Uploaded by onuoha.mary10

JONES CREEK GAS EXPORT PROJECT CTR comments

advertisement
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
DATE: 26-03-2020
PROJECT
JONES CREEK GAS EXPORT PROJECT
DURATION: 8weeks
DEPARTMENT
ENGINEERING
Revise costs in
table in line with
comments within
DEPARTMENT CODE
DISCIPLINE UNIT
08
SCOPE OF WORK
Nigerians
Lead Engr (hr)
CTR
Lead Engr.($/hr)
Discipline
Desgin Engr.
(hr)
$279,840.00
Discipline
Design Engr.
($/hr)
Sub Total
CONCEPTUAL DESIGN, FEED, DED
Discipline Code
SUMMARY SHEET
ENGINEERING
$71,360.00
PROCESS ENGINEERING
4200
474.00
120.00
294.00
80.00
$80,400.00
CIVIL/STRUCTURAL ENGINEERING
4400
524.00
120.00
149.00
80.00
$74,800.00
MECHANICAL/PIPING ENGINEERING
4700
387.00
120.00
95.00
80.00
$54,040.00
PIPELINE ENGINEERING
4500
300.00
120.00
234.00
80.00
$54,720.00
INSTRUMENTATION & CONTROL ENGINEERING
4100
647.00
120.00
120.00
80.00
$87,240.00
Engineering Grand Total
($ 279,840.00)
$71,360.00 $351,200.00
TECHNICAL NOTES
(1)Engineering Design and Project Management services shall be carried out to meet project schedule and cost. Project shall be executed in line with Clientapproved codes and standards.
(2) Client shall be responsible for providing as-built drawings/specifications/data sheets/lists and relevant information/data of the facility.
(3) Upon approval of the CTR, the Client shall issue Purchase Order (PO) or Work Order (WO).
(4) Client shall be responsible for site logistics, security and community FTO.
(5) The Lumpsum price are applicable to the SOW and excludes VAT and WHT.
(6) Contractor quote excludes Geotechnical and underground survey cost. As it is assumed that the project geotechnical report is available.
PAYMENT MILESTONES
15% upon issuance of Service Order or Work Order
25% at Conceptual Desiign Delivery
20% at Front End Engineering Design
30% at Detailed Engineering Design
10% Project Closeout
ID
Start
Finish
Duration
Complete
1/4/2020
JONES CREEK GAS EXPORT
PROJECT
1/4/2020
1
Contract Award
1/4/2020
1/4/2020
1.0 d.
0%
2
Project Kick-Off Meeting
2/4/2020
2/4/2020
1.0 d.
0%
3
Sites Visit / Mobilization
6/4/2020
10/4/2020
5.0 d.
0%
4
Engineering
13/4/2020
30/6/2020
57.0 d.
0%
13/4/2020
24/4/2020
10.0 d.
0%
21/4/2020
8/6/2020
35.0 d.
0.0%
5
6
Conceptual Design
Front End Engineering Design
7
Detailed Engineering Design
28/4/2020
26/6/2020
44.0 d.
0%
8
DED Closeout
29/6/2020
30/6/2020
2.0 d.
0%
4/4/2020
11/4/2020
1/5/2020
18/4/2020
25/4/2020
2/5/2020
9/5/2020
16/5/2020
1/6/2020
23/5/2020
30/5/2020
6/6/2020
13/6/2020
20/6/2020
27/6/2020
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
DEPARTMENT
ENGINEERING
DURATION WEEKS:
8 WEEKS
DEPARTMENT CODE 10
SCOPE OF WORK
CTR
Nigerians
Lead Engr.
Discipline Design
Engr.
Sub Total
CONCEPTUAL DESIGN, FEED, DED
Discipline
Code
SUMMARY SHEET
2332.00
892.00
3224.00
PROCESS ENGINEERING
4200
474.00
294.00
768.00
CIVIL/STRUCTURAL ENGINEERING
4400
524.00
149.00
673.00
MECHANICAL/PIPING ENGINEERING
4700
387.00
95.00
482.00
PIPELINE ENGINEERING
4500
300.00
234.00
534.00
INSTRUMENTATION & CONTROL ENGINEERING
4100
647.00
120.00
767.00
2332.00
892.00
3,224.00
Engineering Grand Total
Cost, Time and Resource Analysis
REVISION No.:
R1
CLIENT
NECONDE ENERGY LIMITED
DATE:
26:03:2020
PROJECT
JONES CREEK GAS EXPORT PROJECT
DURATION WEEKS:
8 WEEKS
DEPARTMENT
ENGINEERING
DEPARTMENT CODE 10
DISCIPLINE CODE
DISCIPLINE UNIT
4200
CONCEPTUAL DESIGN, FEED, DED
Nigerians
Lead Engr.
4200
474.00
294.00
768.00
CONCEPTUAL DESIGN
4200
63.00
0.00
63.00
FRONT END ENGINEERING DESIGN
4200
198.00
141.00
339.00
DETAILED ENGINEERING DESIGN
4200
213.00
153.00
366.00
474.00
294.00
768.00
SCOPE OF WORK
CTR
Discipline Grand Total
Discipline Design
Engr.
Sub Total
Discipline
Code
SUMMARY SHEET
PROCESS
ENGINEERING
Cost, Time and Resource Analysis
REVISION No.:
R1
CLIENT
NECONDE ENERGY LIMITED
DATE:
26:03:2020
PROJECT
JONES CREEK GAS EXPORT PROJECT
DURATION WEEKS:
8 WEEKS
DEPARTMENT
ENGINEERING
DISCIPLINE CODE
DISCIPLINE UNIT
4200
ACTIVITY SCOPE:
DEPARTMENT CODE 10
PROCESS
ENGINEERING
CONCEPTUAL DESIGN
Nigerians
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Lead Engr.
Discipline Design
Engr.
2.00
14.00
0.00
14.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
0.00
5
Scope Clarifications
1.00
9.00
0.00
9
3.00
33.00
0.00
33.00
Site Visit Checklist
1.00
5.00
0.00
5.00
Site Visit
1.00
20.00
0.00
20.00
Site Visit Report
1.00
8.00
0.00
8.00
2.00
16.00
0.00
16.00
Block Flow Diagram
1.00
8.00
0.00
8
Process Flow Diagram
1.00
8.00
0.00
8
63.00
0.00
63.00
General
Site Visit
Process Diagram
Discipline Grand Total
Cost, Time and Resource Analysis
REVISION No.:
CLIENT
NECONDE ENERGY LIMITED
PROJECT
JONES CREEK GAS EXPORT PROJECT
DEPARTMENT
ENGINEERING
DISCIPLINE CODE
26:03:2020
DURATION WEEKS:
8 WEEKS
DEPARTMENT CODE 10
DISCIPLINE UNIT
4200
ACTIVITY SCOPE:
R1
DATE:
PROCESS
ENGINEERING
FRONT END ENGINEERING DESIGN (FEED)
Sub Total
Nigerians
Lead Engr.
Discipline Design
Engr.
3.00
15.00
0.00
15.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
0.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
0.00
5
Technical Query , RFIs
1.00
5.00
0.00
5
8.00
60.00
35.00
95.00
Process Flow Diagrams (PFDs)
1.00
8.00
4.00
12
Piping and Instrumentation Diagrams (P&ID)
1.00
8.00
4.00
12
Utility Flow Diagrams (UFDs)
1.00
8.00
4.00
12
Safe Chart
1.00
8.00
4.00
12
Legend and Symbols
1.00
5.00
4.00
9
P&ID - Pig Receiver
1.00
8.00
5.00
13
P&ID - Pig Launcher
1.00
8.00
5.00
13
P&ID - Gas Metering System
1.00
7.00
5.00
12
2.00
10.00
16.00
26.00
Line Sizing
1.00
5.00
8.00
13
Relief and Blowdown Sizing and Calculations
1.00
5.00
8.00
13
2.00
10.00
16.00
26.00
PED - Design & Operating Conditions
1.00
5.00
8.00
13
PED - Isolation, Relief & Blowdown
1.00
5.00
8.00
13
3.00
21.00
30.00
51.00
Blowdown Philosophy
1.00
7.00
10.00
17
Startup Philosophy
1.00
7.00
10.00
17
Isolation Philosophy
1.00
7.00
10.00
17
8.00
78.00
38.00
116.00
Process Design Basis
1.00
7.00
10.00
17
Heat and Material Balance Report
1.00
6.00
6.00
12
Utility Balance Report
1.00
6.00
6.00
12
Process Simulation Report
1.00
6.00
8.00
14
Line Sizing Report
1.00
6.00
8.00
14
Flow Assurance Report
1.00
25.00
0.00
25
HAZOP Study
1.00
12.00
0.00
12
HAZOP Close-out Report
1.00
10.00
0.00
10
1.00
4.00
6.00
10.00
1.00
4.00
6.00
10
198.00
141.00
339.00
General
No pig traps are
required
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
PFD's/UFD's/PID
Line Sizing
Datasheets
Design Philosophies
Studies & Report
List
Process Index
Discipline Grand Total
Cost, Time and Resource Analysis
REVISION No.:
R1
CLIENT
NECONDE ENERGY LIMITED
DATE:
26:03:2020
PROJECT
JONES CREEK GAS EXPORT PROJECT
DURATION WEEKS:
8 WEEKS
DEPARTMENT
ENGINEERING
DISCIPLINE CODE
DEPARTMENT CODE 10
DISCIPLINE UNIT
4200
ACTIVITY SCOPE:
PROCESS
ENGINEERING
DETAILED ENGINEERING DESIGN (DED)
Nigerians
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Lead Engr.
Discipline Design
Engr.
3.00
15.00
0.00
15.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
0.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
0.00
5
Technical Query , RFIs
1.00
5.00
0.00
5
80.00
43.00
123.00
10.00
5.00
15
General
PFD's/UFD's/PID
8.00
Not required per
contract scope
Process Flow Diagrams (PFDs)
1.00
Piping and Instrumentation Diagrams (P&ID)
1.00
10.00
5.00
15
Utility Flow Diagrams (UFDs)
1.00
10.00
5.00
15
Safe Chart
1.00
10.00
5.00
15
Legend and Symbols
1.00
10.00
5.00
15
P&ID - Pig Receiver
1.00
10.00
6.00
16
P&ID - Pig Launcher
1.00
10.00
6.00
16
P&ID - Gas Metering System
1.00
10.00
6.00
16
2.00
12.00
20.00
32.00
Line Sizing
1.00
6.00
10.00
16
Relief and Blowdown Sizing and Calculations
1.00
6.00
10.00
16
2.00
10.00
16.00
26.00
PED - Design & Operating Conditions
1.00
5.00
8.00
13
PED - Isolation, Relief & Blowdown
1.00
5.00
8.00
13
Line Sizing
Datasheets
Design Philosophies
3.00
24.00
30.00
54.00
Blowdown Philosophy
1.00
8.00
10.00
18
Startup Philosophy
1.00
8.00
10.00
18
Isolation Philosophy
1.00
8.00
10.00
18
Studies & Report
6.00
56.00
38.00
94.00
Process Design Basis
1.00
7.00
10.00
17
Heat and Material Balance Report
1.00
6.00
6.00
12
Utility Balance Report
1.00
6.00
6.00
12
Process Simulation Report
1.00
6.00
8.00
14
Line Sizing Report
1.00
6.00
8.00
14
Flow Assurance Report
1.00
25.00
0.00
25
1.00
4.00
6.00
10.00
1.00
4.00
6.00
10
1.00
12.00
0.00
12.00
1.00
12.00
0.00
12
213.00
153.00
366.00
List
Process Index
Reviews
3D Model and Constructability Review
Discipline Grand Total
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
PROJECT
JONES CREEK GAS EXPORT PROJECT
DEPARTMENT
ENGINEERING
DISCIPLINE CODE
4100
R1
26.03.20
DEPARTMENT CODE 04
DURATION
8 WEEKS
DISCIPLINE UNIT
INSTRUMENTATION &
CONTROL ENGINEERING
Sub Total
CONCEPTUAL DESIGN, FEED, DED
Discipline
Code
SUMMARY SHEET
REVISION No
DATE
Lead Engr.
4100
647.00
120.00
767.00
CONCEPTUAL DESIGN
4100
68.00
0.00
68.00
FRONT END ENGINEERING DESIGN
4100
247.00
60.00
307.00
DETAILED ENGINEERING DESIGN
4100
332.00
60.00
392.00
647.00
120.00
SCOPE OF WORK
CTR
Discipline Grand Total
Nigerians
Discipline Design
Engr.
767.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No
R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE
26.03.20
DEPARTMENT
ENGINEERING
DURATION
8 WEEKS
DISCIPLINE CODE
DEPARTMENT CODE 04
DISCIPLINE UNIT
4100
ACTIVITY SCOPE:
INSTRUMENTATION &
CONTROL ENGINEERING
CONCEPTUAL DESIGN
Sub Total
10.00
Lead
Engr
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Discipline Design
Engr.
2.00
10.00
0.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Scope Clarifications
1.00
5.00
5
General
Site Visit
3.00
33.00
Site Visit Checklist
1.00
5.00
5
Site Visit
1.00
20.00
20
Site Visit Report
1.00
8.00
Design Philosophies
1.00
10.00
Instrumentation & Control Philosophy
0.00
33.00
8
0.00
10
1.00
10.00
Studies & Report
0.00
0.00
0.00
0
Specifications
0.00
0.00
0.00
0
LISTS
0.00
0.00
0.00
0
General Layouts & Drawings
0.00
0.00
0.00
0
Meetings - Project
3.00
15.00
0.00
15
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
Discipline Grand Total
68.00
10
0.00
68.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
PROJECT
JONES CREEK GAS EXPORT PROJECT
DEPARTMENT
ENGINEERING
REVISION No
DEPARTMENT CODE 04
DISCIPLINE CODE
DISCIPLINE UNIT
4100
R1
DATE
26.03.20
DURATION
8 WEEKS
INSTRUMENTATION &
CONTROL
FEED
ACTIVITY SCOPE:
Sub Total
Lead
Engr
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Discipline Design
Engr
3.00
15.00
0.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Technical Query, RFIs
1.00
5.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
5
1.00
8.00
General
Design Philosophies
Instrumentation & Control Philosophy
15.00
0.00
8.00
0.00
20.00
1.00
8.00
2.00
20.00
Verification/Mark-up of As-Built Drawing
1.00
10.00
Input to Piping and Instrumentation Diagram (P&ID)
1.00
10.00
9.00
90.00
45.00
135.00
Pressure Instruments Datasheet
1.00
10.00
5.00
15
Flow Instruments Datasheet
1.00
10.00
5.00
15
Shutdown Valves Datasheet
1.00
10.00
5.00
15
Control Valves Datasheet
1.00
10.00
5.00
15
Pressure gauge Datasheet
1.00
10.00
5.00
15
Temperature gauge Datasheet
1.00
10.00
5.00
15
PFD's/UFD's/PID/UID's
Datasheets
8
10
10
On /off Valves Datasheets
1.00
10.00
5.00
15
Restriction Orifice Datasheet
1.00
10.00
5.00
15
Breather Valve Datasheet
1.00
10.00
5.00
15
0.00
32
Studies & Report
2.00
32.00
HAZOP Study
1.00
12.00
12
SIL Report Review
1.00
20.00
20
4.00
32.00
1.00
8.00
Specifications
General Instrumentation Specification
0.00
32.00
8
Instrument Cable Specifications
1.00
8.00
8
Metering System Specification
1.00
8.00
8
Control System Specification
1.00
8.00
8
LISTS
3.00
30.00
15.00
45
Instrument Index
1.00
10.00
5.00
15
I/O List
1.00
10.00
5.00
15
RAT List
1.00
10.00
5.00
15
1.00
5.00
0.00
5.00
General Layouts & Drawings
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
PROJECT
JONES CREEK GAS EXPORT PROJECT
DEPARTMENT
ENGINEERING
REVISION No
DEPARTMENT CODE 04
DISCIPLINE CODE
DISCIPLINE UNIT
4100
R1
DATE
26.03.20
DURATION
8 WEEKS
INSTRUMENTATION &
CONTROL
FEED
ACTIVITY SCOPE:
Cable Tray Layout Diagram
Meetings - Project
1.00
5.00
Discipline Design
Engr
Sub Total
Lead
Engr
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
5
3.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
Discipline Grand Total
247.00
0.00
60.00
15
307.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
PROJECT
JONES CREEK GAS EXPORT PROJECT
DEPARTMENT
ENGINEERING
REVISION No
DEPARTMENT CODE 04
DISCIPLINE CODE
DISCIPLINE UNIT
4100
R1
DATE
26.03.20
DURATION
8 WEEKS
INSTRUMENTATION &
CONTROL
DED
ACTIVITY SCOPE:
Sub Total
Lead
Engr
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Discipline Design
Engr
3.00
15.00
0.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Technical Query, RFIs
1.00
5.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
5
1.00
10.00
1.00
10.00
1.00
20.00
General
Design Philosophies
Instrumentation & Control Philosophy
PFD's/UFD's/PID/UID's
Input to Piping and Instrumentation Diagram (P&ID)
Datasheets
1.00
20.00
9.00
90.00
0.00
15.00
10.00
10
0.00
20.00
45.00
135.00
20
Pressure Instruments Datasheet
1.00
10.00
5.00
15
Flow Instruments Datasheet
1.00
10.00
5.00
15
Shutdown Valves Datasheet
1.00
10.00
5.00
15
Control Valves Datasheet
1.00
10.00
5.00
15
Pressure gauge Datasheet
1.00
10.00
5.00
15
Temperature gauge Datasheet
1.00
10.00
5.00
15
On /off Valves Datasheets
1.00
10.00
5.00
15
Restriction Orifice Datasheet
1.00
10.00
5.00
15
Breather Valve Datasheet
Reviews
3D Model & Constructability Review
SIL Report Review
1.00
10.00
5.00
15
2.00
10.00
0.00
10
1.00
12.00
12
1.00
10.00
4.00
32.00
General Instrumentation Specification
1.00
8.00
8
Specifications
10
0.00
32.00
Instrument Cable Specifications
1.00
8.00
8
Metering System Specification
1.00
8.00
8
Control System Specification
1.00
8.00
8
3.00
45.00
15.00
60
Instrument Index
1.00
15.00
5.00
20
I/O List
1.00
15.00
5.00
20
LISTS
RAT List
General Layouts & Drawings
Cable Tray Layout Diagram
1.00
15.00
5.00
20
1.00
10.00
0.00
10.00
1.00
10.00
10
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
PROJECT
JONES CREEK GAS EXPORT PROJECT
DEPARTMENT
ENGINEERING
REVISION No
DEPARTMENT CODE 04
DISCIPLINE CODE
DISCIPLINE UNIT
4100
R1
DATE
26.03.20
DURATION
8 WEEKS
INSTRUMENTATION &
CONTROL
DED
ACTIVITY SCOPE:
Control Valve Sizing Report
Support Details
Instrument Support Details
Detailed Drawings
Discipline Design
Engr
1.00
15.00
0.00
1.00
15.00
1.00
10.00
1.00
10.00
8.00
50.00
Sub Total
Lead
Engr
Equipment Sizing/Instrument Sizing
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
15.00
15
0.00
10.00
10
0.00
50.00
Junction box Termination Drawings
1.00
5.00
5
Instrument Cable Routing Drawings
1.00
5.00
5
Instrument Hook up Drawings
1.00
5.00
5
Instrument Loop Drawings
1.00
5.00
5
Inter Connection Drawings
1.00
5.00
5
Cause & Effect Matrix
1.00
15.00
15
Instrument Location Diagrams
1.00
5.00
5
ESD Block Diagram
1.00
5.00
5
Material Take-Off
Instrument Material Take-Off's
Schedule
1.00
5.00
1.00
5.00
0.00
5.00
5
1.00
5.00
1.00
5.00
3.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
Instrument Cable Schedule
Meetings - Project
Discipline Grand Total
332.00
0.00
5.00
5
0.00
60.00
15
392.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
R1
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 07
DISCIPLINE CODE
DISCIPLINE UNIT
4400
Nigerians
Sub Total
CONCEPTUAL DESIGN, FEED, DED
Discipline
Code
SUMMARY SHEET
CIVIL/ STRUCTURAL
ENGINEERING
Lead Engr.
4400
524.00
149.00
673.00
CONCEPTUAL DESIGN
4400
98.00
0.00
98.00
FRONT END ENGINEERING DESIGN
4400
196.00
49.00
245.00
DETAILED ENGINEERING DESIGN
4400
230.00
100.00
330.00
524.00
149.00
673.00
SCOPE OF WORK
CTR
Discipline Grand Total
Discipline/
Design Engr.
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
R1
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 07
DISCIPLINE CODE
DISCIPLINE UNIT
4400
ACTIVITY SCOPE:
CIVIL/ STRUCTURAL
ENGINEERING
CONCEPTUAL DESIGN
Site Visit
Nigerians
Sub Total
Deliverable
Type
Reword to scope of
Activity / Deliverables
work for subsurface
investigation General
and
Input to MDR / Schedule Preparation and Weekly updates
exploratory
Scope Clarifications
trenching
Estimated
No. of
Deliverables
DELIVERABLES:
Lead Engr.
Discipline/
Design
Engr.
2.00
10.00
0.00
1.00
5.00
5
1.00
5.00
5
3.00
33.00
Structural Site Visit Checklist
1.00
5.00
5
Site Visit
1.00
20.00
20
Site Visit Report
1.00
8.00
Design Philosophies
1.00
16.00
1.00
16.00
1.00
16.00
1.00
16.00
1.00
8.00
Civil/ Structural Design Philosophy
Studies & Report
Topographical, Geotechnical, Bathymetric and Underground Facilities Survey Report
Review
General Layouts & Drawings
Civil/ Structural General Layout Drawings
0.00
10.00
33.00
8
0.00
16.00
16
0.00
16.00
16
0.00
8.00
0.00
15.00
1.00
8.00
3.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
Meetings - Project
Discipline Grand Total
98.00
8
0.00
98.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 07
DISCIPLINE UNIT
Nigerians
Lead Engr.
3.00
15.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
Technical Query, RFIs
1.00
5.00
Input to Final Design Dossiers & Close-out Report
1.00
5.00
1.00
8.00
Civil/ Structural Design Philosophy
1.00
8.00
9.00
44.00
Bearing Capacity Calculation Report
1.00
6.00
Pipe Support Calculation Report
1.00
6.00
Pipe Racks/ Sleepers Structural Analysis and Design
1.00
6.00
Pipe Racks/ Sleepers Foundation Analysis and Design
1.00
6.00
Pig Launcher/ Reciever Foundation Design Calculations
1.00
6.00
Drain Pit Structural Analysis and Design
1.00
6.00
Gas Metering Skid Foundation Design Calculations
1.00
6.00
Structural Design of Cable Tray Support
1.00
1.00
Structural Design of Cable Tray Support Foundation
1.00
Studies & Report
Specifications
Specification for Structural Steelworks and Fabrication
Specification for Concrete Works
General Specification for Foundations
Specification for General Earthworks
Discipline/
Design
Engr.
Sub Total
Deliverable
Type
Activity / Deliverables
Design Philosophies
No drain pit
required. gas is
reasonably
dehydrated and
scrubbed off
condensates at
compressor's
downstream
CIVIL/ STRUCTURAL
ENGINEERING
FEED
Estimated
No. of
Deliverables
Not required.
Bearing capacity
of
DISCIPLINE CODE
4400
soil carrying specific
foundationACTIVITY
to be
SCOPE:
calculatedDELIVERABLES:
in the
course of the
foundation design
and reported thereGeneral
of
R1
0.00
15.00
Not
required.
Pipe
5
supports are to be
designed 5or integrity
of existing5 are to be
0.00
8.00
confirmed
via
structural 8verification
42.00
86.00
analysis
if piping is
6
to follow existing
6
installed racks
for
6
gas lifting
6
6
14.00
20
14.00
15
6
14.00
15
No pigging
20.00
0.00
equipment
is20.00
required
4.00
4
1.00
5.00
1.00
not required.
This
is a brown1.00field
4.00
4
1.00
4.00
4
1.00
4.00
4
Specification for Site Preparation
1.00
4.00
General Layouts & Detailed Drawings
17.00
62.00
Concrete General Note and Abbreviations
1.00
2.00
2
Structural Steelwork General Notes and Abbreviations
1.00
2.00
2
Civil/ Structural General Plot Plans
1.00
2.00
2
Pipe Racks/ Sleepers Structural Framing Plans
1.00
Pipe Racks/ Sleepers Foundation Plans
1.00
Pig Launcher/ Reciever Foundation Plans
1.00
Pig Launcher/ Reciever Monorail Structural Plan
1.00
Drain Pit Plans
1.00
Gas Metering Skid Foundation Plan
4
7.00
2.00
One structural
2.00
general notes
is
2.00
satisfactory to
2.00
1.00
cover both
2.00
1.00
No
piperacks 2.00
are
required but pipe
supports.
2.00
69.00
2
2
2
3
4
2
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
R1
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 07
DISCIPLINE CODE
DISCIPLINE UNIT
4400
ACTIVITY SCOPE:
CIVIL/ STRUCTURAL
ENGINEERING
FEED
Nigerians
Lead Engr.
Discipline/
Design
Engr.
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Cable Tray Support Plan
1.00
2.00
2.00
4
Cable Tray Foundation Plans
1.00
2.00
2.00
4
Pipe Support General Arrangment Plan
1.00
2.00
2
Pipe Support -Steel Framing & Foundation Plans
1.00
2.00
2
Demolition/ Modification Drawings
1.00
4.00
4
Verification/ Mark-up of As-built Drawings
1.00
8.00
1.00
12.00
1.00
12.00
Reviews
HAZOP Study
Requisition and Material Take Off
8
0.00
12.00
12
2.00
20.00
Structural Bulk Material Take Off
1.00
14.00
14
Structural Bar Bending Schedule
1.00
6.00
6
3.00
15.00
Meetings - Project
0.00
0.00
20.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
Discipline Grand Total
196.00
Bar bending
schedules are
captured during
detailed
engineering and
not FEED
Not required for
245.00structures
5
49.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
R1
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 07
DISCIPLINE CODE
DISCIPLINE UNIT
4400
ACTIVITY SCOPE:
CIVIL/ STRUCTURAL
ENGINEERING
DED
Nigerians
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Lead Engr.
Discipline/
Design
Engr.
3.00
15.00
0.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Technical Query, RFIs
1.00
5.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
5
1.00
4.00
1.00
4.00
8.00
44.00
56.00
100.00
Pipe Support Calculation Report
1.00
6.00
8.00
14
Pipe Racks/ Sleepers Structural Analysis and Design
1.00
6.00
6
Pipe Racks/ Sleepers Foundation Analysis and Design
1.00
6.00
6
Pig Launcher/ Reciever Foundation Design Calculations
1.00
6.00
Drain Pit Structural Analysis and Design
1.00
6.00
Gas Metering Skid Foundation Design Calculations
1.00
10.00
Structural Design of Cable Tray Support
1.00
2.00
16.00
18
Structural Design of Cable Tray Support Foundation
1.00
2.00
16.00
18
0.00
10.00
General
Design Philosophies
Civil/ Structural Design Philosophy
Studies & Report
Specifications
0.00
15.00
4.00
4
6
16.00
22
10
5.00
10.00
Specification for Structural Steelworks and Fabrication
1.00
2.00
2
Specification for Concrete Works
1.00
2.00
2
General Specification for Foundations
1.00
2.00
2
Specification for General Earthworks
1.00
2.00
2
Specification for Site Preparation
General Layouts & Detailed Drawings
Merge these2.00two to
18.00
64.00
8.00
General notes
1.00
2
72.00
Concrete General Note and Abbreviations
1.00
4.00
4
Structural Steelwork General Notes and Abbreviations
1.00
4.00
4
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
R1
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 07
DISCIPLINE CODE
DISCIPLINE UNIT
4400
ACTIVITY SCOPE:
CIVIL/ STRUCTURAL
ENGINEERING
DED
Lead Engr.
Discipline/
Design
Engr.
Sub Total
Nigerians
Civil/ Structural General Plot Plans
1.00
2.00
2
Pipe Racks/ Sleepers Structural Framing Plans and Elevations
1.00
2.00
2
Pipe Racks/ Sleepers Foundation Plans, Elevations and Details
1.00
2.00
2
Pig Launcher/ Reciever Foundation Plans
1.00
2.00
2
Pig Launcher/ Reciever Sections and Details
1.00
2.00
2
Pig Launcher/ Reciever Monorail Structural Details
1.00
Gas Metering Skid Foundation Sections and Details
remove all
1.00
2.00
2.00
these and include
1.00
structural 2.00
1.00
2.00
connection designs
Cable Tray Support Plan
1.00
2.00
2.00
4
1.00
2.00
2.00
4
2.00
4
Drain Pit Sections and Details
Gas Metering Skid Foundation Plan
Include pipeline
marker details,
pipeline warning
sign details, typical
details - existing
pipeline crossing &
Typical details existing buried
cable crossing
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Cable Tray Support Structural Details
Cable Tray Foundation Plans, Sections and Details
Pipe Support General Arrangment Plan
Pipe Support -Steel Framing Plans & Foundations, Sections and Details
Demolition/ Modification Drawings
Verification/ Mark-up of As-built Drawings
Requisition and Material Take Off
Requisition for Bolts
Requisition for Gratings
2.00
include pipeline
1.00
2.00
concrete weight
1.00
4.00
coating details,
1.00
4
2
2
4
4.00
If there1.00are no
8.00
access1.00platforms to
16.00
be designed,
this 30.00
5.00
would 1.00
not be
2.00
required
1.00
2.00
2
4
8
16
36.00
66.00
8.00
10
8.00
10
Requisition for Structural Steel Sections and Plates
1.00
2.00
8.00
10
Structural Bulk Material Take Off
1.00
16.00
6.00
22
Structural Bar Bending Schedule
1.00
8.00
6.00
14
5.00
47.00
0.00
47.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
1.00
16.00
1.00
16.00
Meetings - Project
Meetings - Project
3D Model and Constructability Review
Discipline Grand Total
230.00
0.00
16.00
16
100.00
330.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No
R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE
26.03.20
DEPARTMENT
ENGINEERING
DURATION
8 WEEKS
DEPARTMENT CODE 04
DISCIPLINE CODE
DISCIPLINE UNIT
4700
Sub Total
CONCEPTUAL DESIGN, FEED, DED
Discipline
Code
SUMMARY SHEET
PIPING/MECHANICAL
ENGINEERING
Lead Engr.
Discipline/Design
Engr.
4700
387.00
95.00
482.00
CONCEPTUAL DESIGN
4700
70.00
0.00
70.00
FRONT END ENGINEERING DESIGN
4700
110.00
35.00
145.00
DETAILED ENGINEERING DESIGN
4700
207.00
60.00
267.00
387.00
95.00
482.00
SCOPE OF WORK
CTR
Discipline Grand Total
Nigerians
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No
R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE
26.03.20
DEPARTMENT
ENGINEERING
DURATION
8 WEEKS
DEPARTMENT CODE 04
DISCIPLINE CODE
DISCIPLINE UNIT
4700
ACTIVITY SCOPE:
PIPING/MECHANICAL
ENGINEERING
CONCEPTUAL DESIGN
General
Discipline/Design
Engr.
Sub Total
Lead
Engr
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
2.00
6.00
6.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
3.00
3
Scope Clarifications
1.00
3.00
3
3.00
33.00
33.00
Site Visit Checklist
1.00
5.00
5
Site Visit
1.00
20.00
20
Site Visit Report
1.00
8.00
8
Design Philosophies
1.00
6.00
6
1.00
6.00
6
Studies & Report
0.00
0.00
0
Specifications
0.00
0.00
0.00
0
LISTS
1.00
5.00
0.00
5
1.00
5.00
1.00
5.00
2D Plot Plan
1.00
5.00
Meetings - Project
3.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
Site Visit
Piping Design philosophy
Preliminary Valve List
General Layouts & Drawings
Discipline Grand Total
70.00
5
0.00
5
5
0.00
0.00
15
70.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No
R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE
26.03.20
DEPARTMENT
ENGINEERING
DURATION
8 WEEKS
DEPARTMENT CODE 04
DISCIPLINE CODE
DISCIPLINE UNIT
4700
ACTIVITY SCOPE:
PIPING/MECHANICAL
ENGINERING
FEED
General
Discipline/DesignE
ngr
Sub Total
Lead
Engr
Activity / Deliverables
Deliverable
Type
Estimated
No. of
Deliverables
DELIVERABLES:
3.00
15.00
15
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5.00
Technical Query - RFI
1.00
5.00
5.00
Input to Final Design Dossiers & Close-out Report
1.00
5.00
5.00
1.00
5.00
1.00
5.00
2.00
20.00
Verification/Mark-up of As-Built Drawing
1.00
10.00
10
Demolition/Modification Drawing
1.00
10.00
10
1.00
0.00
Design Philosophies
Piping Design philosophy
Drawings
Datasheets
0.00
5.00
0.00
0.00
1.00
Studies & Report
5.00
20
0.00
0
1.00
12.00
1.00
12.00
1.00
18.00
30.00
48.00
Manual Valve Specification
1.00
6.00
10.00
16
Piping Material Specification
1.00
6.00
10.00
16
1.00
6.00
10.00
16
1.00
5.00
5.00
10
1.00
5.00
5.00
10
2.00
20.00
0.00
20.00
2D Plot Plan
1.00
5.00
5
3D Plot Plan
1.00
15.00
15
Meetings - Project
3.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
HAZOP Study
Specifications
Metering System Specification
LISTS
Valve List
General Layouts & Drawings
Discipline Grand Total
Include piping
general
arrangement
drawings and
sections which is to
be captured in
FEED
110.00
0.00
12
12
0.00
35.00
15
145.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No
R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE
26.03.20
DEPARTMENT
ENGINEERING
DURATION
8 WEEKS
DEPARTMENT CODE 04
DISCIPLINE CODE
DISCIPLINE UNIT
4700
ACTIVITY SCOPE:
PIPING/MECHANICAL
ENGINEERING
DED
Nigerians
Sub Total
Activity / Deliverables
Deliverable
Type
Estimated
No. of
Deliverables
DELIVERABLES:
Lead Engr.
Discipline/Design
Engr.
3.00
15.00
0.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Technical Query - RFI
1.00
5.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
5
1.00
5.00
1.00
5.00
1.00
10.00
1.00
10.00
0.00
0.00
0.00
0
1.00
10.00
20.00
30.00
5.00
10.00
15
5.00
10.00
15
60.00
0.00
60
General
Design Philosophies
Piping Design philosophy
Drawings
Demolition/Modification Drawing
Equipment Sizing
Datasheets
Not required as a
piping stress
1.00
analysis would
determine the
1.00
suitability of the
selected pipe
2.00
schedule
Datasheet for Valves
Datasheet for Flanges
Studies & Report
0.00
15
5
5
0.00
10
10
Pipe Stress Analysis Calculation and Report
1.00
30.00
30
Piping Design (Wall Thickness Calculation) and Report
1.00
30.00
30
3.00
15.00
30.00
45.00
Manual Valve Specification
1.00
5.00
10.00
15
Piping Material Specification
1.00
5.00
10.00
15
Metering System Specification
1.00
5.00
10.00
15
2.00
25.00
10.00
35
Piping MTO
1.00
20.00
0.00
20
Valve List
1.00
5.00
10.00
15
5.00
55.00
0.00
55.00
Specifications
LISTS
General Layouts & Drawings
Include piping tie-in
list
Vendor package
3D Plot Plan
1.00
15.00
15
Piping General Arrangement Drawings
1.00
10.00
10
Piping Isometric Drawing
1.00
10.00
10
2D Plot Plan
1.00
5.00
5
Metering Skid General Arrangement Drawing
1.00
15.00
15
1.00
12.00
0.00
12
1.00
12.00
0.00
12
207.00
60.00
267.00
Reviews
3D Model Constructability Review
Discipline Grand Total
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
R1
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
Nigerians
Sub Total
CONCEPTUAL DESIGN, FEED, DED
Discipline
Code
SUMMARY SHEET
PIPELINE ENGINEERING
Lead Engr.
4500
300.00
234.00
CONCEPTUAL DESIGN
4500
63.00
12.00
75.00
FRONT END ENGINEERING DESIGN
4500
95.00
81.00
176.00
DETAILED ENGINEERING DESIGN
4500
142.00
141.00
283.00
300.00
234.00
534.00
SCOPE OF WORK
CTR
Discipline Grand Total
Discipline
Engr.
534.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
ACTIVITY SCOPE:
PIPELINE ENGINEERING
CONCEPTUAL DESIGN
General
Nigerians
Lead Engr.
Discipline
Engr.
0.00
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
2.00
10.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Scope Clarifications
1.00
5.00
5
3.00
33.00
Site Visit
0.00
10.00
33.00
Site Visit Checklist
1.00
5.00
5
Site Visit
1.00
20.00
20
Site Visit Report
1.00
8.00
8
General Layouts & Drawings
1.00
5.00
12.00
17.00
1.00
5.00
12.00
17
0.00
15.00
General Layouts Route Map
Meetings - Project
3.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
Discipline Grand Total
63.00
12.00
75.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
26:03:2020
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
ACTIVITY SCOPE:
PIPELINE ENGINEERING
FEED
General
Nigerians
Lead Engr.
Discipline
Engr.
0.00
Sub Total
Activity / Deliverables
Deliverable
Type
Estimated
No. of
Deliverables
DELIVERABLES:
3.00
15.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Technical Query, RFIs
1.00
5.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
5
1.00
4.00
6.00
10.00
1.00
4.00
6.00
10
1.00
2.00
10.00
12.00
1.00
2.00
10.00
12
7.00
28.00
28.00
56.00
1.00
4.00
4.00
8
1.00
4.00
4.00
8
4.00
4.00
8
4.00
4.00
8
4.00
4.00
8
4.00
4.00
8
Datasheets
Valve Datasheets
Design Philosophies
Pipeline Design Philosophy
Studies & Report
Pipeline Wall Thickness Calculation Report
Pipeline Route Verification Report
Pipeline Expansion Analysis Report
Cathodic Protection Design Report
Pipeline Corrosion Inhibitor Selection Report
Corrosion Control Study/Report
Include pipeline 1.00
on-bottom stability
1.00
analysis as well as
1.00
pipeline alignment
1.00
sheets
Pipeline Corrosion Assessment & Management Report
Lists
Valve List
Schedules
Tie-In Schedules
15.00
1.00
4.00
4.00
8
1.00
6.00
10.00
16.00
1.00
6.00
10.00
16
1.00
3.00
7.00
10.00
1.00
3.00
7.00
10
2.00
10.00
20.00
30.00
Pipeline Route Map
1.00
5.00
10.00
15
General Layouts Route Map
1.00
5.00
10.00
15
1.00
12.00
0.00
12.00
1.00
12.00
3.00
15.00
0.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
General Layouts & Detailed Drawings
Reviews
HAZOP Study
Meetings - Project
Discipline Grand Total
95.00
12
81.00
176.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.: R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
DEPARTMENT
ENGINEERING
26:03:2020
DURATION: 8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
ACTIVITY SCOPE:
PIPELINE
ENGINEERING
DED
General
Nigerians
Lead Engr.
Discipline
Engr.
0.00
Sub Total
Activity / Deliverables
Deliverable
Type
Estimated
No. of
Deliverables
DELIVERABLES:
3.00
15.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Technical Query, RFIs
1.00
5.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
5
1.00
10.00
1.00
10.00
2.00
6.00
Pipeline Design Philosophy
1.00
3.00
3
Welding & NDT Philosophy
1.00
3.00
3
Datasheets
Valve Datasheets
Design Philosophies
9.00
Include pipeline
on-bottom 1.00
stability
analysis 1.00
Studies & Report
3D Plant Model Review
Pipeline Design Basis
0.00
15.00
10.00
10
0.00
6.00
36.00
45.00
81.00
4.00
5.00
9
4.00
5.00
9
Pipeline Wall Thickness Calculation Report
1.00
4.00
5.00
9
Pipeline Route Verification Report
1.00
4.00
5.00
9
Pipeline Expansion Analysis Report
1.00
4.00
5.00
9
Cathodic Protection Design Report
1.00
4.00
5.00
9
Pipeline Corrosion Inhibitor Selection Report
1.00
4.00
5.00
9
Corrosion Control Study/Report
1.00
4.00
5.00
9
Pipeline Corrosion Assessment & Management Report
1.00
4.00
5.00
9
13.00
26.00
52.00
78.00
1.00
2.00
4.00
6
1.00
2.00
4.00
6
Conrete Weight Coating for Pipelines Specification
1.00
2.00
4.00
6
Specification for Seamweld Line Pipe
1.00
2.00
4.00
6
2.00
4.00
6
2.00
4.00
6
1.00
2.00
4.00
6
this is repeated 1.00
1.00
twice
2.00
4.00
6
2.00
4.00
6
1.00
2.00
4.00
6
Specifications
Pipeline material specification
Flanges and fittings specifications
Welding Specification
Field Joint Coating Specification
Isolating Joint Specification
Structural Coating Specification
Pipeline Coating Specification
Cathodic Protection Design Report
captured in welding
specification
structural coating1.00
not required
1.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.: R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
DEPARTMENT
ENGINEERING
26:03:2020
DURATION: 8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
ACTIVITY SCOPE:
PIPELINE
ENGINEERING
DED
Nigerians
Lead Engr.
Discipline
Engr.
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Pipeline Corrosion Inhibitor Selection Report
1.00
2.00
4.00
6
Corrosion Control Study/Report
1.00
2.00
4.00
6
Pipeline Corrosion Assessment & Management Report
1.00
2.00
4.00
6
1.00
2.00
8.00
10.00
1.00
2.00
8.00
10
1.00
2.00
8.00
10.00
1.00
2.00
8.00
10
7.00
14.00
28.00
42.00
Pipeline Alignment Drawing
1.00
2.00
4.00
6
Pipeline Field Joint Coating Drawing
1.00
2.00
4.00
6
Tie-in Spools General Arrangement
1.00
2.00
4.00
6
Tie-in Spools Details Drawing
1.00
2.00
4.00
6
Tie-in Spools Isometric/Spools Isometric
1.00
2.00
4.00
6
Pipeline Route Map
1.00
2.00
4.00
6
General Layouts Route Map
1.00
2.00
4.00
6
3.00
15.00
0.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
1.00
16.00
1.00
16.00
Lists
Valve List
Schedules
Tie-In Schedules
General Layouts & Detailed Drawings
sheets
Meetings - Project
Meetings - Project
3D Model and Constructability Review
Discipline Grand Total
142.00
5
0.00
16.00
16
141.00
283.00
Download