Report No. : Survey Report Asia Classification Society ACS-TH-302-PGFK-0217 Date : 17 Feb. 2020 Job No. : Vessel Particulars Name of Vessel MODU SEA BOSS Previous Names --- Type of vessel & Construction Builder Place & Date of Build No. /Port of registry Call sign IMO & Hull Number Gross Tonnage & DWT Propulsion Owner Operator Self-Elevating Drilling Unit – Independent Leg Cantilever (Triangular Shaped, Slot Type Premium Jack-up) SembCorp Marine Ltd. PPL Shipyard. Singapore, 2012 Kings Town --9655119 10501, 3400 Non-Self Propelled Unit Petro Gohar Farasahel Kish. PGFK Petro Gohar Farasahel Kish. PGFK LOA 236 ft. Breadth Depth 224 ft. 27 ft. Legs LOA --- Spud can Dia. --- Spud Can Height Rig Design & Type Leg Type & Numbers Max Drill Depth --Baker Marine – Pacific 400 Three Independent Three Sided Lattice Braced Legs 35,000 ft. Scope of Survey Survey type Survey date Place of survey Surveyor to ACS Report Number: Surveyor’s to ACS Saeed Ghafoori Pre-Move Survey January 28 to January 29, 2020 Kish Anchorage Area – Persian gulf Saeed Ghafoori ACS-TH-302-PGFK-0217 Offshore Division Page 1 of 8 Report No. : ACS-TH-302-PGFK-0217 Survey Report Date : 17 Feb. 2020 Job No. : Asia Classification Society 1- PART (A) : SURVEY REPORT ITEM A) 8) C) YES Describe any communications failures A) B) C) D) E) Ballast System Do all gauges operate properly? √ Describe any gauge malfunctions Are all sounding lines open? √ Were ballast pumps operating satisfactorily? √ Were all ballast tanks watertight? √ F) Were all valves operational? H) I) J) K) L) REMARKS 1 DSC set of 2 Set is operational. Lack of sufficient sets of portable VHF/UHF devices. Some remote stations is not operational. D) G) NO Communications Is rig intercom system operative? √ Is marine radio operative? √ Are all remote stations operative? √ Function test all valves, main/emer power Function ballast pumps sea to sea Function emergency bilge suctions& pumps Function bilge alarms Function Secondary De Ballast system Function auxiliaries Function bilge alarm/pump auto start Power trial test run 80-90% power Function of deepwell pump. √ M) Surveyor’s to ACS Saeed Ghafoori - - √ Master Dump Valve is under overhaul. Satisfactory √ √ √ √ √ Satisfactory Satisfactory Satisfactory Satisfactory √ a) Exist deepwell pump type and flow rate is not SeaBoss main configure. Should be replace with the manufacturer recommended deepwell pump. b) Need to arrange minimum 2 set of deepwell pump for main and emergency usage. Satisfactory Offshore Division Page 2 of 8 Report No. : ACS-TH-302-PGFK-0217 Survey Report Date : 17 Feb. 2020 Job No. : Asia Classification Society ITEM YES NO REMARKS Structural A) 8) C) D) E) F) Were the main vertical and horizontal members inspected at tie in on lower hull, √ columns and main deck? Were cracks in welds or steel noted? Were corrosion weakened members found? Was hull maintenance or repair work done? √ When were last potential readings taken on cathodic protection system? Was a visual inspection made of anodes? Anchor System A) What is condition of chain, chain chasers and anchors? √ B) C) D) E) Are chain fairleads operating properly? Are all windlasses operating properly? What was condition of buoys? What was condition of pendant line? √ √ √ √ F) What mooring equipment was lost or replaced? A) √ √ System, Legs and LSA FFA Inspections Test jacking system and panel functions and warning lights/alarms. (hull up and hull down √ test) B) √ Check and test lifeboat engines & radios Test emergency generator under load Check emergency switchboard Parallel generators & check main switchb'd Test EPIRB & SART H) Surveyor’s to ACS Saeed Ghafoori Lack of port side anchor. Anchor not fitted in dedicated designed place. a) Over temperature alarm on Motor C1. b) Port leg circuit bracket defect alarm. a) Abandon automatic lifeboat lunch is not operational due to free fall wire defect. b) Davits wires should be change due to SOLAS reg. √ √ √ √ √ Check Life rings, Smokes, Life raft and life jackets - a) Portside anchor winch wire is disconnected. b) Some mooring ropes need to replace. Check lifeboat launch system & activate C) D) E) G) √ √ EPIRB & SART battery is expired, this devices is not on trusted condition. a) Almost all life rings have crack and is out of use. b) Life ring Smokes is out of use. Offshore Division Page 3 of 8 Report No. : ACS-TH-302-PGFK-0217 Survey Report Date : 17 Feb. 2020 Job No. : Asia Classification Society ITEM YES NO REMARKS c) Life raft HRUs are expired. d) Life jackets are expired and life jacket lights need to replace. Navigation Equipment A) B) C) D) E) F) G) H) I) A) B) C) D) E) G) F) Nav. lights main & stand-by N.U.C & towing shapes √ Whistle, fog horns, main & stand-by VHF radios, fixed & portables √ Sat Nav/Astro Nav/Nav System Nav Text Direction Finder Gyro Compass Magnetic Compasses Radar Echo sounder √ √ √ √ Equipment Stowage All loose items an deck stowed & secured √ Any items below deck secured properly All drill pipe & other tubulars secured Crane booms/flare booms secure in cradles Blocks laid an drill floor & secured BOP & subsea equipment stowed & secured Cellar deck equipment all secure Surveyor’s to ACS Saeed Ghafoori Some lights in not operational Some lights in not operational a) 1 Set of DSC & MF/HF is not operational b) lack of sufficient sets of portable VHF radios √ - - √ √ √ √ √ √ Offshore Division Page 4 of 8 Report No. : Survey Report Asia Classification Society ACS-TH-302-PGFK-0217 Date : 17 Feb. 2020 Job No. : 2- PART (B) : PRE-MOVE RECOMMENDATION ACTIVITY FOR PREPRATION A. Barge Engineer's 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) Surveyor’s to ACS Saeed Ghafoori Check operation and hand seat all preload and sump valves. Check Operation of tank gauges and air purge systems. Sound all tanks and void spaces. Strip all preload tanks. Check number and condition of portable radios. Check all tank manholes and sounding caps. Check all watertight doors and hatches for proper sealing and make log entry. Calculate and check the expected "afloat" condition. Check the securing of cargo and equipment. Review "essential personnel" required to be a board during jacking and towing operations. Assemble all charts and weather forecasts for move. Assemble and review all data with regard to the proposed location, including certificate of approval. Check all towing brackets are free and greased, locking pins are in place, and that release equipment is rigged or on hand. Confirm towing arrangements with Marine Superintendent and Tow Master. Ensure any pre-rigged towlines are safely secured. Test jacking panel functions and warning lights/alarms. Recover and secure current and wave height meters. Confirm that the necessary ventilation closures are closed and watertight. Make required log entry. Assign personnel to work locations and establish reliable communications. Maintain good communication with all key personnel throughout operation Offshore Division Page 5 of 8 Report No. : Survey Report Asia Classification Society ACS-TH-302-PGFK-0217 Date : 17 Feb. 2020 Job No. : B. Drillers 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) 20) 21) 22) 23) 24) 25) Surveyor’s to ACS Saeed Ghafoori Skid derrick to centerline and secure. Stow B.O.P's. and secure top and bottom. Raise cellar deck and secure. Raise conductor platform and secure. Ensure the skimmer tank is drained. Secure rig floor equipment. Disconnect the centrifuge dump line. · Disconnect mud return line to main deck trough. Disconnect cantilever manifold hoses. Clean and grease cantilever skidding pads. Release securing clamps a cantilever beams and remove cantilever access ladders. Rope off openings. Skid cantilever to towing position. Secure cantilever beams with clamps, wedges and pins. Replace the handrails across the aft end of the rig. Reconnect cantilever hoses for fire and deluge lines. Secure top drive and travelling blocks with 50 K. load. Open and inspect master dump non-return valve. Open and inspect pump room drain non-return valves. Close all mud pit valves. Close and padlock the mud pit master dump valve Close and padlock the mud pump room drain valve. Close the mud return to pits isolation valve. Secure the mud pump room. Driller instructs crew for jacking operations a starboard leg. Assistant driller instructs crew for jacking operations a port leg. Return completed checklist to barge engineer. Offshore Division Page 6 of 8 Report No. : Survey Report Asia Classification Society ACS-TH-302-PGFK-0217 Date : 17 Feb. 2020 Job No. : C. Crane Operator's 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) Remove all containers and equipment from bow. Secure flare booms if installed. Liaise with SR, tool pusher and barge engineer with regard to cargo to stay an board during tow, arrange cargo an deck so that lose items can be boxed in by containers, tubulars, or other heavy items. Block stow as much deck load as possible within the central pipe bay. Remove and stow mooring lines, vent hoses and loading hoses. Make available and prepare jetting hoses for use. Liaise with barge engineer and prepare towing equipment per attached checklist. Check and secure equipment in heavy tool store. Check and secure all equipment in the sack store. Ensure all lose equipment is secured to decks or to permanent structure (welding in place if required). Accompany barge engineer on final inspection and rectify any unsecured cargo or equipment. Ensure that there is sufficient grease and brushes available at each leg for rack lubrication. Close and dog all watertight hatches, dose all watertight doors. Have electrician isolate and disconnect the deepwell pumps. Disconnect and flexible hoses and blank-off lines. Lay cranes in rests. Instruct crews as to duties lobe performed during jacking and towing operations. Pay particular attention to the safety aspects of forthcoming operations. Close all ventilation closures an main deck and below except for the engine room, SCR Room and accommodations. NOTE: "Secure" is defined as a means of preventing any horizontal or tipping movement taking into account the weight of the load. Surveyor’s to ACS Saeed Ghafoori Offshore Division Page 7 of 8 Report No. : Survey Report Asia Classification Society ACS-TH-302-PGFK-0217 Date : 17 Feb. 2020 Job No. : D. Maintenance Department 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) Surveyor’s to ACS Saeed Ghafoori Remove blanks from engine exhausts. Disconnect leg top aircraft lights. Open and inspect sanitary, sewage and galley overboard non-return valves. Close overboard valves for the sanitary, sewage and galley lines, redirecting the lines to sewage tank. Remove the leg rack chocks and lock out. Check Operation of sea chest valves and vents. Secure all loose gear in the machinery spaces. Check Operation of mooring winches. Disconnect deepwell pumps. Check all watertight doors to machinery spaces are properly closed. Check that the emergency escape hatch from the S.C.R. room is closed and watertight. Prepare generator load to exceed... KW to absorb regenerative power when jacking down and ensure that.......... KW is available for trial jacking up. Assign power to jacking panel and test all warning devices prior to jacking operations. Shutdown bilge system and operate only when flooding occurs. Line up water supply to sanitary System and fire main from sea chests once rig is in water. Check operation of tow bridle tuggers. Stop all ventilation fans except those for the engine room, SCR room, paint locker and accommodations. Offshore Division Page 8 of 8