Managing safely v3.1 – project Introduction As part of the Managing safely course, you have to complete a project and have it assessed. You will be expected to carry out a risk assessment based on your own work environment. You need to record the results on the attached sheets and submit them for marking. Do not submit any additional material in support of your project work as only the six parts of the A4 project will be assessed. The project can be word processed or hand written. When you have completed your work you should return it to Santis HSE Management JLT 1808 HDS Tower JLT PO Box 454983 Dubai UAE Email: _divya@hse.ae/divya.d.chandra@gmail.com IOSH MS Course Ref. No.: _____________ There is a two week time limit for the return of the project. Your project must be completed and returned by December 29, 2013 Instructions Please read all of the instructions before starting work on your project. The project is broken down into a number of parts. Please complete each section as detailed below. Part 1 – description of the work tasks that are your responsibility Record a brief description of all the work tasks within your work environment including: description/labelled sketch of the location(s) people who work in or visit the area on a regular basis or from time to time. (Think about the different groups of people who may be in the area and how often they may be there.) permanent and temporary items of equipment and substances activities carried out within your work environment MS Project Pack version 3.1 Part 2 – a hazard checklist of the location(s) Record a brief description of three location hazards that may arise in your work environment. For example, car park, stairs, uneven floor. For each of these hazards please include: a description of the location a description of the hazard – in relation to the location the number and occupation of people who could be affected by the hazard – in relation to the location whether a risk assessment is recommended Part 3 – a hazard checklist of permanent and/or temporary items of equipment and substances used in your work environment Record a brief description of three hazards that may arise from equipment or substances used. For each of these hazards please include: a description of permanent and/or temporary items of equipment and substances used a description of the hazard – in relation to the equipment/substance the number and occupation of people who could be affected by the hazard - in relation to the equipment/substance whether a risk assessment is recommended Part 4 – a hazard checklist of the activities carried out within your work environment Record a brief description of three hazards that may arise from within your work environment. For each of these hazards please include: a description of the work activity a description of the hazard – in relation to the work activity the number and occupation of people who could be affected by the hazard – in relation to the work activity Note: for the purpose of this exercise all three activity hazards that you are assessing on part 4 must require a risk assessment. Part 5 – carrying out a risk assessment Please carry out a risk assessment on all three of the activity hazards you have listed on part 4. Please make sure you include: a description of the work activity a description of the hazard, hazardous event and expected consequence – in relation to the work activity the number and occupation of people affected – in relation to the work activity an assessment of risk (please use the 5 x 5 matrix) – in relation to the work activity Note: for the purpose of this exercise all three activity hazards that you are assessing on part 5 must require risk controls. MS Project Pack version 3.1 Part 6 – risk control recommendations Please complete the risk control form for all three activity hazards you have listed on part 5. Please make sure you include: a description of the work activity and risk level from the risk assessment existing risk controls any further risk controls required - in relation to the work activity the residual risk (please use the 5 x 5 matrix) - in relation to the work activity a description of the type of monitoring required and how often - in relation to the residual risk Note: where you have large numbers of hazards in your work environment you will not have space to record them all. In these circumstances, select a representative sample of hazards for the purposes of this project and record only these. Remember that only three hazards are required for parts 2, 3, and 4. Each part has a maximum number of marks which can be awarded and details are given in the table below. Part Maximum marks 1 18 2 16 3 16 4 13 5 30 6 30 Total 123 Minimum mark 62 Finally, before returning your project check that your name, the end of course date, the name of your company, the site name and the name of your training provider are recorded on the first sheet. Please also ensure that you sign each sheet to confirm that the work you submit is your own. Please note: the small square boxes in the bottom right hand corner of each section on parts 2 to 6 are for the markers use only. MS Project Pack version 3.1 Part 1 – description of the work tasks that are your responsibility (continued on the next page) Delegate name Adil Gibreel End of course date 15.12.2013 Company TRANSCO Site name Pipeline excavation – Al Ain Marks allocated Training provider Santis HSE Management JLT A description/labelled sketch of the location(s) This is a typical site excavation in project N7894A for pipe construction of water transmission in Al Ain – The project include excavation, laying of bedding material for the pipe, pipe laying in the excavated trench and backfilling of the trench. Testing and commissioning will be done then the project will be put in operation to convey water to the required area A description of the people who work in or visit the area on a regular basis or from time to time and how often they’re there 1- Contractor Pipe fitters, who are responsible for pipe laying, joints preparation and connecting the pipes together (daily) 2- Contractor Foremen, responsible for organising and managing the working force of labourers and fitters to do the required tasks. (daily) 3- Supporting Contractor staff and Engineers, who supervise and manage the project (as and when required) 4- Consultant Resident Engineer, the key staff of the site supervision team (2-3 times weekly) 5- Consultant civil/mechanical engineers and supervising staff. Each is responsible within his engineering discipline (daily) 6- Plant and equipment operators, such as cranes , excavators, loaders, earth movers and trucks operators (daily) 7- TRANSCO project staff, including visiting responsible department managers (2-3 monthly) 8- Subcontractors staff, such as painters, welders, testing laboratory staff and the likes (as and when required) 9- Public by-passers, these are members of the public who are not authorised to enter the site (if and when they can trespass) MS Project Pack version 3.1 Marks allocated Part 1 – description of the work tasks that are your responsibility A description of permanent and temporary pieces of equipment and substances used in your work environment 1- Excavators, used to do the ground digging and making of the trench to lay the pipe in afterwards 2- Cranes, used to load and off-load the required material such as pipes and fittings (Valves, Bends, Tees … etc.) and civil construction material for backfilling and building of civil works along the pipeline (Valve chambers. Thrust blocks, Line anchors … etc.) 3- Plate compactors, used to compact the back filling material of the trench in layers suitable for compaction 4- Loaders, used to load the excavated material on trucks in order to take it away from the site to a dumping area 5- JCBs, used in the same manner as excavators and sometimes to bring the bottom of the trench to the required level 6- Trucks to transport the required material to the site and to take away exhumed material and the excavated material away from the site A description of the activities carried out within your work environment 12345- Excavation of the trench for the pipeline Pipes transportation from the yard to the laying location Pipes cleaning and preparation Touch paint for the damaged coating areas Preparation of the trench bottom by spreading a selected material called pipe bedding to form a supporting layer for the pipes 6- Pipe laying, by aligning the pipes matching ends (sockets and spigots) and inserting the rubber gaskets in the designated groove in the pipe socket and the push the two ends together using a special tool or the backhoe of a JCB or excavator bucket 7- Backfilling of the trench is layers using selected backfilling material and using plate compactor to achieve the required compaction target Please sign to confirm that this is your own work:__________________ MS Project Pack version 3.1 Hazard Checklist: locations(s) Part 2 The location(s) you manage Company: TRANSCO Description of the location Inside the excavated pipe trench Beside the excavated trench Loading off-loading areas Department: Water Projects Description of the hazard (in relation to the location) Site name: Project N7894A – Al Ain Number and occupation of people affected Risk assessment recommended? (in relation to the location) (If no, please explain) - Collapse or cave-in of the trench of the trench sides - Falling material from the excavated material in the trench - heat stroke due to working under the sun especially in summer - slip while using access ladders to the trench This more likely to affect the following - Labourers (20) - Pipe fitters (5) - Surveyor (1) Who are working inside the trench A lot of activities are going beside the excavated trench involving the following source of hazards: - Earth moving equipment working near excavation and people working below - Stored pipes, Valves and fittings not properly secured and restrained from movement - Piled excavated material and Crane operation the this area is required for loading and off-loading of the materials and other tools and equipment. This has the potential hazard as follows: - Head injuries - Broken leg, arms and other parts of the body - Death Those most likely to be affected are the ones working in the nearby trench (All above persons (36) plus the following occupations: - Plants equipment/operators (1-2) - Supervising Staff (3) Following are most likely to be affected - Labourers (30) - Pipe fitters (5) - Crane operator (1) Please sign to confirm that this is your own work:__________________ Yes Yes Yes No No No MS Project Pack version 3.1 Hazard Checklist: equipment and substances Part 3 Permanent and temporary pieces of equipment and substances used in the work environment Company: TRANSCO Description of the equipment/substances Non- Professionally handled Excavator Department: Water Projects Description of the hazard (in relation to the equipment/substance) - Hitting buried power cable while excavating - Breaking water pipelines while excavating - overturning of unstable positioned excavator Site name: Project N7894A – Al Ain Number and occupation of people affected Risk assessment recommended? (in relation to the equipment/substance) (If no, please explain) Around 30 persons working on or beside the excavator are likely to be affected from the following categories - Labourers - Rigger - Excavator Operator Yes Yes Non- professionally operated Loaders, earth movers, trucks and JCBs - Fall in excavated trench - Collisions with other equipment - Run overs of personnel by moving equipment - Operator (2-3) - Labourers (4-5) - Rigger (1-2) - Supervisor (1) Non—properly maintained and operated Lifting equipment (Cranes) - Breaking of the lifting slings - Falling of the lifted objects/load - Oil leaks from the hydraulic system pipes - exhaust gases - Operator (1) - Rigger (1) - Labourers (3) - Supervisor (1) Please sign to confirm that this is your own work:__________________ Yes No No No MS Project Pack version 3.1 Hazard Checklist: activities Part 4 Activities carried out within your work environment Company: TRANSCO Department: Water Projects Site name: Project N7894A – Al Ain Note: For the purpose of this exercise, all three activity hazards must require a risk assessment. Description of the Description of the hazard Number and occupation of Risk assessment (in relation to the work activity) people affected Work activity recommended? (in relation to the work activity) Excavation of the pipe trench Earth moving and transporting of material Heavy loads lifting using mechanical Handling This may lead to electric shocks due to hitting or getting in contact with power cable especially High Voltage cable. It may also lead to flooding of the trench and drowning of the staff trapped in the trench if a pressurized water main is broken while excavation is carried out Around 20 persons working inside the trench are likely to be affected from the following categories - Labourers - Pipe fitters - Surveyor - Excavator operator √ Yes No Equipment working close to the open trench may fall in the trench. Too many moving equipment working in a relatively congested area may lead to collision between them. Unaware staff may be run over by moving equipment Around 30 persons working beside & inside the trench are likely to be affected from the following categories - Labourers - Supervisors - Trucks, loaders and other equipment operators - Public trespassers √ Yes No Lifted loads may get loose and fall on the working personnel and equipment. Personnel are also likely to be hit by the lifted loads while moving it to the required place while the load is in the level of the workers. Excessive and/or unbalance loading of the lifting crane is most like to result in toppling the crane Around 15 persons working in the vicinity of the crane are likely to be affected from the following categories - Labourers - Riggers - Supervisors - Public trespassers √ Yes No Please sign to confirm that this is your own work:__________________ MS Project Pack version 3.1 Risk assessment form Company: TRANSCO Work activity Earth moving & Materials transportation Mechanical Lifting/Handl ing Site name: Project N7894A – Al Ain Department: Water Projects Note: For the purpose of this exercise, all three activity hazards must require risk controls. Assessment of risk Hazard, hazardous event and People (in relation to the work activity) expected consequence affected Likelihood X Consequence = Risk (in relation to the work activity) (in relation to the work activity) Excavation Part 5 Buried high voltage cable when hit or get in contact with will result in electric shock and a possible death. Pressurised water mains when broken will lead to flooding and result in drowning and/or death Occupation: Operating machineries and equipment near trenches may lead to fall of them in trenches resulting in injuries and death. Collision may also happen between machineries with damage to property and lives Occupation: Exceeding the safe working loads may lead to loads falling on people resulting in broken bones and fractured skulls and consequently death Occupation: Date: 24.12.2013 Time: 15:23 Assessor’s name: Adil Gibreel Labourers, Pipe fitters & Excavator operators Are risk controls required? level level level 4 5 20 √ Yes No 3 5 15 √ Yes No 4 5 20 √ Yes No Number: 20 Labourers, Supervisors, Trucks, loaders & other equipment operators - Public trespassers Number: 40 - Labourers - Riggers - Supervisors - Public trespassers Number: 15 Review period: every 2 month Position: Project Manager Please sign to confirm that this is your own work:__________________ Date of next review: 24.02.2014 Signature: MS Project Pack version 3.1 Part 6 Risk control form Company: TRANSCO Residual risk Work activity and risk level Existing risk controls Further risk controls required (from risk assessment form) (in relation to the work activity) (in relation to the work activity) Training of Excavators operators Use of advance cable locators for power cables and metal detectors for metallic pipelines 1 Use of signs and markings. Improve traffic management in the site (e.g. one way system). Speed limit reduction 1 Colour coding of slings. Destroy or Remove defective slings from site. Promote safe working procedures by posters. Use of PPE 2 Excavation Risk level: 20 Earth moving & Materials Transportation Restrict traffic to 2 meters away from open trench Risk level: 15 Heavy loads lifting using mechanical Handling Risk level: 20 Training of operators and riggers. Visual checking of slings Date: 24.12.2013 Assessor’s name: Adil Gibreel Site name: Project N7894A – Al Ain Department: Water Projects (in relation to the work activity) Probable Likelihood X Potential Consequence 5 = New risk level 5 Description of monitoring required (in relation to the residual risk) During site/safety visits, check the locators and detectors are being used Frequency: Monthly 5 5 Maintenance and cleaning of the signs and markings. Daily Toolbox Talks. Penalise violators Frequency: Daily 5 10 Check the slings for physical damage, tear and wear. Check record of destroyed or removed slings Frequency: Bi-weekly Review period: every 2 months Date of next review: 24.02.2014 Position: Project Manager Please sign to confirm that this is your own work:__________________ Signature: MS Project Pack version 3.1