RAMADI WEST 132/33 KV S.S PROJECT UNI-TECH WEEKLY EHS SITE WALKTHROUGH REPORT INTRODUCTION: • Weekly site safety walk down is conducting to track the safety observations, hazards, risks and as a monitor tool for the control measures being implemented in the working area and to keep the workplace safe. • An EHS walkthrough take place with our UNI-TECH site management • Some of urgent EHS matters were discussed immediately on site. • The corrective action report will be prepared as soon as all items be closed. • As a leading safety indicators and as proactive action we have conducted safety walkthrough to ensure that all safety issues are controlled as well as showing the commitment regarding the HSE. PARTICIPANTS: 1. Khalid Waleed. Site Manager 2. Wissam Qadir. Site Supervisor 3. Ahmed Dheyaa. QA/QC Engineer 4 Nashwan Ghanim. Permit Coordinator 5. Ismael Ayyash Hussein. EHS Engineer S/N 1 2 3 4 5 OBSERVATION Housekeeping OBSERVATION DETAILS Poor housekeeping notice at GIS area CORRECTIVE ACTION STATUS Huge amount of formwork (plywood, tie-rods, timbers and jacks) are left at main building 1st roof. Scaffold materials are left after dismantling MB columns SCAFF without arrangement. Improper place for Electric Sliding Miter Saw, no ergonomic position during use it Rubbish and compostable materials are near to the smoking area. Also, 2nd workshop has huge amount of sawdust and plywood without control. Poor management for at GIS area, scaffold materials without proper store, plywood and timbers was disarray