Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED DATE: 26-03-2020 PROJECT JONES CREEK GAS EXPORT PROJECT DURATION: 8weeks DEPARTMENT ENGINEERING Revise costs in table in line with comments within DEPARTMENT CODE DISCIPLINE UNIT 08 SCOPE OF WORK Nigerians Lead Engr (hr) CTR Lead Engr.($/hr) Discipline Desgin Engr. (hr) $279,840.00 Discipline Design Engr. ($/hr) Sub Total CONCEPTUAL DESIGN, FEED, DED Discipline Code SUMMARY SHEET ENGINEERING $71,360.00 PROCESS ENGINEERING 4200 474.00 120.00 294.00 80.00 $80,400.00 CIVIL/STRUCTURAL ENGINEERING 4400 524.00 120.00 149.00 80.00 $74,800.00 MECHANICAL/PIPING ENGINEERING 4700 387.00 120.00 95.00 80.00 $54,040.00 PIPELINE ENGINEERING 4500 300.00 120.00 234.00 80.00 $54,720.00 INSTRUMENTATION & CONTROL ENGINEERING 4100 647.00 120.00 120.00 80.00 $87,240.00 Engineering Grand Total ($ 279,840.00) $71,360.00 $351,200.00 TECHNICAL NOTES (1)Engineering Design and Project Management services shall be carried out to meet project schedule and cost. Project shall be executed in line with Clientapproved codes and standards. (2) Client shall be responsible for providing as-built drawings/specifications/data sheets/lists and relevant information/data of the facility. (3) Upon approval of the CTR, the Client shall issue Purchase Order (PO) or Work Order (WO). (4) Client shall be responsible for site logistics, security and community FTO. (5) The Lumpsum price are applicable to the SOW and excludes VAT and WHT. (6) Contractor quote excludes Geotechnical and underground survey cost. As it is assumed that the project geotechnical report is available. PAYMENT MILESTONES 15% upon issuance of Service Order or Work Order 25% at Conceptual Desiign Delivery 20% at Front End Engineering Design 30% at Detailed Engineering Design 10% Project Closeout ID Start Finish Duration Complete 1/4/2020 JONES CREEK GAS EXPORT PROJECT 1/4/2020 1 Contract Award 1/4/2020 1/4/2020 1.0 d. 0% 2 Project Kick-Off Meeting 2/4/2020 2/4/2020 1.0 d. 0% 3 Sites Visit / Mobilization 6/4/2020 10/4/2020 5.0 d. 0% 4 Engineering 13/4/2020 30/6/2020 57.0 d. 0% 13/4/2020 24/4/2020 10.0 d. 0% 21/4/2020 8/6/2020 35.0 d. 0.0% 5 6 Conceptual Design Front End Engineering Design 7 Detailed Engineering Design 28/4/2020 26/6/2020 44.0 d. 0% 8 DED Closeout 29/6/2020 30/6/2020 2.0 d. 0% 4/4/2020 11/4/2020 1/5/2020 18/4/2020 25/4/2020 2/5/2020 9/5/2020 16/5/2020 1/6/2020 23/5/2020 30/5/2020 6/6/2020 13/6/2020 20/6/2020 27/6/2020 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 DEPARTMENT ENGINEERING DURATION WEEKS: 8 WEEKS DEPARTMENT CODE 10 SCOPE OF WORK CTR Nigerians Lead Engr. Discipline Design Engr. Sub Total CONCEPTUAL DESIGN, FEED, DED Discipline Code SUMMARY SHEET 2332.00 892.00 3224.00 PROCESS ENGINEERING 4200 474.00 294.00 768.00 CIVIL/STRUCTURAL ENGINEERING 4400 524.00 149.00 673.00 MECHANICAL/PIPING ENGINEERING 4700 387.00 95.00 482.00 PIPELINE ENGINEERING 4500 300.00 234.00 534.00 INSTRUMENTATION & CONTROL ENGINEERING 4100 647.00 120.00 767.00 2332.00 892.00 3,224.00 Engineering Grand Total Cost, Time and Resource Analysis REVISION No.: R1 CLIENT NECONDE ENERGY LIMITED DATE: 26:03:2020 PROJECT JONES CREEK GAS EXPORT PROJECT DURATION WEEKS: 8 WEEKS DEPARTMENT ENGINEERING DEPARTMENT CODE 10 DISCIPLINE CODE DISCIPLINE UNIT 4200 CONCEPTUAL DESIGN, FEED, DED Nigerians Lead Engr. 4200 474.00 294.00 768.00 CONCEPTUAL DESIGN 4200 63.00 0.00 63.00 FRONT END ENGINEERING DESIGN 4200 198.00 141.00 339.00 DETAILED ENGINEERING DESIGN 4200 213.00 153.00 366.00 474.00 294.00 768.00 SCOPE OF WORK CTR Discipline Grand Total Discipline Design Engr. Sub Total Discipline Code SUMMARY SHEET PROCESS ENGINEERING Cost, Time and Resource Analysis REVISION No.: R1 CLIENT NECONDE ENERGY LIMITED DATE: 26:03:2020 PROJECT JONES CREEK GAS EXPORT PROJECT DURATION WEEKS: 8 WEEKS DEPARTMENT ENGINEERING DISCIPLINE CODE DISCIPLINE UNIT 4200 ACTIVITY SCOPE: DEPARTMENT CODE 10 PROCESS ENGINEERING CONCEPTUAL DESIGN Nigerians Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Lead Engr. Discipline Design Engr. 2.00 14.00 0.00 14.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 0.00 5 Scope Clarifications 1.00 9.00 0.00 9 3.00 33.00 0.00 33.00 Site Visit Checklist 1.00 5.00 0.00 5.00 Site Visit 1.00 20.00 0.00 20.00 Site Visit Report 1.00 8.00 0.00 8.00 2.00 16.00 0.00 16.00 Block Flow Diagram 1.00 8.00 0.00 8 Process Flow Diagram 1.00 8.00 0.00 8 63.00 0.00 63.00 General Site Visit Process Diagram Discipline Grand Total Cost, Time and Resource Analysis REVISION No.: CLIENT NECONDE ENERGY LIMITED PROJECT JONES CREEK GAS EXPORT PROJECT DEPARTMENT ENGINEERING DISCIPLINE CODE 26:03:2020 DURATION WEEKS: 8 WEEKS DEPARTMENT CODE 10 DISCIPLINE UNIT 4200 ACTIVITY SCOPE: R1 DATE: PROCESS ENGINEERING FRONT END ENGINEERING DESIGN (FEED) Sub Total Nigerians Lead Engr. Discipline Design Engr. 3.00 15.00 0.00 15.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 0.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 0.00 5 Technical Query , RFIs 1.00 5.00 0.00 5 8.00 60.00 35.00 95.00 Process Flow Diagrams (PFDs) 1.00 8.00 4.00 12 Piping and Instrumentation Diagrams (P&ID) 1.00 8.00 4.00 12 Utility Flow Diagrams (UFDs) 1.00 8.00 4.00 12 Safe Chart 1.00 8.00 4.00 12 Legend and Symbols 1.00 5.00 4.00 9 P&ID - Pig Receiver 1.00 8.00 5.00 13 P&ID - Pig Launcher 1.00 8.00 5.00 13 P&ID - Gas Metering System 1.00 7.00 5.00 12 2.00 10.00 16.00 26.00 Line Sizing 1.00 5.00 8.00 13 Relief and Blowdown Sizing and Calculations 1.00 5.00 8.00 13 2.00 10.00 16.00 26.00 PED - Design & Operating Conditions 1.00 5.00 8.00 13 PED - Isolation, Relief & Blowdown 1.00 5.00 8.00 13 3.00 21.00 30.00 51.00 Blowdown Philosophy 1.00 7.00 10.00 17 Startup Philosophy 1.00 7.00 10.00 17 Isolation Philosophy 1.00 7.00 10.00 17 8.00 78.00 38.00 116.00 Process Design Basis 1.00 7.00 10.00 17 Heat and Material Balance Report 1.00 6.00 6.00 12 Utility Balance Report 1.00 6.00 6.00 12 Process Simulation Report 1.00 6.00 8.00 14 Line Sizing Report 1.00 6.00 8.00 14 Flow Assurance Report 1.00 25.00 0.00 25 HAZOP Study 1.00 12.00 0.00 12 HAZOP Close-out Report 1.00 10.00 0.00 10 1.00 4.00 6.00 10.00 1.00 4.00 6.00 10 198.00 141.00 339.00 General No pig traps are required Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: PFD's/UFD's/PID Line Sizing Datasheets Design Philosophies Studies & Report List Process Index Discipline Grand Total Cost, Time and Resource Analysis REVISION No.: R1 CLIENT NECONDE ENERGY LIMITED DATE: 26:03:2020 PROJECT JONES CREEK GAS EXPORT PROJECT DURATION WEEKS: 8 WEEKS DEPARTMENT ENGINEERING DISCIPLINE CODE DEPARTMENT CODE 10 DISCIPLINE UNIT 4200 ACTIVITY SCOPE: PROCESS ENGINEERING DETAILED ENGINEERING DESIGN (DED) Nigerians Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Lead Engr. Discipline Design Engr. 3.00 15.00 0.00 15.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 0.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 0.00 5 Technical Query , RFIs 1.00 5.00 0.00 5 80.00 43.00 123.00 10.00 5.00 15 General PFD's/UFD's/PID 8.00 Not required per contract scope Process Flow Diagrams (PFDs) 1.00 Piping and Instrumentation Diagrams (P&ID) 1.00 10.00 5.00 15 Utility Flow Diagrams (UFDs) 1.00 10.00 5.00 15 Safe Chart 1.00 10.00 5.00 15 Legend and Symbols 1.00 10.00 5.00 15 P&ID - Pig Receiver 1.00 10.00 6.00 16 P&ID - Pig Launcher 1.00 10.00 6.00 16 P&ID - Gas Metering System 1.00 10.00 6.00 16 2.00 12.00 20.00 32.00 Line Sizing 1.00 6.00 10.00 16 Relief and Blowdown Sizing and Calculations 1.00 6.00 10.00 16 2.00 10.00 16.00 26.00 PED - Design & Operating Conditions 1.00 5.00 8.00 13 PED - Isolation, Relief & Blowdown 1.00 5.00 8.00 13 Line Sizing Datasheets Design Philosophies 3.00 24.00 30.00 54.00 Blowdown Philosophy 1.00 8.00 10.00 18 Startup Philosophy 1.00 8.00 10.00 18 Isolation Philosophy 1.00 8.00 10.00 18 Studies & Report 6.00 56.00 38.00 94.00 Process Design Basis 1.00 7.00 10.00 17 Heat and Material Balance Report 1.00 6.00 6.00 12 Utility Balance Report 1.00 6.00 6.00 12 Process Simulation Report 1.00 6.00 8.00 14 Line Sizing Report 1.00 6.00 8.00 14 Flow Assurance Report 1.00 25.00 0.00 25 1.00 4.00 6.00 10.00 1.00 4.00 6.00 10 1.00 12.00 0.00 12.00 1.00 12.00 0.00 12 213.00 153.00 366.00 List Process Index Reviews 3D Model and Constructability Review Discipline Grand Total Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED PROJECT JONES CREEK GAS EXPORT PROJECT DEPARTMENT ENGINEERING DISCIPLINE CODE 4100 R1 26.03.20 DEPARTMENT CODE 04 DURATION 8 WEEKS DISCIPLINE UNIT INSTRUMENTATION & CONTROL ENGINEERING Sub Total CONCEPTUAL DESIGN, FEED, DED Discipline Code SUMMARY SHEET REVISION No DATE Lead Engr. 4100 647.00 120.00 767.00 CONCEPTUAL DESIGN 4100 68.00 0.00 68.00 FRONT END ENGINEERING DESIGN 4100 247.00 60.00 307.00 DETAILED ENGINEERING DESIGN 4100 332.00 60.00 392.00 647.00 120.00 SCOPE OF WORK CTR Discipline Grand Total Nigerians Discipline Design Engr. 767.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE 26.03.20 DEPARTMENT ENGINEERING DURATION 8 WEEKS DISCIPLINE CODE DEPARTMENT CODE 04 DISCIPLINE UNIT 4100 ACTIVITY SCOPE: INSTRUMENTATION & CONTROL ENGINEERING CONCEPTUAL DESIGN Sub Total 10.00 Lead Engr Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Discipline Design Engr. 2.00 10.00 0.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Scope Clarifications 1.00 5.00 5 General Site Visit 3.00 33.00 Site Visit Checklist 1.00 5.00 5 Site Visit 1.00 20.00 20 Site Visit Report 1.00 8.00 Design Philosophies 1.00 10.00 Instrumentation & Control Philosophy 0.00 33.00 8 0.00 10 1.00 10.00 Studies & Report 0.00 0.00 0.00 0 Specifications 0.00 0.00 0.00 0 LISTS 0.00 0.00 0.00 0 General Layouts & Drawings 0.00 0.00 0.00 0 Meetings - Project 3.00 15.00 0.00 15 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 Discipline Grand Total 68.00 10 0.00 68.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED PROJECT JONES CREEK GAS EXPORT PROJECT DEPARTMENT ENGINEERING REVISION No DEPARTMENT CODE 04 DISCIPLINE CODE DISCIPLINE UNIT 4100 R1 DATE 26.03.20 DURATION 8 WEEKS INSTRUMENTATION & CONTROL FEED ACTIVITY SCOPE: Sub Total Lead Engr Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Discipline Design Engr 3.00 15.00 0.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Technical Query, RFIs 1.00 5.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 5 1.00 8.00 General Design Philosophies Instrumentation & Control Philosophy 15.00 0.00 8.00 0.00 20.00 1.00 8.00 2.00 20.00 Verification/Mark-up of As-Built Drawing 1.00 10.00 Input to Piping and Instrumentation Diagram (P&ID) 1.00 10.00 9.00 90.00 45.00 135.00 Pressure Instruments Datasheet 1.00 10.00 5.00 15 Flow Instruments Datasheet 1.00 10.00 5.00 15 Shutdown Valves Datasheet 1.00 10.00 5.00 15 Control Valves Datasheet 1.00 10.00 5.00 15 Pressure gauge Datasheet 1.00 10.00 5.00 15 Temperature gauge Datasheet 1.00 10.00 5.00 15 PFD's/UFD's/PID/UID's Datasheets 8 10 10 On /off Valves Datasheets 1.00 10.00 5.00 15 Restriction Orifice Datasheet 1.00 10.00 5.00 15 Breather Valve Datasheet 1.00 10.00 5.00 15 0.00 32 Studies & Report 2.00 32.00 HAZOP Study 1.00 12.00 12 SIL Report Review 1.00 20.00 20 4.00 32.00 1.00 8.00 Specifications General Instrumentation Specification 0.00 32.00 8 Instrument Cable Specifications 1.00 8.00 8 Metering System Specification 1.00 8.00 8 Control System Specification 1.00 8.00 8 LISTS 3.00 30.00 15.00 45 Instrument Index 1.00 10.00 5.00 15 I/O List 1.00 10.00 5.00 15 RAT List 1.00 10.00 5.00 15 1.00 5.00 0.00 5.00 General Layouts & Drawings Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED PROJECT JONES CREEK GAS EXPORT PROJECT DEPARTMENT ENGINEERING REVISION No DEPARTMENT CODE 04 DISCIPLINE CODE DISCIPLINE UNIT 4100 R1 DATE 26.03.20 DURATION 8 WEEKS INSTRUMENTATION & CONTROL FEED ACTIVITY SCOPE: Cable Tray Layout Diagram Meetings - Project 1.00 5.00 Discipline Design Engr Sub Total Lead Engr Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: 5 3.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 Discipline Grand Total 247.00 0.00 60.00 15 307.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED PROJECT JONES CREEK GAS EXPORT PROJECT DEPARTMENT ENGINEERING REVISION No DEPARTMENT CODE 04 DISCIPLINE CODE DISCIPLINE UNIT 4100 R1 DATE 26.03.20 DURATION 8 WEEKS INSTRUMENTATION & CONTROL DED ACTIVITY SCOPE: Sub Total Lead Engr Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Discipline Design Engr 3.00 15.00 0.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Technical Query, RFIs 1.00 5.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 5 1.00 10.00 1.00 10.00 1.00 20.00 General Design Philosophies Instrumentation & Control Philosophy PFD's/UFD's/PID/UID's Input to Piping and Instrumentation Diagram (P&ID) Datasheets 1.00 20.00 9.00 90.00 0.00 15.00 10.00 10 0.00 20.00 45.00 135.00 20 Pressure Instruments Datasheet 1.00 10.00 5.00 15 Flow Instruments Datasheet 1.00 10.00 5.00 15 Shutdown Valves Datasheet 1.00 10.00 5.00 15 Control Valves Datasheet 1.00 10.00 5.00 15 Pressure gauge Datasheet 1.00 10.00 5.00 15 Temperature gauge Datasheet 1.00 10.00 5.00 15 On /off Valves Datasheets 1.00 10.00 5.00 15 Restriction Orifice Datasheet 1.00 10.00 5.00 15 Breather Valve Datasheet Reviews 3D Model & Constructability Review SIL Report Review 1.00 10.00 5.00 15 2.00 10.00 0.00 10 1.00 12.00 12 1.00 10.00 4.00 32.00 General Instrumentation Specification 1.00 8.00 8 Specifications 10 0.00 32.00 Instrument Cable Specifications 1.00 8.00 8 Metering System Specification 1.00 8.00 8 Control System Specification 1.00 8.00 8 3.00 45.00 15.00 60 Instrument Index 1.00 15.00 5.00 20 I/O List 1.00 15.00 5.00 20 LISTS RAT List General Layouts & Drawings Cable Tray Layout Diagram 1.00 15.00 5.00 20 1.00 10.00 0.00 10.00 1.00 10.00 10 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED PROJECT JONES CREEK GAS EXPORT PROJECT DEPARTMENT ENGINEERING REVISION No DEPARTMENT CODE 04 DISCIPLINE CODE DISCIPLINE UNIT 4100 R1 DATE 26.03.20 DURATION 8 WEEKS INSTRUMENTATION & CONTROL DED ACTIVITY SCOPE: Control Valve Sizing Report Support Details Instrument Support Details Detailed Drawings Discipline Design Engr 1.00 15.00 0.00 1.00 15.00 1.00 10.00 1.00 10.00 8.00 50.00 Sub Total Lead Engr Equipment Sizing/Instrument Sizing Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: 15.00 15 0.00 10.00 10 0.00 50.00 Junction box Termination Drawings 1.00 5.00 5 Instrument Cable Routing Drawings 1.00 5.00 5 Instrument Hook up Drawings 1.00 5.00 5 Instrument Loop Drawings 1.00 5.00 5 Inter Connection Drawings 1.00 5.00 5 Cause & Effect Matrix 1.00 15.00 15 Instrument Location Diagrams 1.00 5.00 5 ESD Block Diagram 1.00 5.00 5 Material Take-Off Instrument Material Take-Off's Schedule 1.00 5.00 1.00 5.00 0.00 5.00 5 1.00 5.00 1.00 5.00 3.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 Instrument Cable Schedule Meetings - Project Discipline Grand Total 332.00 0.00 5.00 5 0.00 60.00 15 392.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 R1 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 07 DISCIPLINE CODE DISCIPLINE UNIT 4400 Nigerians Sub Total CONCEPTUAL DESIGN, FEED, DED Discipline Code SUMMARY SHEET CIVIL/ STRUCTURAL ENGINEERING Lead Engr. 4400 524.00 149.00 673.00 CONCEPTUAL DESIGN 4400 98.00 0.00 98.00 FRONT END ENGINEERING DESIGN 4400 196.00 49.00 245.00 DETAILED ENGINEERING DESIGN 4400 230.00 100.00 330.00 524.00 149.00 673.00 SCOPE OF WORK CTR Discipline Grand Total Discipline/ Design Engr. Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 R1 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 07 DISCIPLINE CODE DISCIPLINE UNIT 4400 ACTIVITY SCOPE: CIVIL/ STRUCTURAL ENGINEERING CONCEPTUAL DESIGN Site Visit Nigerians Sub Total Deliverable Type Reword to scope of Activity / Deliverables work for subsurface investigation General and Input to MDR / Schedule Preparation and Weekly updates exploratory Scope Clarifications trenching Estimated No. of Deliverables DELIVERABLES: Lead Engr. Discipline/ Design Engr. 2.00 10.00 0.00 1.00 5.00 5 1.00 5.00 5 3.00 33.00 Structural Site Visit Checklist 1.00 5.00 5 Site Visit 1.00 20.00 20 Site Visit Report 1.00 8.00 Design Philosophies 1.00 16.00 1.00 16.00 1.00 16.00 1.00 16.00 1.00 8.00 Civil/ Structural Design Philosophy Studies & Report Topographical, Geotechnical, Bathymetric and Underground Facilities Survey Report Review General Layouts & Drawings Civil/ Structural General Layout Drawings 0.00 10.00 33.00 8 0.00 16.00 16 0.00 16.00 16 0.00 8.00 0.00 15.00 1.00 8.00 3.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 Meetings - Project Discipline Grand Total 98.00 8 0.00 98.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 07 DISCIPLINE UNIT Nigerians Lead Engr. 3.00 15.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 Technical Query, RFIs 1.00 5.00 Input to Final Design Dossiers & Close-out Report 1.00 5.00 1.00 8.00 Civil/ Structural Design Philosophy 1.00 8.00 9.00 44.00 Bearing Capacity Calculation Report 1.00 6.00 Pipe Support Calculation Report 1.00 6.00 Pipe Racks/ Sleepers Structural Analysis and Design 1.00 6.00 Pipe Racks/ Sleepers Foundation Analysis and Design 1.00 6.00 Pig Launcher/ Reciever Foundation Design Calculations 1.00 6.00 Drain Pit Structural Analysis and Design 1.00 6.00 Gas Metering Skid Foundation Design Calculations 1.00 6.00 Structural Design of Cable Tray Support 1.00 1.00 Structural Design of Cable Tray Support Foundation 1.00 Studies & Report Specifications Specification for Structural Steelworks and Fabrication Specification for Concrete Works General Specification for Foundations Specification for General Earthworks Discipline/ Design Engr. Sub Total Deliverable Type Activity / Deliverables Design Philosophies No drain pit required. gas is reasonably dehydrated and scrubbed off condensates at compressor's downstream CIVIL/ STRUCTURAL ENGINEERING FEED Estimated No. of Deliverables Not required. Bearing capacity of DISCIPLINE CODE 4400 soil carrying specific foundationACTIVITY to be SCOPE: calculatedDELIVERABLES: in the course of the foundation design and reported thereGeneral of R1 0.00 15.00 Not required. Pipe 5 supports are to be designed 5or integrity of existing5 are to be 0.00 8.00 confirmed via structural 8verification 42.00 86.00 analysis if piping is 6 to follow existing 6 installed racks for 6 gas lifting 6 6 14.00 20 14.00 15 6 14.00 15 No pigging 20.00 0.00 equipment is20.00 required 4.00 4 1.00 5.00 1.00 not required. This is a brown1.00field 4.00 4 1.00 4.00 4 1.00 4.00 4 Specification for Site Preparation 1.00 4.00 General Layouts & Detailed Drawings 17.00 62.00 Concrete General Note and Abbreviations 1.00 2.00 2 Structural Steelwork General Notes and Abbreviations 1.00 2.00 2 Civil/ Structural General Plot Plans 1.00 2.00 2 Pipe Racks/ Sleepers Structural Framing Plans 1.00 Pipe Racks/ Sleepers Foundation Plans 1.00 Pig Launcher/ Reciever Foundation Plans 1.00 Pig Launcher/ Reciever Monorail Structural Plan 1.00 Drain Pit Plans 1.00 Gas Metering Skid Foundation Plan 4 7.00 2.00 One structural 2.00 general notes is 2.00 satisfactory to 2.00 1.00 cover both 2.00 1.00 No piperacks 2.00 are required but pipe supports. 2.00 69.00 2 2 2 3 4 2 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 R1 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 07 DISCIPLINE CODE DISCIPLINE UNIT 4400 ACTIVITY SCOPE: CIVIL/ STRUCTURAL ENGINEERING FEED Nigerians Lead Engr. Discipline/ Design Engr. Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Cable Tray Support Plan 1.00 2.00 2.00 4 Cable Tray Foundation Plans 1.00 2.00 2.00 4 Pipe Support General Arrangment Plan 1.00 2.00 2 Pipe Support -Steel Framing & Foundation Plans 1.00 2.00 2 Demolition/ Modification Drawings 1.00 4.00 4 Verification/ Mark-up of As-built Drawings 1.00 8.00 1.00 12.00 1.00 12.00 Reviews HAZOP Study Requisition and Material Take Off 8 0.00 12.00 12 2.00 20.00 Structural Bulk Material Take Off 1.00 14.00 14 Structural Bar Bending Schedule 1.00 6.00 6 3.00 15.00 Meetings - Project 0.00 0.00 20.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 Discipline Grand Total 196.00 Bar bending schedules are captured during detailed engineering and not FEED Not required for 245.00structures 5 49.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 R1 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 07 DISCIPLINE CODE DISCIPLINE UNIT 4400 ACTIVITY SCOPE: CIVIL/ STRUCTURAL ENGINEERING DED Nigerians Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Lead Engr. Discipline/ Design Engr. 3.00 15.00 0.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Technical Query, RFIs 1.00 5.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 5 1.00 4.00 1.00 4.00 8.00 44.00 56.00 100.00 Pipe Support Calculation Report 1.00 6.00 8.00 14 Pipe Racks/ Sleepers Structural Analysis and Design 1.00 6.00 6 Pipe Racks/ Sleepers Foundation Analysis and Design 1.00 6.00 6 Pig Launcher/ Reciever Foundation Design Calculations 1.00 6.00 Drain Pit Structural Analysis and Design 1.00 6.00 Gas Metering Skid Foundation Design Calculations 1.00 10.00 Structural Design of Cable Tray Support 1.00 2.00 16.00 18 Structural Design of Cable Tray Support Foundation 1.00 2.00 16.00 18 0.00 10.00 General Design Philosophies Civil/ Structural Design Philosophy Studies & Report Specifications 0.00 15.00 4.00 4 6 16.00 22 10 5.00 10.00 Specification for Structural Steelworks and Fabrication 1.00 2.00 2 Specification for Concrete Works 1.00 2.00 2 General Specification for Foundations 1.00 2.00 2 Specification for General Earthworks 1.00 2.00 2 Specification for Site Preparation General Layouts & Detailed Drawings Merge these2.00two to 18.00 64.00 8.00 General notes 1.00 2 72.00 Concrete General Note and Abbreviations 1.00 4.00 4 Structural Steelwork General Notes and Abbreviations 1.00 4.00 4 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 R1 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 07 DISCIPLINE CODE DISCIPLINE UNIT 4400 ACTIVITY SCOPE: CIVIL/ STRUCTURAL ENGINEERING DED Lead Engr. Discipline/ Design Engr. Sub Total Nigerians Civil/ Structural General Plot Plans 1.00 2.00 2 Pipe Racks/ Sleepers Structural Framing Plans and Elevations 1.00 2.00 2 Pipe Racks/ Sleepers Foundation Plans, Elevations and Details 1.00 2.00 2 Pig Launcher/ Reciever Foundation Plans 1.00 2.00 2 Pig Launcher/ Reciever Sections and Details 1.00 2.00 2 Pig Launcher/ Reciever Monorail Structural Details 1.00 Gas Metering Skid Foundation Sections and Details remove all 1.00 2.00 2.00 these and include 1.00 structural 2.00 1.00 2.00 connection designs Cable Tray Support Plan 1.00 2.00 2.00 4 1.00 2.00 2.00 4 2.00 4 Drain Pit Sections and Details Gas Metering Skid Foundation Plan Include pipeline marker details, pipeline warning sign details, typical details - existing pipeline crossing & Typical details existing buried cable crossing Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Cable Tray Support Structural Details Cable Tray Foundation Plans, Sections and Details Pipe Support General Arrangment Plan Pipe Support -Steel Framing Plans & Foundations, Sections and Details Demolition/ Modification Drawings Verification/ Mark-up of As-built Drawings Requisition and Material Take Off Requisition for Bolts Requisition for Gratings 2.00 include pipeline 1.00 2.00 concrete weight 1.00 4.00 coating details, 1.00 4 2 2 4 4.00 If there1.00are no 8.00 access1.00platforms to 16.00 be designed, this 30.00 5.00 would 1.00 not be 2.00 required 1.00 2.00 2 4 8 16 36.00 66.00 8.00 10 8.00 10 Requisition for Structural Steel Sections and Plates 1.00 2.00 8.00 10 Structural Bulk Material Take Off 1.00 16.00 6.00 22 Structural Bar Bending Schedule 1.00 8.00 6.00 14 5.00 47.00 0.00 47.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 1.00 16.00 1.00 16.00 Meetings - Project Meetings - Project 3D Model and Constructability Review Discipline Grand Total 230.00 0.00 16.00 16 100.00 330.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE 26.03.20 DEPARTMENT ENGINEERING DURATION 8 WEEKS DEPARTMENT CODE 04 DISCIPLINE CODE DISCIPLINE UNIT 4700 Sub Total CONCEPTUAL DESIGN, FEED, DED Discipline Code SUMMARY SHEET PIPING/MECHANICAL ENGINEERING Lead Engr. Discipline/Design Engr. 4700 387.00 95.00 482.00 CONCEPTUAL DESIGN 4700 70.00 0.00 70.00 FRONT END ENGINEERING DESIGN 4700 110.00 35.00 145.00 DETAILED ENGINEERING DESIGN 4700 207.00 60.00 267.00 387.00 95.00 482.00 SCOPE OF WORK CTR Discipline Grand Total Nigerians Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE 26.03.20 DEPARTMENT ENGINEERING DURATION 8 WEEKS DEPARTMENT CODE 04 DISCIPLINE CODE DISCIPLINE UNIT 4700 ACTIVITY SCOPE: PIPING/MECHANICAL ENGINEERING CONCEPTUAL DESIGN General Discipline/Design Engr. Sub Total Lead Engr Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: 2.00 6.00 6.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 3.00 3 Scope Clarifications 1.00 3.00 3 3.00 33.00 33.00 Site Visit Checklist 1.00 5.00 5 Site Visit 1.00 20.00 20 Site Visit Report 1.00 8.00 8 Design Philosophies 1.00 6.00 6 1.00 6.00 6 Studies & Report 0.00 0.00 0 Specifications 0.00 0.00 0.00 0 LISTS 1.00 5.00 0.00 5 1.00 5.00 1.00 5.00 2D Plot Plan 1.00 5.00 Meetings - Project 3.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 Site Visit Piping Design philosophy Preliminary Valve List General Layouts & Drawings Discipline Grand Total 70.00 5 0.00 5 5 0.00 0.00 15 70.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE 26.03.20 DEPARTMENT ENGINEERING DURATION 8 WEEKS DEPARTMENT CODE 04 DISCIPLINE CODE DISCIPLINE UNIT 4700 ACTIVITY SCOPE: PIPING/MECHANICAL ENGINERING FEED General Discipline/DesignE ngr Sub Total Lead Engr Activity / Deliverables Deliverable Type Estimated No. of Deliverables DELIVERABLES: 3.00 15.00 15 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5.00 Technical Query - RFI 1.00 5.00 5.00 Input to Final Design Dossiers & Close-out Report 1.00 5.00 5.00 1.00 5.00 1.00 5.00 2.00 20.00 Verification/Mark-up of As-Built Drawing 1.00 10.00 10 Demolition/Modification Drawing 1.00 10.00 10 1.00 0.00 Design Philosophies Piping Design philosophy Drawings Datasheets 0.00 5.00 0.00 0.00 1.00 Studies & Report 5.00 20 0.00 0 1.00 12.00 1.00 12.00 1.00 18.00 30.00 48.00 Manual Valve Specification 1.00 6.00 10.00 16 Piping Material Specification 1.00 6.00 10.00 16 1.00 6.00 10.00 16 1.00 5.00 5.00 10 1.00 5.00 5.00 10 2.00 20.00 0.00 20.00 2D Plot Plan 1.00 5.00 5 3D Plot Plan 1.00 15.00 15 Meetings - Project 3.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 HAZOP Study Specifications Metering System Specification LISTS Valve List General Layouts & Drawings Discipline Grand Total Include piping general arrangement drawings and sections which is to be captured in FEED 110.00 0.00 12 12 0.00 35.00 15 145.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE 26.03.20 DEPARTMENT ENGINEERING DURATION 8 WEEKS DEPARTMENT CODE 04 DISCIPLINE CODE DISCIPLINE UNIT 4700 ACTIVITY SCOPE: PIPING/MECHANICAL ENGINEERING DED Nigerians Sub Total Activity / Deliverables Deliverable Type Estimated No. of Deliverables DELIVERABLES: Lead Engr. Discipline/Design Engr. 3.00 15.00 0.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Technical Query - RFI 1.00 5.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 5 1.00 5.00 1.00 5.00 1.00 10.00 1.00 10.00 0.00 0.00 0.00 0 1.00 10.00 20.00 30.00 5.00 10.00 15 5.00 10.00 15 60.00 0.00 60 General Design Philosophies Piping Design philosophy Drawings Demolition/Modification Drawing Equipment Sizing Datasheets Not required as a piping stress 1.00 analysis would determine the 1.00 suitability of the selected pipe 2.00 schedule Datasheet for Valves Datasheet for Flanges Studies & Report 0.00 15 5 5 0.00 10 10 Pipe Stress Analysis Calculation and Report 1.00 30.00 30 Piping Design (Wall Thickness Calculation) and Report 1.00 30.00 30 3.00 15.00 30.00 45.00 Manual Valve Specification 1.00 5.00 10.00 15 Piping Material Specification 1.00 5.00 10.00 15 Metering System Specification 1.00 5.00 10.00 15 2.00 25.00 10.00 35 Piping MTO 1.00 20.00 0.00 20 Valve List 1.00 5.00 10.00 15 5.00 55.00 0.00 55.00 Specifications LISTS General Layouts & Drawings Include piping tie-in list Vendor package 3D Plot Plan 1.00 15.00 15 Piping General Arrangement Drawings 1.00 10.00 10 Piping Isometric Drawing 1.00 10.00 10 2D Plot Plan 1.00 5.00 5 Metering Skid General Arrangement Drawing 1.00 15.00 15 1.00 12.00 0.00 12 1.00 12.00 0.00 12 207.00 60.00 267.00 Reviews 3D Model Constructability Review Discipline Grand Total Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 R1 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 Nigerians Sub Total CONCEPTUAL DESIGN, FEED, DED Discipline Code SUMMARY SHEET PIPELINE ENGINEERING Lead Engr. 4500 300.00 234.00 CONCEPTUAL DESIGN 4500 63.00 12.00 75.00 FRONT END ENGINEERING DESIGN 4500 95.00 81.00 176.00 DETAILED ENGINEERING DESIGN 4500 142.00 141.00 283.00 300.00 234.00 534.00 SCOPE OF WORK CTR Discipline Grand Total Discipline Engr. 534.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 ACTIVITY SCOPE: PIPELINE ENGINEERING CONCEPTUAL DESIGN General Nigerians Lead Engr. Discipline Engr. 0.00 Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: 2.00 10.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Scope Clarifications 1.00 5.00 5 3.00 33.00 Site Visit 0.00 10.00 33.00 Site Visit Checklist 1.00 5.00 5 Site Visit 1.00 20.00 20 Site Visit Report 1.00 8.00 8 General Layouts & Drawings 1.00 5.00 12.00 17.00 1.00 5.00 12.00 17 0.00 15.00 General Layouts Route Map Meetings - Project 3.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 Discipline Grand Total 63.00 12.00 75.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 26:03:2020 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 ACTIVITY SCOPE: PIPELINE ENGINEERING FEED General Nigerians Lead Engr. Discipline Engr. 0.00 Sub Total Activity / Deliverables Deliverable Type Estimated No. of Deliverables DELIVERABLES: 3.00 15.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Technical Query, RFIs 1.00 5.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 5 1.00 4.00 6.00 10.00 1.00 4.00 6.00 10 1.00 2.00 10.00 12.00 1.00 2.00 10.00 12 7.00 28.00 28.00 56.00 1.00 4.00 4.00 8 1.00 4.00 4.00 8 4.00 4.00 8 4.00 4.00 8 4.00 4.00 8 4.00 4.00 8 Datasheets Valve Datasheets Design Philosophies Pipeline Design Philosophy Studies & Report Pipeline Wall Thickness Calculation Report Pipeline Route Verification Report Pipeline Expansion Analysis Report Cathodic Protection Design Report Pipeline Corrosion Inhibitor Selection Report Corrosion Control Study/Report Include pipeline 1.00 on-bottom stability 1.00 analysis as well as 1.00 pipeline alignment 1.00 sheets Pipeline Corrosion Assessment & Management Report Lists Valve List Schedules Tie-In Schedules 15.00 1.00 4.00 4.00 8 1.00 6.00 10.00 16.00 1.00 6.00 10.00 16 1.00 3.00 7.00 10.00 1.00 3.00 7.00 10 2.00 10.00 20.00 30.00 Pipeline Route Map 1.00 5.00 10.00 15 General Layouts Route Map 1.00 5.00 10.00 15 1.00 12.00 0.00 12.00 1.00 12.00 3.00 15.00 0.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 General Layouts & Detailed Drawings Reviews HAZOP Study Meetings - Project Discipline Grand Total 95.00 12 81.00 176.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE: DEPARTMENT ENGINEERING 26:03:2020 DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 ACTIVITY SCOPE: PIPELINE ENGINEERING DED General Nigerians Lead Engr. Discipline Engr. 0.00 Sub Total Activity / Deliverables Deliverable Type Estimated No. of Deliverables DELIVERABLES: 3.00 15.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Technical Query, RFIs 1.00 5.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 5 1.00 10.00 1.00 10.00 2.00 6.00 Pipeline Design Philosophy 1.00 3.00 3 Welding & NDT Philosophy 1.00 3.00 3 Datasheets Valve Datasheets Design Philosophies 9.00 Include pipeline on-bottom 1.00 stability analysis 1.00 Studies & Report 3D Plant Model Review Pipeline Design Basis 0.00 15.00 10.00 10 0.00 6.00 36.00 45.00 81.00 4.00 5.00 9 4.00 5.00 9 Pipeline Wall Thickness Calculation Report 1.00 4.00 5.00 9 Pipeline Route Verification Report 1.00 4.00 5.00 9 Pipeline Expansion Analysis Report 1.00 4.00 5.00 9 Cathodic Protection Design Report 1.00 4.00 5.00 9 Pipeline Corrosion Inhibitor Selection Report 1.00 4.00 5.00 9 Corrosion Control Study/Report 1.00 4.00 5.00 9 Pipeline Corrosion Assessment & Management Report 1.00 4.00 5.00 9 13.00 26.00 52.00 78.00 1.00 2.00 4.00 6 1.00 2.00 4.00 6 Conrete Weight Coating for Pipelines Specification 1.00 2.00 4.00 6 Specification for Seamweld Line Pipe 1.00 2.00 4.00 6 2.00 4.00 6 2.00 4.00 6 1.00 2.00 4.00 6 this is repeated 1.00 1.00 twice 2.00 4.00 6 2.00 4.00 6 1.00 2.00 4.00 6 Specifications Pipeline material specification Flanges and fittings specifications Welding Specification Field Joint Coating Specification Isolating Joint Specification Structural Coating Specification Pipeline Coating Specification Cathodic Protection Design Report captured in welding specification structural coating1.00 not required 1.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE: DEPARTMENT ENGINEERING 26:03:2020 DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 ACTIVITY SCOPE: PIPELINE ENGINEERING DED Nigerians Lead Engr. Discipline Engr. Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Pipeline Corrosion Inhibitor Selection Report 1.00 2.00 4.00 6 Corrosion Control Study/Report 1.00 2.00 4.00 6 Pipeline Corrosion Assessment & Management Report 1.00 2.00 4.00 6 1.00 2.00 8.00 10.00 1.00 2.00 8.00 10 1.00 2.00 8.00 10.00 1.00 2.00 8.00 10 7.00 14.00 28.00 42.00 Pipeline Alignment Drawing 1.00 2.00 4.00 6 Pipeline Field Joint Coating Drawing 1.00 2.00 4.00 6 Tie-in Spools General Arrangement 1.00 2.00 4.00 6 Tie-in Spools Details Drawing 1.00 2.00 4.00 6 Tie-in Spools Isometric/Spools Isometric 1.00 2.00 4.00 6 Pipeline Route Map 1.00 2.00 4.00 6 General Layouts Route Map 1.00 2.00 4.00 6 3.00 15.00 0.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 1.00 16.00 1.00 16.00 Lists Valve List Schedules Tie-In Schedules General Layouts & Detailed Drawings sheets Meetings - Project Meetings - Project 3D Model and Constructability Review Discipline Grand Total 142.00 5 0.00 16.00 16 141.00 283.00