SALUNGA, RAIEL CE-304 Self-Check Questions Lesson 3: INSTRUCTION: Read carefully and answer each of the following questions. Write your surname beside your chosen answer. Correct answers will be available after submission of your answer. 1. The basic traditional design procedure is executed in the following stages____, except: a. b. c. d. e. Program development, Schematic or conceptual phase Design development Contract document phase None of the above (SALUNGA) 2. Specifications for a building project are written descriptions, and the drawings are a diagrammatic presentation of the construction work required for that project. The drawings and specifications are not complementary. a. True b. False (SALUNGA) 3. The building permit, for which a fee is paid by the contractor or client, is an indication of the following except: a. b. c. d. Drawings shows the work to be done are prepared by registered professional Governing authority have jurisdiction over design Design documents meet the applicable building codes and regulations. None of the above (SALUNGA) 4. The purpose specifications is to determine the following __except: a. b. c. d. Details or material required Sequence of work Quality of workmanship Cost of the product. (SALUNGA) 5. Generally, an owner will prepare estimates at different stages of project development to establish the baseline of the project’s cost: a. b. True (SALUNGA) False SALUNGA, RAIEL CE-304 Answer: 1-e, 2-b, 3-d, 4-d, 5-a INSTRUCTION: Identify the attribute being described by each statement. Choose from the pool of words below. Write your answer with your first name. Descriptive Specification Shall Quantity takeoffs Design Estimates Base-Bid Specification 1. Describe the components of a product and how they are assembled. (DESCRIPTIVE SPECIFICATION RAIEL) 2. These establish acceptable materials and equipment by naming one or more (often three) manufacturers and fabricators (BASE-BID SPECIFICATION RAIEL) 3. Specifying the contractor’s duties and responsibilities under the contract a Philippine Mechanical Engineering Code (SHALL RAIEL) 4. The direct cost of construction for bid estimating is usually derived from it. (QUANTITY TAKEOFFS RAIEL) 5. Used to determine the financial feasibility of the project and to obtain financing for it (DESIGN ESTIMATES RAIEL) Answers: 1. Descriptive Specification 2. Base-Bid Specification 3. Shall 4. Quantity Takeoff 5. Design Estimates INSTRUCTION: Draw the cross section of Isolated square R.C.C. column footing to the scale to 1:20. 1. Size of footing – 1200mm x 1200mm 2. Shape of footing – trapezoidal with vertical depth of 150mm each side tapers from 200 to 1200mm SALUNGA, RAIEL CE-304 3. Steel reinforcement for the footing : 12mm dia rods at 150mm c/c parallel to each side with a clear cover 25mm at bottom and 50mm at sides. 4. Size of columns – 200mm x 200mm 5. Steel reinforcement for columns : 6 No.’s of 16mm dia rods 6. Lateral ties for columns: 6mm dia rods at 150mm c/c 7. Covers – Side cover to longitudinal reinforcement is 40mm. Anchorage for longitudinal reinforcement all the 6 bars of 16mm dia are taken down and extended in horizontal direction to a length of 200mm beyond the face of the column and tied to the reinforcement of the footing in the form of dowel bars.