RSL‐4: Repair and Remanufacturing Requirements API‐16AR Revision‐4 Non API well control equipment: Equipment requiring remanufacturing has not been build in accordance with the required API standard. Equipment remanufacturing process not covered by API‐ 16AR. Equipment has not been repaired / remanufactured by the OEM only. Remanufacture / Repair to Lower RSL2 or lower level. Remanufacture / Repair to Lower RSL‐2 or lower level. Equipment does not have the required traceability for the OEM. API equipment: Equipment requiring remanufacturing has been build in accordance with the required API t d db d under d a valid lid API lilicense standard by a vendor certificate and required product listing(s) without exclusions for manufacturing / remanufacturing of the equipment. API Monogram: Equipment does have an API Monogram and API licensed facility with API‐Q1 or equivalent QMS and acess to Origional Product Specification. Valid API Quality Management System: 1) Selected OEM repair shop has a valid and active API‐Q1 certificate and API yearly audit findings affecting the remanufacturing process have been addressed in a close out plan. Valid product license: Selected OEM repair shop shall have a valid active API license and i d product d listing(s) li i ( ) without ih required exclusions for manufacturing / remanufacturing of the equipment. or 2) Selected OEM repair shop is working with an API approved Quality Management System that meets the requirements of API‐Q1 and API three yearly audit findings affecting the remanufacturing process have been have been addressed in a close out plan. OEM check: Equipment has been repaired / remanufactured by the OEM only. Equipment traceability: Full data book of the equipment showing : 1) Equipment Type/Description/Rating 2) Original Equipment Manufacturer Name 3) Original Date of Manufacturing 4) Original Design Verification report number 5) Original OEM Job order / Purchase Order number 6) Original OEM Equipment Markings 7)OEM Part Number 8)OEM Part Serial Number(s) 9)OEM Assembly Part Number 10)OEM Assembly Serial Number 11) Maintenance history, including list of replacement parts parts. 12) Repair and Remanufacturing history. 13) Heat treatment history / records and welding history. 14) Copy of used WPS and Welder Qualification records. 15) Certificate Of Conformance when equipment was new. 16) Subsequent Certificates of Conformance issued after periodic inspections , repair and remanufacturing. 17) Other equipment certificates issued by the OEM. 18) List of standard under which the equipment was manufactured. 19) Third Party Inspection reports. Design status: 1) The equipment design established is no longer suitable for repair and remanufacturing by the OEM as a result of design changes, such as designs for materials, processes, physical features or application. Design status: 2) The equipment design established is suitable for repair and remanufacturing by the OEM. OEM declares equipment design as no longer suitable for repair and remanufacturing Equipment cannot be repaired / remanufactured. Third Party Inspection: The equipment owner can require third party inspection in the repair / remanufacturing process. OEM prepares an Internal Test Plan in consultation with the equipment owner. Equipment repair / remanufacturing by the OEM. Non OEM parts found at disassembly. Remanufacture / Repair to RSL‐2 level or lower level Non‐OEM parts are not replaced. Non OEM p parts replaced p with OEM p parts. Equipment repair: Equipment fully disassembled and all parts checked for compliance to OEM specifications. Positive Material Identification: There where required Positive Material Identification by Spark Emission Spectrography shall be used to distil material composition. There where this does not match the material certificates material properties shall be established through destructive testing. Equipment safety notices: OEM informs equipment owner when the equipment or parts of the equipment is not compliant to the latest equipment safety notification (s) as published by the OEM. Equipment reassembly: Equipment assembled with new OEM parts and / or with OEM remanufactured parts in compliance with the latest safety notification. Equipment testing: Equipment is function and pressure tested as required by the OEM meeting or exceeding the original product specification. New replacement part delivered for assembly. Data book update: O M updates the equipment owners data book and the O M data book with: OEM OEM 1) Date of repair 2) Certificate of Conformance in compliance with this standard. 3) Third Party Inspection reports 4) Other equipment certificates issued by the OEM 5) Design verification report number for new part number(s) and / or assembly number. 6) Copy of the new equipment markings as required under the API standard. 7) Update maintenance history. 8) Update equipment manual for new part number(s) and / or assembly number. 9) Test report(s) 10) Component dimensional reports 11) List of standard under which the equipment was repaired. 12) etc. Equipment recertified and lit ttrademark d k applied: li d quality Equipment is fully qualified and meeting or exceeding all original design and testing requirements as listed in the API standard and as such documented in the OEM Design Verification Reports. Remanufacture / Repair to RSL‐4 level. The remanufacturing of the part is technically or not possible or economical not justified. Equipment remanufacturing: Equipment and / or parts identified for remanufacturing Inspection after Machining: Equipment and / or parts are fully inspected, visual , appropriate NDE method(s) and dimensional inspection(s). Equipment remanufacturing assessment: 1) Can equipment be remanufactured so that it meets or exceed the required specification for the part and / or assembly. 2) The Welding Process Specification(s) and Procedure Qualification Record(s) required for the repair in combination with the heat treatment history and further required heat treatment (s) shall guarantee minimum requirements for the material microstructure and mechanical properties. 3) The remanufacturing of the part or assembly is economical justified. Equipment final surface treatment and final dimensional Inspection: Equipment and / or parts do get their final surface treatment where applicable and final inspection. Equipment reassembly: Equipment assembled with new OEM parts and / or with OEM remanufactured parts in compliance with the latest safety notification. Equipment testing: Equipment is function and pressure tested as required by the OEM meeting or exceeding the original product specification. Equipment remanufacturing: Equipment and / or parts are welded, machined and inspected visual and with appropriate NDE method(s). Equipment heat treatment: Equipment and / or parts are heat treated in accordance with the WPS. Inspection after heat treatment: Equipment and / or parts are fully inspected, visual , appropriate NDE method(s) and dimensional inspection(s). Data book update: OEM updates the equipment owners data book and the OEM data book with: 1) Date of repair / remanufacturing 2) Certificate of Conformance in compliance with this standard. 3) Third Party Inspection reports 4) Other equipment certificates issued by the OEM 5) Design verification report number for new part number(s) and / or assembly number. 6) Copy of the new equipment markings as required under the API standard. 7) Update maintenance history. 8) Update equipment manual for new part number(s) and / or assembly number. 9) Test report(s) 10) Component dimensional reports 11) Weld inspection reports 12) Weld maps 13) NDE reports 14) Heat treatment history / records and welding history. 15) Copy of used WPS and Welder Qualification records. 16) List of standard under which the equipment was remanufactured 17) ect. Equipment Machining: Equipment and / or parts are machined in accordance with the product specification. Equipment recertified and quality trademark applied: Equipment is fully qualified and meeting or exceeding all original design and testing requirements as listed in the API standard and as such documented in the OEM Design Verification Reports. Remanufacture / Repair to RSL‐4 level.