HAMBANTOTA INTERNATIONAL PORT GROUP (PVT) LTD MEETING MINUTES Meeting: Discussion on progress of Custom Inspection Yard Meeting Place: 9th floor meeting room-HMC AGENDA 1. 2. 3. 4. Date & Time: 01.01.2021/ 1400Hr PARTICIPANTS HIPG Memebers Datta Gunasekara - HIPG- ETM Rohan Sanjeewa- HIPS- HSE KS Kumara- HIPG- ETM Safety Issues Quality Issues Progress Status AOB Members from Contractor/ Designer parties Chen Fengmin – Changsha - CRBCCLL DISTRIBUTION TO: All present – by email only No. 1. (Meeting Records) Action Concerns Discussed Continued concerns from previous meeting As less participants attended to the meeting, Previous MOM was not discussed in detail. Issues from HSE, ETM & CRBCCLL were discussed as follows. 1.1. Quality tests of the Asphalt Material and Asphalt Mix Design KS Kumara stated that Supplier’s Mix design which was Plant visit shall organize to visit next week by received on 08-12-2020 for Asphalt, was reviewed and no the Contractor. issues found. Contractor can use asphalt from China Harbour Engineering Company Ltd (CHEC) – Andarawewa Testing of Asphalt Material to be done as per Asphalt Plant. the contract. 1|Page HAMBANTOTA INTERNATIONAL PORT GROUP (PVT) LTD 1.2. Fire System Drawings Mr. Roahan requested the fire system drawing to submit Mr. Chen has to check the possibility to to the Fire Department. connect fire line to the existing fire lines of HMC and requires to update the fire system Mr. Chen explained that he wants to check the existing fire drawing. pump status of basement of HMC to connect proposed fire HSE-HIPS requires to handover the fire line to existing lines. system drawings to Fire Department to get Fire Approval. 1.3. Detail Structural Design Calculation – Pedestrian Bridge KS Kumara Stated that Detailed design calculation for Design drawings shall be incorporated with pedestrian bridge which was received on 08-12-2020, was design calculations to proceed. reviewed and no issues found. 1.4. Security Hut & Driver’s rest Room Mr. Chen stated that Setting out of both structures were Mr. Chen has to modify the drawing to done at site and inspected to the Mr. Jayanatha – Security proceed. – HIPS. Mr. Jayantha has changed the location of security hut from the Main road side to the yard side as security officers require to see the whole yard from security hut. 1.5. Yard marking material & details of markings Mr. Rohan requested 0.8m strip for all internal road (one Mr. Chen agreed and required to modify the side) and 1.0m strip for peripheral road for the pedestrian drawing before next week. walkway to use for drivers and maintenance crew. 1.6. Progress of the Contract. Mr. Chen stated that overall Progress of the contract is in line with construction programme and no delay items found. --------------Meeting Record END------------- 2|Page