelment
1)
ISO 9001 : 2008 (for providing Engineering Consultancy and Information
Technology services to Power Plants)
2)
Quality Council of India (as Member - Large Corporate)
3)
Central Boilers Board (as Well Known Remnant Life Assessment Organisation)
4)
NABL – National Accreditation Board for Testing and Calibration Laboratories (for
Transformer Oil Testing & Electrical Testing)
5)
Bureau of Energy Efficiency (as Energy Services Company (ESCO)
6)
Bureau of Energy Efficiency (as Accredited Energy Auditor Firm)
7)
REC Power Distribution Company Limited (as Consultant for Energy Audit &
Residual Life Assessment Studies)
8)
Rural Electrification Corporation Ltd. (as Consultant for preparation of DPRs for
Decentralised Distributed Generation (DDG) Projects)
9)
Power Finance Corporation Ltd. (as Lender’s Engineer for Thermal & Biomass, Wind
& other Renewable Energy Power Projects)
10) Bihar Renewable Energy Development Agency (BREDA) (as Consultant for
preparation of DPRs for installation of Solar/Biomass Power Plants in the state of
Bihar)
11) PFC Consulting Ltd. (as Consultant for Thermal Power Projects)
12) Bharat Heavy Electricals Ltd., Bhopal (as R&M Consultant)
13) National Power Training Institute (for Simulator Training)
14) Central Electricity Authority (as R&M Consultant)
15) Central Electricity Authority (as Power Plant Learning Centre)
5
16) Gujarat Energy Development Agency (as Energy Audit Consultant)
17) Directorate of Factories & Boilers, Odisha (as Boiler Repairer)
18) Energy Efficiency Services Ltd. (as Consultant for Energy Efficiency Projects)
19) India SME Technology Services Ltd. (as Technical Consultant/ESCO for
Implementation of 4E (End to End Energy Efficiency) Solutions.
20) Syndicate Bank (as Consultant for Techno-Economic Viability (TEV) study)
21) Ministry of New and Renewable Energy (MNRE) (as Channel Partner for Solar
System Integrator (PV).
22) Consultancy Development Centre (as Consultant for Feasibility Report / Detailed
Project Report. Sector: Power Plants)
Contact Us
STEAG Energy Services (India) Pvt. Ltd.
Corporate Office:
A-29, Sector-16
Noida – 201 301, Uttar Pradesh, India
Tel: +91-120-4625000
Fax: +91-120-4625100, 4625333
Email: info@steag.in
Website: www.steag.in
Registered Office:
903, Bhikaji Cama Bhawan
Bhikaji Cama Place
New Delhi – 110 066, India
Regional Offices:
Western Region
Eastern Region
STEAG Energy Services (India) Pvt. Ltd.
2nd Floor, Kala Chambers,
Near Khanpur Post Office,
Khanpur,
Ahmedabad-380001
Gujarat, India
Mr. A.N. Shukla (Email: an.shukla@steag.in)
STEAG Energy Services (India) Pvt. Ltd.
Premises No: 32/6,
Gariahat Road (South),
PS: Jadavpur,
Kolkata – 700031
West Bengal, India
Mr. S. Choudhuri (Email: s.choudhuri@steag.in)
Southern Region
STEAG Energy Services (India) Pvt. Ltd.
Unit “B”, 1st Floor, Brigade Plaza
71/1, S.C.Road, Anandrao Circle
Bangalore - 560 009
Karnataka, India
Mr. N. Thangarajan (Email: n.thangarajan@steag.in)
O&M Site Offices:
Hazira (Gujarat)
STEAG Energy Services (India) Pvt. Ltd.
C/o. GSEG, Village Mora, Post - Bhatha
Surat-Hazira Road, Surat - 394 510
Gujarat, India
6
Mr. M.K. Gupta (Email: mk.gupta@steag.in)
Bathinda (Punjab)
STEAG Energy Services (India) Pvt. Ltd.
C/o HPCL – Mittal Energy Limited
Village – Phulokhari
Taluka – Talwandi Saboo
Bathinda – 151302
Punjab, India
Mr. Rajiv Dhenge (Email: r.dhenge@steag.in)
Vizag (Andhra Pradesh)
STEAG O&M Company Pvt. Ltd.
Palavalasa Village, T-Devada Post
Pedagantayada Mandal
Steel Plant (Sub Office)
Visakhapatnam – 531031
Andhra Pradesh, India
Mr. K. Bhanuprakash (Email: k.bhanuprakash@steag.in)
Board of Directors
Dr. Wolfgang Benesch
Achim Nietzschmann
Dr. Ralf Schiele
Ulrich Sigel
Dr. Jacob T Verghese, Managing Director
7
References
Project Development
Consultancy Services – Feasibility Study, TEFR, DFR & DPR (Greenfield Projects):
1) IOCL: Preparation of DPR for the 500 MW Refinery Residue Project at Savli, Baroda.
2) Chennai Power Generation Corporation: Preparation of DPR for the 1000 MW LNG
Plant.
3) Neyveli Lignite Corporation: Preparation of Master plan for Neyveli Area and
performing power development studies – Under this study sites for ST-CMS (1x250
MW), TPS –II extension (500 MW), TPS-I extension (2x210 MW), Station B (4x500
MW), Station III (3x500 MW), Jayamkondam I (3x500 MW), Jayamkondam II (3x500
MW), Vellar (3x500 MW) and Behur (3x500 MW) were identified for development.
4) Moserbaer India Ltd.: Consultancy services for preparation of Feasibility Report for
setting up of 1000 MW Coal based power plant in the state of Chattisgarh, India.
5) Coastal Energy Pvt. Ltd.: Consultancy Services for preparation of DPR for setting up of
1000 MW imported coal based power plant at Tuticorin.
6) Karnataka Power Corporation Ltd (KPCL): Consultancy services for preparation of
Detailed Project Report for coal based thermal power station at Yermaras in
Karnataka.
7) Karnataka Power Corporation Ltd (KPCL): Consultancy services for preparation of
Detailed Project Report for coal based thermal power station at Yadgir in Karnataka.
8) Power Company of Karnataka (formerly SPPCC) : Consultancy services for preparation
of Detailed Project Report for setting up of 1320 MW coal based power plant at
Belgaum District in Karnataka.
9) Power Company of Karnataka (formerly SPPCC): Consultancy services for preparation
of Detailed Project Report for setting up of 1320 MW coal based power plant at
Jewargi District in Karnataka.
10) CMR Power Projects Pvt. Ltd.: Consultancy services for preparation of Feasibility Study
for setting up of 1000 MW imported coal based power plant in the state of Andhra
Pradesh.
8
11) Corporate Power Ltd.: Consultancy Services for preparation of Detailed Project Report
for Phase II (2x330 MW) of Matrishi Usha Jayaswal Mega Power Plant at Village
Chitarpur, Dist. Latehar, Jharkhand.
12) Farouk Sodagar Darvesh & Co.: Consultancy Services for preparation of Feasibility
Study Report for setting up of 1000 MW coal based power project either in
Maharashtra, Chhattisgarh & Jharkhand.
13) Bhushan Energy Ltd.: Consultancy Services for preparation of Pre-Feasibility Report,
Feasibility Report and Detailed Project Report for setting up of 1000 MW coal based
Power Project in the State of Chhattisgarh.
14) UPRVUNL: Consultancy Services for preparation of Detailed Project Report for 1x250
MW Panki TPS Extension project.
15) SLS Energy Pvt. Ltd.: Consultancy Services for preparation of Feasibility Report for
setting up of 1000 MW coal based power project at Tuticorin, Tamil Nadu.
16) Machilipatnam Power Pvt. Ltd.: Consultancy Services for preparation of Pre-Feasibility
Report and Detailed Project Report for setting up of 1000 MW coal based power
project in Vijayawada, Andhra Pradesh.
17) GSPC Pipavav Power Company Ltd.: Consultancy Services for preparation of Detailed
Project Report for setting up of 1600 – 1800 MW thermal power project at Kovaya in
Gujarat.
18) UPRVUNL: Consultancy Services for preparation of Detailed Project Report for
Harduaganj Thermal Power Station Extn-II (2x250 MW).
19) UPRVUNL: Consultancy Services for preparation of Feasibility Study Report and
Detailed Project Report for 500 MW/660 MW (Supercritical) Units as Anpara
Expansion Project.
20) Maharashtra State Power Generation Co. Ltd.: Consultancy services for feasibility
study and preparation of DPR for the proposed 1x660 MW Power Station at Lohara,
at Tahsil & District Yavatmal.
21) Petronet LNG Ltd.: Consultancy Services for preparation of Detailed Feasibility Report
for the 1200 MW Gas based Thermal Power Plant at Dahej in Gujarat.
22) Uttar Pradesh Power Corporation Ltd.: Consultancy services for preparation of
Feasibility Report,
Environmental
Detailed Project
Impact
Assessment
Report and
(CEIA)
carrying out Comprehensive
study for
establishing
3x660
MW
9
(Supercritical) Power Project at Dopaha in Uttar Pradesh and securing environmental
clearance from the UP Pollution Control Board (UPPCB) and Ministry of Environment
and Forest (MOEF), Govt. of India.
23) Uttar Pradesh Power Corporation Ltd.: Consultancy services for preparation of
Feasibility Report,
Environmental
(Supercritical)
Detailed Project
Impact
Assessment
Power Project
at
Report and
(CEIA)
carrying out Comprehensive
study for
Jawaharpur
in
Uttar
establishing
Pradesh
2x660
and
MW
securing
environmental clearance from the UP Pollution Control Board (UPPCB) and Ministry of
Environment and Forest (MOEF), Govt. of India.
24) Action Ispat & Power (P) Ltd.: Engineering consultancy services for setting up 600
MW Coal based Merchant Power Project in Gujarat including preparation of PreFeasibility Report and Detailed Project Report.
25) Uttar Pradesh Power Corporation Ltd.: Consultancy services for preparation of
Feasibility Report for establishing 3x660 MW (Supercritical) Power Project at Dist.
Lalitpur in Uttar Pradesh.
26) Indiabulls Power Ltd.: Consultancy services for preparation of Detailed Project Report
for 5x270 MW Coal based Subcritical Thermal Power Plant at Amravati in
Maharashtra.
27) Indiabulls Power Ltd.: Consultancy services for preparation of Detailed Project Report
for 5x270 MW Coal based Subcritical Thermal Power Plant at Nashik in Maharashtra.
28) Anant Raj Power Ltd: Consultancy services for preparation of TEFR for 107 MW gas
based CCPP at Rai, Sonepat, Haryana.
29) Core Minerals: Preparation of PFR for proposed coal fired power plant in Gujarat.
30) Prakash Industries Ltd.: Preparation of DPR for Gas Based Power Plant at GIDC,
Ghajadia, Gujarat.
31) Prakash Industries Ltd.: Detailed Project Report for 1320 MW (2x660 MW) Coal Based
Power Plant (CPP) at Village Bhada, Dist. Jhanjgir Champa, Chhattisgarh.
32) Prakash Industries Ltd.: Detailed Project Report for 1320 MW (2x660 MW) Coal Based
Power Plant (CPP) at Village Parsi, Dist. Anuppur, Madhya Pradesh.
33) Prakash Industries Ltd.: Preparation of DPR for 219 MW Gas Based Power Plant at
Pithampur, Madhya Pradesh.
10
34) Mecwel Power Pvt. Ltd.: Preparation of DPR for 2x150 MW CFBC Project in Nalgonda
District in Andhra Pradesh.
35) GAIL (India) Ltd.: Preparation of DFR for setting up Gas Based CCP of around 350
MW capacity at Dibiyapur in Uttar Pradesh and Vijaipur in Madhya Pradesh.
36) Haryana Power Generation Corporation Ltd.: Preparation of DPR for the proposed
2x750 + 5% (1575) MW Gas Based Combined Cycle Power Project at villages
Mothuka & Arwa, Tehsil Ballabhgarh, Dist. Faridabad.
37) APGENCO, Hyderabad: Preparation of Pre-Feasibility Report for Kakatiya Thermal
Power Project Stage-III (1x800 MW) in Warangal District, Andhra Pradesh.
38) NALCO, Bhubaneswar: Consultancy services for Site Selection Study and Preliminary
Land Survey for the proposed Smelter and Power Plant in Sundargarh District,
Odisha.
39) Petronet LNG Limited: Consultancy services for preparation of Detailed Feasibility
Report (DFR) for the 1200 MW Gas based Thermal Power Plant at Kochi (Kerala).
40) Gujarat Mineral Development Corporation Ltd: Consultancy Engineering Services for
preparation of Feasibility Study Report for 250 MW Lignite based Thermal Power
Plant as an Extension of Akrimota Thermal Power Station at Village Nani Chher, Ta:
Lakhpat, District Kutch.
41) The Kerala Minerals and Metals Ltd: Study and submission of feasibility report and
detailed project report for a 20 MW captive power plant from Municipal solid waste
and LNG.
42) Bansagar Thermal Power Company Ltd.: Conducting prefeasibility study, preparation
of prefeasibility report and obtaining TOR from MoEF for Bansagar Thermal Power
Project (2x800 MW) in District Shahdol, M.P.
43) Puducherry Power Corporation Ltd.: Consultancy Services to study and prepare a
Detailed Feasibility Report to set up 1x660 MW coal based Thermal Power Plant at
Karaikal, U.T. of Puducherry.
44) GIFT Power Company Ltd.: Consultancy Services for preparation of Techno-Economic
Feasibility study for setting up gas based power generation plant in the GIFT City.
45) HPGCL, Panchkula: Consultancy services for preparation of Detailed Feasibility Report
(DFR) for accommodating supercritical unit at PTPS, Panipat and RGTPP, Khedar, Hisar
11
46) PFC Consulting Ltd.: Consultancy services for preparation of Detailed Project Report
(DPR) for extension of one Unit of either 600 MW or 660 MW at Singareni Thermal
Power Project (STPP), Jaipur (M), Adilabad District, Telangana State.
47) Puducherry Power Corporation Ltd.: Consultancy services for preparation of Detailed
Project Report (DPR) for 1x660 MW coal based Thermal Power Plant at Karaikal.
48) UPRVUNL, Lucknow: Consultancy services for updating the DPR for 2x660 MW Super
Critical Power Project at Jawaharpur, Uttar Pradesh.
49) STEAG Energy Services GmbH, Germany: Pre-feasibility Concept Study of a Power
Plant for a Nickel Smelter Project in the Island of Pomala, Indonesia.
50) IOCL Guwahati: Feasibility Study for Installation of Refinery Fuel Gas Based Gas
Turbine and HRSG Package at Guwahati Refinery.
51) Kyushu Electric Power Co. Inc. Japan.: Topographic Survey and Geotechnical
Investigation related to the Preparatory survey on the project for construction of
Barauni Supercritical coal fired thermal power station in India.
12
Energy Technologies
Consultancy Services – Owner’s Engineer (Greenfield Projects):
1) Raichur Power Corporation Ltd.: Engineering Consultancy and Owner’s Engineer’s
Services for establishing Coal fired Thermal Power Plant of capacity 2x800 MW based
on Super critical technology at Yermaras, Dist. Raichur, Karnataka.
2) Meenakshi Energy Pvt. Ltd.: Consultancy Services as Owner’s Engineer for setting up
of 2x150 MW (Stage-I) Coastal based Power Plant at Thamminapatanam, Nellore Dist.,
Near Krishnapatanam, Andhra Pradesh.
3) Meenakshi Energy Pvt. Ltd.: Consultancy Services as Owner’s Engineer for setting up
of 2x350 MW (Stage-II) Coastal based Power Plant at Thamminapatanam, Nellore
Dist., Near Krishnapatanam, Andhra Pradesh.
4) Shree Cement Ltd.: Consultancy Services as Owner’s Engineer for setting up 2x150
MW Thermal Power Plant at Beawar, Rajasthan.
5) Kribhco Shyam Fertilizers Ltd.: Consultancy services for design, engineering,
supervision and project management for power sale project at Shahjahanpur plant
(2x22.4 MW).
6) Mass Global Investment Co., Jordan: Consultancy services as Owner’s Engineer for
setting up of 450 MW gas based power plant at Sulemaniya, in northern province of
Iraq (BHEL is EPC contractor).
7) Corporate Power Ltd. (Abhijeet Group): Consultancy Services as Owner’s Engineer for
Phase II (2x330 MW) of Matrishi Usha Jayaswal Mega Power Plant at Village Chitarpur,
Dist. Latehar, Jharkhand.
8) Prakash Industries Ltd.: Consultancy Services for review of technical specifications of
2x150 MW coal based power project at Champa in the State of Chhattisgarh.
9) Bihar State Electricity Board: Project Management Consultancy Services for 2x250 MW
Coal fired Thermal Power Plant at Barauni, Begusarai District in Bihar.
10) Mecwel Power Pvt. Ltd.: Consultancy Services as Owner’s Engineer for establishing
2x150 MW coal based Power Plant at Nalgonda in Andhra Pradesh.
11) EKTON
ENERGI,
Turkey:
Consultancy
Services
for
preparation
of
Technical
Specifications for 15 MWe Biomass Fired (Cotton, Corn, Sunflower Body, Cane etc.)
Power Plant in Turkey.
13
12) STEAG Energy Services GmbH: Provision of Site Services for the Owner's Engineer
CCPP Kpone, Ghana.
13) Bangladesh Power Development Board: Owner's Engineer consultancy services for
extension of Barapukuria coal fired thermal power station by 275 MW (3rd Unit)
Project.
14) Bangladesh Power Development Board: Rendering Consultancy Services for Power
Plant Projects at Maheshkhali Upazila in Cox's Bazar District of Bangladesh
15) Bihar State Power Generation Company Ltd.: Technical Consultancy and Project
Management Services for enabling works associated with 2x110 MW Barauni TPS.
16) Rabigh Arabian Water and Electricity Company (RAWEC): Detailed Engineering
Services for Rabigh IWSPP Phase-II Steam Shedding Project.
17) IOCL, Guwahati: PMC Services for Installation of New-Pet-Coke Based CFBC Boiler at
Guwahati Refinery.
Consultancy Services – Renovation & Modernization:
1) Punjab State Power Corporation Ltd. (PSPCL): Consultancy Services for Renovation &
Modernization of 2x110 MW units 3 & 4, Guru Nanak Dev Thermal Plant at Bathinda,
Punjab, India.
2) West Bengal Power Development Corporation Ltd. (WBPDCL): Consultancy for Energy
audit, preparation of technical specification till finalization of contract for R&M of 210
MW, Unit # 5 of Bandel TPS, West Bengal, India. (World Bank funded project).
3) Maharashtra State Power Generation Company Ltd. (MSPGCL): Consultancy Services
to design Renovation & Modernization scheme to improve the Energy Efficiency,
Upgrade Capacity and Residual Life of Koradi Thermal Power Station Unit-6 (210
MW), Maharashtra, India (World Bank funded Project).
4) Chhattisgarh State Power Generation Company Ltd. (CSPGCL): Consultancy Services
for preparation of Techno-commercial specifications, Evaluation of bids and detail
engineering etc. for Renovation & Modernization of 4x210 MW units of Hasdeo TPS,
Korba West, Chhattisgarh, India.
14
5) Jharkhand State Electricity Board (JSEB): Consultancy Services for Preparation of DPR,
BOQ preparation, tender evaluation & supervision during RM&U works of Unit No.7
& 8 (110/105 MW each) at Patratu TPS, Jharkhand, India.
6) Central Electricity Authority (CEA): Consultancy assignment for preparation of
Feasibility Report of three power plants under Energy Efficiency Programme (EEP) in
India for Nasik TPS, Unit-3 (210 MW) of MSPGCL; Kolaghat TPS, Units 1, 2 & 3 (3x210
MW) of WBPDCL; Bokaro ‘B’ TPS, Units 1, 2 & 3 (3x210 MW) of DVC.
7) Japan Coal Energy Center (JCOAL): Support and Facilitation work for Preprimary study
of Efficiency and Environmental Improvement of Coal Fired Power Stations in India
(Stage-I) and Support and Facilitation work for Full Fledged Diagnosis of Efficiency
and Environmental Improvement of Coal Fired Power Stations in India (Stage-II).
8) Bokaro Power Supply Co. (P) Ltd. (BPSCL): Consultancy Services for Renovation &
Modernization of Boiler # 1 to 5 at BPSCL, Bokaro Steel City, Jharkhand, India.
9) Maharashtra State Power Generation Company Ltd. (MSPGCL): Consultancy Services
for
providing
‘Implementation
Support
to
Energy
Efficient
Renovation
&
Modernization and Life Extension Project of Nasik Thermal Power Station, Unit-3 (210
MW), Maharashtra, India with German Development Co-operation through KfW
Entwicklungs Bank.
10) JCOAL(Stage-III): Support and Facilitation work for Full-Fledged Diagnosis of Efficiency
and Environmental Improvement of coal fired power stations in India.
11) Maharashtra State Power Generation Company Ltd. (MSPGCL): Consultancy Services
for Feasibility Study for Energy Efficient Renovation & Modernization and Life
Extension Project (EE R&M) of Unit-5 (210 MW) at Nasik TPS, Maharashtra, India.
12) Toshiba India Private Limited: Consultancy Services for Feasibility Study for
Renovation & Modernization of three units of Tuticorin Thermal Power Plant of
TANGEDCO, Tamil Nadu, India.
13) Maharashtra State Power Generation Company Ltd. (MSPGCL): Consultancy Services
for Feasibility Study for Energy Efficient Renovation & Modernization and Life
Extension Project (EE R&M) of Unit-4 (210 MW) at Nasik TPS, Maharashtra, India.
14) JCOAL (Stage-IV): Support and Facilitation Work for the Full-fledged diagnosis of
Efficiency and Environmental Improvement of Coal Fired Power Stations.
15
15) Gujarat State Electricity Corporation Ltd. (GSECL): Consultancy Services to undertake
the work of Turbine retrofitting of one no. of 200 / 210 MW LMZ Turbines each at
Wanakbori TPS and Ukai TPS, Gujarat, India for Heat Rate (efficiency) improvement.
16) JCOAL (Stage-V): Support and Facilitation Work for the Full-fledged diagnosis of
Efficiency and Environmental Improvement of Coal Fired Power Stations.
17) WBPDCL, Kolkata: Consultancy Services for Design, Engineering and Preparation of
Technical Specification for (i) Up gradation and Renovation of Electro static
Precipitators, (ii) Augmentation of capacity of Mills and associated system of Unit
No.1, 2 & 3 (3x210 MW), of Kalaghat Thermal Power Station.
18) JCOAL: Support and Facilitation Work for Japan-India Cooperation for Project on
Efficiency and Environmental Improvement for Sustainable, Stable and Low-carbon
Supply of Electricity – NTPC Dadri R&M.
Technical Support Services – BOP & Electrical Systems for R & M:
1) BHEL, Bhopal: 1x110 MW Unit-7 of UPRVUNL at Harduaganj Thermal Power Plant,
Uttar Pradesh, India.
2) BHEL, Bhopal: 2x110 MW Unit-3 & 4 of UPRVUNL at Panki Thermal Power Plant,
Uttar Pradesh, India.
3) BHEL, Bhopal: 2x110 MW Unit-1 & 2 of UPRVUNL at Parichha Thermal Power
Plant, Uttar Pradesh, India.
4) BHEL, Bhopal: 2x110 MW Unit-3 & 4 of HPGCL at Panipat Thermal Power Plant,
Haryana, India.
5) BHEL, Bhopal: 2x110 MW Unit-6 & 7 of Barauni TPS, Bihar, India
Consultancy Services – Renewable Energy:
1) NTPC
Limited:
Consultancy
Services
for
“Tendering
Phase-I“
and
“Project
Implementation Phase-II“ for 15MWe Solar Thermal Plant at Anta, Rajasthan.
2) NTPC Limited: Consultancy Services for preparation of Feasibility Report for 15 MW
Solar Thermal Power Project at Anta in the State of Rajasthan.
16
3) ACME Tele Power Ltd.: Consultancy services for preparation of Feasibility Report and
Detailed Project Report for setting up of 10 MW Solar Thermal Power Project in the
State of Rajasthan.
4) ACME Tele Power Ltd.: Consultancy services for preparation of Detailed Project
Report for setting up of 50 MW Solar Thermal Power Project in the State of Gujarat.
5) Utthan: Preparation of Feasibility Report for setting up of 1 MW Solar Power Project
in Allahabad, UP
6) IL&FS: Consultancy Services for preparation of Detailed Project Report for setting up
12 MW Biomass & Solar Thermal Hybrid (Linear Fresnel) Power Project in Kutch,
Gujarat.
7) Avantha Power: Consultancy Services for preparation of Detailed Project Report for 5
MW Solar PV Plant at Pokhran, Rajasthan.
8) Lanco Solar Energy Pvt. Ltd.: Consultancy Services for preparation of Detailed Project
Report for Solar Thermal Power Plant in Rajasthan.
9) MEIL Green Power Ltd.: Preparation of Bid Document on EPC basis as per ICB
guidelines for 1x50 MW solar thermal power project at Anantapur.
10) North Eastern Electric Power Corporation Ltd. (NEEPCO): Preparation of Feasibility
Report for On Grid Solar Power Plant at the Assam Gas Based Power Plant (AGPP),
Bokuloni, Tinsukia, Assam.
11) North Eastern Electric Power Corporation Ltd. (NEEPCO): Preparation of Feasibility
Report and Detailed Project Report for On Grid Solar Power Plant at the Tripura Gas
Based Power Project (TGBP), Monarchak, Tripura.
12) Shree Cement Ltd.: Consultancy services for preparation of Feasibility Study Report
including the modeling of the existing WHRB and proposed Solar System.
13) Aurum Renewable Energy Pvt. Ltd.: Technical Due Diligence for Supplier Proposal
(Novatec Germany)
14) North Eastern Electric Power Corporation Ltd. (NEEPCO): Consultancy service for
preparation of Feasibility Report for Grid Interactive Solar Power Plant at NEEPCO’s
premises at Lanka, Nagaon District of Assam.
15) GIZ, New Delhi: Capacity Building at Solar Thermal Power Plant Technology at IIT,
Rajasthan.
17
16) Bihar Renewable Energy Development Agency (BREDA): Consultancy Services for
preparation of two DPRs for Roof Top Solar Power Project in Patna (40 KW for Chief
Justice House & 50 KW for Governor's House).
17) Bihar Renewable Energy Development Agency (BREDA): Consultancy Services for
preparation of
RFP
for selection of
EPC contractor,
Review of
Bids
and
Recommendation and Review of Contractor's documents for 40 KWp Solar Rooftop
at the Chief Justice residence in Patna.
18) Pan Asia Renewables Pvt. Ltd.: Consultancy Services for carrying out Technical Due
Diligence of Renewable Energy (PV) Projects
19) Bihar Renewable Energy Development Agency (BREDA): Preparation of DPR for 25
Kwp Rooftop Solar off grid Power Plant at District Collectorate Building, Circuit house
& District Hospital in ten districts in South-East region of Bihar (Gaya, Nawada, Jamui,
Munger, Sheikhpura, Lakhisarai, Begusarai, Khagaria, Bhagalpur and Banka).
20) Bihar Renewable Energy Development Agency (BREDA): Consultancy Services for
preparation of
RFP
for selection of
EPC contractor,
Review of
Bids
and
Recommendation and Review of Contractor's documents for 60 KWp Solar Rooftop
at the Hon'ble Governor residence in Patna.
21) North Eastern Electric Power Corporation Ltd. (NEEPCO): Consultancy Services for
preparation of the Detailed Project Report for Grid Interactive Solar Power Plant
within NEEPCO's premises at Lanka, Nagaon District of Assam.
22) Ministry of New and Renewable Energy (MNRE): Consultancy Assignment on
"Biomass - Solar thermal hybrid technology for power generation".
23) NEEPCO: Consultancy Services for preparation of the Detailed Project Report for Grid
Interactive Solar Power Plant within NEEPCO's premises at Kopili Hydro Electric
Project, Umrangso, Assam.
24) IOCL, New Delhi: Consultancy Services for setting up of 100 KW - 2.0 MW scale Solar
PV Power Plant(s) (Ground and/or Roof Mounted) in Synchronization with existing
power source(s) at various installations across India for Indian Oil Corporation Ltd.
25) NEEPCO, Shillong: Consultancy Services for preparation of the Detailed Project Report
for Grid Interactive Solar Power Plant at Assam Don Bosco University, Sonapur,
Assam.
26) IOCL, Guwahati: Feasibility Assessment and Design of 200KWp Solar PV System for
IOCL, Guwahati Refinery.
18
System Technologies
Performance Analysis, Diagnostic and Optimization Software (PADO):
S.No.
Client
Location
Unit Size
1.
BHEL / NTPC
Simhadri
2 x 500 MW Stage-I
2.
BHEL / NTPC
Sipat
2 x 500 MW
3.
BHEL / NTPC
Ramagundam
1 x 500 MW
4.
BHEL / NTPC
Vindhyachal
2 x 500 MW Stage-III
5.
BHEL / NTPC
Rihand
2 x 500 MW Stage-II
6.
BHEL / NTPC
Bellary
1 x 500 MW
7.
BHEL / NTPC
Talcher
4 x 500 MW
8.
ILK / RRVUNL
Chhabra
1 x 250 MW
9.
BHEL / NTPC
Kahalgaon
3 x 500 MW
10.
Shree Cement Ltd.
Beawar
172 MW
11.
BHEL / NTPC
Dadri
2 x 500 MW
12.
BHEL / NTPC
Farakka
1 x 500 MW
13.
BHEL / NTPC
Korba
1 x 500 MW
14.
BHEL / MAHAGENCO
Khaparkheda
1 x 500 MW
15.
BHEL / GSECL
Ukai
1 x 500 MW
16.
BHEL / MAHAGENCO
Bhusawal
2 x 500 MW
17.
BHEL / DVC & Tata Power JV
Maithan
2 x 500 MW
18.
BHEL / NTPC
Simhadri
2 x 500 MW Stage-II
19.
BHEL / MPPGCL
Malwa
2 x 600 MW
20.
BHEL / NTPC
Jhajjar
3 x 500 MW
21.
BHEL / NTPC
Vindhyachal
2 x 500 MW Stage-IV
22.
BHEL / CSPGCL
Marwa
2 x 500 MW
23.
BHEL / NTPC
Rihand
2 x 500 MW Stage-III
24.
BHEL / CSPGCL
Korba Extension
1 x 500 MW
25.
BHEL / NTPC
Bongaigaon
3 x 250 MW
26.
ILK / RRVUNL
Chhabra
2 x 250 MW Stage-II
27.
BHEL / TNEB
North Chennai
2 x 600 MW
28.
BHEL / MAHAGENCO
Chandrapur
2 x 500 MW
29.
BHEL / NTPC
Mouda
2 x 500 MW
19
30.
BHEL / NTPC
Vallur
2 x 500 MW
31.
BHEL / UPRVUNL
Anpara
2 x 500 MW
32.
ILK / HPGCL
Panipat
1 x 210 MW
33.
L&T, Mumbai
Koradi
3 x 660 MW
34.
L&T, Mumbai
Rajpura
2 x 700 MW
35.
BHEL / NTPC
Barh
2 x 660 MW
36.
BHEL / BRBCL
Nabinagar
4 x 250 MW
37.
BHEL / KBUNL
Muzaffarpur
2 x 195 MW
38.
BHEL / HNPCL
Vizag
2 x 520 MW
39.
Siemens / NTPC
Kudgi
3 x 800 MW
40.
BHEL / KPCL
Bellary
1 x 700 MW
41.
BHEL / APGENCO
Rayalaseema Unit-6
1 x 600 MW
42.
CESC Ltd.
Budge Budge
3 x 250 MW
43.
Siemens / NTPC
Lara
2 x 800 MW
44.
BHEL / RRVUNL
Suratgarh Unit-7
1 x 660 MW
45.
Essar Projects / NNTPS
Neyveli New TPS
2 x 500 MW
Simulator & Simulation Services:
S.No.
1.
2.
Client
Description
National Power
Training Simulator for V 94.2 Combined Cycle Power
Training Institute (NPTI)
Plant to NPTI Faridabad, India
STEAG Training Centre
Training Simulator for 9 FA Combined Cycle Power
Plant for STEAG Training Center at Noida
3.
4.
National Power
Training Simulator for Hydro Power Plant to NPTI
Training Institute (NPTI)
Faridabad, India for 250 MW Nathpa Jhakri HEP
STEAG Germany
Training Simulator for Combined Cycle Power Plant
supplied to STEAG Germany.
5.
STEAG Germany
Training Simulator for 500 MW Coal based Thermal
Power Plant to STEAG Germany
6.
STEAG Training Center
Training Simulator (Chinese Design) for 600 MW Coal
based Thermal Power Plant for STEAG Training Center
20
at Noida
7.
HPL Co-generation Ltd.
Steam System Dynamic Simulation Study for 116 MW
Gas based CCPP HPL Co-generation Limited, Haldia,
West Bengal
8.
STEAG Training Center
Customized Training program for Power plant
professionals:
Essar Power Ltd.
Gujarat Paguthan Ltd.
9.
Sterlite Energy Limited
Training Simulator (Chinese Design) for 600 MW Coal
based Thermal Power Plant for M/s. Sterlite Energy
Ltd., Jharsuguda, Orissa
10.
ILK / RRVUNL
Training Simulator for 195 MW Coal fired Power Plant
supplied to Kota Thermal Power Plant, in India of
RRVUNL.
11.
ILK / RRVUNL
Training Simulator for 250 MW Coal fired Power Plant
supplied to Suratgarh Thermal Power Plant, in India of
RRVUNL.
12.
IIT, Jodhpur
Design, Engineering & Supply of 50 MW Solar Power
Plant Simulator.
13.
L&T, Mumbai
Operator Training Simulator for Rajpura Station DCS
Project (2x700 MW)
14.
L&T, Mumbai
Operator Training Simulator for 3x660 MW Koradi
Expansion Project
15.
CESC Ltd., Kolkata
Virtual Based Simulator for 250 MW Turbo-Generator
Set for Budge Budge Generating Station at Pujali, 24
Parganas (South), West Bengal.
16.
Siemens AG, Germany
Operator Training Simulator for 3x800 MW Kudgi
Supercritical Thermal Power Project of NTPC.
17.
National Power
Supply and installation of Combined Cycle Gas
Training Institute of
Turbine Simulator at AFAM RTC, Nigeria.
Nigeria (NAPTIN)
18.
Siemens AG, Germany
Training Simulator for one unit of 2x800 MW Lara
Power Plant of NTPC
19.
BHEL, Bangalore
GUI Package for 800 MW STPP Simulator for
Krishnapatnam, APPDCL.
21
20.
Rabigh Arabian Water
Design and Supply Contract for IWSPP Integrated
& Electricity Company
Plant Operator Training Simulator.
(RAWEC), Saudi Arabia
21.
S&S Water and Power
Supply of Custom Built Simulators for 220 MW and
Projects Pvt. Ltd.
120 MW units similar to Hwange Power Station and
for training for Skill Development of Zimbabwean
Engineers and Operators in Zimbabwe.
Other Projects:
1) NTPC Noida: Math Modeling & Power Plant Simulation Software for NETRA.
2) Central Power Research Institute (CPRI), Bangalore: Supply of Software for
Simulation & Evaluation of Thermal Power Plant – Ebsilon Software.
3) National Productivity Council (NPC), Chennai: Supply of Thermal Power Plant
Software – Ebsilon Software.
4) CPRI, Bangalore: Plant Simulation Modeling for optimization of combined cycle
plants of NTPC.
5) BHEL, Bangalore: Supply, Erection & Commissioning of Fault Tree (Diagnostic &
Water Chemistry Software) for Rihand Units 5 & 6 and Anpara Units 1 & 2).
6) SESG, Germany: Commissioning Support for Advanced Steam Temperature Control
at O&M site of 4x600 MW Thermal Power Plant at Jharsuguda, Orissa, India.
7) BHEL, Bangalore: Supply, Erection & Commissioning of Fault Tree (Diagnostic &
Water Chemistry Software) for 2x195 MW Muzaffarpur Project of KBUNL, 2x250 MW
Nabinagar Project of BRBCL & 2x520 MW Vizag Project of HNPCL.
8) BHEL, Hyderabad: GUI based Sofware Tool (Ebsilon Professional) for generating
HBDs of IGCC & Solar Thermal Power Plants.
9) BHEL, Bangalore: Diagnostic & Water Chemistry Software for 1x700 MW Bellary Unit3 of KPCL.
10) BHEL,
Bangalore:
Diagnostic
&
Water
Chemistry Software
for 1x600
MW
Rayalaseema Unit-6.
22
11) Aditya Birla Group: Supply of Power Plant Simulation Software & License "Ebsilon
Professional" and Ebsilon Boiler Module (EbsBoiler).
12) Aditya Birla Group: Development of models on Ebsilon software for all three units
(Boilers & Turbine) of Birla Cellulosic plant.
13) BHEL, Bangalore: Diagnostic and Water Chemistry Software for 660 MW Suratgarh
Unit-7.
Plant Services
Operation & Maintenance Services:
1) Sterlite Energy Ltd.(Vedanta Group): Comprehensive O&M contract for 4x600 MW
Coal based Power Plant at Jharsuguda, Orissa.
Owner: Sterlite Energy Ltd.
Fuel: Coal
Steam Turbine: 4 x 600 MW - Dongfang
Contract Period: Mar 2010 – July 2015
2) Hinduja
National
Power
Corporation
Ltd.:
Operation
&
Maintenance
with
Consumables for 2x520 MW Coal based Power Plant at Visakhapatnam, Andhra
Pradesh.
Owner: Hinduja National Power Corporation Ltd.
Fuel: Coal
Steam Turbine: 2 x 520 MW - BHEL
Contract Period: March 2012 – May 2039 (25 years)
3) Botswana Power Corporation: Operation & Maintenance services for 4x150 MW
Morupule B Power Station in Botswana.
Owner: Botswana Power Corporation
Fuel: Coal
Steam Turbine: 4 x 150 MW - Dongfang
Contract Period: Dec.2013 – Dec. 2018
4) HPCL-Mittal Energy Limited: O&M contract for 165 MW Combined Cycle Captive
Power Plant at Guru Gobind Singh Refinery, Bathinda, Punjab
23
Owner: HPCL-Mittal Energy Limited (HMEL)
Fuel: Refinery Gas
Gas Turbine: GE Frame 6B Model, 2x34.5 MW
Condensing Steam Turbine: 2x35 MW with double extraction
Back Pressure Steam Turbine: 1x32 MW
Contract Period: Jan. 2011 – Dec. 2015
5) Haldia Petrochemicals Ltd.: O&M contract for 116 MW Co-generation Plant at
Haldia, West Bengal.
Owner: Haldia Petrochemical Ltd.
Fuel: Naphtha
Gas Turbine: GE Frame 6551B Model, 2x38 MW
Condensing Steam Turbine: 1x33 MW
Back Pressure Steam Turbine: 1x16.58 MW with dual extraction
Contract Period: Jul. 2006 – July 2015
6) Gujarat State Energy Generation Ltd.: O&M contract for 507 MW [156 MW Phase I
+ 351 MW Phase II] Gas based CCPP at Hazira, Gujarat
Owner: Gujarat State Energy Generation Ltd. (GSEG)
Fuel: Natural Gas
Phase-I:
Gas Turbines: 2 x 52 MW GT8C2 – Alstom
Steam Turbine: 1 x 52 MW - Alstom
Phase-II:
Gas Turbine: 1 x 222.43 MW MS9001(FA) – BHEL
Steam Turbine: 1 x 129 MW - BHEL
Contract Period: Jan. 2011 – Dec. 2015
7) Gujarat State Energy Generation Ltd.: O&M contract for 156 MW Gas based CCPP
at Hazira, Gujarat
Owner: Gujarat State Energy Generation Ltd. (GSEG)
Fuel: Natural Gas
Gas Turbines: 2 x 52 MW GT8C2 – Alstom
Steam Turbine: 1 x 52 MW - Alstom
Contract Period: Jan. 2001 – Dec. 2010
24
8) Oil and Natural Gas Corporation Ltd.: O&M for the power island for 30 MW CCP at
Gandhar for ONGC.
Owner: Oil and Natural Gas Corporation Ltd. (ONGC)
Fuel: Natural Gas
Gas Turbine: 1 x PG 5371 PA – GE Frame 5 (21 MW)
Steam Turbine: BHEL NK/40/56/25-3 (11 MW)
Contract Period: Dec. 2003 – Feb.2007
9) Goa Energy Pvt. Ltd.: O&M advisory services contract for 30 MW WHRP at Amona,
Goa.
Owner: Videocon
Fuel: Coke oven & blast furnace gas.
Steam Turbine: One cylinder non-reheat turbine with one stage regenerative heater
(steam parameters: 64 ata, 480°C)
Two waste heat recovery boilers: 64 t/hr steam
Contract Period: 2006-2009
Field Supervisory Services/Pre-Commissioning/Commissioning:
1) Gujarat State Energy Generation Ltd. (GSEG): Pre-commissioning and commissioning
of 156 MW Gas based CCPP at Hazira.
2) Cairn Energy India Pty Ltd.: Field Supervisory services for commissioning testing,
Reliability Test, PG Test and O&M Support for captive power plant at Barmer,
Rajasthan.
3) VS Lignite Power Private Limited (KSK Group): Expert field supervisory services for
Commissioning, Testing, Reliability test and PG test of 135 MW Lignite based power
plant at Gurha, Bikaner Dist., Rajasthan.
4) Wardha Power Company Limited (KSK Group): Expert field supervisory services for
Commissioning, Testing, Reliability test and PG test of 540 MW Coal based power
plant at Warora, Wardha, Maharashtra.
5) Sterlite Energy Limited - Field Supervisory services for commissioning testing,
Reliability Test, PG Test and O&M services for 4x600 MW IPP at Jharsuguda, Orissa.
6) Gujarat State Energy Generation Ltd. (GSEG): Pre-commissioning and commissioning
of 351.43 MW Gas based CCPP (Stage-II) at Hazira.
25
7) HPCL-Mittal Energy Limited: Pre-commissioning and commissioning services leading
upto successful commissioning and start-up and O&M of 165 MW CPP for Guru
Gobind Singh Refinery at Bathinda, Punjab.
8) Cairn India Limited: Expert field supervisory services for Pre-commissioning and
Commissioning activities of Boilers & Turbine at Mangla Processing Terminal, Barmer,
Rajasthan.
9) Lanco Infratech Limited: Operation Manpower for pre commissioning and post
commissioning activities at 2x600 MW Anuppur Thermal Power Project site, Madhya
Pradesh.
Project Management Services
1) Maharashtra
State
Power
Generation
Co.
Ltd.
(MSPGCL),
Mumbai:
Project
Management Consultancy Services for 2x500 MW (Unit Nos. 8 & 9) of Chandrapur
Thermal Power Project at Chandrapur, Maharashtra.
2) Raichur Power Corporation Ltd.: Project Management Consultancy Services for 2x800
MW coal fired Thermal Power Plant based on Super critical technology at Yermaras,
Dist. Raichur, Karnataka.
3) Bihar State Electricity Board: Project Management Consultancy Services for 2x250 MW
Coal fired Thermal Power Plant at Barauni, Begusarai District in Bihar.
4) Meenakshi Energy Pvt. Ltd.: Project Management Consultancy Services for setting up
2x150 MW (Stage-I) coal fired Power Plant at Thamminapatanam, Nellore Dist., Near
Krishnapatanam, Andhra Pradesh.
5) Meenakshi Energy Pvt. Ltd.: Project Management Consultancy Services for setting up
2x350 MW (Stage-II) coal fired Power Plant at Thamminapatanam, Nellore Dist., Near
Krishnapatanam, Andhra Pradesh.
6) Krishna
Godavari
Power
Utilities
Ltd.:
Project
Management
(Monitoring
&
Commissioning) Services for 1x60 MW coal based power project at Wadapalli,
Nalgonda District, Andhra Pradesh.
7) GSPC Pipavav Power Company Ltd.: Project Management Services for 2x351.43 MW
gas Power Plant Project at Pipavav, Gujarat.
8) Action Ispat & Power Pvt. Ltd.: Project Management Services for 2x40 MW coal based
Power Project at Jharsuguda, Orissa.
26
9) Hazira LNG Pvt. Ltd.: Consultancy Services for Project Engg. for GIS substation project
at Hazira, Gujarat.
Energy Audits & M&V Audits:
1) Haryana Power Generation Corporation Ltd. (HPGCL): Energy Audit of 210 MW (Unit #
5 & 6), 117.8 MW (Unit # 1), 110 MW (Unit # 2, 3 & 4), Panipat TPS, Haryana, India.
2) Maharashtra State Power Generation Corporation Ltd. (MSPGCL): Energy Audit of Unit
# 4 (210 MW) Nasik TPS, Maharashtra, India.
3) Maharashtra State Power Generation Corporation Ltd. (MSPGCL): Energy Audit of Unit
# 5 (210 MW) Nasik TPS, Maharashtra, India.
4) Maharashtra State Power Generation Corporation Ltd. (MSPGCL): Energy Audit of Unit
# 3 (210 MW) Nasik TPS, Maharashtra, India.
5) Damodar Valley Corporation (DVC): Energy Audit of 210 MW (Unit # 1), Bokaro ‘B’
TPS, Jharkhand
6) West Bengal Power Development Corporation Ltd. (WBPDCL): Energy Audit of 210
MW (Unit # 3), Kolaghat TPS, West Bengal, India.
7) West Bengal Power Development Corporation Ltd. (WBPDCL): Energy Audit of 210
MW (Unit # 5), Bandel TPS, West Bengal, India.
8) Maharashtra State Power Generation Corporation Ltd. (MSPGCL): Energy Audit of 210
MW (Unit # 6), Koradi TPS, Maharashtra, India.
9) Haryana Power Generation Corporation Ltd. (HPGCL): Energy Audit of 55 MW (Unit #
3), Faridabad TPS, Haryana, India.
10) Haldia Petrochemicals Ltd.: Energy Audit of 116 MW Captive Cogeneration Plant at
Haldia, West Bengal, India.
11) Shree Cement Ltd.: Energy Audit, Efficiency Evaluation and Improvement study of
2x150 MW units at Shree Mega Power plant at Beawar, Rajasthan.
12) Rajasthan Rajya Vidyut Utpadan Nigam Limited: Consultancy Services to RVUN for
implementation of Perform, Achieve and Trade (PAT) Scheme under National Mission
for Enhanced Energy Efficiency at STPS, Suratgarh (Unit # 1 to 6), CTPP, Chhabra (Unit
# 1 & 2), DCCP, Dholpur (3x110 MW), RGTPP, Ramgarh (3x37.5 MW).
27
13) Gujarat State Electricity Corporation Ltd.: Energy Audit and Post verification of
Wanakbori Thermal Power Station (7x210 MW Units) by Accredited Energy Auditor.
14) WBPDCL, Bakreswar Thermal Power Project: Mandatory Energy Audit of all units
(5x210 MW) of Bakreswar Thermal Power Plant.
15) HPGCL, Panipat TPS: To conduct Energy Audit Test of Unit-1 to 8 (1x117.8 MW +
3x110 MW + 2x250 MW) at PTPS, Panipat.
16) DVC, Chandrapura TPS: Energy Audit of 3x130 MW Units of CTPS, DVC, Chandrapura
and support in preparation of PAT and its normalization related documentations.
17) HPGCL Panipat TPS: M&V audit of Unit 1 to 8 (1x117.8 MW + 3x110 MW + 2x210
MW + 2x250 MW) PTPS, Panipat and Unit 1 to 2 (2x300 MW) of DCRTPP, Yamuna
Nagar.
18) MSPGCL Nasik TPS: Hiring of Expert services for Monitoring & Verification for PAT
Cycle as per BEE at Nasik TPS
19) Neyveli Lignite Corporation Ltd.,TS-II: Monitoring & Verification of TPS-II Cycle-I.
20) Damodar Valley Corporation, Mejia TPS: M&V Audit and Energy Audit of 4x210 MW
+ 2x250 MW of Mejia Thermal Power Station.
21) CSPGCL, Raipur: M&V Assessment under PAT Scheme for the three thermal Power
Stations (Hasdeo TPS, Korba TPS & Dr. SPM TPS) of Chhattisgarh State Power
Generation Company Ltd.
22) MSPGCL, Khaperkheda TPS: Hiring of Expert Services for Monitoring & Verification
(M&V) for PAT Cycle as per BEE at Khaperkheda TPS (4x210 MW)
23) NTPC Feroz Gandhi Unchahar TPS: PAT M&V Audit at Feroz Gandhi Unchahar
Thermal Power Station of NTPC.
24) Power Cell, Ministry of Power, Bangladesh: Technical Audit Study for old power plants
of Bangladesh.
25) MSPGCL, Koradi TPS: Monitoring & Verification (M&V) under PAT Scheme of Koradi
TPS.
Performance Testing:
1) Hasdeo TPS, Korba West, Chhattisgarh (CSPGCL): Performance Testing of 210 MW
(Unit # 2).
2) GGSSTP, Ropar, Punjab (PSEB): Performance Testing of 210 MW (Unit # 1).
28
3) Hazira, Gujarat (GSEG): Performance Testing of 156 MW CCPP.
4) GNDTP, Bathinda, Punjab (PSEB): Supervision of PG Test for Stage-1 (Units 1 & 2) and
Stage-2 (Units 3 & 4) of 4x110 MW.
5) Koradi TPS (MAHAGENCO): Performance Testing of 210 MW (Unit # 6).
6) Bandel TPS (WBPDCL): Performance Testing of 210 MW (Unit # 5).
7) Faridabad TPS (HPGCL): Performance Testing of 55 MW (Unit # 3).
8) Parichha TPS (UPRVUNL): Checking of Boiler Efficiency & Turbine Heat Rate of 2x210
MW BHEL Make (KWU Design), Parichha TPS.
9) Konaseema Gas Power Ltd.: Performance Testing at 445 MW Combined Cycle Gas
Power Plant at Ravulapalem (2 Nos. V94.2 Gas Turbines)
10) Konaseema Gas Power Ltd.: Conducting annual capacity test for 445 MW gas based
CCPP at Ravulapalem, Andhra Pradesh (Nov. 2011).
11) Gupta Energy Pvt. Ltd.: Performance Test of 2x60 MW TPP at Village Usegaon, Taluka
Ghugus, Dist. Chandrapur, Maharashtra.
12) Shree Cement Ltd.: PG Test Consultancy services for 2x150 MW Thermal Power Plant
at Beawar, Rajasthan.
13) Damodar Valley Corporation, Bokaro 'B' TPS: Performance Evaluation Test of DVC,
Bokaro 'B' TPS, Unit No.3.
14) Shree Cement Ltd.: Providing Instruments & Engineers for carrying out PG Test of
ACC at 2x150 MW Units of Shree Mega Power Plant, Shree Cement Ltd., Beawar,
Rajasthan.
15) SKODA Power Pvt. Ltd.: PG Testing of 2x110 MW (E & F Station) of Torrent Sabarmati
Project at Ahmedabad.
16) Aries Power Systems (I) Pvt. Ltd., Hyderabad: PG Test of Steam Turbines and
Generator of 2x150 MW Meenakshi Power Project at Thamminapatanam, Nellore
Dist., Andhra Pradesh.
17) Lanco Infratech Limited: Performance Guarantee Test for Unit # 1 of 2x300 MW Lanco
Amarkantak Thermal Power Plant at Pathadi, Korba, Chattisgarh.
18) Lanco Infratech Limited: Performance Guarantee Test for Unit # 2 of 2x600 MW
Udupi Thermal Power Plant, Yellur Village, Udupi District, Karnataka.
29
19) Lanco Anpara Power Limited: Performance Guarantee Test for Unit # 1 and Unit # 2
(2x600 MW) of LANPL Plant at Anpara, Sonebhadra, Uttar Pradesh.
20) Lanco Infratech Ltd.: PG Test including Fans and Demonstration of Parameters along
with Preparation of PG Test Procedure for Unit # 1 & 2 (2x600 MW) Anuppur
Thermal Power Project at District Anuppur, Madhya Pradesh.
21) GMR Rajahmundry Energy Ltd.: Conducting the Performance test and witnessing
Reliability test for 2 x 384 MW Combined Cycle Power Plant at Rajahmundry, Andhra
Pradesh, India
Consultancy Services – Residual Life Assessment/Condition Assessment Studies:
1) Guru Gobind Singh STPP, Ropar of PSEB: RLA, Condition Assessment & Performance
Testing of 2x210 MW Units (Scope of Work: RLA of SG & Auxiliaries, TG & Auxiliaries,
Material Handling (Ash & Fuel), Electrical and C&I Systems, BOP incl. Civil Structures,
Civil & Structural Study of (SG & TG) & Auxiliaries. Boiler: BHEL, Turbine: BHEL)
2) Hasdeo TPS, Korba West of CSPGCL: RLA/Condition Assessment Studies along with
Performance Evaluation Test of 4x210 MW Units. (Scope of Work: RLA Study of
Turbine, Boiler & Aux., Electrical, I&C, BOP Systems. (Make: U 1 & 2: Boiler-BHEL,
Turbine-KWU-BHEL. U 3 & 4: Boiler-ABL, Turbine-KWU-BHEL)
3) Nasik TPS of MSPGCL: RLA Study of Boiler & Turbine of 1x210 MW Unit # 3 (Make:
Boiler-BHEL, Turbine-LMW).
4) Kolaghat TPS of WBPDCL: RLA Study of Boiler & Turbine of 3x210 MW Units 1, 2 & 3.
(Make: Boiler-BHEL, Turbine-LMW).
5) Bokaro ‘B’ TPS of DVC: RLA Study of Boiler & Turbine of 3x210 MW Units 1, 2 & 3.
(Make: Boiler-BHEL, Turbine-LMW).
6) Kahalgaon STPP of NTPC: RLA Study & Steam Path Audit of 210 MW Turbines of
Units 2 & 3. (Make: LMZ Russia).
7) Ramagundam STPP of NTPC: RLA Study & Steam Path Audit of Turbines, Unit # 2
(200 MW). (Make: Ansaldo).
8) NTPC-SAIL Power Company (P) Ltd., Rourkela: RLA of Turbine, Generators & Piping of
Unit-1 (60 MW).
9) Obra ‘B’ TPS of UPRVUNL: RLA & CA of Electrical Equipments of 5x200 MW Units.
30
10) Koradi TPS of MAHAGENCO: RLA & Life Extension Study of Turbine, Boiler & Aux.,
Electrical, I&C, BOP Systems of 4x120 MW Units.
11) Panipat TPS of HPGCL: RLA/LE Study of 1x110 MW Unit # 3.
12) Koradi TPS of MAHAGENCO: RLA & CA Study of Boiler & Turbine of 1x210 MW Unit
# 6.
13) Parli TPS of MAHAGENCO: RLA/LE Study of Boiler, Turbine & Aux., Electrical, I&C,
BOP Systems of 2x30 MW Units 1 & 2.
14) Patratu TPS of JSEB: RLA/LE Study of Boiler of 105 MW Unit # 8.
15) Indian Copper Complex, Ghatsila of Hindustan Copper Ltd.: RLA/LE Study of Boiler
(Capacity: 2x30 TPH)
16) Khetri Copper Complex, Khetri of Hindustan Copper Ltd.: RLA/LE Study of WHR Boiler
(Capacity: 33 TPH)
17) Essar Power Ltd., Hazira: RLA Study of HRSG # 2 (Capacity: 176 TPH)
18) Essar Steel Ltd., Hazira: RLA Study of HRSG Boiler (Capacity: 32 MW)
19) Indo Gulf Fertilizers Ltd., Jagdishpur: RLA Study of Boilers (6 Nos.) (Capacity: 2x100
TPH, 4 WHRB, 1x55 TPH)
20) Reliance Industries Ltd., Hazira: RLA Study of HRSG-3 Boiler (Make: BHEL), RLA Study
of Aux. Boiler (Make: Stork, The Netherlands) (Capacity: HRSG-125 TPH, Aux. Boiler95 TPH)
21) NTPC Vindhyachal: RLA study of LMZ Turbine in one unit of 6x210 MW TPS at
Vindhyachal. (April 2011)
22) APGENCO: RLA/LE Study of Boiler, Turbine & auxiliaries and ESP Performance Test of
210 MW Unit No.5 (Stage-III) of Dr. NTTPS, Vijayawada. (Oct.2011)
23) NTPC Vindhyachal: RLA study of LMZ Turbine in one unit of Stage-I during capital
overhauling (Feb.2012).
24) Shree Cement Ltd.: RLA Study of Unit-1 Super Heater and Final Super Heater of
2x150 MW Thermal Power Plant at Beawar, Rajasthan (Aug. 2012).
25) SKODA Power Pvt. Ltd. (A Doosan Company): RLA, FEM, Eddy Current Testing &
Condenser Cleaning of 2x110 MW (Station F & E) Torrent Sabarmati Project at
Ahmedabad. (Nov.2012).
31
26) Neyveli Lignite Corporation Ltd., TPS-I: Residual Life Assessment Study works on
Boiler, Turbine, Generator and Civil Zones in Units 3&5 (50 MW) of TPS-I.
27) Neyveli Lignite Corporation Ltd., TPS-II: RLA Study of HP, IP & LP Turbines of Unit V
and NFT and other testing of Spare LP Rotor of 210 MW KWU design BHEL make
Turbine.
28) Neyveli Lignite Corporation Ltd., TPS-II: RLA Study on Turbine of Unit-1 and Bore
sonic test of HP IP rotor.
29) APGENCO, Hyderabad: RLA/LE Study of Turbine & Auxiliaries of 210 MW Unit No.3
(Stage-II) of Dr. Narla Tatarao Thermal Power Station (Dr. NTTPS)
30) Yatagan Power Plant, Turkey: Technical Analysis of 3x210 MW Yatagan Power Plant
project in Turkey.
Diagnostic Services – Power Plant Simulation & Base line Studies:
1) Baseline studies under the Indo-German Energy Efficiency Program:
UPRVUNL
Panki 110 MW
Parichha 110 MW
Harduaganj 110 MW
Anpara 210 MW &
Obra 200 MW
RRVUNL
Kota 110 MW
MPGENCO
Satpura 210 MW
NTPC
Badarpur 200 MW
PSEB
Bathinda 110 MW
2) GTZ GmbH: Baseline studies of 85 Units (capacity ranging from 100 MW to 210
MW) by Central Electricity Authority under the Indo-German Energy Efficiency
Program.
32
3) Adani Power Ltd.: Services for boiler combustion optimization of 330 MW (Unit1) at Adani Power Ltd., Mundra, Gujarat.
Steam Path Audits:
1) NTPC-SAIL Power Company (P) Ltd.
Unit #1 (60 MW) at Rourkela
2) WBPDCL
Unit #1 (210 MW) at Kolaghat TPP
Unit # 3 (210 MW) at Kolaghat TPS
3) PSEB
Unit # 1 (210 MW) at GGSTPP, Ropar
4) CSEB
Unit # 2 (210 MW) at Korba (West)
5) NTPC
Unit # 2 (200 MW) of Ramagundam STPP.
210 MW Turbine (Stage-1) of Kahalgaon STPP.
Steam Turbine of Rajiv Gandhi CCPP, Kayamkulam (Kerala)
Steam Path Audit of HP & LP Module of Steam Turbine at NTPC, Anta.
6) MAHAGENCO
Unit # 3 (210 MW) at Nashik TPS
7) DVC
3x210 MW (Units # 1, 2 & 3) at Bokaro ‘B’ TPS
Other Projects:
1) Panipat Thermal Power Station (HPGCL): Dirty Air Flow & Clean Air Flow test of 250
MW Boiler of Unit-7, PTPS Panipat.
Advisory Services
Consultancy Services – Due Diligence:
1) GMR Energy Ltd: Due Diligence for the Consortium of GMR Energy, India, Macquire,
Singapore & NAK, Kuwait for acquisition of TUAS Power Asset of 2x600 MW oil fired
Steam Turbine Sets & 4x367.5 MW gas fired CCGT.
33
2) STEAG Energy Services GmbH: Technical Due Diligence study of 96 MW Hydro Power
Plant located in the North-Eastern State of Sikkim.
3) Lanco Power: Due Diligence for 2x300 MW coal based Power Plant.
4) Globeleq/Mott MacDonald: Due Diligence for international developer for 2x520 MW
coal based Power Plant.
5) Moserbaer India Ltd: Due Diligence for 2x300 MW coal based Power Plant.
6) IL&FS: Technical Due Diligence of Biomass projects in Maharashtra (2x15 MW), Punjab
(3x10 MW + 1x20 MW) & Haryana (5x12 MW).
7) Ethiope Power Ltd.: Technical Due Diligence of SAPELE Power Assets in Nigeria for
acquisition by the consortium of EPL, GSHL & GSPC.
8) STEAG Energy Services GmbH: Due Diligence of Wind Mill Projects of KS Oils Ltd. in
Tamil Nadu, Madhya Pradesh & Rajasthan.
Advisory Services/Studies:
1) Central Electricity Regulatory Commission (CERC): Consultancy Services for developing
benchmarks of capital cost for thermal power stations and transmission system
elements.
2) GTZ GmbH: Assessment of tendering procedures followed by Public Utilities and
review of documents of Standard R&M Projects.
3) IDFC Projects Ltd.: Study of various aspects related to design, installation & operation
of Supercritical Power Plants.
4) British High Commission / Mott MacDonald:
Consultancy services in respect of
UMPP Risk Analysis
5) WBPDCL: Study for optimum restructuring in association with Price Waterhouse
Cooper.
6) Assam State Electricity Board: Capacity development of Assam Power Sector Utilities
in association with Mercados EMI.
7) WBPDCL: Optimization study of generating units with the help of power plant
performance mapping software.
8) WBPDCL: Manpower mapping study of Kolaghat Thermal Power Station
34
9) GTZ GmbH: Power plant performance reporting and improvement under the
provisions of the Indian Energy Conservation Act.
10) Western U.P. Power Transmission Co. Ltd.: Preparation of Bid Document for selection
of EPC Contractor for development of 7 Nos. 765 kV & 400 kV GIS Sub-stations &
Transmission lines.
11) Shree Cement Ltd.: O&M Advisory Services for 2x150
MW Thermal Power Plant
at Beawar, Rajasthan.
12) Bina Power Supply Company Ltd. (Jaypee Group): Consultancy services for
stabilization of water chemistry in Water Treatment Plant of 2x250 MW Jaypee Bina
Thermal Power Plant, Bina, M.P.
13) Indiabulls Power Ltd.: Study for ash dyke area requirement for the proposed 1x660
MW coal based Power Project at Nashik in Maharashtra
14) GIZ: Technical Support and assistance for Power Plant Performance Improvement
under GIZ’s Indo German Energy Programme.
15) KPMG, Mumbai: Consultancy services to benchmark the costs for BOP Packages.
16) IL&FS Energy Development Company Ltd. (IEDCL): Assessment of 2x300 MW
operational units, 2x660 MW supercritical units under construction and 2x660 MW
under development in the State of Chhattisgarh.
17) European Commission: Workshops and Training Programme on Renovation and
Modernisation (R&M) and operational practices for the Indian thermal power sector.
18) Hitachi India Pvt. Ltd.: Consultancy services to do research of 10 power plants in India
to enable Hitachi to participate in Reverse Engineering work.
19) HPGCL, Panchkula: Consultancy services for assessment of operation engineers
engaged in operation of thermal power plant at DCRTPP, Yamunanagar and RFTPP,
Khedar.
20) Visa Power Ltd.: Assessment of Civil, Structural and Electro-mechanical work carried
out by L&T for 2x600 MW BOP package of VISA Raigarh Thermal Power Project,
Chhattisgarh.
21) KfW:
Consultancy Services for revision of the Economical Analysis of the Detailed
Project Report for the Rehabilitation of Unit 3 of WBPDCL's Kolaghat Thermal Power
Station.
35
22) Haryana Power Generation Corporation Ltd. (HPGCL): Consultancy Services relating to
Assessment of Operation and Maintenance Practices for PTPS, DCRTPP & RGTPP of
HPGCL.
23) L&T Power, Vadodara: Consultancy Services for Carrying out Quantity Measurement/
Assessment Study for BOP package of 2x600 MW VISA Thermal Power Project site in
Chattisgarh
24) JSW Energy Vijayanagar: Advisory Services during reopening and reassembly of 130
MW JSWEL SBU1 Unit-2 at JSWEL Toranagallu, Bellary, Karnataka.
25) GSPC LNG Ltd.: Consultancy Services for Power and Water System for Mundra LNG
Terminal at Mundra, Kutch, Gujarat.
26) Axis Bank Ltd.: Consultancy Services for Techno Economic Viability (TEV) Study of 2x60
MW Power Plant of Gupta Energy Private Limited at Chandrapur
27) GIZ, New Delhi: Consultancy contract on feasibility for installation of Co-Generation
unit at Puducherry Co-operative Sugar Mill.
28) Essar Power Gujarat Ltd.: Chemistry Expert Services for 2x600 MW Power Plant at
Jamnagar, Gujarat.
29) Hazira LNG Pvt. Ltd.: Consultancy Services for Review of GTG maintenance and
operating practice at HLPL, Hazira.
30) JSW Energy Ltd.: Advisory Services for opening and reassembly of HIP rotor of Unit-3
during Capital Overhauling at JSWEL Toranagallu (Bellary Dist.), Karnataka.
31) Adhunik Power and Natural Resource Ltd.: Advisory Services for the supervision of
works related to Generator for 2x270 MW MPSTPP near Jamshedpur in the state of
Jharkhand.
32) Adhunik Power and Natural Resource Ltd.: Consultancy/Audit Services for Operation
& Maintenance of 2x270 MW (Stage-I) MPSTPP at Padampur, Jharkhand.
33) KPMG Advisory Services Pvt. Ltd.: Diagnostic/Design services for Sasan UMPP of
Reliance Power.
34) Lanco Anpara Power Ltd.: Technical Audit of 2x600 MW LANPL Plant at Anpara, Uttar
Pradesh
35) STEAG Power Minerals GmbH: Advisory Services to assess the potential for SPM
products and services in India and to develop a strategy to service identified markets.
36
36) ONGC Tripura Power Company Ltd.: Consultancy Services for Technical System and
Performance Audit of 2x363.3 MW Gas Based Combined Cycle Power Plant at
Palatana, Tripura.
37) JCOAL: Survey on status of coal fired power stations and coal consumption in India.
38) Meenakshi Energy Pvt. Ltd.: HAZOP study for Coastal Power plant located at
Thamminapatnam, A.P.
39) Rosa Power Supply Company Ltd.: Consultancy Services for analyzing root cause of
fast erosion of APH outlet to ESP inlet Flue Gas Duct.
40) GMR Energy: TEV Studies of 2x300 MW thermal Power Project EMCO Energy Limited
at Warora, Maharashtra
41) KPMG: Advisory Services for conducting technical interview assessment and tool
development.
42) Meenakshi Energy Pvt. Ltd.: Preparation of Electrical I/O list for main plant DCS for
2x350 MW (Stage-II) project at Thamminapatnam.
43) Kyushu Electric Power Co., Inc., Japan: Consultancy Services for the planning of Plant
Basic Design related to the preparatory survey on the project for construction of
Barauni super critical coal fired thermal power station in India.
44) Mitsubishi Hitachi Power Systems India Pvt. Ltd.: Consultancy services to do research
of 10 power plants in India to enable Mitsubishi Hitachi to participate in Reverse
Engineering work.
45) Gupta Energy Pvt. Ltd.: Preparation of Assessment Report on the present technical
status of 2x60 MW power plant at Chandrapur
46) Adhunik Power & Natural Resources Ltd.: Consultancy/Audit services for Monitoring
of O&M and Performance improvement activities of 2x270 MW M.P. Super Thermal
Power Plant located at Padampur (Saraikela-Kharsawan), Jharkhand.
47) Catalagzi TPP, Turkey: Techno-Economic Study between FBC Boiler Vs PC fired
(rehabilitated) Boiler + Seawater FGD + DeNOx System and PC fired (rehabilitated)
Boiler + Limestone FGD + DeNOx System.
48) Rabigh Arabian Water and Electricity Company (RAWEC): Engineering Services for
CCR1 Power Supply Modification and for T&I - FGD UPS Implementation.
37
Lender Engineer Services:
1) PFC: Lender’s Engineer to PFC for M/s. Indian Metals & Ferro-Alloys Limited’s 2 x 60
MW Coal based Captive Thermal Power Project at Choudwar in the State of Orissa.
2) PFC: Lender’s Engineer for PFC for M/s. KSK Mahanadi Company Ltd’s 6 x 660 MW
Coal based Thermal Power Project at Janjgir, District Champa in the State of
Chhattisgarh.
3) PTC India Financial Services Ltd.: Lender’s Engineer to PTC India for M/s. Greta
Energy Limited’s 15 MW Biomass Power Project at Mul, Maharashtra.
4) IDBI Bank: Lender’s Engineer to IDBI Bank for M/s. GMR Rajahmundry Energy
Limited’s 2x384 MW CCPP in the State of Andhra Pradesh.
5) PFC: Lender’s Engineer to PFC for M/s. Bhubaneshwar Power Pvt. Ltd’s 2x67.5 MW
(135 MW) Captive Power Plant in Cuttack, Orissa.
6) Axis Bank: Lender’s Engineer to Axis Bank for M/s. GMR Chhattisgarh Energy Ltd’s
2x685 MW (1370 MW) coal based Supercritical Power Plant at Raikheda, Raipur
District, Chhattisgarh.
7) Axis Bank: Lenders' Engineer to Axis Bank for M/s. ACME Tele Power Ltd’s 10 MW
Solar Power Project in Rajasthan.
8) IFCI Ltd.: Lenders' Engineer to IFCI for M/s. Pioneer Gas Power Ltd.'s project of
setting up 388 MW CCPP at MIDC, Raigad Dist., Maharashtra.
9) ICICI Bank: Lenders' Engineer to ICICI Bank for M/s. GMR Energy's Maru Transmission
Service Company in Rajasthan.
10) ICICI Bank: Lenders' Engineer to ICICI Bank for M/s. GMR Energy's Aravali
Transmission Service Company in Rajasthan.
11) PTC India Financial Services Ltd.: Lenders Independent Engineer (LIE) services for
4.25 MW Cogen Power Plant of M/s. Abellon Cogen Ltd. (ACL) at Ahmedabad,
Gujarat.
12) PFC: Lenders' Engineering services for 1x525 MW coal based Thermal Power Plant
being set up by M/s. SEPL Power Private Limited (SEPCPPL) in Thoothukudi district of
Tamil Nadu.
13) PFC: Lender's Independent Mining Engineer (LIME) for KSK Mahanadi Power
Company Limited's 6x660 MW coal based Thermal Power Project at Nariyara, JanjgirChampa District, Chhattisgarh.
38
14) Axis Bank Ltd.: Lenders' Independent Engineer (LIE) for review and monitoring of rail
infrastructure from Akaltara station to the power project site of KSK Mahanadi Power
Company Ltd.
15) GMR Energy: Assessment of Project Cost of Aravali Transmission Service Company
Ltd. and Maru Transmission Service Company Ltd.
16) Pioneer Gas Power Ltd.: Preparation of final time and cost overrun report for 388
MW CCPP at MIDC, Maharashtra.
17) Power Finance Corporation Ltd.: Lenders Engineer for carrying out Phase Segregation
work for 6x600 MW Coal based TPP of M/s. KSK Mahanadi Power Co. Ltd.
Consultancy Services – Asset Evaluation:
1) Adani Power Ltd.: Evaluating Present Value of Plant & Equipment of 1320 MW (PhaseI & Phase-II) Coal based Thermal Power Plant at Mundra, Gujarat.
2) Haryana Power Generation Corporation Ltd.: Valuation of Assets at 3x60 MW Coal
based Units at Faridabad, Haryana.(March 2011)
3) Damodar Valley Corporation: Valuation of Retired Unit # 4, 5 & 6 of 120 MW each of
Chandrapura TPS (May 2013).
4) GMR Energy Ltd.: Valuation of 768 MW gas based combined cycle power plant at
Rajahmundry (GREL – 2x384 MW).
Consultancy Services – Transmission and Distribution Projects:
1) Central Electricity Regulatory Commission (CERC): Development of a model for
benchmarking of capital cost for thermal power stations and transmission system
elements.
2) Western U.P. Power Transmission Co. Ltd.: Preparation of Bid Document and
evaluation of bids for construction of 765/400 kV transmission system project of
about 900 km including 7 substations.
3) UP Power Corporation Ltd.: Review of proposed 765/400 kV substation of UPPCL’s
Jawaharpur project.
4) Indian Metals & Ferro Alloys (IMFA): Review of power system studies for evacuation
of power from 2x60 MW thermal power plant of IMFA, Bhubaneswar.
39
5) HPCL-Mittal Energy Ltd.: Operation and Maintenance of 220/33 kV grid switchyard,
165 MW captive power plant substation and 18 nos. refinery distribution substations
of Guru Gobind Singh Refinery at Bathinda.
6) Maru Transmission Service Company Ltd.: Due diligence, construction monitoring,
performance test monitoring and annual operations review of 400 kV S/C power
transmission Bikaner-Deedwana-Ajmer line, 220 kV D/C Deedwana-Sujangarh power
transmission line and the 400 kV/220 kV GSS at Deedwana (265 km in total).
7) Aravali Transmission Service Company Ltd.: Due diligence, construction monitoring,
performance test monitoring and annual operations review of 400 kV S/C HinduanAlwar transmission line (85 km) and 2x315 MVA 400/220 kV Grid substation at Alwar.
8) Kribhco Shyam Fertilizers Ltd. (KSFL): Consultancy services for design, engineering,
supervision and project management of power for sale project at Shahjahanpur in
U.P.
9) Kyushu Electric Power Co., Inc., Japan: Consultancy Services for the planning of power
system analysis related to the preparatory survey on the project for construction of
Barauni super critical coal fired thermal power station in India.
10) STEAG Energy Services GmbH: Provision of Engineering Services for Impulse
International (PTY) LTD. - Refurbishment of Bellevue Substation in South Africa.
40
Training
S.No. Name of Assignment
Client Name
Location
Duration
1.
NPTI, Faridabad
Noida
2 weeks for
Power Plant Simulator Training
Program for NPTI
each batch
(4 Batches of 8 trainees each)
2.
Power Plant Simulator Training
NPTI, Faridabad
Noida
2 weeks
NPTI, Faridabad
Noida
2 weeks
NPTI, Faridabad
Noida
2 weeks
GSECL, Baroda
Noida
2 days each
NPTI, Faridabad
Noida
1 week for 3
Program for NPTI
(Batch of 16 trainees)
3.
Power Plant Simulator Training
Program for NPTI
(Batch of 03 trainees)
4.
Power Plant Simulator Training
Program for NPTI
(Batch of 12 trainees)
5.
Short Term Power Plant Training
Program- 2 batches of 15 Engineers
each, on “Advanced Heat Rate
Monitoring and Diagnostics” and “
Advanced Level Heat Rate
Awareness”
6.
7.
Training Course on Use of Eblison
Software on Performance Assessment
batches of 20
of Thermal Power Stations
students each
Familiarization and interchange of
GTZ, Germany
All India
6 months
GTZ, Germany
All India
2 years
GTZ, Germany
All India
2 years
Best Practices with Power Plant
Operators in Europe/Germany
8.
Assessment of training need of
Energy Managers &Energy Auditors.
9.
Training courses of Energy Auditors
and Energy Managers.
41
10.
Assessment of Human Resource
GTZ, Germany
All India
2 years
GTZ, Germany
All India
2 years
GTZ, Germany
All India
2 years
GTZ, Germany
All India
2 years
Power Plant Simulator training for
CL&P
Noida
1 week
China Light and Power Corporation.
Corporation
Development Needs in upto 30
Power Plants across India.
11.
Mapping of Thermal Power plants
upto 85 numbers & Capacity building
of upto 4 engineers of the
Conservation and Environment
Division of CEA in the use of
Software.
12.
Design of Organization Structure of
Energy Efficiency Cell, functions and
duties of Energy Managers and
personnel working in Energy
Efficiency Cell.
Seminars and Workshops on Best
13.
Practices in power plant performance
monitoring in Europe/Germany vis a
vis Indian practices
14.
engineers
15.
Power Plant Familiarization and
C&C Energy Pvt. Noida
simulator training for unit operators
Ltd.
6 weeks
of Zimbabwe Power Company,
Zimbabwe
16.
Training Programme for Middle
C&C Energy Pvt. Noida
Management & Senior Management
Ltd.
15 days
officials of Zimbabwe Power
Company, Zimbabwe
17.
Simulator Training for B. Tech
NPTI, Badarpur
Noida
2 weeks
NPTI, Badarpur
Noida
2 weeks
Students (62 students) for two weeks
18.
Simulator Training for B. Tech
42
Students (72 students) for two weeks
in August & September 2013
19.
Training for Power Plant Personnel
GIZ (Excellence
(25 delegates) to improve the
Enhancement
efficiency and performance of the
Centre)
Noida
6 days (two
batches)
sector. 6 Trainings (2 x 3-days
training + 4 x 2-days training)
20.
Simulator Training for 60 PGDC 18th
NPTI, Badarpur
Noida
6 weeks (six
Batch students (Training in Nov,
batches of 10
Dec.2013 & Jan 2014)
students
each)
21.
22.
Training on identified areas to Engineers at
HPGCL sites (2x300 MW DCR TPP,
Yamuna Nagar and 2x600 MW RGTPP,
Khedar)
HPGCL,
Yamuna
2 weeks for
Panchkula
Nagar &
each location
Simulator Training for 26 PGDC 16th
NPTI, Badarpur
Khedar
Noida
2 weeks (two
Batch students (Training from 03.2.14
batches of 13
to 13.2.14)
students
each)
23.
Training Program on Power Plant
Performance System for engineers at
JSW Energy Ltd.
Toranagallu,
3 days
Karnataka
JSW Toranagallu, Karnataka
43
Download